Line 26: |
Line 26: |
| : 1. Florida Power & Light Company Letter L-2014-216, "License Amendment Request No.231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," July 10, 2014.2. Florida Power & Light Company Letter L-2014-235, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 1, and Response to Request for Additional Information," dated July 22, 2014.3. Florida Power & Light Company Letter L-2014-250, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 2, and Response to Request for Additional Information ( RAI-5 and BOP RAIs 5 and 5.1)," dated July 29, 2014.4. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information | | : 1. Florida Power & Light Company Letter L-2014-216, "License Amendment Request No.231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," July 10, 2014.2. Florida Power & Light Company Letter L-2014-235, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 1, and Response to Request for Additional Information," dated July 22, 2014.3. Florida Power & Light Company Letter L-2014-250, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 2, and Response to Request for Additional Information ( RAI-5 and BOP RAIs 5 and 5.1)," dated July 29, 2014.4. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information |
| -LAR 231 (TACs MF4392 and MF4393)," dated July 25, 2014 (BOP RAIs 5.1 and 6, SCVB RAI-3).5. Florida Power & Light Company Letter L-2014-237, "Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit," dated July 26, 2014 (BOP RAIs 1, 2, 3, 4, 6 and SCVB RAI-3).6. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information | | -LAR 231 (TACs MF4392 and MF4393)," dated July 25, 2014 (BOP RAIs 5.1 and 6, SCVB RAI-3).5. Florida Power & Light Company Letter L-2014-237, "Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit," dated July 26, 2014 (BOP RAIs 1, 2, 3, 4, 6 and SCVB RAI-3).6. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information |
| -LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).In Reference 1, Florida Power & Light Company (FPL) requested an amendment to the Technical Specifications (TS) for the Turkey Point Nuclear Plant (Turkey Point), Units 3 and 4.Florida Power & Light Company 9760 SW 3 4 4 th St., Florida City, FL 33035 Florida Power & Light Company License Amendment Request No. 231 Response to SCVB Request for Additional Information L-2014-259 Page 2 of 2 The proposed amendment would revise the ultimate heat sink (UHS) water temperature limit from 100lF to 104'F.FPL supplemented the July 10, 2014 application via References 2 and 3. The supplement provided in Reference 3 proposed to increase the frequency of Component Cooling Water heat exchanger performance tests from at least once per 31 days to at least once per 14 days.In Reference 4, the NRC Containment and Ventilation Branch (SCVB) staff requested additional information (RAI). FPL provided a response to the RAI in Reference | | -LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).In Reference 1, Florida Power & Light Company (FPL) requested an amendment to the Technical Specifications (TS) for the Turkey Point Nuclear Plant (Turkey Point), Units 3 and 4.Florida Power & Light Company 9760 SW 3 4 4 th St., Florida City, FL 33035 Florida Power & Light Company License Amendment Request No. 231 Response to SCVB Request for Additional Information L-2014-259 Page 2 of 2 The proposed amendment would revise the ultimate heat sink (UHS) water temperature limit from 100lF to 104'F.FPL supplemented the July 10, 2014 application via References 2 and 3. The supplement provided in Reference 3 proposed to increase the frequency of Component Cooling Water heat exchanger performance tests from at least once per 31 days to at least once per 14 days.In Reference 4, the NRC Containment and Ventilation Branch (SCVB) staff requested additional information (RAI). FPL provided a response to the RAI in Reference |
| : 5. In Reference 6, the NRC forwarded SCVB RAI-5, which is a follow-up to the prior RAI. The enclosure to this letter contains the FPL response to SCVB RAI-5.The additional information provided in the enclosure to this letter does not impact the no significant hazards determination and environmental considerations previously provided in References 1 and 3.There are no new commitments made in this submission. | | : 5. In Reference 6, the NRC forwarded SCVB RAI-5, which is a follow-up to the prior RAI. The enclosure to this letter contains the FPL response to SCVB RAI-5.The additional information provided in the enclosure to this letter does not impact the no significant hazards determination and environmental considerations previously provided in References 1 and 3.There are no new commitments made in this submission. |
| If you have any questions or require additional information, please contact Mr. Robert Tomonto at 305-246-7327. | | If you have any questions or require additional information, please contact Mr. Robert Tomonto at 305-246-7327. |
Line 34: |
Line 34: |
|
| |
|
| Response to Request for Additional Information, Containment and Ventilation Branch RAI-5, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company L-2014-259* | | Response to Request for Additional Information, Containment and Ventilation Branch RAI-5, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company L-2014-259* |
| Response to SCVB Request for Additional Information Enclosure Page 1 of 2 Response to Request for Additional Information (RAI)Containment and Ventilation Branch RAI-5 Turkey Point Units 3 and 4 License Amendment Request No. 231 Application to Revise Ultimate Heat Sink Temperature Limit Enclosure Florida Power & Light Company L-2014-259 Response to SCVB Request for Additional Information Enclosure Page 2 of 2 Background By letter dated July 10, 2014, as supplemented by letters dated July 17, July 22, July 24, July 26, July 28, and July 29, 2014, Florida Power & Light Company (FPL) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point).FPL requested revisions to the Turkey Point Technical Specifications (TS), Sections 3/4.7.4,"Ultimate Heat Sink [UHS]," and 3/4.7.2, "Component Cooling Water System." The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is contained in Reference | | Response to SCVB Request for Additional Information Enclosure Page 1 of 2 Response to Request for Additional Information (RAI)Containment and Ventilation Branch RAI-5 Turkey Point Units 3 and 4 License Amendment Request No. 231 Application to Revise Ultimate Heat Sink Temperature Limit Enclosure Florida Power & Light Company L-2014-259 Response to SCVB Request for Additional Information Enclosure Page 2 of 2 Background By letter dated July 10, 2014, as supplemented by letters dated July 17, July 22, July 24, July 26, July 28, and July 29, 2014, Florida Power & Light Company (FPL) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point).FPL requested revisions to the Turkey Point Technical Specifications (TS), Sections 3/4.7.4,"Ultimate Heat Sink [UHS]," and 3/4.7.2, "Component Cooling Water System." The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is contained in Reference |
| : 1. The FPL response to Containment and Ventilation Branch (SCVB) RAI-5 follows.SCVB RAI-5 In reference to SCVB RAI-3 from the NRC's email dated July 25, 2014 (ADAMS Accession No. ML14208A010), and the licensee's letter dated July 26, 2014 (ADAMS Accession No.ML 14210A374), please provide the value of the maximum increase in containment pressure caused by the calculation errors.FPL Response Based on information provided by Westinghouse regarding a Turkey Point specific sensitivity calculation, the errors reported in NSAL- 14-2 resulted in a maximum increase in containment peak pressure of +0.13 psi.Reference 1. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information | | : 1. The FPL response to Containment and Ventilation Branch (SCVB) RAI-5 follows.SCVB RAI-5 In reference to SCVB RAI-3 from the NRC's email dated July 25, 2014 (ADAMS Accession No. ML14208A010), and the licensee's letter dated July 26, 2014 (ADAMS Accession No.ML 14210A374), please provide the value of the maximum increase in containment pressure caused by the calculation errors.FPL Response Based on information provided by Westinghouse regarding a Turkey Point specific sensitivity calculation, the errors reported in NSAL- 14-2 resulted in a maximum increase in containment peak pressure of +0.13 psi.Reference 1. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information |
| -LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).}} | | -LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).}} |
Letter Sequence Request |
---|
|
|
MONTHYEARL-2014-216, License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit2014-07-10010 July 2014 License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit Project stage: Request L-2014-226, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval2014-07-17017 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval Project stage: Request ML14203A6182014-07-18018 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML15131A5752014-07-18018 July 2014 La - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML14203A6142014-07-18018 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML14203A6202014-07-21021 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-232, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit2014-07-22022 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI L-2014-235, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information2014-07-22022 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information Project stage: Supplement ML14204A8142014-07-22022 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-236, Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Temperature Limit2014-07-24024 July 2014 Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Temperature Limit Project stage: Request ML14208A0102014-07-25025 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14208A0112014-07-26026 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-237, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-07-26026 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI ML14216A0722014-07-28028 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14209A0312014-07-28028 July 2014 Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit Project stage: Other NRC-2014-0181, Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit (TAC Nos. MF4392 and MF4393)2014-07-28028 July 2014 Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit (TAC Nos. MF4392 and MF4393) Project stage: Other ML14217A0042014-08-0303 August 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-259, Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-08-0404 August 2014 Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Request 2014-07-24
