ML13088A003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O NWASHINGTON, DC 20555 - 0001 March 29, 201 3      In the Matter of FirstEnergy Nuclear Operating Co.
{{#Wiki_filter:U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O NWASHINGTON, DC 20555 - 0001 March 29, 201 3      In the Matter of FirstEnergy Nuclear Operating Co.
(Davis-Besse Nuclear Power Station, Unit 1)
(Davis-Besse Nuclear Power Station, Unit 1)
Docket No. 50
Docket No. 50
-34 6-LR  Dear Administrative Judges
-34 6-LR  Dear Administrative Judges
:  Pursuant to the Atomic Safety and Licensing Board's ("Board") Memorandum and Order dated June 15, 2011
:  Pursuant to the Atomic Safety and Licensing Board's ("Board") Memorandum and Order dated June 15, 2011
("Order") and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission ("Staff") notes that the Safety Evaluation Report ("SER") with open items was published July 31, 2012 and the Staff is currently expecting to publish the SER in July 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement ("DSEIS") in Ma y 2013 and the Final SEIS in November 2013.                  Respectfully submitted,          /signed (electronically) by/
("Order") and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission ("Staff") notes that the Safety Evaluation Report ("SER") with open items was published July 31, 2012 and the Staff is currently expecting to publish the SER in July 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement ("DSEIS") in Ma y 2013 and the Final SEIS in November 2013.                  Respectfully submitted,          /signed (electronically) by/
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
-15 D21        Washington, DC 20555
-15 D21        Washington, DC 20555

Revision as of 22:05, 28 April 2019

NRC Staff'S Status Update Letter March 29, 2013
ML13088A003
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/29/2013
From: Harris B G
NRC/OGC
To: Froehlich W J, Kastenberg W E, Trikouros N G
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24302, 50-346-LR, ASLBP 11-907-01-LR-BD01
Download: ML13088A003 (2)


Text

U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O NWASHINGTON, DC 20555 - 0001 March 29, 201 3 In the Matter of FirstEnergy Nuclear Operating Co.

(Davis-Besse Nuclear Power Station, Unit 1)

Docket No. 50

-34 6-LR Dear Administrative Judges

Pursuant to the Atomic Safety and Licensing Board's ("Board") Memorandum and Order dated June 15, 2011

("Order") and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission ("Staff") notes that the Safety Evaluation Report ("SER") with open items was published July 31, 2012 and the Staff is currently expecting to publish the SER in July 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement ("DSEIS") in Ma y 2013 and the Final SEIS in November 2013. Respectfully submitted, /signed (electronically) by/

Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O

-15 D21 Washington, DC 20555

-0001 (301) 415-1392 Brian.harris@nrc.gov Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Mail Stop: T

-3F23 Washington, DC 20555

-001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Mail Stop: T

-3F23 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T

-3F23 Washington, DC 20555

-0001 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

) ) FIRSTENERGY NUCLEAR OPERATING CO.

) Docket No.

50-346-LRA ) (Davis-Besse Nuclear Power Station, Unit 1)

) ) CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the March 29, 2013 Letter from Brian G. Harris to the Board

, in the above

-captioned proceeding have bee n served upon the Electronic Information Exchange, the NRC's E

-Filing System, in the above captioned proceeding, this 29 th day of March, 201 3. Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O

-15 D21 Washington, DC 20555

-0001 Telephone: (301) 415

-1392 E-mail: brian.harris@nrc.gov Date of Signature: March 29, 2013