SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT 94-010-00 October 12, 1994 This Licensee Event Report is being submitted pursuant to the requirements of Code of Federal Regulation 10CFR50.73(a)  
SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT 94-010-00 October 12, 1994 This Licensee Event Report is being submitted pursuant to the requirements of Code of Federal Regulation 10CFR50.73(a)
(2) (i) (A). Issuance of this report is required within thirty (30} days of event discovery.
(2) (i) (A). Issuance of this report is required within thirty (30} days of event discovery.
MJPJ:pc Distribution  
MJPJ:pc Distribution  
':: ;_'-J ['" ,,... :... :1:1_; "* '-' 9410250120 941012 PDR ADOCK 05000311 S PDR The power is in your hanis. Sincerely yours, -1£11';, y 95-2189 REV I I NRC FORM 366 .:::.. NUCLEAR REGULATORY COMMISSION  
':: ;_'-J ['" ,,... :... :1:1_; "* '-' 9410250120 941012 PDR ADOCK 05000311 S PDR The power is in your hanis. Sincerely yours, -1£11';, y 95-2189 REV I I NRC FORM 366 .:::.. NUCLEAR REGULATORY COMMISSION  
*' APPROVED BY OMB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS LICENSEE EVENT REPORT {LER) INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150-0104), OFFICE OF (See reverse for required number of digits/characters for each block) MANAGEMENT AND BUDGET, WASHINGTON, DC 20503. FACILITY NAME (1) DOCKET NUMBER (2) II PAGE (3) Salem Generating Station Unit 2 05000311 1 Of()4 TITLE (4) Controlled Reactor Shutdown uue To :n Centri:tugal Charging Pump Inoperable Greater Than 72 Hours EVENT DATE (5) LER NUMBER (6 REPORT NUMBER (7) OTHER FACILITIES INVOLVED 18\ REVISION FACILITY NAME DOCKET NUMBER SEQUENTIAL MONTH DAY YEAR MONTH DAY YEAR YEAR NUMBER NUMBER 05000 FACILITY NAME DOCKET NUMBER 09 22 94 94 --010 --00 10 12 94 05000 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check one or more (11\ MODE (9) 1 20.402(b) 20.405(c) 50.73(a)(2)(iv) 73.71(b) POWER 20.405(a)(1  
*' APPROVED BY OMB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS LICENSEE EVENT REPORT {LER) INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150-0104), OFFICE OF (See reverse for required number of digits/characters for each block) MANAGEMENT AND BUDGET, WASHINGTON, DC 20503. FACILITY NAME (1) DOCKET NUMBER (2) II PAGE (3) Salem Generating Station Unit 2 05000311 1 Of()4 TITLE (4) Controlled Reactor Shutdown uue To :n Centri:tugal Charging Pump Inoperable Greater Than 72 Hours EVENT DATE (5) LER NUMBER (6 REPORT NUMBER (7) OTHER FACILITIES INVOLVED 18\ REVISION FACILITY NAME DOCKET NUMBER SEQUENTIAL MONTH DAY YEAR MONTH DAY YEAR YEAR NUMBER NUMBER 05000 FACILITY NAME DOCKET NUMBER 09 22 94 94 --010 --00 10 12 94 05000 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check one or more (11\ MODE (9) 1 20.402(b) 20.405(c) 50.73(a)(2)(iv) 73.71(b) POWER 20.405(a)(1  
)(i) 50.36(c)(1) 50.73(a)(2)(v) 73.71 (c) LEVEL (10) 100% 20.405(a)  
)(i) 50.36(c)(1) 50.73(a)(2)(v) 73.71 (c) LEVEL (10) 100% 20.405(a)
(1) (ii) 50.36(c)(2) 50.73(a) (2) (vii) OTHER -20.405(a)  
(1) (ii) 50.36(c)(2) 50.73(a) (2) (vii) OTHER -20.405(a)
(1) (iii) x 50. 73 (a)(2)(i)
(1) (iii) x 50. 73 (a)(2)(i)
* 50.73(a) (2) (viii) (A) (Specify in Abstract below and in Text, NRC 20.405(a)  
* 50.73(a) (2) (viii) (A) (Specify in Abstract below and in Text, NRC 20.405(a)
(1) (iv) 50.73(a)(2)(ii) 50.73(a) (2) (viii) (B) Form 366A) 20.405(a)(1  
(1) (iv) 50.73(a)(2)(ii) 50.73(a) (2) (viii) (B) Form 366A) 20.405(a)(1  
)(v) 50.73(a)(2)(iii) 50.73(a)(2)(x)
)(v) 50.73(a)(2)(iii) 50.73(a)(2)(x)
Line 49: Line 49:
-Pressurized Water Reactor LER NUMBER 94-010-00 PAGE 2 of 4 Energy Industry Identification System (EIIS) and Institute of Electrical and Electronics Engineers (IEEE) Component Function Identifiers codes are identified in the text as {xx/xx} IDENTIFICATION OF OCCURRENCE:
-Pressurized Water Reactor LER NUMBER 94-010-00 PAGE 2 of 4 Energy Industry Identification System (EIIS) and Institute of Electrical and Electronics Engineers (IEEE) Component Function Identifiers codes are identified in the text as {xx/xx} IDENTIFICATION OF OCCURRENCE:
Controlled Reactor Shutdown Due To 21 Centrifugal Charging Pump Inoperable Greater Than 72 Hours Event Date: 9/22/94 Report Date: 10/12/94 This report was initiated by Incident Report No. 94-271. CONDITIONS PRIOR TO OCCURRENCE:
Controlled Reactor Shutdown Due To 21 Centrifugal Charging Pump Inoperable Greater Than 72 Hours Event Date: 9/22/94 Report Date: 10/12/94 This report was initiated by Incident Report No. 94-271. CONDITIONS PRIOR TO OCCURRENCE:
Mode 1 Reactor Power 100% Unit Load 1080 MWe At 0108 hours on September 19, 1994, 21 Centrifugal Charging Pump (CCP) {BQ/P} was removed from service for scheduled preventive maintenance (PM). One of the activities was to investigate unusual noise from the speed increaser  
Mode 1 Reactor Power 100% Unit Load 1080 MWe At 0108 hours on September 19, 1994, 21 Centrifugal Charging Pump (CCP) {BQ/P} was removed from service for scheduled preventive maintenance (PM). One of the activities was to investigate unusual noise from the speed increaser
{BQ/P/SC}
{BQ/P/SC}
during pump operation.
during pump operation.
Line 65: Line 65:
Whenever a single CCP is unavailable, the redundant CCP will provide high head injection flow for the mitigation of any design base accident.
Whenever a single CCP is unavailable, the redundant CCP will provide high head injection flow for the mitigation of any design base accident.
APPARENT CAUSE OF OCCURRENCE:
APPARENT CAUSE OF OCCURRENCE:
Upon measuring high vibration in the 21CCP speed increaser it was conservatively determined that the pump was inoperable from when it was previously removed from service on September  
Upon measuring high vibration in the 21CCP speed increaser it was conservatively determined that the pump was inoperable from when it was previously removed from service on September
: 19. As such, there was insufficient time to restore the pump to Operable status prior to expiration of the action time constraints of TS 3.5.2.a. Identification of the cause of the high vibration in the 21CCP speed increaser, Nuttal Gear Corp., Model No. SU-1023-8X, is pending results of root cause analysis by the vendor, with assistance from PSE&G. No problems were identified as contributory to this occurrence.
: 19. As such, there was insufficient time to restore the pump to Operable status prior to expiration of the action time constraints of TS 3.5.2.a. Identification of the cause of the high vibration in the 21CCP speed increaser, Nuttal Gear Corp., Model No. SU-1023-8X, is pending results of root cause analysis by the vendor, with assistance from PSE&G. No problems were identified as contributory to this occurrence.
PREVIOUS OCCURRENCES:
PREVIOUS OCCURRENCES:
Line 73: Line 73:
This occurrence is reportable pursuant to the requirements of
This occurrence is reportable pursuant to the requirements of
* r
* r
* LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station Unit 2 SAFETY SIGNIFICANCE: (cont'd) DOCKET NUMBER 5000311 LER NUMBER 94-010-00 PAGE 4 of 4 10CFR50.73(a)  
* LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station Unit 2 SAFETY SIGNIFICANCE: (cont'd) DOCKET NUMBER 5000311 LER NUMBER 94-010-00 PAGE 4 of 4 10CFR50.73(a)
(2) (i) (A), due to completion of a TS-required shutdown.
(2) (i) (A), due to completion of a TS-required shutdown.
During this occurrence 22CCP was available, if required, to provide high head injection flow for the mitigation of any design base accident.
During this occurrence 22CCP was available, if required, to provide high head injection flow for the mitigation of any design base accident.
CORRECTIVE ACTION: The 21CCP speed increaser was replaced, the pump was satisfactorily tested; and, at 2241 hours on September 25, 1994, the Action of TS 3.5.2.a was exited. It is anticipated that by January 31, 1995 a supplement to this report will be submitted detailing the results of the root cause analysis of the 21CCP speed increaser high vibration.
CORRECTIVE ACTION: The 21CCP speed increaser was replaced, the pump was satisfactorily tested; and, at 2241 hours on September 25, 1994, the Action of TS 3.5.2.a was exited. It is anticipated that by January 31, 1995 a supplement to this report will be submitted detailing the results of the root cause analysis of the 21CCP speed increaser high vibration.
MJPJ:pc SORC Mtg. 94-078}}
MJPJ:pc SORC Mtg. 94-078}}

