ML072950298: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML072950298
| number = ML072950298
| issue date = 05/09/2007
| issue date = 05/09/2007
| title = Sequoyah April/May 2007 Exam Nos. 05000327-07-301, 05000328-07-301, - Draft JPMs and Outlines (Part 3 of 3) Section 2 of 2
| title = April/May 2007 Exam Nos. 05000327-07-301, 05000328-07-301, - Draft JPMs and Outlines (Part 3 of 3) Section 2 of 2
| author name =  
| author name =  
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority

Revision as of 17:58, 17 April 2019

April/May 2007 Exam Nos. 05000327-07-301, 05000328-07-301, - Draft JPMs and Outlines (Part 3 of 3) Section 2 of 2
ML072950298
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/09/2007
From:
Tennessee Valley Authority
To:
NRC/RGN-II
References
50-327/07-301, 50-328/07-301
Download: ML072950298 (129)


See also: IR 05000327/2007301

Text

ES-1.4Rev.5 TRANSFERTOHOTLEG RECIRCULATION

r---]I SQN I L-I..-.----L.----J (\.I[ACTION/EXPECTED

RESPONSE I I RESPONSE NOT OBTAINED 17.ISOLATE SI pumpflowtocoldlegs

a.CHECK BOTH 81 pumps ALIGNED forhotleg recirculation.

a.PERFORM the following:

1)IF one 81 pump is alignedforhotleg recirculation, THEN ENSURE 81 pump aligned to cold legs STOPPED.2)GOTO Step 18.(b.CHECK power.AVAILABLEtoSI pumpcoldleg inject ion valve FCV-63-22.b.DISPATCH personnel to restore powerto81pumpcoldleg

injection valve FCV-63-22, USING EA-201-1 , 480 VBoardRoom Breaker Alignments.

WHEN power available to FCV-63-22 , THEN CLOSE 81pumpcoldleg

injection valve FCV-63-22.RETURNTO procedure and step in effect.--..---c.CLOSE SI pumpcoldleg injection valve FCV-63-22.


Page15of16

Rev.5---TRANSFERTOHOTLEG RECIRCULATION

b_[ACTION/EXPECTED

RESPONSE][RESPONSE NOT OBTAINED_18.RETURN TO procedureandstep in effect.---..END (L._Page16of16

JPM B.1.e Page 1of13Rev.7 SEQUOVAH NUCLEAR PLANT JOB PERFORMANCE

MEASURE B.1.eJPM36 RETURN PRESSURIZER

RELIEF TANK TO NORMALOriginalSignaturesonFile

PREPAREDIREVISEDBY:

Date!VALIDATEDBY:

Date!APPROVEDBY:

Date!(Operations

Training Manager)CONCURRED:

"*Datel (Operations

Representative)*Validationnotrequiredfor

minorenhancements,procedureRev

changesthatdonot affecttheJPM,orindividualstepchangesthatdonot

affecttheflowoftheJPM.

  • " Operations

ConcurrencerequiredfornewJPMsandchanges

that affecttheflowoftheJPM(ifnotdriven

by a procedure revision).

((JPM B.1.e Page2of13Rev.7NUCLEARTRAININGREVISIONIUSAGELOG

REVISION DESCRIPTION

OF VDATEPAGES PREPAREDI NUMBER REVISION AFFECTED REVISED BY: 4 TransferfromWP.Procedure change to N 8/17/94 AllHJBirchRev.4.Made a perform JPM,nota simulate JPM.pen/ink Added dates to cover sheep.N 10/26/95 1HJBirch penlinkRevchg.Minor rewording of N 9/25/96 4,8HJBirch step13.Addstepto

monitorRCDTlevel.

penlinkChgdinit iatingcuestodirectprtdrainfirst.N1/9/97 4HJBirchTohelpflowthru

procedures

.Deleted step to reset Pri Wtr alarm.Itno longer comes in.SO-68-5RevchgN11/17/97 4 HJ.B irch pen/ink SO-68-5Revchg.Added transition

s tep N 5/12/98 4-9HJB irch to sect 8.2.Several step enhancements

.5 Rev ised steps,7and18, addedstep19N9/18/98 All JP Kearneyasaresultof

revisions to SO-68-5.Changes d id not affecttheflowofthe

JPM.Rev ised JAITAtask numbers.RevisedKIAratings.

Reformatted

crit ical steps.pen/ink SO-68-5Revchg.Correcttypoin N 8/21/00 4 SR Taylor Direction to trainee penlink SO-68-5Revchgonlyno

effect N 12/13/00 4 W.R.Ramsey 6 Incorporated

pen/ink changes N 8/22/02 4JP Kearney , Pen/ink Updated references&IC#N 11/17/03 2,4 T.E.Pitchford 7 Updated references.

M inor format N 2/09/07 2,4 R.H.Evans changes.v-Specifyifthe JPM changewillrequire

another Validation

(YorN).See cover sheet for criter ia.

r\JPM 8.1.e Page3of13Rev.7SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE

MEASURE Task: Pzr Vapor Space Accident(ReturnPRT

to Normal)JAITA task#:007004010100700501010680990101

(RO)0070010102 (SRO)KIA Ratings: 008AA 1.08 (3.8/3.8)007 A2.01 (3.9/4.2)007K4.01 (2.6/2.9)007A2.02 (2.6/3.2)Task Standard: Pressurizer

Relief Tank (PRT)paramete rshavebeenreturnedtowithin

normal ranges;temperature

G:.1550F}, pressure (1.5-6.5psi),andlevel

(-70%).Evaluation

Method: Simulator XIn-Plant_Performer:

(NAME Performance

Rating: SAT__UNSAT__Perlormance

T ime__Evaluator:

Start Time_Finish Time_i l v SIGNATURE DATE COMMENTS

(JPMB.1.ePage4of13Rev.7 SPECIAL INSTRUCTIONS

TO EVALUATOR:

1.Sequencedstepsidentifiedbyan

"s"2.AnyUNSATrequ

ires comments 3.Acknowledgeanyassociatedalarms.4.Init ializethesimu latorinIC-96.5.NOTE:ThisJPMhasbeenpre-shotinIC

  1. 96.ShouldIC
  1. 96beerasedorfailtoperformas

expected then usethefollowingset-upinstructions:*Initialize

SimulatorinIC:#16.ACTIVATEMFRC05at5%tocausePCV-68-334to

leak through.*AllowPORVTailpipe

temperaturetoincreaseandbringinthealarm

,thenclose FCV-68-333

.ACTIVATERFRCR04toremovepowerfromvalve.*ActivatethefollowingOVERRIDES:ZAOPI6830110[PRTpressureat10psi], ZAOTI68309130[PRT temperature

at-180 0F],andlOR AN:OVRD[357]

ON&AN:OVRD[21

09]ON*(These will be deleted during the performance)*Ensure FCV-81-12isopen..6.DuetotimerestraintsCUEsforPRTleveland

temperaturewillbegivenatappropriatetimes.

Validation

Time:CR.17mins Local_Tools/Equipment/Procedures

Needed:.1-80-68-5 8ection8.2&8.4.Reference 1-80-68-5 T itleReactorCoolantSystemRevNo.17==========================

===================================================READTO OPERATOR Directions

to Trainee:Iwillexplaintheinitialcond

itions,andstatethetasktobeperformed.AllcontrolroomstepsshallbeperformedforthisJPM.Iwillprovideinitiatingcuesandreportsonotheractionswhen

directedbyyou.Whenyoucompletethetasksuccessfully,theobjectiveforthisjob

performance

measurewillbesatisfied.Ensureyouindicatetomewhenyouunderstandyourassignedtask.To

indicatethatyouhave

completedyourassignedtaskreturnthehandoutsheetIprovidedyou.

INITIAL CONDITIONS:Unit1isat100%power,steadystate.Pressurizerpressurecontrolsin

automatic.Pressurizerspraysinautomatic.

PORV PCV-68-334ispart iallyopenedbuttheblockvalvehasbeenclosedand

de-energized.Thevalveisnolonge

r leak ing through.1ARxCoolantDrainTankpump

isinoperable.

INITIATING

CUES:YouaretheUnit1CROandaretocoolthePRTandthen

, if necessary ,drainthePRTtowithin

normal parameters.NotifytheUSwhenthePRT

parametershavebeenreturnedtothenormalconditions.

(JobPerformanceChecklist: STEP/STANDARDJPM8.1.ePage5 of13Rev.7 SAT/UNSAT cSTEP1.:Obtaincorrect proceduretor eturnPRTparameter(s)tonormal.-S AT-UNSAT STANDARD: Operato robtainsacop

yof1*S0*68*5 Sections 8.2&8.4._StartTime--COMMENTS: NOTE: The operator may choose to pumpthePRT level down first, start at step5oftheJPMin

that case.NOTE: This portion is performed using Section 8.4oftheSO.-S ATSTEP2.:[1]ENSURE[FCV-81-12]OPEN

.-UNSAT STANDARD: Operatorverifiesthat

FCV*81-12isopenb yredlighton.

COMMENTS: STEP 3.:[2]OPEN[1-FCV-68-303]b

yplacing[1-HS-68-303A]toOPEN

-SAT position.-UNSATNOTE:WhenFCV

-68-303 is opened, THEN delete ZAOT I68309 andAN:OVRD[2109]Overrides

Critical Step STANDARD: Operatorta kes hand switchHS*68

  • 303AonM-5toOPEN.Hands

witch indicatesvalveisopenby

redlight"ON".This step is criticaltoadd primary watertothePRT for cooling.C OMMENTS:

(JobPerfo rmance Checklist:

STEP/ST ANDARD JPM B.1.e Page6of13 Rev.7 SAT/UNSAT ST EP 4.:[3]IFPRTlevelincreases

to?88%or PRTtem peraturedecreasesto

-SAT s 120 0F THEN_UNSAT CLOSE[1-FCV-S8-303]

Cue: P RT level is 91%.Cr i tical S tep PRT temp is as indicated.S TANDARD: Operat or m onitorsPRTlevelonU-68-300 and temperature

on TI-68-309 ,thenplaces

FCV-68-303

intheclosedpositionandverifiesgreenlightON

.This s tepiscriticalt o pre vent overfilling

thePRT.COMM ENTS: ,-STEP5.:[4]IFPRTlev el i s:2: 88%THEN-SA TGOTO sect ion 8.2or8.3ofthisinstr

uction, AN D-UNSA T RETURNtostep[1]ofthissect

ioniffurthe r temperature

reduction isnee ded.STANDARD: Operatorgoestosection8.2

(1ARC DTpumpisinop

)COMM ENTS: EV A LUATOR NOTE T heIollowlnostepevaluatesection8.2 ST EP 6.:[1]VERIFYRCDTpumpsal

ignedforservice

inaccordancewith

-SAT val vechecklist1-77-1.02.-UNSAT Cue:NOdevia t ions.STANDARD: Operato rchecksstatuslogt

oensurenodeviat

ions exist.COMM ENTS: I

(JobP erforma nce Ch ecklist: STEPISTANDARD

JPM B.1.ePage7of13 Re v.7 SAT/UNSATSTEP7.:[2]STAT IONAUOatpanel0-L-2

.-SATCue:Role playtheRadWasteAUO.StatethatyouareatO-L-2

-UNSAT panel and willstayhere and wait onyourinstructions.

STANDARD Operator ensuresanAUOisstationedat0-L

-2 panel.COMMENTS: STEP.a,:[3]IFRCDTlevel>20%, THEN-SAT PUMPdownRCDTlevel in accordance

withAppendi

xCofthi s-UNSAT I nstruction.Cue:Role playtheRadWasteAUO.Statethatyouareat

O-L-2 panel and the level in Unit 1 RCDTis18%.STANDARD: Operator checks with anAUOat0-L-2 paneland ensures level i s<2 0%COMMENTS:STEP9.:[4]ENSURE[1-FCV-77-91 and[1-FCV-77-10]are OPEN.-SAT-UNSAT STANDARD: OperatorverifiesFCV-77

-9andFCV-77-10openonpanelM-15(rediightson

handswitches

ON)COMMENTS:

(Job PerformanceCheck

list: STEP/STANDARD

JP M B.1.e Page8of 13 Rev.7 SATIUNSAT ((STEP 10.:[5]ENSURE[1-HS-n-6Al forRCDT Pump Bisinthe PULL*P-AUTO

-SAT posit ion.-UNSAT Cue: Rad waste Operator informs UO that RCDr Pump" B" is in p-AUrO and that the level in the Unit 1 RCDr Is s tIl/18%.STANDARD: O perator c ontacts Ra d Waste O perator andverifies HS-77-6Afor RCDT Pump BisinP-AUTO.COMMENTS: STEP 1 1.:[6]OPEN[1-

FCV-68-305lNitrogenSupplytoPRT.-SAT-UNSAT STANDARD: OperatorverifiesFCV

-68-305openonp anel1M-5(redlight s on handswitches

ON).This stepis critica l to align Nitrogen to the PRT.Critical Step COMMENTS: STEP1 2.:[7]PLACE[1-HS-68-310A]

i n theOPENposition, AND-SA T VER IFY[1-FCV-68-310]

OPENS-UNSAT Cue: When operator opens FCV-68*31 0 and the operat or contacts the Crillcal Step Rad Waste operat or , then state to the operatortheB RCDr pump has started.STANDARD: Operator ensuresFCV*68*310openonpanel l-M-5,red l ight.This step is critical to drainthePRTto norma l level.COMMENTS:

(Jo b Performance Check li st: STEP/STA NDARD JP M B.1.e Page9o f 13 R ev.7 SAT/UNSAT ((S TEP 1 3.:[8]ENSURE RCD T PumpBSTARTS.-S A T-U N SAT Cue: RCDr pumpBis running.STAN DARD: Operator checkswith Rad Waste AUOtoensure RCDT pump B starts.COMM ENTS: ST EP 1 4.:[9]IF PRTpressuredrops<1.5 p si g , THEN...-SA T-UNSAT NOTE: 30 seconds after FCV*68*310

is open ,DELETEZAOPI68301

&AN:OVRD[357}

Cue: PRr pressure is constant-6.5 ps ig." ST.ll,NDA RD: Ope r ator m on ito rs P RT pressure withPI*68*301on

1*M-5.I COMM E N T S: ST EP 15.:[10]IF at a nytime while pumping d o wnthe PRTtheRCDT level approaches-SAT 50%, THEN..-U N SA T Cu e: When AUO contacted, Sta te: I w ill moni tor RCDr level , Stop RCDr pump and notify you to close FCV*68*310

if RCDr approaches

50%.STANDA RD: Op erator notifiesAUOofthisstep.COMMENTS:

JPM B.1.ePage10of13

Rev.7 SAT/UNSAT STEP/STANDARD

J ob PerformanceChecklist--STEP16.:[11]IFreturningfromAppendixC,THEN

-S AT-UNS AT STANDARD: Operator N/A'sste p.CQMMENTS:STEP17.:[12]WHENPRTlevelreaches de sired level, THEN-SATSTOP"B" RCDT.-UNS ATCue:Whenthe

operator begins to monitor levelonLI-68-300

,Tellthe Critical Step operator that"PRT level has decreased to70%", Cue: When operator requests AVO to stop RCDT pump1B,Tell him"RCDT pump 1Bis stopped andHSisin Pull-P-Auto".STAN_DARD: Operatorverifieslevel,andhas the R ad W aste OperatorSTOPR CDTPump1B and placeHS inPull*P*Auto.This step is critical to prevent pumping downPRTto below normal level.COMMENTS: (

STEP 18.:[13]CLOSE[1-FCV-68-310]

.-SAT-UNSAT 9!£: If operator asks , PRT Level I s 70%, Temp Is 110"F , and Pr ess Is6.5 pslg.Cri tical S tep STAN DARD: Operator c loses w ith HS-68-310Aandverifies c iosed on paneI1-M-5

(green lightsonhandsw

itches ON).This step Is criticaltore turn system to normal a lignment.COMM ENTS: STEP 1 9.:[1 4]PLACE[1-HS-77-6AJ

RC DT pump B in PULL-P-AUTO

position_SAT at O-L-2 panel.-UN SATCUE:When operator requests AUO to place theHS for RCDT pump 18 , Tell him"RCDT pump 18 HSIsIn Pull-P-Auto

".STANDARD:OperatorhastheRadWasteOperato

rplaceHSinPull-P-Auto.COMMENT S:STEP20.:[15]CLOSE[1-FCV-68-305].

-SAT-UNSA T STANDARD: Operator closesw ith H S-68-305Aandverif iesclosedonpanel

1-M-5 (greenlightson

handswitches

ON).COMMENTS: (Jo b PerlormanceChecklist:STEP/STANDARD

JPMB.1.ePage11of 1 3 Rev.7 SATIUNSA T

(Job Performance

Checklist:

STEP/STANDARDJPMB.1.ePage12of13Rev.7 SAT/UNSAT SAT c lSTEP21.: STANDARD: COMMENTS:InformtheUS

/SROthatthePRTparamete

rshavebeenreturnedtowithinnormalope

rating conditions

/ranges.Ope ratorinformstheUS

/SROthatthePRT

parameters

havebeenreturnedtowithinnormaloperatingconditions/ranges.

UNSATStopTime__

(lPage13of13

Re v.7CANDIDATECUESHEET(TOBERETURNEDTOEXAMINERUPONCOMPLETIONOF

TASK)DIRECTIONTOTRAINEE:Iwillexplainthe

initialconditions,andstatethetasktobeperformed.AllcontrolroomstepsshallbeperformedforthisJPM

,includinganyrequired

communications.Iwillprovideinitiatingcuesandreportsonotheractionswhen

directedbyyou.Ensureyouindicatetomewhenyouunderstandyour

assignedtask.Toindicatethatyouhavecompletedyourassignedtaskreturnthe

handout sheetIprovidedyou.

INITIAL CONDITIONS:Unit1isat100

%power ,steadystate.Pressurizerp

ressurecontrolsin

automatic.

Pressurizerspraysinautomatic.

PORV PCV-68-334ispartiallyopenedbuttheblockvalvehasbeenclosedand

de-energized.Thevalveisnolongerleakingthrough.1ARx CoolantDrainTankpumpisinoperable.INITIATINGCUES:Youare the Unit1CROandareto

cool thePRTand then, if necessary, drain thePRTto within normal parameters.

Notify the US when the PRT parametershavebeen returned to the normal conditions

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT SYSTEM OPERATING INSTRUCTION

1-50-68-5 PRESSURIZER

RELIEF TANK Revis ion 17 QUALITY RELATEDPREPARED/PROOFREADBY:JUDYV

ARNERRESPONSIBLEORGANIZATION

OPERATIONSAPPROVEDBY
D.A.PORTER EFFECTIVE DATE: 05/09/2006LEVELOFUSE
CONTINUOUS

USE REVISIONDESCRIPTION:RevisedtoincorporatePCF007.Addedstepsinsection8

.9toallowpurgingPRTwitheitherHydrogenorNitrogenonVCT

.

SQN[PRESSURIZER

RELIEF TANK (1 TABLEOFCONTENTS

Page 1 o f 2 Sectio n Title 1-S0-68-5 Rev: 17 Pag e 2 of 3 5 Page 1.0 1.1 1.2 2.0 2.1 2.2 3.0 4.0 5.0 C 6.0 7.0 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 INTRODUCTION

4 Purpose.........................................

...........

...............................

..............

...................4 Scope 4 REFERENCES

4 PerformanceReferences 4 DevelopmentalReferences 5 PRECAUTIONSANDLIMI TATIONS......................................................

........................

5 PREREQUISITE

ACTIONS 6 STARTUP/STA

NDBY READINESS 7 NORMAL OPERATION 8 SHUTDOWN 8 INFREQUENT

OPERATION 9 Increa singPRTLevel..............

9 ReducingPRTLev el Usin gBRCDTPump 10 Reducing PRT LevelUsingARCDTPump..1 3 ReducingtheTemperatureoftheP RT.....................................................................

16 Incre asing th e Pr essureofth e PRT 17Reducingthe Pressureofth e PRT..............................................

..........

...................

1 8 GravityDrainingPRTtothe Containment

FloorandEquipment Drain Sump (RBF&EDS)1 9 Reducin g theO 2 Concentrationin

thePRTin Mode5 or6 22Purgingth ePRT.2 3

(SQN 1-S0-68-5 1PRESSURIZERRELIEFTANKRev:17Page3of35SectionTitleTABLEOFCONTENTSPage2of2 Page l 9.0 RECORDS 25 APPENDIXA:PRTO 2CONCENTRATIONREDUCTIONUSINGRCDTPUMPB 26 APPENDI XB:PRTO 2 CONCENTR ATIONREDUCTIONUSINGRCDTPUMPA 30 APPENDI XC:REDUCINGLE

VELINRCDT 3 4SOURCENOTES

35 ATTACHMENT1:POWERCHECKLIST1-68-5

.01 ATTACHMENT2:VALVECHECKLIST1-68-5

.02

(l SQN 1-S0-68-5 1PRESSURIZERRELIEF

TANKRev:17Page4 of 35 1.0 INTRODUCTION

1.1 PurposeToprovide instructionsforthe operationofthePressurizerReliefTank

(PRT).1.2 ScopeA.PlacingthePRTinservice

.B.IncreasingthePRTlevel.

C.DecreasingthePRTlevel.

D.Reducingthe

temperatureofthePRT.E.IncreasingthepressureofthePRT.

F.ReducingthepressureofthePRT.G.GravitydrainingPRTtothe

ContainmentFloorand Equipment Drain Sump (RBF&EDS).H.Reducingthe0

, Concentration

inthePRTinMode5or6

.I.PurgingthePRTinModes1thru4

.2.0 REFERENCES

2.1 Performance

References

None

(SQN 1-S0-68-5 1 PRESSURIZER

RELIEF TANKRev:17Page5o f 35 2.2 Developmental

References

A.SOI-68.1, R e actor CoolantSystemB.O-MI-MXX-068-006

.0, Venting of Pressur izer, Pressurizer

Relief Tank , a nd R eact or Head C.SPP-10.3 , Verification

Program D.TVA Draw ing 1.47W813-1 2.47W819-1 3.47W830-1 4.47W830-6 E.FSAR 1.Sect ion 5.5 3.0 PRECAUTIONS

AND LIMITATIONSA.Duringnormaloperation , PRT water temperatureshouldno t e xceed 120°F.B.Maintaining3to6psig N , gas blanketonthePRTw ill prevent t he format ionofexplosive hydrogen-oxygen m ixtures.C.ThePRTcon centrat ionofo xygenshallbelimi

tedtolessthanor

equalto2%by volume whenever the hydrogenconcentration exceeds 4%byvo lume.D.Over fillingthePRTtosolid

water condition during oxygen reductionpe

r Section 8.8may resultinfailureofthePRTrupturedisc.

E.ThePRTpressu re shou ldbemain tained<7.5psigduring normal operation.(Except dur ing the performance

o f sect ion 8.9).F.ThePRT rupturediscsareratedat85psig

.G.ThelevelinthePRTshou

ldbemain tained at 70%.If thelevelinc

reasesto88%, then decreasinglevelto 70%is necessary.I f thelevel decreasesto55%, then increasing levelto70%is neededwhenthe PRTisreq uiredtobe operable.H.Completely drainingthePRTmayresultingasb inding theRCDT pumps.I.Water intrus ionintothe waste gas vent header isposs ible during PRT venting operationswithPRT levelhigh.Th iscouldaffectRCPsea

lleakoff fl ows andtheventcapabilityoftan kswhichventtowastegasvent

header.J.PRTlevelind icat ionsoralarmsa

re no t availableintheAu x Cont ro l Room ,thusPRTl evel manipu lationsandfeed&ble ed processes are unavailable

.

(SQN 1 PRESSURIZERRELIEFTANK

1-S0-68-5 Rev: 17Page6of35 Date_4.0 PREREQUISITE

ACTIONS NOTE ThroughoutthisInstruction,wherean

IFITHEN statement exists ,thestepshouldbe

N/Aifconditiondoesnotexist.

[1]ENSUREInstructiontobeused

,isacopyoftheeffective

version.[2]ENSURE Precautions

and Limitations

, Section 3.0havebeen reviewed.[3]ENSURE Attachment1,Power Checklist1-68-5.01is

complete.[4]ENSURE Attachment

2 , Valve Checklist 1-68-5.02 is complete.[5]VERIFY primary waterisavailabletofillandcoolthePRT(N/Aifprimarywaterwillnotbeused)

.[6]VERIFYWasteDisposalSystemisavailabletoreceiveliquidfromPRT.Print Name Initials[1 0]INDICATEbelowwhich

performancesectionofthisInstructionwillbeusedandthereasonforthis

performance

o 5.0 STARTUP/STANDBY

READINESS o 8.0 INFREQUENT

OPERATION REASON:_

(((SQ N 1-50-68-5 PRESSURIZERRELIEFTA NK Rev: 17 1 Page7of35 Date_5.0 STARTUP/STANDBY

READ INESS[1]VERIFYPRTh asnormaloperatinglevel of-7 0%.[2]I FPRTlevelneedsad

just ing , THEN REFER TO Section8.1, 8.2, or8.3 , AN D ADJUST leve l asnecessary.[3]IFPRTpressu reneedsad justing, THEN REFER TO Section8.5 or8.6 , AND ADJUST pressureas necessary.E NDOFTE XT

((1-50-68-5 SQNPRESSURIZERRELIEFTAN

KRev:17 1 Page8o f 35 6.0 NORMAL OPERATION None.7.0 SHUTDOWN N one.

(((SQN 1-S0-68-5*PRESSURIZERRELIEFTANKRev:17 1 Pag e9of 3 5 Date_8.0INFREQUENTOPERATION

8.1IncreasingPRTLevel[1]ENSUREaprimarywaterpump i s runn ing.[2]ENSURE[1-FCV-81-12]

pr imarywater con ta inment isolation valve i s OPEN.[3]OPEN[1-FCV-68-303]PRT

makeupvalve.[4]MAINTAINPRTp ressure between3and6ps ig by operat ing[1-PCV-301]PRTventval

ve.NOTE NormalPRTle vel isappro ximately 70%,[5]WHEN PR T level increasestodesired level (nottoexceed8 8%), THEN CLOSE[1-FCV-68*303].1s t I V[6]ENSURE[1-PCV-68-301]

PRT vent valve CLOSED.1 st I V END OF TEXT

(SQN 1-50-68-5 1PRESSURIZERRELIEFTANK

Rev: 17Page10of35Date_8.2 ReducingPRTLevel UsingBRCDT PumpCAUTION1CAUTION2 NOTE Pump damage could occur if suction is lost while pumping water>175'F.RCDT pump1B will NOT automatically

stop on lowlevelinPRTOR closure of FCV-68-310.RCDTpumpBwillAutostartwhen1-FCV-68-310

,PRTdraintoRCDTopens

.[1]VERIFYRCDTpumpsal

ignedforservicei

naccordancewithValveChecklist1-77-1

.02.NOTEAnAUOatpanel

O-L-2incommunicationwithaMCRUOisneededtoperformthisInstruction

.[2]STATIONanAUOatpanel0-L-2.[3]IFRCDT level>20%, THENPUMPdownRCDTlevelinaccordancewithAppendixCofthisInstruction

.[4]ENSURE[1-FCV-77-9]and[1-FCV-77-10]RCDTpumpoutlet

isolationva

lvesareOPEN.[5]ENSURE[1-HS-77-6A]

forRCDTpumpBis

i n the PULL-P-AUTO

position.[6]OPEN[1-FCV-68-305]

Ni trogen Supp lytoPRT.[7]PLACE[1-HS-68-310A]

intheOPENposit

ion , ANDVERIFY[1-FCV-68-310]OPENS

.[8]ENSURERCDTpumpBSTARTS

.

(SQN 1-50-68-5 1PRESSURIZERRELIEF

TANKRev:17Page11of35

Oate_8.2 Reducing PRT Level UsingBRCDT Pump (Continued)[9]IFPRTpressuredrops

<1.5 psig , THEN COMPLETEthefollowing

[a]STOP'B'RCOTpumpat0-L-2

, AND CLOSE[1-FCV-68-3101[b]WHENPRTpressurereturnstonormal, THEN OPEN[1-FCV-68-310]

, ANDVERIFYRCDTpumpBSTARTS.

CAUTIONTheRCDT levelistobe maintained

<50%while1-FCV-68-310is

open to prevent inadvertent

opening of 1-LCV*77-415

which could cause overfilling

of RCDT fromthePRT.l[10]IFatanyt

imewhilepumpingdownthePRTtheRCDTlevelapproaches50

%, THENPERFORMthefollowingbeforecontinuingthePRTle

vel reduction:[a]PLACE[1-HS-77-6A]RCDTpumpBinthe

PULL*TO*LOCK

position.[b]CLOSE[1-FCV-68-3101

[c]GOTOAppendixCofthisInstruct

ionforRCOTlevelreductionandreturntoStep[11)ofSection8

.2.

