ML18096B074: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/27/1992
| issue date = 10/27/1992
| title = Forwards WCAP-13366, Analysis of Capsule X from Public Service Electric & Gas Co,Salem Unit 2 Reactor Vessel Radiation Surveillance Program, Per 10CFR50,app H,Section Iii.A
| title = Forwards WCAP-13366, Analysis of Capsule X from Public Service Electric & Gas Co,Salem Unit 2 Reactor Vessel Radiation Surveillance Program, Per 10CFR50,app H,Section Iii.A
| author name = LABRUNA S
| author name = Labruna S
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  

Revision as of 12:10, 17 June 2019

Forwards WCAP-13366, Analysis of Capsule X from Public Service Electric & Gas Co,Salem Unit 2 Reactor Vessel Radiation Surveillance Program, Per 10CFR50,app H,Section Iii.A
ML18096B074
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/27/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18096B075 List:
References
NLR-N92147, NUDOCS 9211040245
Download: ML18096B074 (2)


Text

. .,..' y * .. Public Service Electric and Gas Company

  • Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President

-Nuclear Operations OCT 2 7 1992 NLR-N92147 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM; SPECIMEN CAPSULE ANALYSIS REPORT SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 10CFR50, Appendix H, Section III.A requires a summary technical report submittal within one year after capsule withdrawal.

Capsule "X" was withdrawn from Salem Unit 2 on December 1, 1991. The attached technical report (WCAP-13366) summarizes the testing of and postirradiation data obtained from Capsule 11 X". Based on the capsule analysis results, a License Change Request (LCR) revising the Salem Unit 2 heatup and cooldown curves will be forwarded by January 1993. Should you have any questions on this transmittal, please contact us. Sincerely, Attachment .

921027-*.

PDR ADOCK 05000311 p PDR

  • ......

Document Control Desk NLR-N92147 c Mr. J. c. stone 2 Licensing Project Manager -Salem Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief