1 WBN2Public Resource From:
Poole, Justin Sent:
Tuesday, October 19, 2010 4:18 PM To:
Campbell, Stephen; Raghavan, Rags Cc:
WBN2HearingFile Resource
Subject:
FW: Bucket List Attachments:
NRC PM Open Items List 10-21-10.docx JustinC.Poole ProjectManager NRR/DORL/LPWB U.S.NuclearRegulatoryCommission (301)4152048 email:Justin.Poole@nrc.gov From: Crouch, William D [1]
Sent: Tuesday, October 19, 2010 4:11 PM To: Poole, Justin; Wiebe, Joel; Milano, Patrick Cc: Arent, Gordon
Subject:
Bucket List HereistheupdatedbucketlistforThursday.Iadded/closedtheitemswediscussedtodayat9:00.Ialsoaddedseveral items(Items46-56)thatGordonandIhaveidentifiedassomethingthatneedstogetdonesometimeinthefuture.
Wedidnotwantthesetogetlost.
William D. (Bill) Crouch (423)3652004WBN (256)7777676Cell
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
185 Mail Envelope Properties (19D990B45D535548840D1118C451C74D6FD36BC883)
Subject:
FW: Bucket List Sent Date:
10/19/2010 4:17:53 PM Received Date:
10/19/2010 4:17:55 PM From:
Poole, Justin Created By:
Justin.Poole@nrc.gov Recipients:
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 704 10/19/2010 4:17:55 PM NRC PM Open Items List 10-21-10.docx 31698 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Page 1 of 5 NRC PM Open Items List 10/21/10 (423) 751-6338 ID 657601 No.
Description Status Additional Comments Resp Org/Person
- 1.
Step 1 - Submit Cyber Security Plan/Controls and Implementation Schedule. State will be ready for inspection by April 2011.
Step 2 - Implement Plan/Controls and Conduct Cyber Security Self Assessment (Ryan)
Step 1 -
Complete Step 2 -
February 2011 Update Cyber Security Plan IAW NEI 08-09 Rev 6 per NRC letter dated 5/24/10. NRC Inspection early 2011 Need TVA letter to state ready for inspection in April 2011 Licensing/
Crouch
- 2.
NUREG-0847 Appendix update A-12 and A-36 in particular (Ryan) 01/31/2010 04/30/2010 5/26/10 10/8/10 Letter to update the TVA appendices from NUREG-0847 including the USIs. Need date for completion of A-36 calc being done by Mark Ray.
Licensing/
Crouch &
Eng/Adair
- 3.
Ongoing Licensing/Eng
- 4.
Step 1 -
3/31/10 5/14/10 5/28/10 Step 1 Step 1 -
Complete Step 2-10/14/10A Complete 2-Step Approach Step 1 - Address Initial RAIs Step 2 - Provide comparison of Riskman vs CAFTA results Analysis is complete. Preparing cost estimates of design alternatives.
Eng/Koontz
- 5.
GL 2004-02 submittal of post Unit 1 RAIs (Beach)
Step 1 9/10/10A Step 2 12/15/10 Step 1 Report w/o test data Step 2 Include test data Eng/Koontz
- 6.
Provide categorization table for A92 thru A97 (Stockton)
Step 1 6/2/10A Step 2 - TBD Step 1 - Disks provided on 6/8/10 Step 2 - Need to add a column that identifies change by Amendment Number Licensing/
Stockton
- 7.
Develop Plan for early Tech Spec Need Describe how the Tech Spec template was developed Licensing/
Page 2 of 5 No.
Description Status Additional Comments Resp Org/Person verification (Elton/Stockton)
Schedule Elton
- 8. Confirm acceptability of shifting EP drill from May 2011 to July 2011 to support other state drills. (Crouch)
Re-Opened No NRC objections. Meeting with state on 7/16/10 determined state does not need a U2 drill and thus will not participate. FEMA has determined that no additional drill is required. Need written concurrence from NRR.
- 9. Instrumentation RAI List (Knuettel)
Ongoing Eng/Hilmes
- 10. Develop list of planned License Conditions (Crouch)
Licensing/
Crouch
- 11. Refurb Program followup items (Ryan)
Eng/Refurb Welch/Schlessel
- 12. Fire Protection Report Common Sections (Knuettel) 8/9/10A Re-opened Unit 2 Deviations included in Part VII of FPR.
Specifically address questions from June 11, 2010 RAI Provide better justifications for why changes are required for Unit 2/dual unit operation and why change is technically acceptable.
Eng/Hilmes
- 13. MSO scenarios (Knuettel) 8/20/10A Re-opened Add the 3 missing resolutions to the summary tables. Remove reference to Unit 1 PERs that do not apply to Unit 2. Add mods in work to table of required actions. Explicitly identify OMAs that are being credited to resolve MSO scenarios and reference the Unit 1 approval.
Eng/Hilmes
- 14. Markup of Report Changes from Rev 5 to 40 (Knuettel) 8/30/10A Re-opened Provide additional detail regarding changes and justification. Ensure all changes are marked, justified and addressed in Revision Log. In Revision 7, what was the conclusion of the submittal to the NRC.
Eng/Hilmes
- 15. Final Fire Protection Report Submitted (Knuettel) 12/17/10 Eng/Hilmes
- 16. Resolve Licensing Basis Preservation Self Assessment PERs (Crouch)
Eng/Freeman
- 18. IPEEE Response NRC Review (Crouch) 10/26/10 Provide briefing to NRC reviewers NRR/TVA/Adair
- 19. B.5.b Phase I issue 10/14/10A Address issues on 7/1/10 submittal regarding Licensing/Lyons
Page 3 of 5 No.
Description Status Additional Comments Resp Org/Person Complete locations and shielding. Add commitments from 3/06/07 letter.
- 20. Diesel AOT duration (Spink)
Eng/Hilmes
- 21. Schedule/plan for GL89-10 testing (Ryan)
Construction
- 22. Schedule/plan for GL 96-01 testing (Ryan)
Startup/Olson
- 23. WCAP reference for NRC approval of new control rod material (Ryan)
Eng/Koontz
- 24. Fuel Related RAI comments from 8/3 meeting SNPB 4.2.3-3, 4.3.2-1, SRP 5.2.2 ASME Code analysis, 15.2.14 Inadvertant ECCS, CVCS malfunction analysis, Fig 15.4-11 poor quality, Fig 15.4-11a vs 15.4-12a bounding reactivity issue 10/14/10A Closed Close to FSAR RAIs Eng/Koontz
- 25. Schedule for submitting ISI/IST first 10 year plan. What triggers the submittal?
(Ryan)
ISI/Tinley
- 26. SAMA RAI response-item 5.e need more info regarding can we do something to fix the ones with low values of HCLPF? (Metzler)
Was this fixed in the new analysis?
Eng/Koontz
- 27. Shared System GDC 5 - Provide explanation of why we are a hot shutdown vs cold shutdown plant. What events/scenarios are involved? How does this meet GDC 5? How did the NRC approve us as a hot shutdown plant? Do we have a procedure for heating up to hot standby on decay heat?
Is the ERCW path to the cooling tower/holding pond seismic? Is the 10/26/10 Provide flow rates/heat load/cool down analyses.
Address two unit Tech spec shutdown.
Eng/Thompson
Page 4 of 5 No.
Description Status Additional Comments Resp Org/Person holding pond structure seismic? (Elton)
- 28. Unit 2 Target Sets (Metzler) 11/15/10 Provide submittal that target sets are developed and they meet the regulatory requirements. Reference the 1st letter (April 2010) and the commitment.
Corp Security/Glover
- 29. Generic Letter 2008-01 Gas Accumulation High Point Vents (Beach) 10/29/10 Provide submittal of Engineering Products with commitment for final walkdown in 2011 Licensing
- 30. Status on Aquatic Contention (Arent) 10/21/10 Arent
- 31. Part 30 and 40 License (Spink) 10/20/10 Address the issues on the additional SNM material via a supplement to the Part 70 License. Confirmed with Rafael Rodriguiz that no additional submittal is required. confirmed Part 40 License is not applicable.
Licensing/Spink
- 32. Status of Aux Instrument Room CO2 Issue (Ryan)
Confirm this is a Unit 1 only issue.
Licensing/
Ryan
- 33. Unit Difference submittal (Stockton) 10/19/10 Licensing
- 34. Confirm status of NRC review of Developmental Tech Specs (Elton) 10/26/10 Meeting with reviewer to discuss status of review and specifically Revision D.
Licensing
Eng/Thompson
- 36. Status of GSI 199 Eastern Seismicity (Crouch) 11/15/10 TVA/NRR
Eng/Johnson
- 38. Address ACRS questions - Tritium concentration in plume from leak, WBN versus VC Summer weld flaw commonalities, baffle bolts status (Crouch)
Eng/Freeman
- 39. Fuel Pool Hxr analysis in FSAR (Elton)
Need supplemental RAI response to address current Hxr, and makeup for evaporation losses Eng/Thompson
- 40. Submit final REP prior to fuel load (Spink)
EP/
Detchemendy
- 41. Close SSER Open items (Crouch)
Licensing
- 42. Need comparison of accident dose Eng/Koontz
Page 5 of 5 No.
Description Status Additional Comments Resp Org/Person source terms for U1 vs U2 and justify the differences (Stockton)
- 43. Maintenance Rule - Must be put in place prior to license rather than prior to fuel load (Ryan)
Freeman
- 44. SSER 22 Open Item Indemnity Agreements (Crouch)
- 45. October 26 Meeting Topics - Sump Strainer RAIs, IPEEE Submittal, Fuel Pool Hxr status, Tech Spec Rev D, Setpoint Methodology (Crouch)
Eng/Koontz/
Enis/Hilmes
- 46. Complete B.5.b Implementation (Ryan)
??
- 47. Issue two Unit Offsite Dose Calculation Manual (Beach)
Chemistry/
Woods
- 48. Issue Unit 2 Completion Letter (Crouch)
Licensing
- 49. Close Licensing Commitments (Elton)
Licensing
- 50. Close 10CFR50.55e/CDRs (Metzler)
Engineering/
Licensing
- 51. CAP/SP closures (Stephenson)
Eng/Freeman
- 52. Maximum Uncertainty Rerate (MUR)
Submittal for post U2 Licensing (Spink)
Eng/Koontz
- 53. Intake Flow Rate Calc for Impingement (Ryan)
Eng/Thompson
- 54. Combined U1/U2 FSAR (Stockton)
Licensing
- 55. Final Hydrology Submittal (Ryan)
??
- 56. Dual Unit License Resolution (Crouch)
Licensing
Closed The new analysis addresses the entire SAMA issue and utilizes the updated population data (SECPOP2000 code) and the updated radiological consequences to the public data (WINMACS code) and is therefore a replacement for the old analysis.
Eng/Koontz
- 58.
59.