L-MT-14-104, Withdrawal of Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/16/2014
| issue date = 12/16/2014
| title = Withdrawal of Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information
| title = Withdrawal of Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information
| author name = Fili K D
| author name = Fili K
| author affiliation = Northern States Power Co, Xcel Energy
| author affiliation = Northern States Power Co, Xcel Energy
| addressee name =  
| addressee name =  
Line 21: Line 21:


==References:==
==References:==
: 1) NSPM letter to NRC Document Control Desk, L-MT-14-016, Exemption Request for Dry Shielded Canisters 11 -16 Due to Nonconforming Dye Penetrant Examinations, dated July 16, 2014 (ADAMS Accession No. ML 14199A370).
: 1) NSPM letter to NRC Document Control Desk, L-MT-14-016, Exemption Request for Dry Shielded Canisters 11 -16 Due to Nonconforming Dye Penetrant Examinations, dated July 16, 2014 (ADAMS Accession No. ML14199A370).
: 2) NSPM letter to NRC Document Control Desk, L-MT-14-082, Exemption Request for Dry Shielded Canisters 11 -16 Due to Nonconforming Dye Penetrant Exam inations, Supplemental Information, dated November 3, 2014 (ADAMS Accession No. ML 14309A 194). Pursuant to 10 CFR 72.7, "Specific Exemptions", the Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energ y, submitted Reference 1 to request an exemption to the requirements of 10 CFR 72.212(b)(3) and 10 CFR 72.212(b)(11) for six (6) NUHOMS Dry Shielded Canisters (DSCs) due to nonconforming dye penetrant (PT) examinat ions performed during the loading campaign started in September 2013. That exemption request was supplemented by Reference
: 2) NSPM letter to NRC Document Control Desk, L-MT-14-082, Exemption Request for Dry Shielded Canisters 11 -16 Due to Nonconforming Dye Penetrant Exam inations, Supplemental Information, dated November 3, 2014 (ADAMS Accession No. ML14309A194). Pursuant to 10 CFR 72.7, "Specific Exemptions", the Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energ y, submitted Reference 1 to request an exemption to the requirements of 10 CFR 72.212(b)(3) and 10 CFR 72.212(b)(11) for six (6) NUHOMS Dry Shielded Canisters (DSCs) due to nonconforming dye penetrant (PT) examinat ions performed during the loading campaign started in September 2013. That exemption request was supplemented by Reference
: 2. This l etter hereby withdraws the exempt ion request subm itt ed in Reference
: 2. This l etter hereby withdraws the exempt ion request subm itt ed in Reference
: 1.
: 1.
Document Control Desk Page 2 Summary of Commitments Thi s letter mak es no new commitm e nts a nd no re vi s ion s to e xi s ting commitm e nts. Karen:Fili Site Vice-President Monticello Nuclear Generating Plant Northern State s Power Company-Minnesot a No enclosures cc: Administrator, Region Ill, USNRC Terry Beltz, Project Manager, Monticello Nuclear Generating Plant, USNRC Jennifer Davis, Project Manager, Spent Fuel Storage and Transportation, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC}}
Document Control Desk Page 2 Summary of Commitments Thi s letter mak es no new commitm e nts a nd no re vi s ion s to e xi s ting commitm e nts. Karen:Fili Site Vice-President Monticello Nuclear Generating Plant Northern State s Power Company-Minnesot a No enclosures cc: Administrator, Region Ill, USNRC Terry Beltz, Project Manager, Monticello Nuclear Generating Plant, USNRC Jennifer Davis, Project Manager, Spent Fuel Storage and Transportation, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC}}

Revision as of 06:30, 21 June 2019

Withdrawal of Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information
ML14351A155
Person / Time
Site: Monticello  Xcel Energy icon.png
Issue date: 12/16/2014
From: Fili K
Northern States Power Co, Xcel Energy
To:
Document Control Desk, NRC/NMSS/SFST
References
L-MT-14-104, TAC L24939
Download: ML14351A155 (2)


Text

(l Xcel Energy Monticello Nuclear Generating Plant 2807 W County Rd 75 December 16, 2014 U.S. Nuclear Regulatory Comm i ssion ATTN: Document Contro l Desk Monticello, MN 55362 Director, Division of Spent Fue l Storage and Transportation Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 Ind ependent Spent Fuel Storage Installation Docket No. 72-58 Withdrawal of Exempt ion Request for Dry Shielded Canisters 11 -16 L-MT-14-104 10 CFR 72.7 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information (TAC No. L24939)

References:

1) NSPM letter to NRC Document Control Desk, L-MT-14-016, Exemption Request for Dry Shielded Canisters 11 -16 Due to Nonconforming Dye Penetrant Examinations, dated July 16, 2014 (ADAMS Accession No. ML14199A370).
2) NSPM letter to NRC Document Control Desk, L-MT-14-082, Exemption Request for Dry Shielded Canisters 11 -16 Due to Nonconforming Dye Penetrant Exam inations, Supplemental Information, dated November 3, 2014 (ADAMS Accession No. ML14309A194). Pursuant to 10 CFR 72.7, "Specific Exemptions", the Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energ y, submitted Reference 1 to request an exemption to the requirements of 10 CFR 72.212(b)(3) and 10 CFR 72.212(b)(11) for six (6) NUHOMS Dry Shielded Canisters (DSCs) due to nonconforming dye penetrant (PT) examinat ions performed during the loading campaign started in September 2013. That exemption request was supplemented by Reference
2. This l etter hereby withdraws the exempt ion request subm itt ed in Reference
1.

Document Control Desk Page 2 Summary of Commitments Thi s letter mak es no new commitm e nts a nd no re vi s ion s to e xi s ting commitm e nts. Karen:Fili Site Vice-President Monticello Nuclear Generating Plant Northern State s Power Company-Minnesot a No enclosures cc: Administrator, Region Ill, USNRC Terry Beltz, Project Manager, Monticello Nuclear Generating Plant, USNRC Jennifer Davis, Project Manager, Spent Fuel Storage and Transportation, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC