L-2014-259, Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 26: Line 26:
: 1. Florida Power & Light Company Letter L-2014-216, "License Amendment Request No.231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," July 10, 2014.2. Florida Power & Light Company Letter L-2014-235, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 1, and Response to Request for Additional Information," dated July 22, 2014.3. Florida Power & Light Company Letter L-2014-250, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 2, and Response to Request for Additional Information ( RAI-5 and BOP RAIs 5 and 5.1)," dated July 29, 2014.4. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information  
: 1. Florida Power & Light Company Letter L-2014-216, "License Amendment Request No.231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," July 10, 2014.2. Florida Power & Light Company Letter L-2014-235, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 1, and Response to Request for Additional Information," dated July 22, 2014.3. Florida Power & Light Company Letter L-2014-250, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 2, and Response to Request for Additional Information ( RAI-5 and BOP RAIs 5 and 5.1)," dated July 29, 2014.4. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information  
-LAR 231 (TACs MF4392 and MF4393)," dated July 25, 2014 (BOP RAIs 5.1 and 6, SCVB RAI-3).5. Florida Power & Light Company Letter L-2014-237, "Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit," dated July 26, 2014 (BOP RAIs 1, 2, 3, 4, 6 and SCVB RAI-3).6. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information  
-LAR 231 (TACs MF4392 and MF4393)," dated July 25, 2014 (BOP RAIs 5.1 and 6, SCVB RAI-3).5. Florida Power & Light Company Letter L-2014-237, "Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit," dated July 26, 2014 (BOP RAIs 1, 2, 3, 4, 6 and SCVB RAI-3).6. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information  
-LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).In Reference 1, Florida Power & Light Company (FPL) requested an amendment to the Technical Specifications (TS) for the Turkey Point Nuclear Plant (Turkey Point), Units 3 and 4.Florida Power & Light Company 9760 SW 3 4 4 th St., Florida City, FL 33035 Florida Power & Light Company License Amendment Request No. 231 Response to SCVB Request for Additional Information L-2014-259 Page 2 of 2 The proposed amendment would revise the ultimate heat sink (UHS) water temperature limit from 100lF to 104'F.FPL supplemented the July 10, 2014 application via References 2 and 3. The supplement provided in Reference 3 proposed to increase the frequency of Component Cooling Water heat exchanger performance tests from at least once per 31 days to at least once per 14 days.In Reference 4, the NRC Containment and Ventilation Branch (SCVB) staff requested additional information (RAI). FPL provided a response to the RAI in Reference  
-LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).In Reference 1, Florida Power & Light Company (FPL) requested an amendment to the Technical Specifications (TS) for the Turkey Point Nuclear Plant (Turkey Point), Units 3 and 4.Florida Power & Light Company 9760 SW 3 4 4 th St., Florida City, FL 33035 Florida Power & Light Company License Amendment Request No. 231 Response to SCVB Request for Additional Information L-2014-259 Page 2 of 2 The proposed amendment would revise the ultimate heat sink (UHS) water temperature limit from 100lF to 104'F.FPL supplemented the July 10, 2014 application via References 2 and 3. The supplement provided in Reference 3 proposed to increase the frequency of Component Cooling Water heat exchanger performance tests from at least once per 31 days to at least once per 14 days.In Reference 4, the NRC Containment and Ventilation Branch (SCVB) staff requested additional information (RAI). FPL provided a response to the RAI in Reference
: 5. In Reference 6, the NRC forwarded SCVB RAI-5, which is a follow-up to the prior RAI. The enclosure to this letter contains the FPL response to SCVB RAI-5.The additional information provided in the enclosure to this letter does not impact the no significant hazards determination and environmental considerations previously provided in References 1 and 3.There are no new commitments made in this submission.
: 5. In Reference 6, the NRC forwarded SCVB RAI-5, which is a follow-up to the prior RAI. The enclosure to this letter contains the FPL response to SCVB RAI-5.The additional information provided in the enclosure to this letter does not impact the no significant hazards determination and environmental considerations previously provided in References 1 and 3.There are no new commitments made in this submission.
If you have any questions or require additional information, please contact Mr. Robert Tomonto at 305-246-7327.
If you have any questions or require additional information, please contact Mr. Robert Tomonto at 305-246-7327.
Line 34: Line 34:


