|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20087G5791992-05-0808 May 1992 Provides Matl Re Complaint Against Stated Utils & Nuclear Support Svc,Inc & Addresses Issues in Detail.Respondents Actions Prevent Complainant Career in Nuclear Industry. Related Info,Including DOL Correspondence Encl.Info Deleted ML17305B2721990-12-21021 December 1990 Submits Results from Investigation Re Partial Welding of Jacket Water Header Supports on Three Engines,During Production of Ksv Nuclear Engines in 1979,per LER 90-010-00 ML17305B1541990-10-24024 October 1990 Forwards Request for State Approval for Disposal of Low Concentrations of Radionuclides in Controlled Area ML17285B4531989-06-28028 June 1989 Potential Significant Deficiency & Part 21 Rept Re Insufficient Actuator Force to Open Atmospheric Dump Valves. New Plug Assembly & New Piston Ring Assembly Should Be Installed.Nrc Also Informed of Problem ML20211L4301986-03-0404 March 1986 Responds to Re Use of Lie Detector Tests to Determine Identity of Employees Talking to Press.Issue Solely Matter of Security.Lie Detectors Never Utilized ML17298B9861985-03-14014 March 1985 Forwards Amends 2 & 3 to Indemnity Agreement B-95 ML20079S1381984-01-19019 January 1984 Forwards Proprietary Interim Rept on Performance Evaluation of Palo Verde Control Element Assembly Shroud. Encl Withheld (Ref 10CFR2.790) ML20210A2221984-01-0303 January 1984 FOIA Request for Documents Re DOJ or FBI Investigation & Inquiry Into Allegations of Dumping & Destruction of New & Usable Matls & Equipment at or Near Facility Site ML20080T4731982-12-0707 December 1982 Requests Assistance in Disclosing Worker Allegations Re Problems at Facility.Various Allegations by Workers Re Const,Qa & QC Problems Existing at Plant Discussed ML17297B8171982-11-12012 November 1982 Submits Final Biweekly Status Rept for Independent QA Evaluation Covering 821023-1105.Final Rept Publication Projected for Wk of 821115 ML17297B7321982-10-18018 October 1982 Forwards Independent QA Evaluation of Palo Verde Nuclear Generating Stations Units 1,2 & 3, Biweekly Status Rept 7 for Period Ending 821008 ML17297B6861982-09-21021 September 1982 Forwards Independent QA Evaluation of Palo Verde Nuclear Generating Stations,Units 1,2 & 3, Biweekly Status Rept 5 for Period Ending 820910 ML17297B6671982-09-0909 September 1982 Forwards Independent QA Evaluation of Palo Verde Nuclear Generating Stations Units 1,2 & 3, Biweekly Status Rept for Period Ending 820827 ML17297B6351982-08-0303 August 1982 Forwards Independent QA Evaluation, Biweekly Status Rept for 820719-30 ML17297B6291982-07-27027 July 1982 Forwards Independent QA Evaluation of Palo Verde Nuclear Generating Station Units 1,2 & 3, Biweekly Status Rept 1 for Period Ending 820716 ML17297B6121982-07-0202 July 1982 Forwards Revised Page 16 to Slide Presentation Entitled, Tentative Feature Selection, in Response in NRC Comments at 820629 Presentation of Program Plan for Independent QA Evaluation of Facilities ML17297B2041982-01-20020 January 1982 Forwards Comments Re Des.Liquid Waste Evaporation Pond Will Require Approval or Permits from Bureau of Waste Control ML17297A3921981-04-23023 April 1981 Ack Receipt of Util 810331 Ltr & Suppl 2 to Environ Rept. Recommends Development of Mineral Reconnaissance & Impact Analysis for Pipeline Alignment for Incorporation in Documentation ML17296B0251980-10-23023 October 1980 Comments by Water & Power Resources Svc on Suppl 1 to Environ Rept for Facility.Proposal Has No Identifiable Effect on Doi Programs 1992-05-08