(SQN 1-S0-68-5PRESSURIZERRELIEFTANKRev:17 1Page12of35

Date 8.2 ReducingPRTLevel UsingBRCDT Pump (Continued)[11]IFreturningfromAppendixC

, THENPERFORMthefollowing:

[a]PLACE[1-HS-77-6A]RCDTpump

Bin PULL-P-AUTO

position.[b]OPEN[1-FCV-68-310].[12]WHENPRTreachesdesiredlevel

, THEN STOP'B'RCDTpump.[13]CLOSE[1-FCV-68-310l

151 IV C[14]PLACE[1-HS-77-6A]RCDTpump'B

'in PULL-P-AUTOpositionat

O-L-2 panel.1st IV[15]CLOSE[1-FCV-68-305]NitrogenSupplytoPRT

.1st IVENDOFTEXT

(SQN 1-S0-68-5 1PRESSURIZERRELIEF

TANKRev:17Page13of35Date_8.3 ReducingPRTLevel UsingARCDT PumpCAUTION1CAUTION2 NOTE Pump damage could occur if suction is lost while pumping water>175°F.RCDT pump 1A will NOT automatically

stop on low level inPRTOR closure of FCV-68-310.RCDTpumpAoperates

automaticallywith1-LCV-77-415fromtheRCDTonly.

c[1][2]NOTE[3][4][5][6][7][8][9]VERIFYRCDTpumpsalignedforserviceinaccordancewith

Valve Checklist 1-77-1.02.IFRCDT level>20%, THENPUMPdownRCDTlevelinaccordancewithAppendi

xCofthisInstruction.

Communicationswillhavetobeestablishedbetween

MCR, Radwaste (0-L-2),andswitchgearfor"A

"RCDTpump.STATIONanAUOatpanel

O-L-2.STATIONanAUOatSwitchgearfor

"A"RCDTpump.

ENSURE[1.FCV-77-9]

and[1.FCV-77-10]RCDTpumpoutlet

.isolationvalvesareOPEN.

OPEN[1-FCV*68-305]NitrogenSupplytoPRT.

PLACE[1-HS-77*6A]RCDTPumpBin

PULL-TO-LOCK.

PLACE transferswitchXS-77-4on1A-AReactorVentBoard

compartment2CtoAUXposition

.PLACE[1-HS-68-31OA]intheOPENposition

, AND VERIFY[1-FCV-68-310]

OPENS.

((SQN 1-S0-68-5 1PRESSURIZERRELIEFTANKRev:17Page14of35Date_8.3 ReducingPRTLevel UsingARCDTPump (Continued)[10]PLACE[1-HS

-77-4DlRCDTPumpA , intheSTARTpos

it ion (atswitchgear

).[11]IFPRTp

ressure drops<1.5 psig , THENSTOPRCDTpumpA.[12]WHENPRTpressurere

turnstonormal , THEN P LACE[1-HS-77-4DlRCDTpumpAtotheSTARTposition

(atsw itchgear).CAUTIONTheRCDTlevelistobe

maintained

<50%while 1-FCV-68-310isopento prevent inadvertent

opening of 1-LCV-77-415

which could cause overfilling

of RCDT from PRT.[13]IFatanytimewhilepumpingdow

nthePRTtheRCDTlevelapproaches50%, THENPERFORMthefollowingbeforecontinu

ingthePRTlevel

reduction:[a]PLACE[1*HS-77-4DlRCDTpumpA

i ntheSTOPposition.[b]CLOSE[1-FCV

-68-310].[c]OPEN[1-LCV-77-415J.[d]STARTRCDTpump

"A"with1-HS

-77-4D , ANDREDUCERCDT

leveltoapproximately 20%.Ie]WHENRCDTlevelisapproximately 20%, THENSTOPRCDTpump

" A"with1-HS-77-4D.

If]ENSURE[1-LCV-77-4151closed

.

(SQN 1-50*68*5 PRESSURIZER

RELIEF TANKRev:17 1Page15of35ENDOFTEXT

(((SQN 1-50-68-5 1 PRESSURIZER

RELIEF TANKRev:17Page16of35

Date NOTEMayneedane xtracopyofth is Instruction

.8.4 Reducing the Temperature

of the PRT[1]ENSURE[1-FCV-81-12]OPEN.[2]OPEN[1-FCV-68-303]byplacing[1-HS-68-303A]toOPENposition

.[3]IFPRTlevel

increasesto88%o r PRT temperature

decreases y 120°F , THEN CLOSE[1-FCV-68-303]

.1s t IV[4]IFPRTlevelis88%, THENGOTOsect ion 8.2or8.3ofth is Instruction

, ANDRETURNtostep[1]ofth

is sec tioniffurther temperature

reduction i s needed.ENDOFTEXT

(SQN 1-S0-68-5PRESSURIZERRELIEFTANKRev:17 1Page17of35

Date_8.5 Increasing

the Pressure ofthePRT[1]OPEN[1-FCV-68-305]N itrogen Suppl ytoPRT.[2]WHEN[1-PI-68-3011isbetween3to6ps ig , THEN (CLOSE[1-FCV-68*305]

Nitrogen SupplytoPRT.ENDOFTEXT 1st I V

(SQN 1PRESSURIZERRELIEFTANK

1-50-68-5Rev:17Page18of35Date_8.6 Reducing the Pressure ofthePRT[1]STATIONAUOatpanel0-L-2tomonitorventheaderpressureandstartWasteGasCompressor(WGC)ifnecessary.[2]OPEN[1-PCV-68-301].[3]WHEN[1-PI-68-3011isbetween3to6psig

, THEN CLOSE[1-PCV-68-301l1stIVNOTE:Step[4]mayberepeatedifitissuspectedthatwater

remainsinwastegasventheaderandadditionalventingisnecessary

.l[4]IFthePRTpressurewillnotdropwhileventingorwaterissuspectedtobeinwastegasventheader

, THENPERFORMthefollowing:[a]NOTIFY U-1andU-2SROthatventheaderisabouttobeventedand

tomonitorASarearadiationmonitorsand

0-RM-90-1 01 ,ASvent monitor.[b]OPEN[O-LCV-77-403],LoopDrLCV(653

'U1 pipechase),for15seconds

,THENCLOSE.[c]OPEN[O-LCV-77-404],LoopDrLCV(653

'U1 pipe chase),for15seconds

,THENCLOSE.[d]OPEN[O-LCV-77-405],LoopDrLCV(669

'U2pipechase)for15seconds

,THENCLOSE.ENDOFTEXT o

(SQN 1-S0-68-5 1 PRESSURIZERRELIEFTANK

Rev: 17Page19of35

Da te_8.7 Gravity DrainingPRTtothe Containment

Floor and Equipment Drain Sump (RBF&EDS)CAUTION Completely

drainingPRTmay resultingas binding RCDT pumps.c'[1]OBTAINpermiss

ionfromUS todra in PRT toRBF&EDS.[2]ENSUREthefollowingRCDTcontro

l switchesinthe PULL-TO-LOCK

position:A.[1-HS-77-4A]RCDTPUMP1

A.B.[1-HS-77-6A]RCDTPUMP1B

.[3]PLACE[1-HS-77-415]RCDTpumpsuct

ionintheCLOSEpositionANDENSURE[1-LCV-77-415]remainsCLOSED.

(switchisspringreturntoauto

)[4]IFbothofthefollowingconditions e xist:*PressurizerPORVsOPEN

,*RCSisvent

edtoatmosphere

, THENMARKSteps[5]and[6]as

N/A.NOTE: IfStep[4]is

N/A , theneither S tep[5]orS tep[6]mus tbeperformedto

preve nt drawing a vacuum inPRTwhile draining.[5]IFallof

thefollowingconditions e x ist:*Pressur izerPORVsareCLOSED

,*PRTisNOTventedtoatmosphere,*I t isdesiredtous

e N itrogenascovergas, THENOPEN[1-FCV-68-305]NitrogenSupplytoPRT

.

(PRESSURIZER

RELIEF TANK 1-S0-68-5Rev:17 Page 20of35 L Date,_8.7 Gravity Drain ingPRTtothe Containment

Floor and Equipment Drain Sump(RBF&EDS)(Continued)[6]IFallofthefollowing

conditions

e xist:*PRThasbeenpurgedandventedto

atmosphere,*PRTmanualventtobeusedasaventpath

,*1-68-573flangeisremo

ved , THEN ENSURE[1-68-573]PRTManualVentOPEN

.[7]OPEN[1-FCV-68-310]PRTtoRCDTsuctionheader.[8]OPEN[1-FCV-77-3]RCDTto RBF&EDS.[9]IFhighlevelalarm

IlluminatesonRCDTduringthisoperation

, THEN[a]CLOSE[1-FCV-68-31

0]AND DRAINRCDTto-20%level.[b]WHENRCDTlevelisinthenormalrange

, THEN ENSURE[1-LCV-77-415]

is CLOSED AND OPEN[1-FCV-68-310]toresumePRTdraining.

[10]WHEN it isno longerdesiredtotransferPRTtoRBF

&EDS, THEN CLOSE[1-FCV-77-311stIV[11]CLOSE[1-FCV-68-31

0].1stIV

.-'--.---,---



'--r---


, (SQN 1PRESSURIZERRELIEF

TANK 1-S0-68-5Rev:17 Page 21of35Date_8.7 Gravity DrainingPRTtothe Containment

Floor and Equipment Drain Sump(RBF&EDS)(Continued)[12]ENSURE

[1-FCV-68-305]NitrogenSupplytoPRTis

CLOSED.1st IV[13]IFmanualventusedasventpath

isstep[6], THEN ENSURE[1-68

-573]PRTManualVentCLOSED.

1 st IV NOTERCDTsuct ion pip ingmaybegasbound

ifPRTwasdra

ined completely.[14]IFPRTwasdrainedcomple

tely , THEN EVALUATEneedtopr imetheRCDTpumpsusing

1-S0-77-1, Reac tor Coolan t Dra in Tank.[15]ENSURE

[1-HS-77-415]RCDTpumpsuctio

ninAUTO.1 st IV[16]PLACEthefollowingcontrolswitches

tothe PULL-P-AUTO

position.A.[1-HS-77-4AlRCDTpump1A.

1st IV B.[1-HS-77-6A]RCDTp ump 1 B.1st IVENDOF TEXT

Date_c SQN 1-S0-68-5PRESSURIZERRELIEFTANKRev:17 1Page22of35

8.8 Reducing the 0 , ConcentrationinthePRTin

Mode 5 or 6NOTE1LocalAUGassistancewillbeneededtoperformthisInstruction.NOTE2SeveralcopiesofAppendicesAandBmaybeneededtocompletethis

Instruction

.NOTE3NOTE4ThisInstructioncanonl

ybeperformedinmodes5and6

.Step[1]maybeNA

'difflangehasbeenpreviouslyremovedandhose

installed.

[1]REQUESTMechanicalMaintenancetoREMOVEblindflange

from[1-68-573]andto INSTALLatemporaryhose.

[2]IFreducingPRToxygenconcentrationutilizingRCDTpump"B" , THENPERFORMAppendixAtoreducethePRT0

, concentration

.[3]IFreducingPRTo

xygenconcentrationutilizingRCDTpump

"A",THENPERFORMAppendi

xBtoreducethePRT0

, concentration.

[4]ENSURE[1-PCV-68-304]PRTN2pressureregulator

maintains-6.5 psig.[5]CLOSE[1-FCV-68-305]nitrogeninlet

isolationvalve.1st IV[6]ENSURE[1-FCV-68-308]gasanalyzer

FeV CLOSED.1st IV[7]ENSURE[1-68-573]PRTventisCLOSED.[8]REQUESTMechanicalMaintenancetoremovehosefrom[1-68-5731,AND

INSTALLblindflange.

[9]ENSURE[1-68-573]PRTventtoatmosphereCLOSEDANDBlindFlange

INSTALLED.1st IV END OF TEXT

1-50-68-5Rev:17Page23of35PRESSURIZERRELIEFTANK

SQN 1_L.__---'--_(8.9 Purging the PRT Da te_CAUTIONNOTE1NOTE2NOTE3NOTE4 NOTESIfPRT temperature

is>130°F(1-TI-68-309)

, this procedurecanNOT be performed.ThissectionpurgesthePRTbyincreasingpressureto

-15psigthendecreasingpressureto

-5psig.NumberoftimespressurewillbeincreasedanddecreasedwillbedeterminedbyChemLab.

0 , concentrat

ionforinserviceWasteGasDecayTankshouldbemonitoredduringthisprocess

.WhenPRTisventedtotheRCDT

,pressurewillincreasetonearPRT

pressure.Twoorthreegasdecaytankswillberequiredforthispurge.VCTpressuremustbemaintained25psigwhenpurgingPRT.[1]IFdesiredtoraisePRTleveltojustbelowhighlevelalarm

, THENPERFORMSection8

,1.[2]IFhydrogenalignedtoVCT, THEN ADJUST[1*PCV-62-120]VCTHydrogenBlanket

,tomaintain25psig.(ontopofVCTroom)[3]IFNitrogenalignedtoVCT, THEN ADJUST[1-PCV-62-119]VCTNitrogenBlanket

,tomaintain25psig.(ontopofVCTroom)

[4]ADJUST[1-PCV-68-304]setpointto

-15psig.(locatedin690pipechasenortheastcorner)

NOTE 1-XA-55-5A

window D1isane xpectedalarmwhenthisprocessincreases

pressure>8ps ig.[5]OPEN[1-FCV-68-3051NitrogenSupplytoPRT.[6]WHEN[1-PI-68-301]

is-15psig,THENCLOSE[1-FCV-68-3051NitrogenSupplytoPRT.

._----,.----

---_._-------------

-,----------, (PRESSURIZERRELIEFTANK

8.9 PurgingthePRT(Continued)[7]STATIONAUOatpanel0-L-2toMONITORVentHeaderpressure

1-S0-68-5Rev:17Page24of35Oate_D.NOTE1-XA-55-5BwindowA2,B2,C2

,&02areexpectedalarmwhenPRTisventedtotheventheaderduetoincreasedpressureon

RCOT.[8]OPERATEWasteGasCompressorasnecessary.[9]OPEN[1-PCV-68-3011,PRTVentheaderPCV.[10]WHEN[1-PI-68-301]is

-5psig,THENCLOSE[1-PCV-68-301]

,PRTVentheaderPCV

.[11]REPEATsteps[5]thru[10]asdirectedbyChemLab

.[12]VERIFY[1-PCV-68-305]CLOSED

,NitrogentoPRT

.[13]VERIFY[1-PCV-68-301]CLOSED,PRTVentheaderPCV

.[14]RETURN[1-PCV-68-304]setpointto

-6.5 psig(locatedin690p

ipechasenortheastcorner)

o IV IV1stCV[15]IFusingHydrogen,THENADJUST[1-PCV-62-120]VCTHydrogenBlanket,tomaintainapproximately17-20psig.(ontop

ofVCT room)[16]IFusingNitrogen

, THEN ADJUST[1-PCV-62-119]VCTNitrogenBlanket

,tomaintainapproximately17-20psig.(ontopofVCTroom)[17]NOTIFYChemLabthatPRTpurgehasbeencompleted

.ENDOFTEXT

(SQN 1-S0-68-5 PRESSURIZERRELIEFTANKRev:17 1Page25of35

9.0 RECORDS Completedcopiesof allsections,Appendices

, and attachmentsshallbe transmittedtothe Operations

Superintendent's

Secretary.

