Letter Sequence Request |
|---|
|
|
MONTHYEARML14314A8722014-07-0101 July 2014 Attachment B: FPL Turkey Point Power Plant Additional Temporary Use of Water Conditions of Certification (PA 03-45D), Sfwmd File 720202-1 Project stage: Request L-2014-216, License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit2014-07-10010 July 2014 License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit Project stage: Request L-2014-226, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval2014-07-17017 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval Project stage: Request ML14203A6182014-07-18018 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML14203A6142014-07-18018 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML15131A5752014-07-18018 July 2014 La - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI L-2014-221, Comment (9) of James M. Petro on Behalf of FPL on Draft Branch Technical Position 8-9, Open Phase Conditions in Electric Power System (Docket Id: NRC-2014-0131)2014-07-21021 July 2014 Comment (9) of James M. Petro on Behalf of FPL on Draft Branch Technical Position 8-9, Open Phase Conditions in Electric Power System (Docket Id: NRC-2014-0131) Project stage: Request ML14203A6202014-07-21021 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14204A8142014-07-22022 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-232, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit2014-07-22022 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI L-2014-235, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information2014-07-22022 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information Project stage: Supplement ML14204A1292014-07-24024 July 2014 LTR - Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Sign. Hazards and Opportunity for Hearing (Exigent Circumstances) (TAC No. MF4392-4293) Project stage: Other L-2014-236, Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Temperature Limit2014-07-24024 July 2014 Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Temperature Limit Project stage: Request ML14199A1112014-07-24024 July 2014 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Sign. Hazards and Opportunity for Hearing (Exigent Circumstances) (TAC No. MF4392-4293) Project stage: Other ML14208A0102014-07-25025 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14206A8062014-07-25025 July 2014 Biological Assessment on the American Crocodile for Proposed License Amendment to Increase the Turkey Point Ultimate Heat Sink Temperature Limit Project stage: Other L-2014-249, Request for Revision of Enforcement Discretion Regarding Technical Specification 3/4.7.4, Ultimate Heat Sink2014-07-25025 July 2014 Request for Revision of Enforcement Discretion Regarding Technical Specification 3/4.7.4, Ultimate Heat Sink Project stage: Request L-2014-237, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-07-26026 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI ML14208A0112014-07-26026 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI NRC-2014-0181, Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit (TAC Nos. MF4392 and MF4393)2014-07-28028 July 2014 Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit (TAC Nos. MF4392 and MF4393) Project stage: Other L-2014-253, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-07-28028 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI ML14216A0722014-07-28028 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14209A0312014-07-28028 July 2014 Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit Project stage: Other L-2014-250, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1)2014-07-29029 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1) Project stage: Supplement ML14210A1702014-07-29029 July 2014 Letter from C. Aubrey, Fws, to D. Wrona, NRC, Concurrence with NRCs Biological Assessment Determination and Conclusion of ESA Section 7 Consultation Project stage: Request ML14217A0042014-08-0303 August 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-259, Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-08-0404 August 2014 Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Request ML14199A1072014-08-0808 August 2014 Issuance of Amendments Under Exigent Circumstances Regarding Ultimate Heat Sink and Component Cooling Water Technical Specifications (Tacs MF4392 and MF4393) Project stage: Approval 2014-07-24
[Table View] |
Text
... -10 CFR 50.90 L-2014-259 August 4, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating License Nos. DPR-31 and DPR-41
Subject:
Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit
References:
- 1. Florida Power & Light Company Letter L-2014-216, "License Amendment Request No.
231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," July 10, 2014.
- 2. Florida Power & Light Company Letter L-2014-235, "License Amendment Request No.
231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information," dated July 22, 2014.
- 3. Florida Power & Light Company Letter L-2014-250, "License Amendment Request No.
231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information ( RAI-5 and BOP RAIs 5 and 5.1),"
dated July 29, 2014.
- 4. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393)," dated July 25, 2014 (BOP RAIs 5.1 and 6, SCVB RAI-3).
- 5. Florida Power & Light Company Letter L-2014-237, "Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit," dated July 26, 2014 (BOP RAIs 1, 2, 3, 4, 6 and SCVB RAI-3).
- 6. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).
In Reference 1, Florida Power & Light Company (FPL) requested an amendment to the Technical Specifications (TS) for the Turkey Point Nuclear Plant (Turkey Point), Units 3 and 4.
Florida Power & Light Company 9760 SW 3 4 4th St., Florida City, FL 33035
Florida Power & Light Company L-2014-259 License Amendment Request No. 231 Response to SCVB Request for Additional Information Page 2 of 2 The proposed amendment would revise the ultimate heat sink (UHS) water temperature limit from 100lF to 104'F.
FPL supplemented the July 10, 2014 application via References 2 and 3. The supplement provided in Reference 3 proposed to increase the frequency of Component Cooling Water heat exchanger performance tests from at least once per 31 days to at least once per 14 days.
In Reference 4, the NRC Containment and Ventilation Branch (SCVB) staff requested additional information (RAI). FPL provided a response to the RAI in Reference 5. In Reference 6, the NRC forwarded SCVB RAI-5, which is a follow-up to the prior RAI. The enclosure to this letter contains the FPL response to SCVB RAI-5.
The additional information provided in the enclosure to this letter does not impact the no significant hazards determination and environmental considerations previously provided in References 1 and 3.
There are no new commitments made in this submission.
If you have any questions or require additional information, please contact Mr. Robert Tomonto at 305-246-7327.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: August 4, 2014.
Very truly yours, Michael Kiley Vice President Turkey Point Nuc:lear Plant
Enclosure:
Response to Request for Additional Information, Containment and Ventilation Branch RAI-5, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health
Florida Power & Light Company L-2014-259*
Response to SCVB Request for Additional Information Enclosure Page 1 of 2 Response to Request for Additional Information (RAI)
Containment and Ventilation Branch RAI-5 Turkey Point Units 3 and 4 License Amendment Request No. 231 Application to Revise Ultimate Heat Sink Temperature Limit Enclosure
Florida Power & Light Company L-2014-259 Response to SCVB Request for Additional Information Enclosure Page 2 of 2
Background
By letter dated July 10, 2014, as supplemented by letters dated July 17, July 22, July 24, July 26, July 28, and July 29, 2014, Florida Power & Light Company (FPL) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point).
FPL requested revisions to the Turkey Point Technical Specifications (TS), Sections 3/4.7.4, "Ultimate Heat Sink [UHS]," and 3/4.7.2, "Component Cooling Water System."
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is contained in Reference 1. The FPL response to Containment and Ventilation Branch (SCVB) RAI-5 follows.
SCVB RAI-5 In reference to SCVB RAI-3 from the NRC's email dated July 25, 2014 (ADAMS Accession No. ML14208A010), and the licensee's letter dated July 26, 2014 (ADAMS Accession No. ML14210A374), please provide the value of the maximum increase in containment pressure caused by the calculation errors.
FPL Response Based on information provided by Westinghouse regarding a Turkey Point specific sensitivity calculation, the errors reported in NSAL- 14-2 resulted in a maximum increase in containment peak pressure of +0.13 psi.
Reference
- 1. Email from A. Klett (NRC) to R. Tomonto, et al. (FPL), "Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393)," dated August 3, 2014 (SCVB RAI-5).