Revision as of 15:25, 25 April 2019

LER 94-010-00:on 940922,controlled Reactor Shutdown Occurred.Caused by Centrifugal Charging Pump 21 Being Inoperable for Greater than 72 H.Speed Increaser Replaced & Pump Satisfactorily tested.W/941012 Ltr
ML18101A293
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/12/1994
From: HAGAN J J, PASTVA M J
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-94-010-00, LER-94-10, NUDOCS 9410250120
Download: ML18101A293 (6)


Text

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT 94-010-00 October 12, 1994 This Licensee Event Report is being submitted pursuant to the requirements of Code of Federal Regulation 10CFR50.73(a)

(2) (i) (A). Issuance of this report is required within thirty (30} days of event discovery.

MJPJ:pc Distribution

':: ;_'-J ['" ,,... :... :1:1_; "* '-' 9410250120 941012 PDR ADOCK 05000311 S PDR The power is in your hanis. Sincerely yours, -1£11';, y 95-2189 REV I I NRC FORM 366 .:::.. NUCLEAR REGULATORY COMMISSION

  • ' APPROVED BY OMB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS LICENSEE EVENT REPORT {LER) INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150-0104), OFFICE OF (See reverse for required number of digits/characters for each block) MANAGEMENT AND BUDGET, WASHINGTON, DC 20503. FACILITY NAME (1) DOCKET NUMBER (2) II PAGE (3) Salem Generating Station Unit 2 05000311 1 Of()4 TITLE (4) Controlled Reactor Shutdown uue To :n Centri:tugal Charging Pump Inoperable Greater Than 72 Hours EVENT DATE (5) LER NUMBER (6 REPORT NUMBER (7) OTHER FACILITIES INVOLVED 18\ REVISION FACILITY NAME DOCKET NUMBER SEQUENTIAL MONTH DAY YEAR MONTH DAY YEAR YEAR NUMBER NUMBER 05000 FACILITY NAME DOCKET NUMBER 09 22 94 94 --010 --00 10 12 94 05000 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check one or more (11\ MODE (9) 1 20.402(b) 20.405(c) 50.73(a)(2)(iv) 73.71(b) POWER 20.405(a)(1

)(i) 50.36(c)(1) 50.73(a)(2)(v) 73.71 (c) LEVEL (10) 100% 20.405(a)

(1) (ii) 50.36(c)(2) 50.73(a) (2) (vii) OTHER -20.405(a)

(1) (iii) x 50. 73 (a)(2)(i)

  • 50.73(a) (2) (viii) (A) (Specify in Abstract below and in Text, NRC 20.405(a)

(1) (iv) 50.73(a)(2)(ii) 50.73(a) (2) (viii) (B) Form 366A) 20.405(a)(1

)(v) 50.73(a)(2)(iii) 50.73(a)(2)(x)

LICENSEE CONTACT FOR THIS LEA {12) NAME TELEPHONE NUMBER (Include Area Code) M. J. Pastva, Jr*' Licensee Event Reuort Coordinator 609-339-5165 CAUSE SYSTEM COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

"""'"°'""'

';;;",';':,"°

"'"""

REPORTABLE TO NPRDS x BO SC N402 N llJliilll SUPPLEMENTAL REPORT EXPECTED 114) EXPECTED MONTH DAY YEAR I YES SUBMISSION X (If yes, complete EXPECTED SUBMISSION DATE) NO DATE (15) 01 31 95 ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced tfPewritten lines) (16) At 0108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br />, on 9/19/94, 21 Cen rifugal Charging Pump (CCP} was removed from service for scheduled preventive maintenance.