1-50-68-5Rev:17Page26of35PRESSURIZERRELIEF

TANK SQN 1[

(APPENDIXAPage1of4Oate_PRT 0,CONCENTRATIONREDUCTIONUSINGRCDTPUMPB

CAUTION Over fillingthePRTto solid water condition may result in failure of..thePRT rupture disc.[1]ENSURE[1*FCY*68*305]nitrogeninletisolationvalveis

CLOSED.[2]ENSURE[1-PCY-68-301]PRTventvalvetoventheaderis

CLOSED.[3]ENSURE[1-68-573]PRTventtoatmosphereisOPEN.[4]OPEN[1-FCY-68-303]primarywatersupplytoPRT.[5]YERIFY[1-L1*68*300]PRTlevelindicatoron1-M-4shows

increase.[6]YERIFYPRThighlevelalarmcomesinat

-88%.[7]WHENwaterlevelreaches98%

,asindicatedon

[1-L1-68*3001

, THEN CLOSE[1-FCY-68-303l1stIV[8]CLOSE[1-68-573]PRTventtoatmosphere

..[9]OPEN[1*FCY*68*305]nitrogeninletisolationvalve

.[10]VERIFYRCOTpumpsalignedforserviceinaccordancewithValveChecklist1-77

-1.02.NOTEAnAUOatpanel0-L-2incommunicationwithaMCRUOisneededtoperformthisInstruction

.[11]STATIONanAUOatpanel0-L-2.[12]ENSURE

[1-FCY*77*9]

and[1-FCY*77*10]RCOTpumpoutlet

is olationvalvesareOPEN

.

(SQN 1-50-68-5PRESSURIZERRELIEFTANKRev:17 1 Page 27of35APPENDIXA Page 2 of 4Oate_[13]IF fillingand vent ingofRCOTsuct ion l ineorpumpsISNOT

requ ired , THENGOTOs tep[20]andN/Asteps[14]through[19].[14]PLACEcontrolswitchesinthe PULL-TO-LOCK

position: ,A.[1-HS-77-4A]RCOTpump1A.B.[1*HS-77-6A]RCOTpump1B.

NOTE S teps[15]through[19]fil

landventtheRCOTpumpsuctionheader.Step[20]startsthe

O 2concentrationreduction.[15]PLACE[1-HS-68-310A]intheOPENposition

, ANDVERIFY[1-FCV-68-310]opens

.NOTE Opening1-FCV-77-3allo

ws suct ionheadertobeventedtoCntmt

Floor&Equ ip.Drain Sump.l[16]OPEN[1-FCV-77

-3]RCOTtoRBF&EOS isolation.[17)WHENadrop

inPRTlevel isobserv ed , THENCLOSE[1-FCV-77

-31.[18]IFRCOTorsuctionline fromRCOThasbeendrain

ed and i sreadytobe filled ,THEN[a]OPEN[1-LCV-77-415]whileMONITORINGRCOTa

ndPRTlevels.[b]WHENadropinPR

T leve lisobservedand

/orRCOTlevelincreasesor

isatdesiredlev

el, THENCLOSE[1-LCV-77-415].[19]CLOSE[1-FCV

-68-3101.

1-50-68-5Rev:17Page28 of35PRESSURIZERRELIEFTANK

SQN 1----J[__--------'-------'

(APPENDIXA Page 30f4CAUTION1Date_Pump damage could occur if suction is lost while pumping water>175°F.CAUTION2RCDT

pump 1A will NOT automatically

stop on low levelinPRTOR closureofFCV-68-310.

NOTERCDTPumpBw

illAutos tartwhen1-FCV-68-310,PRTdra in toRCDTopens.[20]ENSUREcontrolswitchesareintheP-AUTOpos

ition: A.[1-HS-77-4A]RCDTpump1A.

1st IV B.[1-HS-77-6A]RCDTpump1B

.1st IV[2 1]PLACE[1-HS-68-310A]intheOPENpos

ition, AND VERIFY[1-FCV-68-310]

opens.[22]ENSURERCDTPumpBSTARTS

.[23]IFPRTpressuredrops

<1.5psig , THENCOMPLETEthefollowing:[a]STOP'B'RCDTpumpat

O-L-2, ANDCLOSE[1-FCV-68-310].[b]WHENPRTpressu

re returns tonormal , THEN (OPEN[1-FCV-68-310], ANDVERIFYRCDTpumpBSTARTS

.

1-S0-68-5Rev:17Page29of35PRESSURIZERRELIEF

TANK__----L-----------'

(.APPENDIX A Pa ge4of4 Da te__-,--_[24]WHENPRT

reachesdesiredlevel , THENSTOPRCDTPump B.[25]CLOSE[1-FCV-68-310].

tst IV[26]DIRECTChemLab toobta ingrabsamp leofthePRT atmosphereforox ygen concentration.[27]IFPRTO

2 concentrationi s>2%byvolume, THEN.RETURNtostep[1]ofthisAppendix

.[28]IFPRTO 2 concentration

i s<2%byvolume

, THEN RETURN tostep[4]Sect

ion 8.8ofthisInstruction

.ENDOFTEXT (

1-S0-68-5Rev:17 Page 30of35PRESSURIZERRELIEF

TANKN_-.L.L------'(APPENDIX BPage1of4Date_PRT 0, CONCENTRATIONREDUCTIONUSINGRCDTPUMPA

CAUTION Over filling thePRTto solid water condition may result in failure of the PRT rupture disc.[1]ENSURE[1-FCV-68-305]nitrogeninletisolat

ionvalveis CLOSED.[2]ENSURE[1-PCV-68-301]PRTventvalvetoventheaderis

CLOSED.[3]ENSURE[1-68-573]PRTventtoatmosphereisOPEN

.[4]OPEN[1-FCV-68-303]primarywatersupplytoPRT.[5]VERIFY[1-L1-68-300]PRTlevelindicatoron1-M-4shows

increase.[6]VERIFYPRThighlevelalarmcomesinat

-88%.[7]WHENwaterlevelreaches98%

,asindicatedon

[1-L1-68-300]

, THEN CLOSE[1-FCV-68-303].1sl IV[8]CLOSE[1-68-573]PRTventtoatmosphere.

[9]OPEN[1-FCV-68-305]nitrogeninletisolationvalve

.[10]VERIFYRCDTpumpsalignedforserviceinaccordancewith

Valve Checklist 1-77-1.02.NOTEAnAUOatpanel0-L-2incommunicationwithaMCRUOisneededtoperformthisInstruction

.[11]STATIONanAUOatpanelO-L-2.l[12]ENSURE[1-FCV-77-9]

and[1-FCV-77-10]RCDTpumpoutlet

isolationvalvesareOPEN.

1-50-68-5Rev:17 Page 31of35PRESSURIZERRELIEFTANK

SQN 1 L---.-.l l__--'-----------'

(APPENDIXBPage2of4Date_[13]IFfillingandventingofRCDTsuctionlineorpumpsISNOT

required , THENGOTOstep[20]andN

/Asteps[14]through[19].[14]PLACEcontrolswitchesinthe

PULL-TO-LOCK

position: ,A.[1-HS-77-4A]RCDTpump1A.B.[1-HS-77-6A]RCDTpump1B

.NOTESteps[15]through[19]fillandventtheRCDTpumpsuctionheader.Step[20]startstheO

2concentrationreduction

.[15]PLACE[1-HS-68-310A]intheOPENposition

, ANDVERIFY[1-FCV-68-310]opens

.NOTEOpening1-FCV-77-3allowssuctionheadertobeventedtoCntmtFloor&Equip.DrainSump.[16]OPEN[1-FCV-77-3]RCDTtoRBF&EDSisolation.[17]WHENadropinPRTlevel

isobserved , THENCLOSE[1-FCV-77-31(18]IFRCDTorsuctionlinefromRCDThasbeendrainedandisreadytobefilled

, THEN[a]OPEN[1-LCV-77-415]whileMONITORINGRCDTandPRTlevels.[b]WHENadropinPRTlevelisobservedand/orRCDTlevel

increasesorisatdesiredlevel

, THENCLOSE[1-LCV-77-415].

1-S0-68-5Rev:17Page3 2of35PRESSURIZERRELIEF

TANK.L,-----l (APPENDIX BPage3 of4 Date ,_[19]CLOSE[1-FCV-68-3

1 OJ-CAUT ION 1 Pump damage could occur if suc tion is lost while pump ing water>175'F.CAUTION 2 NOTE RCDT pump 1A will NOT automa tically stop on low level inPRTOR closure of FCV-68-310.RCDTPumpAoperatesautomaticallywith1-FCV-77-415fromth eRCDTonl y.[20]ENSURE[1-

HS-77-61RCDTPumpBin

PULL-TO-LOCK.

[21]PLACE[1-HS-68-310A]intheOPENposition, ANDVERIFY[1-FCV-68-310]

opens,[22]STARTRCDTPUMP

'A'b y placing[1-HS-77-4Alinthe START posit ion.[2 3]IFPRTpr essure drops<1.5psig,THENCOMPLETEthefollo

wing:[a]STOP'A'RCDTPumpat

O-L-2.[b]WHENPR T p ressure r eturnstonormal , THEN STARTRCDTPUMP'A'byplacing[1-HS-77-4A]in the START position.[24]WHENPRTreachesdesiredlevel

, THEN STO PRCDTPumpA[25]CLOSE[1-FCV-68-3

10]1 st I V (

(-SQN 1-50-68-5 1PRESSURIZERRELIEF

TANKRev:17Page33of35

APPENDIX BPage4 of4Date_[26]D IRECTChemLabtoobtain samp le of thePRTa tmosphereforo xygen concentration.[27]ENSUREcontrolsw

itchesareintheP-AUTO position: (A.[1-HS-77-4AlRCDTpump1A.

B.[1-HS-77-6A]RCDTpump1B

.[28]IFPRT 0 , concentration

i s>2%byvolume,THEN

RETURN tostep[1]ofthisAppendi

x.[29]IFPRT 0 , concentration

i s<2%byvolume,THENRETURNtostep[4]Section8

.8ofth is Instruction

.ENDOF TEXT tst IV 1st I V

((SQN 1-50-68-5PRESSURIZERRELIEF

TANKRev:17 1Page34of 3 5APPENDIXCPage1of1Date_REDUCINGLEVELINRCDT[1]ENSURE[1-LCV-77-415]RCDTpumpsuct

ion OPEN.[2]STARTRCDTpumpAorB b y placing[1-HS-77-4Al

o r[1-HS-77-6A]i

n START.[3]WHENRCD

Tlevelisapproximately 2 0%, THENSTOPtherunn

ingRCDTpump.[4]ENSURE[1-LCV*77*415]RCDTpumpsuction

CLOSE D.ENDOFTEXT.

(REQUIREMENTS

STATEMENT PRESSURIZERRELIEFTANKSOURCENOTESPage1of1 SOURCE DOCUMENT 1-50-68-5 Rev: 17Page35of35

IMPLEMENTING

STATEMENT Proceduresthatdonotcontain

appropriate

verification

requirementswillberevised

.(Thisitemisnot annotated within the procedure since the entire pro cedure must meet the verification

program requirements.NCO970071001

C.1

(JP M 8.1.1 Page1of16 Rev.2 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE

MEASURE B.1.f JPM 115-2APRespondTo ERCWPumpTripper

AOP-M.01 PREPARED!.REVISEDBY:VALIDATEDBY

APPROVEDBY
CONCURRED:
      • (OperationsTraining Manager)(OperationsRepresentative)

Dat e!Date!Da te l Date l*Validationnotrequ iredforminorenhancements,procedureRevchang es th atdonotaff ect th e JPM , or indiv idualstep changes thatdonotaff

ect theflowoftheJPM.**Operations Concurrence required f or ne wJPMsandchang

esthataffe ct theflowoftheJPM

(ifnotdriven by a procedurerevision).

(c l JP M B.1.f Page2of1 6 Rev2 INUCLEARTRAINING

REVISIONIUSAGE

LOG REVIS ION DESCRIPTI ON OF VDATEPAGES PREPAREDI NUMBER REVISION AFFECTED REVISED BY: 0 N ew JP M for NR C Exam.Updatefor V 12/4/01 all L.Pauley procedurerev.Andreorder JP M step 8 an d console operator action.1Updated tocurrent revision andI C.Y 8/1 6/04 A ll MG Croteau Rewrotetoinc ludereturningto section 2.1 afterheader break isolated.Extensive rewrite.Needsfull validation runincluding tim e.2 Updatedtocurrentprocedure revision.N 2/5 107 Al lRHEvans MinorForm at changes V-Specifyi f t he JP M change w ill require another validation (Y or N).Se e cover sheetfor criteria.

(JPMB.1.f Page 3of16 Re v.2SEQUOYAHNUCLEARPLANT

RO/SROJOBPERFORMANCEMEASURE

Task:RespondtoER

CWPumpTr ip Note: This JPM satisfies Simulator Manipulation"L".JAIT A task#: 0000620501

(RO)KIA Ratings: 076A2.01 076A4.01 076K6.04 (3.5/3.7)(2.9/2.9)(2.1/2.2)076K4.06

076A2.02 (2.8/3.2)(2.7/3.1)Task Standard: STANDB YATRAINERCWPumpha

sbeenstartedandtheautostartselections

witchisselectedawayfromQ-AERCWPumpposition.ERCWHeaderleakhasbeenisolated.

Evaluation

Method: SimulatorIn-Plant_

Performer:

c Performance

Rat ing: SAT Evaluator:

NAME UNSAT SIGNATUREPerformanceTime

DATEStartT ime_FinishTime_

====
=======
============================

COMMENTS

(JPMB.1.f P age4of16 Rev.2 SP ECIAL INSTRUCTIONS

TO EVALUATOR:

1.Critical s teps areident ifi edwithinthes tep 2.Sequenced s teps ident i fi edby a n" s" 3.AnyUNSATrequires comments 4.InitializethesimulatorinI

C#16.Ensure a-AERCWpumpi s inse rv ice a nd t he selector s w itchi s selectedf or a-A.Ensure 1B-BCCP i s runningand 1 A-Ai s in standby.5.Activate MF#RW01G (Trips a-AERCWPump)6.Freezethes

imulator until theopera t orhasbeenbrie

fedandisreadytoperformtask.

7.Console operator mus t insert malfu nctio n RW13Bat 90%prior toJP M st ep 8.8.See spec i fic J PM steps forr e quir ed remote func tion manipula tions.9.Ensure operator performsthefollowingrequired actions forSELF-CHECKING;a.Identifiesthe

correctunit , train, component , etc.b.Reviewstheintendedactionand

expectedresponse.

c.Comparestheactualresponsetotheexpectedresponse.

Validation

Time: CR.15m ins Local_Tools/EquipmentlProcedure

s Needed: AOP-M.01 , Section2and 2.1 , 2.10 Reference AOP-M.01 Los sofERCW TitleRevNo.15=================

=====
===
==============

REA D TOOPERATOR Directi ons t o Trainee:Iwill explainth e initi a l condit ions, a nd state thetask tobeperformed.A ll controlrooms teps shall be performedf or thisJP M.I will provideinit

iatingcuesandreportso n othera ct ions whendirectedbyyou.Wh en youcompleteth e t ask successfully,theobjectivef or th i s jobperformance measurewill be satisfied.Ensure yo u i n d icat e t o m e wh en y ou understand yourass ignedtask.To i n d ica t e th at y ou have completedyourassignedtask r eturn th e handoutsheetI providedy ou.INITIAL CONDITIONS:

Uni tisinmode1at

100%power INITIATIN G CU ES:Youare theCROandaretomonitortheboardand

respond ,asareade r/doer ,toanyeventtha

t may occur.InformSMwhenanyrequiredaction (s)assoc iatedwithth e failure havebee n comp le ted.

Job Performance

Checkli s t:JPMB.l.!Page5of16 Rev.12 (Examiner NOTE: STEP/STANDARD

CandidatemayperformtheARP

actions.Theyareidentic

al toprocedurestep

s.SAT/UNSAT_SAT_UNSATSTEP1.: Obta inacopyoftheappropriate

procedure.StartTime__cCue:TheSM willevaluateTechSpecs,TRM,andtheREP

STANDARD:Acop yoftheAOP-M.Olhasbeenobtainedandgoestosection2

.1.COMMENTS: STEP.k:[1]IDENTIFY

andLOCKOUTfailedERCWpump

STANDARD:ERCWpumpQ-

AHANDSWITCHhasbee

nplacedinthePULLTOLOCKposition.COMMENTS: 3.:[2]START addition alERCWpumpsasrequir

edtomaintainhe

aderpressurebetween78p sigand124psig

._SAT_UNSAT_SAT_UNSAT STANDARD: COMMENTS:Operators tartsanotherA (J-A)Tra inERCWpump.Thisstepiscriticaltoreturnheaderpressuretonormal

.CriticalStep

(STEP4.:[3]CHECKtwoATrainERCWPumpsAVAIL

ABLE.STAND ARD: Operatorverifiesat

l east2Atra inERCWpumpsavailable

COMMENTS:_SAT_UNSAT

STEP5.:[4]CHECK lA and 2AERCWsupplyheaderpre ssuresandflows-SAT NORMA L: a.Supp ly He ader pressures[between78psigand124

psig]:-UNSAT*l-PI-67-493A*2-P I-67-493A S TANDARD: Opera tor checks header pressures a re between78and124ps

ig o n bo th A T rain i n d icators..COMMENTS: STEP 6.: b.Sup p ly Heade r flows[e xpe cted v a lue].-S AT*l-FI-67-61*2-FI-67-6 1-UNSAT STANDARD: O pe rato r che cks there isflowontheA trainsupply header a s i n dicate d onboth indicators.

C OMM ENTS: Consoleopera tor ins ert malf un ctionRW13Bat 9 0%p riortocheckingheader flows.r"[5]CHE CK1Band2B ERCWsupp ly heade r pressuresandfl ows-SAT NO RMA L: a.SupplyHe a der p re ssu re s[bet wee n78psigand124 psig]:-UNSAT*1-PI-67-488 A*2-PI-67-488A b.Supply headerflows[expected value]:*l-Ft-67-62*2-FI-67-62 STANDA RD: O peratorchec kshea de r pressu r esarebetween78and124psig on bothBTra inind icators.Flo wsarea bnormal, trans it ions t o se ction 2.10.COMMENTS: (((JobP erform ance Check list: ST EP/STANDARD JP M B.1.IPage6of16 Re v.12 SAT/UNSAT

EVALUATORNOTE:Thefollowinastepsarefromsection2.

10: ST EP 8.:[1]Stopand L O CKOUTAllTrainB ERCWPumps-SAT STANDARD: O perator p laces all runningBtrain

ERCWpumps inpull-to-lock-UNSAT position.Thisste piscr iti cal t a prevent pum pin g water autthe break.CriticalSt ep COMMENTS:STEP9.:[2]DISP ATCH operator swithradio stoperformthefollowing:-SA T*PERFORM Appe ndix F , E RCWRxMOV Board ERCWValves.*PERFORMAppendixG,ERCWMCCValves.

-UNSA T*ENSU REallpumpingstation

watertightdoorsareCLOSED.

Cr it ical Step Cue: Play r oleofA UO and acknowledge t he request.STANDARD:Operatordispatchesoperatorstoperformtherequiredappendicesand

actions.This stepisc ritica l t o supply power t o valves needed t o iso late the leak.COMMENTS:-STEP10.:[3]ENSURE 1Aand2ACCPsRUNNING.-SATCue:Play role ofU2CROa nd start 2A CCP-UNSAT STANDARD: Opera tor s tarts lA-A charg ingpump.Thisstepi s criti cal to supply CriticalStep

RC P seal s a nd norma l charging from A trai n eq uipment.COMMENTS: (JobPerformance Checklist:

STEP/STANDARDJPMB.l.fPage7of 1 6 Rev.12 SAT IUNSA T

STEP11.:[4]STOP andLOCKOUT effectedequip

ment:-S AT a.PLACE thefollowingpump

s i n PU LL T O LOCK:-UNS AT*1BCCP Cr itical Step*2BCCP*1BSlP ump*2BSl PumpCue:Playrole

ofU2CRO and S top/Lockout

associated

pumps STAND ARD: Operator securestherunning pump sinthecontrolroom anddispatches a n AUO to lockouttheBAuxControl Air Compressor.ThisstepiscriticaltopreventstartofECCSequipmen

twithoutcoolingwater

availabletotheroomcoolers.

CO M MENTS: S TEP 1 2.: b.DISPATCH operator toplaceTr ain B A ux A ir Compressorin

SAFE STOP.Cue:Playroleof

AUO and acknowledgetherequest.

STANDARD: Operator securestherunningpumpsinthecontrol room anddispatches anAU O tolockoutth e B A ux ControlAir Compressor COMMENTS: STEP 1 3.:[5]OPEN alternate ERCW supply toBtr ain DGs:-S AT*1-FCV-67-65 (1BDG)*2-FCV-67-65 (2BD G)-U NSAT Cue:Playroleof

CRO/AVO andacknOWledgethe

request.STANDARD: Operator opens 1-FCV-67-65anddirectsopeningof 2-FCV-67-65

.COMMENTS: (c Job Performance

Checklist: STEP/S TANDARD JPM B.1.f Pa ge 8 of 16 Rev.12 SAT/UNSAT

JPM B.1.I Page9of16 Rev.12 Job Performance

Checklist:

(STEP/STANDARD

EVALUATOR NOTE: RCP Temperature

alarms mav come in deoendinoonoace.STEP14.:[6]ISOLATEBTrainERCW

Header rupture: a.CLOSE 1-FCV-67-489

.Header1BIsolBefore

Strainer[ERCWMCC1BBCornpt.3C]

.b.CLOSE 2-FCV-67-489.

Header2BIsoI Before Strainer[ERCWMCC2BBCompt,3C].Cue:Playrole

of AUO and acknowledge

the request.STANDARD: OperatornotifiesanAUOtoclosethevalvestoisolatetheBERCW

header.This step is critical to isolate the ERCW leak.COMMENTS: Console Operator perform the following to isolate the leak: MRF RWRV489 0%MRF RWR2V489 0%SAT/UNSAT_SAT_UNSAT Critical Step STEP 15.:[7]OPERATE availableATrainERCW

Pumps to maintain pressure between78psigand124psig.

c STANDARD: COMMENTS: Operatorwillstartan

additionalAtrainpump.

This step is critical to return ERCW supply header pressure to normal._SAT_UNSAT Critical Step (P ressureislessthan78psiq

, but procedurealsoallows

reducingflowto non-essential

equipmenttoraise pressure._.-'---.....J

J ob P erf ormanc e Checklist: JPM B.1.1Page10of16

Re v.12 (STEP16.:[8]Cue: Cue: S T ANDARD: CO MMENTS: STEPIST ANDARD EVALUATEaligningTrainAERCWto

supplyTrainB:

a.IFalig ning1Ato 2Bheaderisdesired

, THEN PERFORMthefollowing

1)DISPATCH per sonnel t o CLOSE 0-67-1501CCSHtx OB2 I nlet valve.2)WHEN 0-67-1501 CLOSED ,THENOPEN 1-FCV-67-147

, Hdr1AtoHdr2BIsolValve[R xMOVBd1A2-A c/9A]ANDRECORDthetime

3)WHEN1-FCV-67-147 ha s b eenOPENfor approximately10

minutes, THENOPEN0-67*1501CCSHt x OB2 Inlet valve Direct operator to align 1A and2AERCW Supplies toTrainB Play role of AUO and acknowledgetherequest.When1

  • FCV*67*147hasbeen

directedopened,cue

that 10 minuteshaveelapsed.

Ope rator dispatchesanAUOto close 0-67-1501,open1-FCV-67-147

andreopens 0-67-1501after1-FCV*67*147

hasbeenopenfor

-10 minutes.This step is critical to supply cooling water to A train equipment.SAT/UNSAT S AT UNS AT Critical Step (Console Operator perform the following to open 1*FCV*67*147 (ig nore cycling 0-I 6 7*1501): RWRV489 100%

J ob PerformanceChecklist:JPMB.1.!Page 11of16Rev.1 2 (STEP17.: STEP/STANDARD

b.IFaligning2Ato1Bhead

erisdesired ,THENPERFORMthe

following:*OPEN 1*FCV-67-424 ,Hdr1BtoHdr

2ACCSH X I sol Val ve[R xMOVBd1 A2-A Comp t.9B]ANDRECORDtheTime*ENSURE1-FCV-67-223,Hdr1BtoHdr2A

Iso1ValveisOPEN.[RxMOVBd1A2-ACom

pt.8B].*ENSURE2-FCV-67-223,Hdr2AtoHdr1BIsolValveis

OPEN.[R xMOVBd2A2-A Comp t.8B].SAT/UNSAT_SAT_UNSAT Critical S tep Cue: Play role of AUO and acknowledge

the request.ST ANDARD: Oper ator dispatche s an AUOtoopen1-FCV-67-424,anden sures th at 1-FCV-67-223 and 2*FCV-67-223areopen.This step is critical to supply cooling water to A train equipment.

C O MMENTS: Console Operator perform the follow ing to open 1-FCV*67-424 (1/2-FCV-67-223

are already open): MRF RWRV424 100%STEP18.:[9]STARTadditi

onal Lo wer CompartmentCoolingFansandCRDMFansas I requiredtomaintaincontainmenttemper

ature.(STANDARD: COMMENTS:STEP19.:[10]ST ANDARD: COMMENTS:Operatorchecks containment

temperatureandstartsfansifneeded.

MONITOR Containment Pressure and Temperature.

Operatormonitorscontainment temperatureandpressure.

_SA T_UNSAT_S AT_U NSAT

STEP 20.:[11]CHECK1Aand2AERCW

header pressuresandflows adequate for-SAT current alignment:

  • 1-FI-67-61and2-FI-67-61 ,atexpectedvalue-UNSAT*1-PI-67-493and2-P

I-67-493 STANDARD: Operatorchecksabove

indicator s and observes parametersarenormal.

Ifnotstarts additiona lAt rainERCWpumps(seeJPMstep15)

. STE P 21.:[12]RESTOR E equ ipment:-SAT a.CHE CKTrainBERCWheadersuppliedf

romTrainAcrosstie.

-UNSAT b.RESTOREtherfollowing

handswltchesasapplicable

  • 1B-BCCPtoA-AUTO Critical Step*1B-BSIPumptoA-AU

TO*2B-BCCPtoA-AU

TO*1B-BSIPu mptoA-AUTOCue:Playro

le of AUO an d acknow ledgetherequest

.I STANDARD: OperatorrestoresBTrain

component stoservice.Thisstepi s critica l t orestoreAtrai

nECCSequi pment.COMMENTS: S TEP 22.:[13]EVALUATEisolationof

non-essential

A TrainCCSheatloads

USING-SAT Appendi x E ,CCSHeatLoadReduction.

-UNSAT Cue: SM will perform the evaluation STANDARD: Operator ensures AppendixEevaluated

.COMMENTS:(Job Performance

Che ckl i st: STEP/STANDARD JPM B.l.I Page 12of16 Rev.12 SAT/UNSAT

STEP 23.:[14]ENSUREallACBsopened

USINGthefollowing

appendixes:

-SAT*AppendixF,ERCWRxMOVBoardAppendi

xRValves-UNSAT*AppendixG,ERCWMCCAppendixRValvesCue:Playrole

of AVO and acknowledgetherequest.

STANDARD: Ope rator dispatchesanAUOtoperformthe

appendices

.COMMENTS: STEP 24.:[15]REFERtothefollowing:

-SAT*Appendix B , Affected EquipmentList(Heade

r1B)-UNSAT*Appendi xD,Affected

EquipmentList(Header2B)

  • Appendi x P ,PotentialTechSpec

Impacts Cue: SM will refer t o the Appendices.

ST ANDARD: Operator ensures Appendi xBreferredto

.COMMENTS: STEP 25.:[16]REFER TO AOP*M.03,Lossof Component Cooling Water.-SA T Cue: SM will refer to AOP-M.03.-UNSA T STANDARD: Operator ensures AOP-M.03referredto.

COMMENTS: (Job Pe rformance Checklist:

STEP/ST ANDARDJPMB.1.IPage13of16Rev.12 SAT/UNSA T

STEP 26.:[1 7]G O T O appropriateplantprocedure

.-SA T Cue:Direct operatortocomplete perfo rmance of AOP-M.01section2.1.

