Line 71: Line 71:
Need supplemental RAI response to address current Hx'r, and makeup for evaporation losses Eng/Thompson 40. Submit final REP prior to fuel load (Spink)  EP/ Detchemendy 41. Close SSER Open items (Crouch)
Need supplemental RAI response to address current Hx'r, and makeup for evaporation losses Eng/Thompson 40. Submit final REP prior to fuel load (Spink)  EP/ Detchemendy 41. Close SSER Open items (Crouch)
Licensing 42. Need comparison of accident dose Eng/Koontz Page 5 of 5    No. Description Status Additional Comments Resp Org/Person source terms for U1 vs U2 and justify the differences (Stockton) 43. Maintenance Rule - Must be put in place prior to license rather than prior to fuel load (Ryan)
Licensing 42. Need comparison of accident dose Eng/Koontz Page 5 of 5    No. Description Status Additional Comments Resp Org/Person source terms for U1 vs U2 and justify the differences (Stockton) 43. Maintenance Rule - Must be put in place prior to license rather than prior to fuel load (Ryan)
Freeman 44. SSER 22 Open Item Indemnity Agreements (Crouch)  
Freeman 44. SSER 22 Open Item Indemnity Agreements (Crouch)
: 45. October 26 Meeting Topics - Sump Strainer RAIs, IPEEE Submittal, Fuel Pool Hx'r status, Tech Spec Rev D, Setpoint Methodology (Crouch)
: 45. October 26 Meeting Topics - Sump Strainer RAIs, IPEEE Submittal, Fuel Pool Hx'r status, Tech Spec Rev D, Setpoint Methodology (Crouch)
Eng/Koontz/
Eng/Koontz/

Revision as of 20:40, 30 April 2019

2010/10/19 Watts Bar 2 OL - FW: Bucket List
ML103140768
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/19/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML103140768 (7)


Text

1 WBN2Public Resource From: Poole, Justin Sent: Tuesday, October 19, 2010 4:18 PM To: Campbell, Stephen; Raghavan, Rags Cc: WBN2HearingFile Resource

Subject:

FW: Bucket List Attachments:

NRC PM Open Items List 10-21-10.docx JustinC.PooleProjectManagerNRR/DORL/LPWBU.S.NuclearRegulatoryCommission(301)4152048email:Justin.Poole@nrc.gov From: Crouch, William D [1]

Sent: Tuesday, October 19, 2010 4:11 PM To: Poole, Justin; Wiebe, Joel; Milano, Patrick Cc: Arent, Gordon

Subject:

Bucket List HereistheupdatedbucketlistforThursday.Iadded/closedtheitemswediscussedtodayat9:00.Ialsoaddedseveralitems(Items46-56)thatGordonandIhaveidentifiedassomethingthatneedstogetdonesometimeinthefuture.Wedidnotwantthesetogetlost.William D. (Bill) Crouch(423)365 2004WBN(256)777 7676Cell Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 185 Mail Envelope Properties (19D990B45D535548840D1118C451C74D6FD36BC883)

Subject:

FW: Bucket List Sent Date: 10/19/2010 4:17:53 PM Received Date: 10/19/2010 4:17:55 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients: "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov> Tracking Status: None

Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 704 10/19/2010 4:17:55 PM NRC PM Open Items List 10-21-10.docx 31698

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

Page 1 of 5 NRC PM Open Items List 10/21/10 (423) 751-6338 ID 657601 No. Description Status Additional Comments Resp Org/Person 1. Step 1 - Submit Cyber Security Plan/Controls and Implementation Schedule. State will be ready for inspection by April 2011.

Step 2 - Implement Plan/Controls and Conduct Cyber Security Self Assessment (Ryan)

Step 1 - Complete Step 2 -

February 2011 Update Cyber Security Plan IAW NEI 08-09 Rev 6 per NRC letter dated 5/24/10. NRC Inspection early 2011 Need TVA letter to state ready for inspection in April

2011 Licensing/

Crouch 2. NUREG-0847 Appendix update A-12 and A-36 in particular (Ryan) 01/31/2010 04/30/2010 5/26/10 10/8/10 Letter to update the TVA appendices from NUREG-0847 including the USIs. Need date for completion of A-36 calc being done by Mark Ray. Licensing/

Crouch &

Eng/Adair 3. FSAR RAIs (Elton)

Ongoing Licensing/Eng 4. SAMA RAIs (Metzler)

Step 1 - 3/31/10 5/14/10 5/28/10 Step 1 Step 1 - Complete Step 2- 10/14/10A Complete 2-Step Approach Step 1 - Address Initial RAIs Step 2 - Provide comparison of Riskman vs CAFTA results Analysis is complete. Preparing cost estimates of design alternatives.