Response to Request for Additional Information, Containment and Ventilation Branch RAI-5, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company L-2014-259*
Response to Request for Additional Information, Containment and Ventilation Branch RAI-5, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company L-2014-259*
Response to SCVB Request for Additional Information Enclosure Page 1 of 2 Response to Request for Additional Information (RAI)Containment and Ventilation Branch RAI-5 Turkey Point Units 3 and 4 License Amendment Request No. 231 Application to Revise Ultimate Heat Sink Temperature Limit Enclosure Florida Power & Light Company L-2014-259 Response to SCVB Request for Additional Information Enclosure Page 2 of 2 Background By letter dated July 10, 2014, as supplemented by letters dated July 17, July 22, July 24, July 26, July 28, and July 29, 2014, Florida Power & Light Company (FPL) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point).FPL requested revisions to the Turkey Point Technical Specifications (TS), Sections 3/4.7.4,"Ultimate Heat Sink [UHS]," and 3/4.7.2, "Component Cooling Water System." The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is contained in Reference  
Response to SCVB Request for Additional Information Enclosure Page 1 of 2 Response to Request for Additional Information (RAI)Containment and Ventilation Branch RAI-5 Turkey Point Units 3 and 4 License Amendment Request No. 231 Application to Revise Ultimate Heat Sink Temperature Limit Enclosure Florida Power & Light Company L-2014-259 Response to SCVB Request for Additional Information Enclosure Page 2 of 2 Background By letter dated July 10, 2014, as supplemented by letters dated July 17, July 22, July 24, July 26, July 28, and July 29, 2014, Florida Power & Light Company (FPL) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point).FPL requested revisions to the Turkey Point Technical Specifications (TS), Sections 3/4.7.4,"Ultimate Heat Sink [UHS]," and 3/4.7.2, "Component Cooling Water System." The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is contained in Reference
: 1. The FPL response to Containment and Ventilation Branch (SCVB) RAI-5 follows.SCVB RAI-5 In reference to SCVB RAI-3 from the NRC's email dated July 25, 2014 (ADAMS Accession No. ML14208A010), and the licensee's letter dated July 26, 2014 (ADAMS Accession No.ML 14210A374), please provide the value of the maximum increase in containment pressure caused by the calculation errors.FPL Response Based on information provided by Westinghouse regarding a Turkey Point specific sensitivity calculation, the errors reported in NSAL- 14-2 resulted in a maximum increase in containment peak pressure of +0.13 psi.Reference 1. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information  
: 1. The FPL response to Containment and Ventilation Branch (SCVB) RAI-5 follows.SCVB RAI-5 In reference to SCVB RAI-3 from the NRC's email dated July 25, 2014 (ADAMS Accession No. ML14208A010), and the licensee's letter dated July 26, 2014 (ADAMS Accession No.ML 14210A374), please provide the value of the maximum increase in containment pressure caused by the calculation errors.FPL Response Based on information provided by Westinghouse regarding a Turkey Point specific sensitivity calculation, the errors reported in NSAL- 14-2 resulted in a maximum increase in containment peak pressure of +0.13 psi.Reference 1. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information  
-LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).}}
-LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).}}

Revision as of 06:33, 28 April 2019

Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit
ML14217A341
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/04/2014
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2014-259, TAC MF4392, TAC MF4393
Download: ML14217A341 (4)


Text

... -10 CFR 50.90 L-2014-259 August 4, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating License Nos. DPR-31 and DPR-41

Subject:

Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit

References:

1. Florida Power & Light Company Letter L-2014-216, "License Amendment Request No.231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," July 10, 2014.2. Florida Power & Light Company Letter L-2014-235, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 1, and Response to Request for Additional Information," dated July 22, 2014.3. Florida Power & Light Company Letter L-2014-250, "License Amendment Request No.231, Application to Revise Ultimate Heat Sink Temperature Limit -Supplement 2, and Response to Request for Additional Information ( RAI-5 and BOP RAIs 5 and 5.1)," dated July 29, 2014.4. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information

-LAR 231 (TACs MF4392 and MF4393)," dated July 25, 2014 (BOP RAIs 5.1 and 6, SCVB RAI-3).5. Florida Power & Light Company Letter L-2014-237, "Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit," dated July 26, 2014 (BOP RAIs 1, 2, 3, 4, 6 and SCVB RAI-3).6. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information

-LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).In Reference 1, Florida Power & Light Company (FPL) requested an amendment to the Technical Specifications (TS) for the Turkey Point Nuclear Plant (Turkey Point), Units 3 and 4.Florida Power & Light Company 9760 SW 3 4 4 th St., Florida City, FL 33035 Florida Power & Light Company License Amendment Request No. 231 Response to SCVB Request for Additional Information L-2014-259 Page 2 of 2 The proposed amendment would revise the ultimate heat sink (UHS) water temperature limit from 100lF to 104'F.FPL supplemented the July 10, 2014 application via References 2 and 3. The supplement provided in Reference 3 proposed to increase the frequency of Component Cooling Water heat exchanger performance tests from at least once per 31 days to at least once per 14 days.In Reference 4, the NRC Containment and Ventilation Branch (SCVB) staff requested additional information (RAI). FPL provided a response to the RAI in Reference

5. In Reference 6, the NRC forwarded SCVB RAI-5, which is a follow-up to the prior RAI. The enclosure to this letter contains the FPL response to SCVB RAI-5.The additional information provided in the enclosure to this letter does not impact the no significant hazards determination and environmental considerations previously provided in References 1 and 3.There are no new commitments made in this submission.

If you have any questions or require additional information, please contact Mr. Robert Tomonto at 305-246-7327.

I declare under penalty of perjury that the foregoing is true and correct.Executed on: August 4, 2014.Very truly yours, Michael Kiley Vice President Turkey Point Nuc:lear Plant

Enclosure:

Response to Request for Additional Information, Containment and Ventilation Branch RAI-5, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company L-2014-259*

Response to SCVB Request for Additional Information Enclosure Page 1 of 2 Response to Request for Additional Information (RAI)Containment and Ventilation Branch RAI-5 Turkey Point Units 3 and 4 License Amendment Request No. 231 Application to Revise Ultimate Heat Sink Temperature Limit Enclosure Florida Power & Light Company L-2014-259 Response to SCVB Request for Additional Information Enclosure Page 2 of 2 Background By letter dated July 10, 2014, as supplemented by letters dated July 17, July 22, July 24, July 26, July 28, and July 29, 2014, Florida Power & Light Company (FPL) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point).FPL requested revisions to the Turkey Point Technical Specifications (TS), Sections 3/4.7.4,"Ultimate Heat Sink [UHS]," and 3/4.7.2, "Component Cooling Water System." The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is contained in Reference

1. The FPL response to Containment and Ventilation Branch (SCVB) RAI-5 follows.SCVB RAI-5 In reference to SCVB RAI-3 from the NRC's email dated July 25, 2014 (ADAMS Accession No. ML14208A010), and the licensee's letter dated July 26, 2014 (ADAMS Accession No.ML 14210A374), please provide the value of the maximum increase in containment pressure caused by the calculation errors.FPL Response Based on information provided by Westinghouse regarding a Turkey Point specific sensitivity calculation, the errors reported in NSAL- 14-2 resulted in a maximum increase in containment peak pressure of +0.13 psi.Reference 1. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information

-LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).