-UNSAT STANDARD:SMis informedofcompletionofAOP-M

.01section2.10.Stop Time__COMMENTS: EVALUATOR NOTEThefollow ina s teosarefromsection2

.1STEP27.:[5]b.CHECK 18 and 28 ERCWsupply Headerflows[expectedvalue].-SAT*1-FI-67-62*2-FI-67-62-UNSA T STANDARD: Operator check sthereisflowonthe8trainsupplyheade

r as indicatedonboth indicators.

COMM ENTS:.STEP28.:[6]DISPATCH per sonnel to INSPECT fa iled pump(s)and determine cause-SA Tforfailure

.-UNSAT Cue:ThefloorUS

reportsthatthe 5 1relayhas a flag pickedup.TheAUOreports n o apparent reasonforthetripl

ocally.STANDARD:TheFloorUSorAUOhasbeennotifiedtoin

spectthebreakerandanAUOhasbeen

dispatchedtothepump.

COMMEN T S:STEP29.:[7]NOT IFYSTAto evaluateTechSpecLCO3.7.4,ERCWSystem

.Cue:Playro

le of STA and acknowledgethereq uest.STANDARD: S TAhasbee n nolifed.COMMENTS: (Job Performance

Checklist:

STEP/ST ANDARD JPM 8.1.f Page 140f 16 Rev.12 SATIUNSAT

STEP30.: (8)CHECK ERCW pumpload ingampsNORMAL.

-SAT STANDARD: Pumpampmeterforpumpthat

wass tarte dverifiedt obeinnormal-UNSA T opera ting range.COMM E N TS: STEP 31.: (9)TRAN SFER emergencypowerselec

to r sw itch a wayfromfa iled pump.-SAT-UNSAT STANDARD: The Emergency Po werSelector Swi tch ispositionedawayfromQ-A

ERCW pump.Critical Step COMM ENTS: ST EP (10)EVALUATE needtoclosea ndplacec lea rance o n manual discharge-SAT va lvef or fa i l ed pu m p.-UNS AT Cue:IfAU O i s conta cted , Playrole o f A UO and ackn owledge the request.STANDARD: Operato r may notify anAUOtoc losethema nual d ischarge val ve o f Q*A E RCW pump.COMMENTS: STEP 33.: Inf o rm SMoffailu re o fERCWpumpandheade

r an d performance

of-S AT A OP-M.0 1-UNSAT S TANDARD:SMisinformedofp umpandhead erfailureandthatAOP-M.01 has bee n performed.Stop Time__COMMENTS: (((Job Perform ance Checklist:

STEP/S TANDARDEndofJPM JPMB.1.I Page15of16 Rev.1 2 SAT/UNSAT

((Page16of16

Rev.2CANDIDATECUESHEET(TOBE RETURNEDTOEXAMINERUPON

COMPLETIONOFTASK)DIRECTION TO TRAINEE:Iwillexplaintheinitialconditions,andstatethetasktobeperformed.All

controlroomstepsshallbe

performedforthisJPM,includinganyrequired

communications

.Iwillprovideinitiatingcuesandreportsonother

actions when directedbyyou.Ensureyouindicatetomewhenyouunderstandyour

assignedtask.Toindicatethatyouhavecompletedyourassignedtaskreturnthe

handout sheetIprovidedyou.

-INITIAL CONDITIONS:Unitisinmode1at100%power

INITIATING

CUES:YouaretheCROandaretomonitortheboardandrespond,asa

reader/doer, to any eventthatmayoccur.InformSMwhenanyrequiredaction(s)

associatedwiththefailurehavebeen

completed

(

(TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANTAOIPROGRAMMANUAL

ABNORMAL OPERATING PROCEDURES

AOP-M.01LOSSOF ESSENTIALRAWCOOLING

WATERRevision15

QUALITY RELATED PREPARED/PROOFREAD

BY: D , A.PORTER RESPONSIBLE

ORGANIZATION:

OPER ATIONS APPR OVEDBY:W.T.LEARY EFFEC TIVE DATE: 07/21/06 REVISION DESCRIPTION

Incorporated

various enhancementstoSect.2,1

1basedupon feedbackfromREPdrill(PER97828

, NB-060173 , NB-060178), Relocated caution, notes , and administrative

act ions from Sect ion 2,0, Incorporated

other enhancements

and minor corrections

, INTENT CHANGES TO SECTION2.11OFTHIS

PROCEDURE MUST BE APPROVED BY PORCo

AOP-M.01 Rev.15 SQN____---e[LOSS OF ESSENllAL RAW COOLING WATER (1.0PURPOSE

This procedure providestheactions

necessarytomitigatetheeffectsofanERCWpumporpipingfailure

.Page 2 of 142

(LOSSOF ESSENTIAL RAW COOLING WATER AOP-M.01Rev.15

j ACTION/EXPECTED

RESPONSE 2.0 OPERATOR ACTIONS RESPONSE NOT OBTAINED CAUTION: ERCW headerrupturein Auxiliary Build ing could fillthepassive

sumpin15minutes.

Promptactionisneeded.

1.DIAGNOSE the failure:IF...GOTO SECTION PAGE ERCW Pump(s)trippedorfailed 2.1 ERCWpumpfailure

5 H igh flow ERCW Supp ly Header 1A 2.2 Supp lyHdr1AFa ilure 8toAuxBldg H igh flow ERCW Supply Header 18 2.3 Supply Hd r1BFai lure 12 toAuxB ldgHighflow ERCW S upply Header 2A 2.4 Supp lyHdr2AFailure 16toAu x BldgHighflow ERCW Supply Header 28 2.5 Supp lyHdr2BFailure

22toAuxBldg Indications

of an ERCW Return Header rupture 2.6ReturnHdrrupture

27 (must be diagnosed l ocally since M-27 indicationsinAuxBldgarenot affected)Lowf low ERCW Supply Header1Aand2A, 2.7SupplyHeade

r 1AJ2A 38 AND Fa ilureinYardArea

STRAINER DIFF PRESSHIGHalarmLIT

[M-27 A , C-3 and/or D-2]Low flow ERCW Supply Header 18 and 28 , 2.8SupplyHeader1B

/2B 52 AND FailureinYa rd Area STRA INER OIFF PRESS H IGHalarmLIT[M-27 A , C-6 and/or 0-5](step continued on next page)Page 3 of 142

(LOSSOF ESSENTIALRAWCOOLING

WATER AOP-M.01Rev.15 RESPONSE NOT OST AINED I STEP I ACTION/EXPECTED

RESPONSE[---'---'------'2.0 OPERATOR ACTIONS (Continued)

3.(Continued)IF...GOTOSECTION

PAGELowflow ERCW supplyheaders1Aand2A, AND STRAINERDIFFPRESSalarmsDARK[M-27A ,C-3andD-2]

, AND at leastone ofthefollowing

alarms LIT:*ERCWDECKSUMPLEVELHIa

larm LIT 2.9 SupplyHeaderA 63[1-M-158 , A-3]Failure Upstream of Strainer Inlet Va lves OR*ERCW DECK S UMP P MP RUNNING[1-M-158 , 0-2 o r 0-4]OR*MECHEQU IPSUMPLVLH IalarmLIT[1-M-15A , 8-6]Lowflow ERCW supply headers18and28 , AND STRAINERDIFFPRESSalarmsDARK[M

-27A, C-6andD-5]I AND at leastoneofthe followingalarmsLIT: ERCW DECK SUMP LEVEL HIalarmLIT[1

-2.10 Supply Header B 71*M-158 , A-3]FailureUpst

ream of St rainerInletVa lves OR*ERCWDECKSUMPPMP

RUNNING[1-M-158 , 0-2orD-4]OR*MECHEQUIPSUMPLVLHIalarmLIT[1-M-

15A ,8-6]'\LossofflowonALL

ERCW supp ly headers 2.11Lossofall ERCW flow 77 in modes 1-4.ENDOFSECTIONPage4 of 142

(SQNLOSSOF ESSENTIALRAWCOOLING

WATER AOP-M.01Rev.15 I STEP I ACTION/EXPECTED

RESPONSE 2.1 ERCWPumpFailure

1.IDENTIFY and LOCK OUTfailedERCW

pump.2.START additional

ERCW pumpsasrequ iredtomaintainsupplyheader

pressurebetween78ps

igand124psig.

3.CHECKtwoTrainAERCWPumps

AVAILABLE.4.CHECK1Aand2AERCWsupp

ly header pressuresandflowsNORMAL

a.Supply header pressures[between78psigand124psig]
  • 1-PI-67-493A*2-PI-67-493A

b.Supply header flows[expectedvalue]:*1-FI-67-61*2-FI-67-61 RESPONSE NOT OBTAINED IFlessthantwoTrainA

ERCW Pumps available , THENEVALUATEisolationofnon-essentialTrainACCSheatloads

USING Appendix E , CCSHeatLoadReduction

[C.1]IFBOTH1A AND 2A ERCW Headers FAILED , THENGOTOSection2.9, ERCW SupplyHeaderAFailurePriortoERCWStrainerInletValves

.IF 1A OR2AERCWHeader

FAILED, THENRETURNTO Section 2.0ford iagnosis.Page5 of 142

(LOSSOF ESSENTIALRAWCOOLING

WATER AOP-M.01Rev.15 I STEP 1 ACTION/EXPECTED

RESPONSE2.1ERCW Pump Failure (cont'd)5.CHECK18and

28ERCWsupplyheaderpressuresandflowsNORMAL:a.Supplyheaderpressures[between78psigand124psig]:

  • 1-PI-67-488A
  • 2-PI-67-488Ab.Supplyheaderflows[expectedvalue]:*1-FI-67-62*2-F I-67-626.DISPATCHpersonneltoINSPECTfailedpump(s)anddeterminecauseforfailure.7.NOTIFYSTAtoevaluateTechSpecLCO3.7.4 ,ERCWSystem

.8.CHECKERCWpumploadingamps

NORMAL.RESPONSENOTOSTAINED

IF 80TH18AND28ERCWHeaders

FAILED , THENGOTOSection2

.10 ,ERCWSupplyHeader8FailurePriortoERCWStrainerInletValves.IF18OR 28ERCWHeaderFAILED

, THENRETURNTOSection2

.0ford iagnosis.INVESTIGATEabnormalampreadings:*CHECKheaderflowsandpressures.IFampsareh

ighduetoonlyonepump

available , THENEVALUATEisolationofnon-essentialERCW

loads.---------_._--------------------------'

Page6of142

AOP-M.01 Rev.15 LOSS OF ESSENTIAL RAW COOLING WATER--l.-------.L_------l

(ISTEP[ACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED

2.1ERCWPumpFailure(cont'd)

9.TRANSFER emergency power selectorswitchawayfromfailedpump.

10.EVALUATEneedtocloseandplaceclearanceonmanualdischargevalveforfailedpump.

11.GOTO appropriateplantprocedure

.--...--ENDOFSECTION

Page I of 142

(SQN LOSS OF ESSENTIAL RAW COOLING WATER AOP*M.01 Rev.15

ACTION/EXPECTED

RESPONSE RESPONSE NOT OBTAINED 2.10 ERCW Supply Header B Failure Upstream of ERCW Strainer Inlet Valves CAUTION: During operation, CCP and SI Pumps may experience

bearing failure 10 minutes after loss of ERCW cooling.1.STOP and LOCKOUTallTrainB

ERCW Pumps.2.DISPATCH operators w ith radios to perform the following:*PERFORM Appendix F ,RxMOVBoard

ERCW Valves[AuxBldgel.749'

, R xMOVBoards]

.*PERFORM Appendix G , ERCW MCC Valves.[ERCW Pumping Stations]*ENSUREallpumpingstation

watertight

doors are CLOSED.[ERCW Pumping Station].3.ENSURE 1 A-Aand2A-ACCPs

RUNNING.4.STOP and LOCK OUT affected equipment:

a.PLACE the followingpumpsinPULLTOLOCK

  • 1B-BCCP*1B-BSIPump*2B-BCCP*2B-BSIPump

b.DISPATCH operatortoplaceTrainB

Aux AirComp ressor inSAFESTOP.

[Aux Bldg , 734'elev ,RefuelFloor]

Page 71 of 142

(SQN LOSS OF ESSENTIAL RAW COOLING WA TER AOP-M.01 Rev.1 5 , I S TEP I AC TION/EXPECTED RESPONSE RESPONSE NOT OBTA INED 2.10 ERCW Supply Heade rBFa ilure Upstrea m ofERCWS trainer InletValves(co nt'd)5.OPENalternate ERCW supply to Train8 DGs*1-FCV-67-65

(18DG)*2-FCV-67-65 (2 8 DG)NOTEF loo d ing at th e ERCWstationmaypreventFCVsfromcl os in g.Manua l valves a re locatedsouthof the CCW stationandare normally lockedopen.6.ISOLATETrain8ERCW Header rupture: a.CLOSE 1-FCV-67-489 , Header 18 Iso l Befo re Strainer[ERCWM GG1B-8 Cornpt, 3C].b.CLOSE 2-FC V-67-489 , Header28Is ol B e f o re Strainer[ER GWMGG28-8 C ornpt, 3C].7.OPERATE ava i l able TrainA ERCW P umps tomai ntain pressure between78ps ig an d124ps ig.a.CLOSE1-VLV-67-5188

, ERC W Supply Iso lation Va lve b.CLOSE 2-VLV-6 7-5188 , ERGWS upply Isola tio n V a lve Page 72of142

(saN LOSS OF ESSENTIAL RAW COOLING WATER AOP-M.01 Rev.15 I STEP I ACT ION/EXPECTED

RESPONSERESPONSENOTOBTAINED

2.10 ERCW Supply Heade rBFailureU p streamo fERCWStrainer Inlet Va lves (cont'd)CAUTION1 CrosstyingAa nd B trainERCW supp lyheadersshou

ld only be performed i f cooling is urgently requiredforTra in8CCSrelatedequipment.LCO3.0.3maybeapp licable.CAUT ION 2 Opening of crosstie valve1-FCV-67-1

47 may resultinsevere fouling or flow blockage of OB1/082CCSHeatE xchanger , therefore theCCSH x OB2 should be isolatedp rior to opening.After approximately

10 minutes OB2CCSHx will be returned toservice.NOTE*Thefollowingstepallows

1AERCWheadertosupply2B

ERCWheader (including OB1 and OB2CCSHX).*Withthe ERCW headercrosstie

valves attheCCW (I PS)stationope

n , 1A heade r w ill supp ly2Band1BERCW AuxBldgsupply heade rs.8.EVALUA TE aligning TrainA ERCWto supply TrainB: a.IF a ligning 1 Ato2Bheaderisdesired

