ML18101B097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/13/1995
| issue date = 11/13/1995
| title = Forwards LER 95-025-00 Re Reportability Criteria,As Defined in 10CFR50.72(b)(2).Attachment a Represents Commitments Made to NRC Re LER 95-025-00
| title = Forwards LER 95-025-00 Re Reportability Criteria,As Defined in 10CFR50.72(b)(2).Attachment a Represents Commitments Made to NRC Re LER 95-025-00
| author name = WARREN C C
| author name = Warren C
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  

Revision as of 12:19, 17 June 2019

Forwards LER 95-025-00 Re Reportability Criteria,As Defined in 10CFR50.72(b)(2).Attachment a Represents Commitments Made to NRC Re LER 95-025-00
ML18101B097
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/13/1995
From: Warren C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18101B098 List:
References
LR-N95199, NUDOCS 9511160219
Download: ML18101B097 (2)


Text

. .

  • Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit NOV 1 3 1995 LR-N95199 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Att: Document Control Desk SALEM GENERATING STATION LICENSE NO: DPR-70 and.DPR-75 DOCKET NO: 50-272 and 50-311 UNIT NOS: 1 and 2 LICENSEE EVENT REPORT NO. 95-025-00 This Licensee Event Report is being submitted pursuant to the requirements of Code of Federal Regulation 10CFR50. 73 (a) (2) (ii). SORC Mtg. No: 95-131 EHV/tcp C Distribution LER file 3.7 The r!,*hrer m h:=c1,i*.

9511160219 PDR ADOCK s 951113 05000272 PDR Sincerely,

  • f /L, (!

C. Warren General Manager -Salem Operations

/.{j*'l;}

i ./\Jr:10' l v 95*2168 REV. 6/94

  • Attachment A The following items represent commitments that Public Service Electric & Gas (PSE&G) made to the Nuclear Regulatory Commission (NRC) relative to this LER (95-025-00) . The commitments are as follows: 1. Pump NPSH margin is currently protected by the river level/NPSH monitoring instructions contained in the Abnormal Environmental Procedure (SC.OP-AB.ZZ-OOOl(Q)).

These instructions will be removed when the pump upgrades are completed, which is scheduled to be completed in 1996. There are presently 2 new design (Johnston)

SW pumps installed

(#12 and 26) . 2. Permanent procedure revisions are being developed (both Normal and Emergency Operating) to address the specific concerns of the Problem Reports. These revisions will be implemented by April 1996. 3. A copy of this LER will be forwarded to the Nuclear Training Center for evaluation and incorporation into the Operability/Reportability training for Design Engineering personnel.

4. The SW System Configuration Baseline Document (CBD) will be revised to clearly identify the design basis and significance for normal operation in the cross-tied mode. This revision will be completed by May 31, 1996.