ML17297A392: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/23/1981
| issue date = 04/23/1981
| title = Ack Receipt of Util 810331 Ltr & Suppl 2 to Environ Rept. Recommends Development of Mineral Reconnaissance & Impact Analysis for Pipeline Alignment for Incorporation in Documentation
| title = Ack Receipt of Util 810331 Ltr & Suppl 2 to Environ Rept. Recommends Development of Mineral Reconnaissance & Impact Analysis for Pipeline Alignment for Incorporation in Documentation
| author name = SMITH J B
| author name = Smith J
| author affiliation = INTERIOR, DEPT. OF, BUREAU OF MINES
| author affiliation = INTERIOR, DEPT. OF, BUREAU OF MINES
| addressee name = VAN BRUNT E E
| addressee name = Van Brunt E
| addressee affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530

Revision as of 22:41, 18 June 2019

Ack Receipt of Util 810331 Ltr & Suppl 2 to Environ Rept. Recommends Development of Mineral Reconnaissance & Impact Analysis for Pipeline Alignment for Incorporation in Documentation
ML17297A392
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/23/1981
From: James Smith
INTERIOR, DEPT. OF, BUREAU OF MINES
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8104300298
Download: ML17297A392 (4)


Text

SUBJECT:

Ack receipt of util 810331 ltr 8 Suppl 2 to environ rept'ecommends development'f mineral reconnaissance 8 impact analysis for pipeline alignment" for incorporation in-documentation, DISTRIBUTION CODE: C002S COPIES RECEIVED:LTR ENCL TITLE'.Environ.Commen ts..SIZE~REGULATO NFORMATION DISTRIBUTION TEM (RIDS)ACCESSION NBR;8100300298 DOC~DATE: 81/04/23 NOTARIZED:

NO FACIL".STN-50 "528 Palo Ve'rde Nuclear Stationi Unit 1~Ar izona Publ i STN-50 529 Palo Verde Nuclear Station~Unit 2r Arizona Publi 05000529 STN 50-530 Palo Vei de, Nuclear Station~Unit 3i Arizona Publi 05000530 AUTH',NAME AUTHOR AFFILIATION.SMITHS',B

~'nter iorr Dept, of~Bureau of Mines RECIP~NAME RECIPIENT AFFILIATION VAN BRUNTiE",ED Arizona Public Service Co, NOTES:Standardized Plant~1 cy:C Grimes Standardized Plant~1 cy:C Gr imes Standardized Plant.1 cytC Grimes 05000528 05000529 05000530 RECIPIENT ID CODE/NAME)

ACTION:" LIC BR¹3 BC 17 INTERNAL: ACCIDNT EVAL BR ENV ENG BR 09 HYDRO GEO BR NRC PDR 02.RAD ASSESSNT BR SIT ANAL BR 10., COPIES LTTR ENCL 1 1 1 1 1 1 RECIPIENT, ID CODE/NAME KERRIGANi J, 05 EF TREAT SYS BR HYD/GEO BR ILE 07 EG FILE 01 ANCE BR COPIES LTTR ENCL EXTERNAL: ACRS NATL LAB 20 LPDR NSIC 03 0Q TOTAL NUMBER OF COPIES REQUIRED: LTTR~ENCL ll f f l t$1 e~~r" eg i 1 1I P p'p V 1 f 1 lh 0 l 1 z z.Q~gt Ot~0 0 JP United States Department of the Interior BUREAU OF MINES~cK'lf (t)'--;8 hPA2g 198 Vsse HVOQR Rf RfQNATORY sw P.O.BOX 25086 BUILDING 20, DENVER FEDERAL CENTER DENVER.COLORADO 80225 Intermountain Field Operations Center Mr.E.E.Van Brunt, Jr.Vice President, Nuclear Projects Arizona Public Service Company P.O.Box 21666 Phoenix, Arizona 85036 April 23, 1981 P-SF 50-5P.)<'-53~

Dear Mr.Van Brunt:

The Intermountain Field Operations Center, Bureau of Mines, has received copies of your letter of March 31, 1981, and Supplement 2 to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Operating License Stage, Maricopa County, Arizona (ER 80/666).Our interest pertains largely to any new or clarified impacts on mineral resources and mineral industry.Pages 2.5.1 to 2.5.4 of the Nuclear Regulatory Commission's"PVNGS Units 1, 2, and 3, Environmental Report (OLS)" cover the general geology, mineral resour-ces, and expected project impacts at the site of the nuclear generating plant.Sand, gravel, and clay are the major mineral resources presently mined in Maricopa County, although molybdenum, lime, mica, stone, copper, silver, and gold have been produced within the last 10 years.The plant itself should have little or no impact on these resources.

The Nuclear Regula-tory Commission's"Final Environmental Statement, Palo Verde-Devers 500 kV Transmission Line," dated February 1979, covers final routing and impacts expected for the necessary transmission lines.The present supplement details the proposed final alignment of required pipelines.

Because mineral resource information along the final alignments was not covered in the environmental statement nor in the present Environmental Report, it is sug-gested that a mineral reconnaissance and a brief impact analysis for the pipeline alignment (and transmission alignment if mineral resources were not previously covered elsewhere) be developed and incorporated in the documentation.

Sincerely yours, Jos ph B.Smith, Chief Intermountain Field Operations Center cc: Office of Environmental g ect Review U.S.Nuclear Regulatory Commission Coo>S i%8>0.48 0 0 ggF' 0 N gc