Line 5: |
Line 5: |
| | author name = Elkins S | | | author name = Elkins S |
| | author affiliation = NRC/RES | | | author affiliation = NRC/RES |
| | addressee name = Nourbakhsh H P | | | addressee name = Nourbakhsh H |
| | addressee affiliation = NRC/ACRS | | | addressee affiliation = NRC/ACRS |
| | docket = 05000280, 05000281 | | | docket = 05000280, 05000281 |
Similar Documents at Surry |
---|
Category:E-Mail
MONTHYEARML24282A9732024-10-0808 October 2024 Temporary SW Piping LAR Acceptance Email ML24116A2822024-04-25025 April 2024 Acceptance of Requested Licensing Action: Surry TS Change Section 3.8 Containment Temperature and Pressure Requirements and Surveillances ML24102A0682024-04-10010 April 2024 IST (z)(2) Hardship RR V-1 RCS Cold Leg, Lh Safety Injection Check Valves ML24075A1762024-03-15015 March 2024 Email, Acceptance of Requested Licensing Action: Surry TSTF-577, Rev. 1 ML24144A2432024-03-0808 March 2024 002 Radiation Safety Baseline Inspection Information Request ML24065A2532024-03-0505 March 2024 RAI Issuance Surry RR IST P-1 P-2 ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML23058A1442022-12-0909 December 2022 Record of Surry Verbal Relief Request Authorization - V-01 Mechanical Agitation Vavle 1-SI-241 ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22277A7252022-10-0303 October 2022 Additions to Turbine Bldg Wind Load Audit ML22256A3032022-09-13013 September 2022 Change in Completion Hours Estimate Amendment Turb Bldg. Loading Basis Change LAR ML22256A2312022-09-13013 September 2022 Acceptance Email TS Change for New Fuel Framatome Agora and SFP Criticality Review ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22224A1442022-08-11011 August 2022 Acceptance Email TS Change AFW Cross Connect AOT LAR ML22223A1182022-08-0404 August 2022 2022004 - Plant Surry RP Inspection - Document Request Letter E-mail ML22200A1032022-07-19019 July 2022 Acceptance of Requested Licensing Action: Surry Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML22193A0052022-07-11011 July 2022 Acceptance of Requested Licensing Action: Admin Changes to Technical Specifications ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22161B0052022-06-0909 June 2022 Acceptance Email TSTF 547 LAR ML22137A1622022-05-17017 May 2022 Acceptance of Requested Licensing Action Amendment Turb Bldg. Loading Basis Change License Amendment Request ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b ML21144A2592021-05-0606 May 2021 003 Radiation Safety Baseline Inspection Information Request 2024-04-25
[Table view] |
Text
Santos, Cayetano From: Elkins, Scott-.Sent: Tuesday, May 04, 2010 9:52 AM To: Nourbakhsh, Hossein Cc: Yerokun, Jimi; Schaperow, Jason; Tinkler, Charles; Mitchell, Jocelyn; Hackett, Edwin; Dias, Antonio; Santos, Cayetano; Afshar-Tous, Mugeh
Subject:
RE: SOARCA request to close the June 21st subcommittee mtg. to the public Hossein, thank you for your feedback on our request to close the meeting. We are restating our request to more clearly state our reason.We request that the briefing for the ACRS Subcommittee on SOARCA scheduled for June 21, 2010, be closed to the public to prevent disclosure of information the premature disclosure of which would be likely to significantly frustrate implementation of a proposed agency action (ref. 5 U.S.C. 552b(c) (9) (B)). The next proposed agency action regarding.
SOARCA is to release the SOARCA draft NUREG for public review and comment in late summer 2010. The SOARCA documentation, including the draft NUREG, that needs to be provided to the ACRS prior to the June meeting is not complete enough to be suitable for public release. The staff is in the process of reconciling and resolving internal staff comments as well as peer review technical comments.
In addition, the staff is still waiting for feedback from the Peach Bottom and Surry power plants on their reviews (fact check) of the plant information used for the analysis.
Further revision to the draft NUREG may be necessary as a result of all these reviews before the document is ready to be made publicly available.
The staff believes that the risk of prematurely releasing SOARCA documentation to the.public before the above mentioned comments have been incorporated will cause unnecessary, and perhaps harmful, confusion for the public and the industry.
The staff will brief the ACRS again later this year in open meetings after public comments have been addressed.
Regards, Scott Elkins 301-251-7544 From: Nourbakhsh, Hossein Sent: Friday, April 30, 2010 4:19 PM To: Elkins, Scott Cc: Yerokun, Jimi; Schaperow, Jason; Tinkler, Charles; Mitchell, Jocelyn; Hackett, Edwin; Dias, Antonio;Santos, Cayetano; Afshar-Tous, Mugeh
Subject:
RE: SOARCA request to close the June 21st subcommittee mtg. to the public Your reason for closing the ACRS Subcommittee meeting on SOARCA does not meet the requirements of subsection 10 (D) of the Federal Advisory Committee Act (FACA), Public Law 92-463, necessary to close the
.-meetitTg.
According to the FACA requirement portions of a meeting may be closed for the reasons noted below: Protect info. Classified as national security info. See 5 U.S.C.552b(c)
(1)Discuss info. Relating solely to internal rules and/or practices.
See 5 U.S.C. 552b(c) (2)Protect unclassified safeguards info. See 5 U.S.C. 552b(c) (3)Protect proprietary information.
See 5 U.S.C. 552b(c) (4)Protect information provided in confidence by a foreign source. See 5 U.S.C. 552b(c) (4)Prevent invasion of personal privacy. See 5 U.S.C. 552b (c) (6)Prevent disclosure of information the premature disclosure of which would be likely to significantly frustrate implementation of a proposed agency action. See 5 U.S.C. 552b(c) (9) (B)One option is to postpone the subcommittee meeting until after the completed draft NUREG is publically available later this year.Best Regards, Hossein Nourbakhsh From: Elkins, Scott Sent: Thursday, April 29, 2010 12:57 PM To: Nourbakhsh, Hossein Cc: Yerokun, Jimi; Schaperow, Jason; Tinkler, Charles; Mitchell, Jocelyn
Subject:
SOARCA request to close the June 21st subcommittee mtg. to the public We request that the SOARCA briefing for the ACRS scheduled for June 21, 2010, be closed to the public. The SOARCA documentation (draft NUREG) that needs to be provided to the ACRS prior to the meeting is not complete enough to be suitable for public release. The staff is in the process of reconciling and resolving internal staff comments as well as peer review technical comments.
In addition, the staff is still waiting for feedback from the Peach Bottom and Surry power plants on their reviews (fact check) of the plant information used for the analysis.
Further revision to the draft NUREG may be necessary as a result of all these reviews before the document is ready to be made publicly available.
The SOARCA team believes the risk of prematurely releasing SOARCA documentation before the above mentioned comments have been incorporated will cause unnecessary, and perhaps harmful, confusion for the public and the industry.
The staff intends to make the completed draft NUREG publicly available prior to the SOARCA briefings for the ACRS later this year.2 Regards, Scott Elkins 301-251-7544 3