Eng/Koontz 5. GL 2004-02 submittal of post Unit 1 RAIs (Beach)

Step 1 9/10/10A Step 2 12/15/10 Step 1 Report w/o test data Step 2 Include test data Eng/Koontz 6. Provide categorization table for A92 thru A97 (Stockton)

Step 1 6/2/10A Step 2 - TBD Step 1 - Disks provided on 6/8/10 Step 2 - Need to add a column that identifies change by Amendment Number Licensing/ Stockton 7. Develop Plan for early Tech Spec Need Describe how the Tech Spec template was developed Licensing/

Page 2 of 5 No. Description Status Additional Comments Resp Org/Person verification (Elton/Stockton) Schedule Elton 8. Confirm acceptability of shifting EP drill from May 2011 to July 2011 to support other state drills. (Crouch) Re-Opened No NRC objections. Meeting with state on 7/16/10 determined state does not need a U2 drill and thus will not participate. FEMA has determined that no additional drill is required. Need written concurrence from NRR. NRR 9. Instrumentation RAI List (Knuettel)

Ongoing Eng/Hilmes 10. Develop list of planned License Conditions (Crouch)

Licensing/

Crouch 11. Refurb Program followup items (Ryan)

Eng/Refurb Welch/Schlessel 12. Fire Protection Report Common Sections (Knuettel) 8/9/10A Re-opened Unit 2 Deviations included in Part VII of FPR.

Specifically address questions from June 11, 2010 RAI Provide better justifications for why changes are required for Unit 2/dual unit operation and why change is technically acceptable.

Eng/Hilmes 13. MSO scenarios (Knuettel) 8/20/10A Re-opened Add the 3 missing "resolutions" to the summary tables. Remove reference to Unit 1 PERs that do not apply to Unit 2. Add "mods in work" to table of required actions. Explicitly identify OMAs that are being credited to resolve MSO scenarios and reference the Unit 1 approval.

Eng/Hilmes 14. Markup of Report Changes from Rev 5 to 40 (Knuettel) 8/30/10A Re-opened Provide additional detail regarding changes and justification. Ensure all changes are marked, justified and addressed in Revision Log. In Revision 7, what was the conclusion of the submittal to the NRC.

Eng/Hilmes 15. Final Fire Protection Report Submitted (Knuettel) 12/17/10 Eng/Hilmes 16. Resolve Licensing Basis Preservation Self Assessment PERs (Crouch)

Eng/Freeman 17. Self Assessments Review (Crouch) 10/15/10 NRR select assessments for onsite review NRR 18. IPEEE Response NRC Review (Crouch) 10/26/10 Provide briefing to NRC reviewers NRR/TVA/Adair 19. B.5.b Phase I issue 10/14/10A Address issues on 7/1/10 submittal regarding Licensing/Lyons Page 3 of 5 No. Description Status Additional Comments Resp Org/Person Complete locations and shielding. Add commitments from 3/06/07 letter. 20. Diesel AOT duration (Spink)

Eng/Hilmes 21. Schedule/plan for GL89-10 testing (Ryan) Construction 22. Schedule/plan for GL 96-01 testing (Ryan) Startup/Olson 23. WCAP reference for NRC approval of new control rod material (Ryan)

Eng/Koontz 24. Fuel Related RAI comments from 8/3 meeting SNPB 4.2.3-3, 4.3.2-1, SRP 5.2.2 ASME Code analysis, 15.2.14 Inadvertant ECCS, CVCS malfunction analysis, Fig 15.4-11 poor quality, Fig 15.4-11a vs 15.4-12a bounding reactivity issue 10/14/10A Closed Close to FSAR RAIs Eng/Koontz 25. Schedule for submitting ISI/IST first 10 year plan. What triggers the submittal? (Ryan) ISI/Tinley 26. SAMA RAI response- item 5.e need more info regarding can we do something to fix the ones with low values of HCLPF? (Metzler)

Was this fixed in the new analysis?