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML17285B4531989-06-28028 June 1989 Potential Significant Deficiency & Part 21 Rept Re Insufficient Actuator Force to Open Atmospheric Dump Valves. New Plug Assembly & New Piston Ring Assembly Should Be Installed.Nrc Also Informed of Problem ML20211L4301986-03-0404 March 1986 Responds to Re Use of Lie Detector Tests to Determine Identity of Employees Talking to Press.Issue Solely Matter of Security.Lie Detectors Never Utilized ML17298B9861985-03-14014 March 1985 Forwards Amends 2 & 3 to Indemnity Agreement B-95 ML20079S1381984-01-19019 January 1984 Forwards Proprietary Interim Rept on Performance Evaluation of Palo Verde Control Element Assembly Shroud. Encl Withheld (Ref 10CFR2.790) ML20210A2221984-01-0303 January 1984 FOIA Request for Documents Re DOJ or FBI Investigation & Inquiry Into Allegations of Dumping & Destruction of New & Usable Matls & Equipment at or Near Facility Site ML20080T4731982-12-0707 December 1982 Requests Assistance in Disclosing Worker Allegations Re Problems at Facility.Various Allegations by Workers Re Const,Qa & QC Problems Existing at Plant Discussed ML17297B8171982-11-12012 November 1982 Submits Final Biweekly Status Rept for Independent QA Evaluation Covering 821023-1105.Final Rept Publication Projected for Wk of 821115 ML17297B7321982-10-18018 October 1982 Forwards Independent QA Evaluation of Palo Verde Nuclear Generating Stations Units 1,2 & 3, Biweekly Status Rept 7 for Period Ending 821008 ML17297B6861982-09-21021 September 1982 Forwards Independent QA Evaluation of Palo Verde Nuclear Generating Stations,Units 1,2 & 3, Biweekly Status Rept 5 for Period Ending 820910 ML17297B6671982-09-0909 September 1982 Forwards Independent QA Evaluation of Palo Verde Nuclear Generating Stations Units 1,2 & 3, Biweekly Status Rept for Period Ending 820827 ML17297B6351982-08-0303 August 1982 Forwards Independent QA Evaluation, Biweekly Status Rept for 820719-30 ML17297B6291982-07-27027 July 1982 Forwards Independent QA Evaluation of Palo Verde Nuclear Generating Station Units 1,2 & 3, Biweekly Status Rept 1 for Period Ending 820716 ML17297B6121982-07-0202 July 1982 Forwards Revised Page 16 to Slide Presentation Entitled, Tentative Feature Selection, in Response in NRC Comments at 820629 Presentation of Program Plan for Independent QA Evaluation of Facilities ML17297B2041982-01-20020 January 1982 Forwards Comments Re Des.Liquid Waste Evaporation Pond Will Require Approval or Permits from Bureau of Waste Control ML17297A3921981-04-23023 April 1981 Ack Receipt of Util 810331 Ltr & Suppl 2 to Environ Rept. Recommends Development of Mineral Reconnaissance & Impact Analysis for Pipeline Alignment for Incorporation in Documentation ML17296B0251980-10-23023 October 1980 Comments by Water & Power Resources Svc on Suppl 1 to Environ Rept for Facility.Proposal Has No Identifiable Effect on Doi Programs 1989-06-28
[Table view] |
Text
g REGULATOR'NFORMAT ION OISTRISUTION S'EM (RIBS)
ACCESSION NBR:8209270273 DOCGDATE'2809/21 NOTARIZED: NO DOCKET ¹ FACIL:STN-50-528 Palo Verde Nuclear StationF Unit 1F Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear StationF Unit 2F Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear StationF Uni.t 3F Arizona Publi 05000530 AUTH ~ NAME 'UTHUR Af FILIATION SIMONY ~ ~ A s Torney Pines Technology REC IP ~ NAME RECIP IEN l'FFILIATION TURLEYFK ~ LE , Arizona Public Service Co ~
SUBJECT:
Forwards "Independent QA Evaluation of Palo Verde Nuclear Generating Stations~Units 1F2 & 3F" Bi'-weekly Status Rept
.. /'~tz.