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] |
Text
... -10 CFR 50.90 L-2014-259 August 4, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating License Nos. DPR-31 and DPR-41
Subject:
Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit
References:
- 1. Florida Power & Light Company Letter L-2014-216, "License Amendment Request No.231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," July 10, 2014.2. Florida Power & Light Company Letter L-2014-235, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 1, and Response to Request for Additional Information," dated July 22, 2014.3. Florida Power & Light Company Letter L-2014-250, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 2, and Response to Request for Additional Information ( RAI-5 and BOP RAIs 5 and 5.1)," dated July 29, 2014.4. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information
-LAR 231 (TACs MF4392 and MF4393)," dated July 25, 2014 (BOP RAIs 5.1 and 6, SCVB RAI-3).5. Florida Power & Light Company Letter L-2014-237, "Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit," dated July 26, 2014 (BOP RAIs 1, 2, 3, 4, 6 and SCVB RAI-3).6. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information
-LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).In Reference 1, Florida Power & Light Company (FPL) requested an amendment to the Technical Specifications (TS) for the Turkey Point Nuclear Plant (Turkey Point), Units 3 and 4.Florida Power & Light Company 9760 SW 3 4 4 th St., Florida City, FL 33035 Florida Power & Light Company License Amendment Request No. 231 Response to SCVB Request for Additional Information L-2014-259 Page 2 of 2 The proposed amendment would revise the ultimate heat sink (UHS) water temperature limit from 100lF to 104'F.FPL supplemented the July 10, 2014 application via References 2 and 3. The supplement provided in Reference 3 proposed to increase the frequency of Component Cooling Water heat exchanger performance tests from at least once per 31 days to at least once per 14 days.In Reference 4, the NRC Containment and Ventilation Branch (SCVB) staff requested additional information (RAI). FPL provided a response to the RAI in Reference
- 5. In Reference 6, the NRC forwarded SCVB RAI-5, which is a follow-up to the prior RAI. The enclosure to this letter contains the FPL response to SCVB RAI-5.The additional information provided in the enclosure to this letter does not impact the no significant hazards determination and environmental considerations previously provided in References 1 and 3.There are no new commitments made in this submission.
If you have any questions or require additional information, please contact Mr. Robert Tomonto at 305-246-7327.
I declare under penalty of perjury that the foregoing is true and correct.Executed on: August 4, 2014.Very truly yours, Michael Kiley Vice President Turkey Point Nuc:lear Plant
Enclosure:
Response to Request for Additional Information, Containment and Ventilation Branch RAI-5, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company L-2014-259*
Response to SCVB Request for Additional Information Enclosure Page 1 of 2 Response to Request for Additional Information (RAI)Containment and Ventilation Branch RAI-5 Turkey Point Units 3 and 4 License Amendment Request No. 231 Application to Revise Ultimate Heat Sink Temperature Limit Enclosure Florida Power & Light Company L-2014-259 Response to SCVB Request for Additional Information Enclosure Page 2 of 2 Background By letter dated July 10, 2014, as supplemented by letters dated July 17, July 22, July 24, July 26, July 28, and July 29, 2014, Florida Power & Light Company (FPL) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point).FPL requested revisions to the Turkey Point Technical Specifications (TS), Sections 3/4.7.4,"Ultimate Heat Sink [UHS]," and 3/4.7.2, "Component Cooling Water System." The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is contained in Reference
- 1. The FPL response to Containment and Ventilation Branch (SCVB) RAI-5 follows.SCVB RAI-5 In reference to SCVB RAI-3 from the NRC's email dated July 25, 2014 (ADAMS Accession No. ML14208A010), and the licensee's letter dated July 26, 2014 (ADAMS Accession No.ML 14210A374), please provide the value of the maximum increase in containment pressure caused by the calculation errors.FPL Response Based on information provided by Westinghouse regarding a Turkey Point specific sensitivity calculation, the errors reported in NSAL- 14-2 resulted in a maximum increase in containment peak pressure of +0.13 psi.Reference 1. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information
-LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).