Post-maintenance testing results satisfied ASME operability criteria.

Increased axial vibration readings in 21CCP speed increaser were measured however, the vibration was not felt to impact pump operability and it was returned to service, at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on 9/21/94. Additional vibration readings showed unstable and increasing speed increaser vibration and at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, on 9/22/94, 21CCP was declared inoperable (effective from prior removal from service on 9/19/94).

At 0108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br /> (same day) the Technical Specification (TS) action time expired and at 1222 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.64971e-4 months <br /> (same day) the Unit was placed in MODE 4 (HOT SHUTDOWN).

Identification of the cause of the high vibration in the 21CCP speed increaser, Nuttal Gear Corp., Model No. SU-1023-SX, is pending results of root cause analysis by the vendor, with assistance from PSE&G. No problems were identified as contributory to this occurrence.

The 21CCP speed increaser was replaced, the pump was satisfactorily tested; and, at 2241 hours0.0259 days <br />0.623 hours <br />0.00371 weeks <br />8.527005e-4 months <br /> on 9/25/94, the TS action was exited. It is anticipated that by 1/31/95 a supplement to this report will be submitted detailing the results of the root cause analysis of the 21CCP speed increaser high vibration.

NRC FORM 366 (5-92)

BLOCK NUMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

  • REQUIRED NUMBER OF DIGITS/CHARACTERS FOR EACH BLOCK NUMBER OF DIGITS/CHARACTERS TITLE UP TO 46 FACILITY NAME 8 TOTAL 3 IN ADDITION TO 05000 DOCKET NUMBER VARIES PAGE NUMBER UP TO 76 TITLE 6 TOTAL 2 PER BLOCK EVENT DATE 7 TOTAL 2 FOR YEAR 3 FOR SEQUENTIAL NUMBER LER NUMBER 2 FOR REVISION NUMBER 6 TOTAL 2 PER BLOCK REPORT DATE UP TO 18 FACILITY NAME 8 TOTAL--DOCKET NUMBER OTHER FACILITIES INVOLVED 3 IN ADDITION TO 05000 1 OPERATING MODE 3 POWER LEVEL 1 CHECK BOX THAT APPLIES REQUIREMENTS OF 10 CFR UP TO 50 FOR NAME 14 FOR TELEPHONE LICENSEE CONTACT CAUSE VARIES 2 FOR SYSTEM 4 FOR COMPONENT EACH COMPONENT FAILURE 4 FOR MANUFACTURER NPRDS VARIES 1 CHECK BOX THAT APPLIES SUPPLEMENTAL REPORT EXPECTED 6 TOTAL 2 PER BLOCK EXPECTED SUBMISSION DATE *l
  • LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station Unit 2 DOCKET NUMBER 5000311 PLANT AND SYSTEM IDENTIFICATION:

Westinghouse

-Pressurized Water Reactor LER NUMBER 94-010-00 PAGE 2 of 4 Energy Industry Identification System (EIIS) and Institute of Electrical and Electronics Engineers (IEEE) Component Function Identifiers codes are identified in the text as {xx/xx} IDENTIFICATION OF OCCURRENCE:

Controlled Reactor Shutdown Due To 21 Centrifugal Charging Pump Inoperable Greater Than 72 Hours Event Date: 9/22/94 Report Date: 10/12/94 This report was initiated by Incident Report No.94-271. CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 Reactor Power 100% Unit Load 1080 MWe At 0108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br /> on September 19, 1994, 21 Centrifugal Charging Pump (CCP) {BQ/P} was removed from service for scheduled preventive maintenance (PM). One of the activities was to investigate unusual noise from the speed increaser

{BQ/P/SC}

during pump operation.