5 for period ending 820910 CODE: QOOBS COPIES RECEIVED:LTR
'ISTRIBUTION ENCL I SIZE:'
TITLE: Quality Assurance Dist, for Amdt to Report NOTES:Standardized p'lant, 050005i?8 Standardized plant. 05000529 Standardized plant ~ 05000530 RECIPIENT ID CODE/NAME E,'OPIES LTTR ENCL REC IP IENT ID CODE/NAMIE COPIES LTTR ENCL L ICITRA F 1 0 INTERNALo IE F ILE NRR/DE/QAB , 01 2 2 RES RGN1 1 0 1
RGN2 RGNll tiJ FI 03 RGN3 RGN5 1, 1 0 0
EXTE'RNAL: ACRS LPDR 1 1 NRC PDR 02 NTIS 04 1 1
- w. wnh-g
- f. i', c.n 4u.f 1
v o il~e~
PO uSA.A 5 . Her rS'~ay R I 1'.l FFg
~r. tfson Ger Ii'np C<
. b. P~r~
gg'An g' "I
TOTAL NUMBER OF COPIES REUUIREOr: LTTR
~ ENCL
~ I j r
e Qt" ww *f>> H
~
j >>le~ l 1 )
II
' fwwpe} g f I'I ,w'>>I >>iles f J t}t>> tp ep I fj>>e I >>
I <<4'I <<ji p>>wt
'l>>'Ije I iw>>jw" >> >>P>>PI+ I '1 ~ tr Jj wjfA f f I lw' f, j>> II>>tw I' j e)tw Iyf I p IMH i>>few>> f 1>>w ' I w If g>> I, I I '. w If I y (I,,l jl) g
,jf f J jj . j J(,jj g,'j wf >>t j e I~ >>II jwi} "p~) p p>>}.'ijj jj kt I .wit wpg ww
'I wjjA 1 I e p q pI>> $ 'l ,I f j}.<w.,'1 , W }<IV 1 1'fp fj
} J j I f e>>>j }e > pp li I >>fP I It'I f I trp p w f '}P wp ll ~
/,3 e' f fw }I,,'we t I
'llf .,<< f '
jj'j'j ye'>>
Il,p.',*<>>l I:<
II f ',pj f fp I qpwpwe'}
W f
Ijj ff I"
i,
< epi I I e tw r f
'I >>N I>
j < > j < , I lf lli
,lfp l I}f 5 'II.I >>'ew f < lit) p'p pw' 4 jill y i
)w '.ll 8 1 I'I Ii w PI>>p 'f 1 if>>it If etw f }I lj I I'W
'ftjl I i pr d rj' WI I' W( W Ill
TO1111EV elNES TECHNO1.0OV P.O. Box 81600 San Diego, California 92138 Telephone: (7) 4I 455-2654
- DIVISION OF GENERAL ATOMIC COMPANY TPT:122'MAST82 September 21, 1982 P
Mr. Keith L. Turley Chairman, President and Chief Executive Officer Arizona Public Service Company 411 N. Central Avenue Phoenix; Arizona 85004
Dear Hr. Turley:
The enclosed bi-weekly status report on our Independent Quality Assur-ance Evaluation of the Palo Verde Nuclear Generating Station covers the period August 28 through September 10, 1982. Copies of this report are also being sent to the U. S. Nuclear Regulatory Commission, Bechtel Power Corporation and Combustion Engineering Corporation.
If you -have any questions regarding the contents of this report, please call me.
Sircerely, N, A.Simon P object Manager.
cc: T. 71. Bishop/NRC C. Ferguson/C-E E. E. Van Br'un', Jv;/A'PS G, Nessman/TPT
, N. Hilson/BPC 8209270273 820921 PDR ADOCK 05000528 R PDR
l 4
II d I N
J