ML17087A091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/01/2017
| issue date = 03/01/2017
| title = Unit - Final Outlines (Folder 3)
| title = Unit - Final Outlines (Folder 3)
| author name = Silk D M
| author name = Silk D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  

Revision as of 16:11, 19 June 2019

Unit - Final Outlines (Folder 3)
ML17087A091
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/01/2017
From: David Silk
Operations Branch I
To:
Dominion Nuclear Connecticut
Shared Package
ML16337A097 List:
References
U01968
Download: ML17087A091 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Millstone Unit 2 Date of Examination:

02/28/2017 Examination Level: RO jZJ SRO D Operating Test Number: ES1 ?LI . Administrative Topic (see Note) Type Describe activity to be performed Code* Kl A 2.1. 7 Ability to evaluate plant performance A 1 .1-RO Conduct of Operations R, D and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4) Evaluate an RCP Seal Failure KIA 2.1.37 Knowledge of procedures, A 1 .2-RO Conduct of Operations guidelines, or limitations associated with R,M reactivity management. (RO 4.3) I Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth. KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control R,N procedures. (RO 3.7) Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.

KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5) A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). *Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:s; 3 for ROs;::; 4 for SROs & RO retakes) (N)ew or (M)odified from bank 1) (P)revious 2 exams (:s; 1; randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Millstone Unit 2 Date of Examination:

02/28/2017 Exam Level: RO SRO-I D SRO-U D Operating Test No.: ES1 ?LI Control Room Systems:*

8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System I JPM Title Type Code* Safety Function S-1 CVCS I Emergency Boration D,L,S l 004/A2.14 Emergency boration (RO 3.8) S-2 LPSI I Verify adequate Safety Injection Flow IA W EOP 2532, LOCA A,L,N,S 2 006/A3.03 ESFAS-operated valves (RO 4.1) S-3 PZR Pressure Control I Force Pressurizer Sprays A,M,S 3 010/Al.07 RCS Pressure (RO 3.7) S-4 Auxiliary Feedwater I Operate TDAFP IAW EOP 2541, App 6 A,L,N,S 4(S) 061/A2.04 Pump failure or improper operation (RO 3.4) S-5 CTMT Spray I Restore from inadvertent CTMT Spray actuation EN,N,S 5 026/A4.05 Containment spray reset switches (RO 3.5) S-6 Emergency Diesel Generators I Unload and secure a EDG A,D,S 6 064/A.4.06 Manual start, loading, and stopping of the ED/G (RO 3.9) S-7 Mitigating a Reactor Regulating System Failed T cow Input N,S 7 016/A,4.01 NNI channel select controls (RO 2.9*) S-8 Water I Respond to the loss of a 2°ct CW pump A,N,S 8 075/A2.02 Loss of circulating water pumps (RO 2.5) In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) P-1 AC Electrical (Instrument Power) I Transfer PPC Power Supply D 6 062/A4.01 All breakers (including available switchyard) (RO 3.3) Service Water I On a loss of 22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation E,M 4(S) 076/A2.01 Loss of SWS (RO 3.5) Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/A4.05 Gas decay tanks, including valves, indicators, and sample D,R 9 line (RO 2.6)

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO I SRO-I I SRO-U A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank :S9/:58/:54 (E)mergency or abnormal in-plant :?:1/<::1/<::1 (EN)gineered safety feature :?:1 I <::1 I<:: 1 (control room system) (L)ow-Power I Shutdown :?:1/<::1/<::1 (N)ew or (M)odified from bank including 1 (A) :?:2/<::2/<::1 (P)revious 2 exams :S 3 I :5 3 I :5 2 (randomly selected) (R)CA :?:1/<::1/<::1 (S)imulator