Eng/Koontz 27. Shared System GDC 5 - Provide explanation of why we are a hot shutdown vs cold shutdown plant. What events/scenarios are involved? How does this meet GDC 5? How did the NRC approve us as a hot shutdown plant? Do we have a procedure for heating up to hot standby on decay heat?

Is the ERCW path to the cooling tower/holding pond seismic? Is the 10/26/10 Provide flow rates/heat load/cool down analyses. Address two unit Tech spec shutdown. Eng/Thompson Page 4 of 5 No. Description Status Additional Comments Resp Org/Person holding pond structure seismic? (Elton) 28. Unit 2 Target Sets (Metzler) 11/15/10 Provide submittal that target sets are developed and they meet the regulatory requirements. Reference the 1st letter (April 2010) and the commitment.

Corp Security/Glover 29. Generic Letter 2008-01 Gas Accumulation High Point Vents (Beach) 10/29/10 Provide submittal of Engineering Products with commitment for final walkdown in 2011 Licensing 30. Status on Aquatic Contention (Arent) 10/21/10 Arent 31. Part 30 and 40 License (Spink) 10/20/10 Address the issues on the additional SNM material via a supplement to the Part 70 License.

Confirmed with Rafael Rodriguiz that no additional submittal is required. confirmed Part 40 License is not applicable.

Licensing/Spink 32. Status of Aux Instrument Room CO 2 Issue (Ryan)

Confirm this is a Unit 1 only issue. Licensing/ Ryan 33. Unit Difference submittal (Stockton) 10/19/10 Licensing 34. Confirm status of NRC review of Developmental Tech Specs (Elton) 10/26/10 Meeting with reviewer to discuss status of review and specifically Revision D. Licensing 35. Add MSIP Description and locations to FSAR (Stockton)

Eng/Thompson 36. Status of GSI 199 Eastern Seismicity (Crouch) 11/15/10 TVA/NRR 37. Revise Implementation Plan for QA Records CAP relative to support records. (Stephenson)

Eng/Johnson 38. Address ACRS questions - Tritium concentration in plume from leak, WBN versus VC Summer weld flaw commonalities, baffle bolts status (Crouch) Eng/Freeman 39. Fuel Pool Hx'r analysis in FSAR (Elton)

Need supplemental RAI response to address current Hx'r, and makeup for evaporation losses Eng/Thompson 40. Submit final REP prior to fuel load (Spink) EP/ Detchemendy 41. Close SSER Open items (Crouch)

Licensing 42. Need comparison of accident dose Eng/Koontz Page 5 of 5 No. Description Status Additional Comments Resp Org/Person source terms for U1 vs U2 and justify the differences (Stockton) 43. Maintenance Rule - Must be put in place prior to license rather than prior to fuel load (Ryan)

Freeman 44. SSER 22 Open Item Indemnity Agreements (Crouch)

45. October 26 Meeting Topics - Sump Strainer RAIs, IPEEE Submittal, Fuel Pool Hx'r status, Tech Spec Rev D, Setpoint Methodology (Crouch)

Eng/Koontz/

Enis/Hilmes 46. Complete B.5.b Implementation (Ryan)

?? 47. Issue two Unit Offsite Dose Calculation Manual (Beach)

Chemistry/

Woods 48. Issue Unit 2 Completion Letter (Crouch)

Licensing 49. Close Licensing Commitments (Elton)

Licensing 50. Close 10CFR50.55e/CDRs (Metzler)

Engineering/ Licensing 51. CAP/SP closures (Stephenson)

Eng/Freeman 52. Maximum Uncertainty Rerate (MUR) Submittal for post U2 Licensing (Spink)

Eng/Koontz 53. Intake Flow Rate Calc for Impingement (Ryan) Eng/Thompson 54. Combined U1/U2 FSAR (Stockton)

Licensing 55. Final Hydrology Submittal (Ryan)

?? 56. Dual Unit License Resolution (Crouch)

Licensing 57. Is the new SAMA analysis a replacement for the old SAMA?

Closed The new analysis addresses the entire SAMA issue and utilizes the updated population data (SECPOP2000 code) and the updated radiological consequences to the public data (WINMACS code) and is therefore a replacement for the old analysis.

Eng/Koontz 58. 59.