, T HEN PERFORMthefollowing:

1)DISPATCH personne ltoCLOSE 0-67-1501CCSH x OB2 Inletval ve.2)WHEN 0-67-15 01 CL OSED.THEN OPEN 1-FCV-67-147, Hdr 1 A toHdr2B IsolVa lve[RxMOVBd1A2-

A Compt.g A l and RECORDtime_3)WHEN 1-FCV-67-147

hasbeenOPEN f or approximately10minutes , THEN OPEN 0-67-1501CCSH xOB2Inlet valve (stepco ntinued on next page)Page 73 of 142

(SQN LOSS OF ESSENTIAL RAW COOLING WATER AOP-M.01 Rev.15 I ST EP I ACTION/EXPECTED

RESPO NSE RESPONSE NOT OBT A INED (2.10ERCW Supply HeaderBFailure Upstream of ERC W S tr ainer InletVa lves (c ont'd)8.b.IF alig ning2Ato1B headeri s desired , THEN PERFOR M thefo llowing:*OPEN 1-FCV-67-424, Hdr1Bto Hdr2ACCS H X Isol Valve[Rx MOVBd1A2-A Compl.9B]and RECORD theTime_*ENSURE 1-FCV-67-223, Hdr1 B to Hdr2A IsolValveisOPEN.[R x MOV B d 1A2-A Compl.8B].*ENSURE 2-FCV-67-223

, Hdr2A to H dr1BIsolValveisOPEN.[Rx MOV Bd2A2-ACornpt.8B].9.START a dditionalLower Compa rtment Cooling Fansand CRDM Fans as requiredtomai ntain containment

temperature

.10.MONITOR Co nta inment Pressu reand Temperature.Page 74 of 14 2

(SQN LOSS OF ESSENTIAL RAW COOLING WATER AOP-M.01 Rev.15 I STEP I ACTION/EXPECTED

RESPONSERESPONSENOT

OBTAINED2.10ERCWS upp ly Header B Failure Upstream of ERCW Strainer Inlet Valves (cont'd)(11.CHECK.1Aand2AERCWheaderpressuresandflowsadequateforcurrent

alignment:*1-F I-67-61and 2-FI-67-61 , a t expectedv a lu e*1-PI-67-493Aa nd 2-PI-67-49 3A 12.RESTOREequipment:a.CHECKTra

in B ERCW header supplied from Tr ainAcrosstie.b.RESTORE thefollowinghandswitches

as applicable:*1B-BCCP t o A-AUTO*1B-B 81PumptoA-AUTO*2B-BCCPtoA-AUTO*2B-B 81PumptoA-AUT O*TrainBAuxAir

CompressortoAUTO[AuxBldg , 734'elev ,RefuelFloor]STARTaddit

ional" A" Train ERCWpumpsasnecessary.

ISOLATE no n-essentia l ERC W loa ds as necessary.DONOTCONTINUEUNTILheader pressureandflowareadequatef or current alignment.a.GOTOstep 1 4.Page 75 of 142

(SQNLOSSOF ESSENTIALRAWCOOLING

WATER AOP-M.01 Rev.15 I STEP I ACTION/EXPECTED

RESPONSERESPONSENOT

OBTAINED 2.10 ERCW Supply Header B Failure UpstreamofERCW Strainer Inlet Valves (cont'd)13.EVALUATE i sol a tionofnon-essential TrainACCSheat loads USING AppendixE , CCSHeat L oad Reduction.14.ENSUREallbreakerso penedUSINGt he following appendi xes*Appendix F , R x MOV Boa rd ERC W Valves*App endixG,ERCWMCC Valves 1 5.REFERTO thefollowing:*AppendixB , AffectedEquipm

ent List (Header1B)*Appendi x D , AffectedEquipmentList

(Header2B)*Append ixP , Potential Tec h Spec Impa cts.16.REFERTO AOP-M.03 , Loss of ComponentCoo ling Water.17.GOTOappropr

iate p lant pr ocedure.---.--ENDOFSECTION

Page76of142

(PREPAREDI REVISED BY:VALIDATEDBY:

APPROVED BY:*JPM8.1.g Page 1 of 9 Rev.9.SEQUOY AH NUCLEAR PLANT JOB PERFORMANCE

MEASURE B.1*9RespondtoSpray

Valve Failure Or iginal Signatureso n File Dat e l Date l Da te l (Op eratio nsT rain ing Manager)CONCURRED:

    • (Operat io ns Representative)

Dat e l*Va lidationnotrequiredforminorenhancements

, procedure R ev chang es thatdonotaffec

ttheJPM ,orind ividual step changesthatdonotaffecttheflowoftheJPM.**Operations Concurrence

required fo rnewJPMsand

changes that affectthe flowoftheJPM(i

f not driven by a procedure revision).

(JPM8.1.g Page2of9 Rev.9 I NUCLEA R TRAINING REVISION/USAGE

LOG REVISION DESCRIPTION

O F V DATEPAGESPR EPARED/NUMBER REVISIONAFFECTEDREVISEDBY

0 Initial Issue Y 2/13/07 A ll RH Evans v-Speci fy i f th e JPMchange willrequireanother v a lidatio n (Y o r N).Seecover sheetforcriteria.

JPMB.1.gPage3of9 Rev.9 (SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE

MEASURE Task:RespondtoSprayValvefailure

Note: This JPM satisfies Simulator Manipulation

XXXXXX.JAIT A task#: 3210140401

0000910501(RO)0150050101 (RO)(RO)0150040101(RO)

KIA Ratings: Task Standard: Repssupplyingfailedsprayvalvearetripped

.Pressurizerheatersareenergized.

In-Plant_x Evaluation

Method: Simulator_--C>.-__===================================================================================

Performer:

NAMEStartTime Performance

Rating:SATUNSAT Pertormance

TimeFinishTime

C Evaluator:

I SIGNATURE DATE===================================================================================

COMMENTS (

(JPM8.1.g Page 4 o f 9Rev.9SPECIALINSTRUCTIONSTOEVALUATOR:a.Setupthe

simulator post trip with one spray valve cracked and stuckopen.RCS pressure should be dropping but not less than approximately

2100*2150 psigwhenthe applicant reaches the step to check pressure control.If possible , fail pressurizer

backup heaters to automatically

energize so that they must be energized manually Validation

Time: CR.11min s Local ToolslEquipmentlProcedures

Needed: 'ES-O.1 Reference ES-O.1 Directions

to Trainee: Reactor Trip Respo nseREADTOOPERATOR

Title RevNo.30Iwillexp laintheinitialconditions

,andstatethetasktobeperformed

.Allcontrolroomstepssha

llbeperfo rmedforthisJPM.Iwillprovideinitiatingcuesandreportsonotheractionswhend

irectedbyyou.Whenyoucompletethetasksuccess

fully,theobjectiveforthisjobperformancemeasurewillbe satisfied.Ensureyouindicatetomewhenyouunderstandyourassignedtask.ToindicatethatyouhavecompletedyourassignedtaskreturnthehandoutsheetIprovidedyou.

INITIALCONDITIONS:

1.Un ithastripped.

2.Transition to ES-O.1hasbeenperformed.INITIATINGCUES:

Y ou have bee n directedtostabilizeth

eunitin accordance

with ES-O.1 , beg inning atstep 1.N ot ify the SRO whent he unitisstable

JPM8.1.g Page 5of9 Re v.0JobPerfo rmance Checkl ist: SAT/UNSAT STEP/STANDARD

Note: Applicant may take actio n re latedtocritical steps prior to reach ing required steps by use of the E8-0.1 Handout.STEP1.:Obtaintheappropriateprocedure

.-SAT-UNSAT STANDARD: Ope ratorobtainsacopyof

ES-O.1.Start Time__S TEP 2.:[1]M ON ITOR 8 1 NOT act uated:-SAT 81 A CT UATED permissive DARK[M-4A, D4]-UNSA T*STANDARD: Determine s SI isNOTactuatedbyobservingannunciatorM-4A-D4permissiveisdark

STJ;;P 3.:[2]VE R IFY generat or breakers OPEN.-SAT-UNSA T STANDARD: Verifies generatorbreakersopenbyobse

rving g reen l ightson1-M-1 benchboard.STEP4.:[3]M ON I TOR RCS temperat ures:-SA T R CP s Ru nn ing: CH ECK T-avg stable at or tr e ndingt o-UNSAT*betwee n 547°F a nd 552°F.STANDARD: DeterminesT-avg isstableato

r t rendingtobetween 547°F an d 5 52°F.((

STEP5.[4]MONITOR feedwater status:-SAT*T-avg less than 550°F.-UNSAT*MFW regu lating valves CLOSED.*MFW regulating

bypass valve controller

outputs ZERO.*MFW isolation valves CLOSED.*MFW pumps TRIPPED.*MFW flow ZERO.*Total feed flow to SIGs greater than 440 gpm.STANDARD: DeterminesTavgisNOTlessthan550

°Fandgoestostep5

.STEP6.:[5]CHECK if emergency boration is required:-SAT[aJ VERIFYall control rods fully inserted:-UNSAT*Rod bottom lights LIT*Rod position indicators

less than or equalto12 steps.STANDARD: DeterminesAllrod Bottom l ights are illuminated.STEP7.:[b]MONITOR RCS temperature:

-SAT*T-avg greater than 540°F if any RCP running-UNSAT STANDARD: Determines

T-a vg is approximately

551°FSTEP8.:[6]ANNOUNCE reactor trip USING PA system.-SAT-UNSAT STANDARD: AnnouncesreactortripoverPAsy

stem ((Job Performance

Che cklist: STEP/ST ANDARDJPMB.1.gPage6of9 Rev.0 SAT/UNSAT

STEP 9.:[7]MONITOR pre ssurizer level control:-SAT CHECK pressurizer

level greater than 17%.-UNSAT**V ER IFY chargingIN SERVICE.*V ERIFY letdo wn I N SERVICE.*CHECK pressurize r level trending t o 25%(normal range 20%t o 30%).STAN DARD: Determ ines ChargingandLe t do wn areinse rv ice a nd PZR levelis>17%an d trending t o 25%.STEP 10.:[8]MONITO R pressurizer

pressure control:-SAT*Pressurizer

pressure greater than 1870 psig.-UNSAT*Pressurizer

pressu re stableatort rending to 2235 psig (n ormalra nge 221 0 psig t o 22 6 a psig).STANDARD: Deterrn ines PZR pressure>1870butNOT

trending toward 2210-2260 p sig.E VALUATORNOTE: JPM steps 11 ,12and13ar e from pro ceduresteo8 RNO STEP 11.: IF pressure less than 2235psiganddr opp ing, THEN-SAT PERFORM the following:

_UNSAT*ENSURE pressuri zer PORVs CLOSED.Critical Step*ENSURE spray valves C LO SE D.*IF spray valve(s)CANNOT be cl osed , THEN STOP RCP s#1 and 2.*IF pressur izer pressure cont inues to drop , TH EN S TO P add it ional RCPs as necessary.

  • ENSURE all pressurizer

heater s ON.STANDARD: StopsNumber 1 R ep by ro t at inghandsw itch counter-cloc

k w ise.((Job Perfo rmanceCheckl ist: STEP/STANDARDJPM8.1.g P age7of9 Rev.0 SAT/UNSAT

STEP 1 2.: IF pressure less than 2235 psigand dropping, THEN PERFORM t he following:-S AT-UNSAT*ENSURE pre ssur izer PORVs CLOSED.*ENSURE sprayvalves CLOSED.CriticalStep

  • IF spray valve(s)CANNOT be closed , THEN STOP RCPs#1 and 2.*IFpres s urizer pressure cont inues to drop , THE N STOP additional RCPs asnecessary.*ENSURE all pressurizer

heaters ON.STANDARD: Stop s Number2 R CP b y rotating handsw itchcounter-c lockwise, i f candid ate de term inesthatRCSpressure continuestodr op , additional RCP smaybestopped.STEP1 3.:IFp ressurelessth an 2235psigand dropp ing , THEN PERFORM the following:-SAT-UNSAT*ENSURE pressurizer

PORVs CLOSED.*ENSURE spray valves CLOSED.Cr itical Step*IF spray valve(s)CANNOT be closed, THEN STOP RCPs#1 and 2.*IF pressurizer pressure continues to drop , THEN STOP additional RCPsas necessary.*.ENSURE all pressurizer

heaters ON.I STANDARD: Manually ene rg ized PZR heater BankDb y rotating handsw itch c lockw ise.(JobPerfo rmance Chec kl ist: STEP/STANDARDEndofJPM JP M B.1.g Page8o f 9 Rev.0 SAT/UNSAT

(Page9of9 Rev.0CANDIDATECUESHEET(TOBERETURNEDTOEXAMINERUPONCOMPLETIONOF

TASK)DIRECTIONTOTRAINEE:Iwillexplainthe

initialconditions,andstatethetasktobeperformed.All

control room stepsshallbeperformedforthisJPM,includinganyrequired

communications.Iwillprovideinitiatingcuesandreportsonotheractions

when directedbyyou.Ensureyouindicatetomewhenyouunderstandyour

assignedtask.To indicatethatyouhavecompletedyourassignedtaskreturnthe

handout sheetIprovidedyou

.INITIAL CONDITIONS:Unithastripped

.Transition

to ES-O.1hasbeen performed.INITIATINGCUES:

You have been directed to stabilize the unit in accordance

with ES-O.1, beginning at step 1.NotifytheSRO when the unit is stable

(

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANTEOIPROGRAM

MANUAL EMERGENCYSUBPROCEDURE

ES-0.1REACTORTRIPRESPONSE

Revision 30 QUALITY RELATED D.A PORTER PREPARED/PROOFREAD

BY:__

_RESPONS IBLE ORGAN IZA TION:

_W 1.LEARY APPROVED BY:.

_EFFECTIVE DATE: 08101/2005

REVISION DESCRIPTION

Added new step which checks generator PCBs open.This step is being relocated from E-QStep3in conjunction

with incorporationofE-OA.Revised step 11.b to provide details on placing steam dumps in pressure mode.This procedurehasa handout page (2 copies)and foldout page.

REACTOR TRIP RESPONSE SQN I ES*O.1'---'-Rev.30 FOLDOUT PAGE SI ACTUATION CRITERIA IF eitherofthefollowing

conditions

occurs:*RCS subcooiingbasedonco re e xit TICslessthan40

o f OR*Pressurizer

level CANNOT be maintained

greaterthan5%, THEN ACTUATESIandGOTOE-D

, Reac torTripor Safety Injection.EVENT DIAGNOSTICS

IF both trains of shutdown boards deenergized, THENGOTO ECA-D.O,LossofAll AC Power.TANK SWITCHOVER

SETPOINTSIFCSTlevellessthan5%.