An adjustment was made to the motor shaft to speed increaser coupling.

Following post-maintenance testing, the pump, motor, and speed increaser vibrations were satisfactory and testing results satisfied ASME criteria for pump operability.

Increased axial vibration readings were measured in the speed increaser.

After Engineering review and consultation with the vendor, it was determined that the increased axial vibration did not impact pump operability.

The pump was determined to be operable and returned to service, at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on September 21, 1994. Additional vibration readings were recommended to verify that the axial vibration remained stable and that the consequences of the coupling adjustment were negligible.

DESCRIPTION OF OCCURRENCE:

At 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> (same day), additional vibration readings indicated unstable and increasing axial vibration in the 21CCP speed increaser.

This condition challenged pump operability and at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, on September 22,1994, it was declared inoperable (effective from prior removal from service on September 19th) . Insufficient time remained to restore the pump to Operable status

  • LICENSEE EVENT REPORT (LER} TEXT CONTINUATION Salem Generating Station Unit 2 DOCKET NUMBER 5000311 DESCRIPTION OF OCCURRENCE: (cont'd) LER NUMBER 94-010-00 PAGE 3 of 4 prior to expiration of the 72-hour action time of Technical Specification (TS} 3.5.2.a, which occurred at 0108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br /> (same day}. At 0230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> (same day} a controlled shutdown was initiated.

At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> (same day}, the NRC was notified of the initiation of the controlled shutdown, in accordance with lOCFR50.72(b} (i} (A}. At 0509 hours0.00589 days <br />0.141 hours <br />8.416005e-4 weeks <br />1.936745e-4 months <br /> (same day} the Unit was placed in MODE 3 (HOT STANDBY} and, at 1222 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.64971e-4 months <br /> (same day} was placed in MODE 4 (HOT SHUTDOWN}, as required by TS 3.5.2.a. ANALYSIS OF OCCURRENCE:

In MODES 1 through 3, operability of two (2) independent Emergency Core Cooling Systems subsystems ensures sufficient emergency core cooling capability in the event of a Loss-Of-Coolant Accident assuming the loss of one subsystem through any active single failure consideration.

Whenever a single CCP is unavailable, the redundant CCP will provide high head injection flow for the mitigation of any design base accident.

APPARENT CAUSE OF OCCURRENCE:

Upon measuring high vibration in the 21CCP speed increaser it was conservatively determined that the pump was inoperable from when it was previously removed from service on September

19. As such, there was insufficient time to restore the pump to Operable status prior to expiration of the action time constraints of TS 3.5.2.a. Identification of the cause of the high vibration in the 21CCP speed increaser, Nuttal Gear Corp., Model No. SU-1023-8X, is pending results of root cause analysis by the vendor, with assistance from PSE&G. No problems were identified as contributory to this occurrence.

PREVIOUS OCCURRENCES:

Based upon review of documentation, the high vibration of 21CCP pump speed increaser, as presently understood, is an isolated occurrence.

LER 272/89-033-00, reported the inoperability 12CCP due to equipment failure of the pump speed increaser, attributed to inadequate Service Water System cooling flow through the speed increaser lube oil cooler. However, the cause of the inadequate flow could not be determined.

SAFETY SIGNIFICANCE:

This occurrence is reportable pursuant to the requirements of

  • r
  • LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station Unit 2 SAFETY SIGNIFICANCE: (cont'd) DOCKET NUMBER 5000311 LER NUMBER 94-010-00 PAGE 4 of 4 10CFR50.73(a)

(2) (i) (A), due to completion of a TS-required shutdown.

During this occurrence 22CCP was available, if required, to provide high head injection flow for the mitigation of any design base accident.

CORRECTIVE ACTION: The 21CCP speed increaser was replaced, the pump was satisfactorily tested; and, at 2241 hours0.0259 days <br />0.623 hours <br />0.00371 weeks <br />8.527005e-4 months <br /> on September 25, 1994, the Action of TS 3.5.2.a was exited. It is anticipated that by January 31, 1995 a supplement to this report will be submitted detailing the results of the root cause analysis of the 21CCP speed increaser high vibration.

MJPJ:pc SORC Mtg.94-078