THEN ALIGN AFWsuctiontoERCW.Page1aof15

REACTOR TRIP RESPONSE SQN I ES-0.1________________________

Rev.30 HANDOUTPage1of2 STEP ACTION FOPIFRCS subcoolingbasedoncoreexit

TICslessthan40

'F OR Pressurizer

level CANNOTbema intained greaterthan5%, THEN ACTUATESIandGOTOE-O

,ReactorTriporSafetyInjection.

.FOPIFCSTlevellessthan5%

, THEN ALIGN AFWsuctiontoERCW

.1.MONITORSINOTactuated:

3.MONITOR RCS temperaturesstableatortrend

ingtobetween 547"Fand552'F.3.c.(ifRCS temperaturecontinuestodrop)

RNO*CONTROLtotalfeedflowto

minimizeRCScooldown

.*MAINTAINtotalfeedflow

greaterthan440gpmUNTILnarrowrangelevel

greaterthan10%inatleastone

S/G.4.MONITOR feedwater status: (verify FVIIIwhenT-avglessthan SSO°F)5.b.MONITOR RCS temperatures

greate rthan540°F.7.MONITOR pressurizerlevelcontrol

(pressurizerlevelgreaterthan17%)

7.a.(ifpzrlevellessthan17

%)RNO 3)CONTROLchargingtorestore

pressurizerlevelgreaterthan17%.

4)WHEN pressurizer

level greaterthan17%, THEN OPERATE pressurizerheatersas necessary.7.c..(ifletdownnotinservice)RNOWHENcharging

established

AND pressurizer

level greaterthan17%, THEN ESTABLISH letdown.7.d.(ifpzrlevelisNOT

trendingto25%)RNO CONTROLchargingandle

tdowntoma intain pressurizerlevelat25%

(normalrange20%to30%).

8.MONITOR pressurizer

pressure control:(pzrpressuregreaterthan1870psigandstableator

trendingto2235psig)

a.b.2)(ifpzr pressure greaterthan2235psigandrising)

RNO CONTROL pressure.9.MA INTAIN SlG narrowrangelevels:(between10%and50

%)9.a.(if SIGlevelslessthan10

%)RNO MAINTAINtotalfeedflow

greaterthan440gpmUNTILlevel

greaterthan10%.Page 1bof15

SQN STEP 12.b.2).RNO REACTOR TRIP RESPONSE HANDOUTPage2of2 ACTION(ifNORCPcanbestarted)

MONITORnaturalcirculation.

I ES-0.1 Rev.30 13.MONITORifso urcerangechannelsshouldbereinstated

(IRMfluxlessthan10.

4%power)15.MAINTAINstableplantconditions: a.Pressurizerpressureat2235psig(normal range2210ps

igto2260 psig)b.Pressurizerlevela t 25%(normalrange20

%to30%)c.S/G narrowrangelevelsbetween10

%and50%d.RCStemperatureat

547"F(between540

'Fand550'F)Page1cof15

REACTOR TRIP RESPONSE SQN I ES-0.1____...L-Rev.30 HANDOUTPage1of2 STEP ACTION FOPIFRCS subcoolingbasedoncoreexit

TICslessthan40"F OR Pressurizer

level CANNOTbemaintainedgreaterthan5

%, THEN ACTUATESIandGOTO E*O,ReactorTripo

r Safely Injection.FOPIFCSTlevel

lessthan5%, THEN ALIGN AFWsuctionto ERCW.1.MONIT ORSINOTactuated:

3.MONITOR RCS temperaturesstableatortrendingtobetween547"F and 552"F.3.c.(ifRCS temperaturecontinuest

o drop)RNO*CONTROLtotalfeedflowtom

inimizeRCScooldown

.*MAINTAINtotalfeedflow

greaterthan440gpmUNTILnarrowrange

level-greaterthan1 0%inatleastone

S/G.4.MONITOR feedwater status: (ve rifyFWlwhen T*avglessthan550"F)5.b.MONIT OR RCS temperatures

greaterthan540"F.

7.MONITOR pressurizerlevelcontrol

(pressurizer

level greaterthan17%)7.a.(ifpzrleve llessthan17%)RNO3)CONTROLchargingtorestore

pressurizer

level greaterthan17%.4)WHEN pressurizer

level greaterthan17%, THEN OPERATE pressurizerheatersasnecessary

.7.c.(ifletdownnotinservice)RNOWHEN charging established

AND pressurizer

level greaterthan17%, THEN ESTABLISH letdown.7.d.(ifpzrlevelisNOTtrendingto25

%)RNO CONTROLchargingand

letdowntomainta in pressurize

rlevelat25%(normalrange20%to30%).8.MONITOR pressurizer

pressure control:(pzrpressure

greaterthan1870 pslg and stableatortrendingto2235psig)

8.b.2)(ifpzrpressure

greaterthan2235ps

igandrising)

RNO CONTROL pressure.9.MAINTAIN SIG narrowrangelevels

(between10%and50%)

9.a.(ifS/Glevelslessthan10%)

RNO MAINTA INtotalfeedflow

greaterthan440gpmUNTILlevel

greaterthan10%.Page1dof1 5

SQN STEP 12.b.2).RNO 13.REACTOR TRIP RESPONSE HANDOUTPage2 of2 ACTION(ifNORCPcanbestarted)

MONITORnaturalcirculation.

MONITORifsourcerange

channelsshouldbereinstated: (IRMfluxlessthan10.

4%power)I ES*0.1 Rev.30 15.MAINTAINstableplantconditions:

a.Pressurizerpressureat2235psig(normalrange2210psigto2260psig)

b.Pressurizerlevelat25%(normalrange20%to30%)

c.SIG narrowrangelevelsbetween10%and50%

d.RCS temperatureat547°F(between540°Fand550°F)Page1eof15

REACTOR TRIP RESPONSE SQN I ES-O.1 Rev.3D-----------------1.0PURPOSEThisprocedureprovidesthenecessaryInstructionstostabilizeandcontroltheplantfollowingareactortripWITHOUTasafetyinjection.2.0SYMPTOMSANDENTRYCONDITIONS2.1ENTRYCONDITIONS

E-OReactorTriporSafetyInjection*SINOTactuatedandNOTrequired

3.0OPERATORACTIONSPage2of15

SQNREACTORTRIPRESPONSE

I ES-O.1Rev.30 I STEP II ACTION/EXPECTED

RESPONSE II RESPONSE NOT OBTAINED NOTEThisprocedurehasa

foldout page.1.2.MONITOR 81NOTactuated:*SI ACTUATED permissive

DARK[M-4A,D4]VERIFY generatorbreakersOPEN.

IFSIactuated, THENGOTO E-O,ReactorTripor

Safety Injection.---OPEN generator breakers.Page 3 of 15

SQN REACTOR TRIP RESPONSE I ES-O.1 Rev.30 I STEP II ACTION/EXPECTED

RESPONSE I I RESPONSE NOT OBTAINED.3.MONITOR RCS temperatures

  • IFanyRCPrunning, THEN CHECK T-avgstableator

trending to between 547°Fand552°F.OR*IFRCPs stopped , THEN CHECK T-coldstableat or trending to between 547°Fand552°F.IF temperaturelessthan547

°F and dropping , THEN PERFORM the following:

a.ENSUREsteamdumpsand

atmospheric

reliefs CLOSED.b.ENSURE S/G blowdown isolation valves CLOSED.c.IFcooldown

continues, THEN PERFORM the following: 1)CONTROLtotalfeed flow USING EA-3-8 , Manual Control of AFWFlow.2)MAINTAINtotalfeed flow greaterthan440gpm

UNTIL narrow range level greaterthan10%inatleastone

S/G.3)DEPRESS RESETonMSRcontrolpanel.

4)IFanyMSR temp control valvefailstoclose

, THEN ISOLATE HP steamtoMSRs.d.IFcooldownstill

continues, THEN CLOSEMSIVsand bypass valves.IF temperature

greaterthan552°Fandrising, THEN*DUMPsteamto condenser.

OR DUMPsteamUSING

atmospheric

reliefs.Page4of15

SQN REACTOR TRIP RESPONSE I ES-O.1R_e_v_._3_0_I STEP I I ACTION/EXPECTED

RESPONSE I I RESPONSE NOT OBTAINED 4.MONITOR feedwater status:a.T-avglessthan

550°F.a.GOTOStep5.b.MFWregulatingvalves

CLOSED.b.CLOSE valves.c.MFWregulatingbypassvalve

controller

c.CLOSE valves.outputsZER

O.d.MFWisolationvalvesCLOSED.

d.CLOSE valves.e.MFW pumps TRIPPED.e.TRIP MFW pumps.f.MFWflowZERO.f.CLOSE feedwater heater isolationMOVsas necessary.

OR D1SPA TCH personnel to isolate MFWregulatingandregulating

bypassvalvesUSINGEA-3-12,LocalIsolationofMainFeedwater.

g.TotalfeedflowtoS/Gs

g.ESTABLISH AFWflow greaterthan440gpm.asnecessary.

IF AFW flow CANNOT be established, THEN ESTABLISH main feedwater flowUSINGEA-2-2, Establishing

SecondaryHeatSinkUsing

Main Feedwater or Condensate

System.Page5of15

SQN REACTOR TRIP RESPONSE I

.1 I STEP II ACTION/EXPECTED

RESPONSE IIRESPONSENOTOBTAINED

5.CHECK if emergencyborationisrequired:

a.VERIFYallcontrolrodsfullyinserted:Rodbottomlights

LITRodposition

indicatorslessthanorequalto

12 steps.b.MONITOR RCS temperature

  • T-avg greater than 540*FifanyRCPrunn

ing OR*T-cold greater than 540*Fifall Reps stopped.6.ANNOUNCE reactor trip USING PA system.a.IFanyofthefollowing

conditions

exists:*twoormoreRPls

indicate*greater than 12 steps OR*twoormorecontrolrodpos

itionsCANNOTbe determined, THENEMERGENCYBORATE

USING EA*68-4 , Emergency Boration.b.EMERGENCYBORATE

as necessary to maintain shutdown margin USING EA-68-4, Emergency Boration.Page6of15

SQNREACTORTRIPRESPONSE

I ES-O.1_______________________

....;.R..:,.e_v_.3_0_I STEP II ACn ONIEXPECTED

RESP ONSE II RESPONSE NOT OBTAINED 7.MONITOR pressur izerlevelcontrol

a.CHECK pressurizer

level greaterthan17%.b.VERIFYchargingIN

SERVICE.c.VERIFYletdownIN SERVICE.d.CHECK pressu rizer level trend ingto25%(norma lrange20%to30%).a.PERFORMthefollowing

1)ENSUREnormal

andexces s letdown ISOLATED.2)ENSURE pressurizer

heaters OFF.3)C ONTROLchargingtorest

ore p ressurizer

level greaterthan17%.4)WHEN pressurizerleve

l g reater tha n 17%, THEN OPERATE press urizer heaters as necessary.b.ESTABLISH chargingUSINGEA-62-5.Establishing

NormalChargingandLetd

own.c.WHENcharging

established

ANDpzrleve l greaterthan17%, THEN ESTABLISH letdownUSINGEA-62-5.Estab lishing Norma l Charging and Letdown.d.CONTROL charg ing and letdown t o mainta in pressurizer

leve lat25%(norma lrange20%to30%).Page7of15

SQN REACTOR TRIP RESPONSE I ES-O.1 I L-.....L..Rev.30.I STEP II A CTIONfEXPECTED

RESPONSE IIRESPONSENOT

OBTAINED 8.MONIT OR pressurizer pressu re control: a.Pressurizerpressuregreaterthan1870psig

.b.Pressu ri zer pressurestableatortrending

to2235psig(normalrange221

0psigto2260ps ig).a.ENSURESIAC

TUATED.GOTOE-O ,ReactorTr iporSafely Injection.*b.IFpressurelessthan2235psig

a nd dr opping, THEN PERF ORMthefollowing:1)ENSUREpressurizerPORVs

CLOSED.IFpressur izer POR VCANNOTbeclosed, THENCLOSEitsblockvalve

.2)ENSUREsprayval

ves CLOSED.IFsprayvalve(s)

CANNOT be closed , THENSTOPRCPs#1and2

.IFpressurize

r p res su re continues tod rop, THENSTOPadd itional Repasnecessary.

3)ENSUREallpre

ssurizer heaters ON.(stepcont inued onnextpage)Page8of15

SQN REACTOR TRIP RESPONSE I ES-0.1 Rev.30 I STEP II ACTION/EXPECTED

RESPONSEIIRESPONSENOT

OBTAINED 8.b.(continued)IFpressuregreaterthan

2235 psigandrising, THENPERFORMthefollowing:

1)ENSUREallpressurizerheaters

OFF.2)CONTROLpressureUSINGnormal

spray.IFnormalsprayNOTavailableANDletdowninservice, THENCONTROLpressureUSINGEA-62-4,EstablishingAuxiliary

Spray.IFnormalsprayNOTavailable

ANDletdownNOTinservice, THENENSUREpressurecontrolledwithpressurizerPORV(s).

9.MAINTAINSIGnarrowrangelevels:

a.Greaterthan10%.b.Between10%and50%.

a.MAINTAINtotalfeedflowgreaterthan440gpmUNTILlevelgreaterthan10%inatleastone

S/G.b.IFlevelinanySIGcontinuestorise, THENENSUREfeedflow

STOPPEDtothatSlG.Page9of15

SQN REACTOR TRIP RESPONSE I ES-0.1___----'R_e_v_, 3_0_I STEP'I AcnONIEXPECTED

RESPONSE II RESPONSE NOT OBTAINED 10.VERIFYACbusses ENERGIZEDfromstartbusses

.PERFORMthefollowing

a.ENSURE diesel generators

supplyingshutdownboardloadsas

necessary:

CCPs*ERCW pumps.*AFWpumps.*Thermal barrier booster pumps.*CCSpumps.

Pressurizer

heaters A-A and B-B.b.ATTEMPTtorestore offsite power USING EA-202-1 , Restoring Off-SitePowerto 6900V Shutdown Boards.c.ENSUREcontrolair

compressorsAand B started USING EA*32*2 , EstablishingControland

Service Air.Pa ge 10 of 15

REACTOR TRIP RESPONSE I ES-O.1R_8_V_._3_0

_--ISTEPII ACTION/EXPECTED

RESPONSE I I RESPONSE NOT OBTAINED CAUTION Arming steam dumps In pressure mode with demand signal present could result in rapid RCS cooldown.11, DETERMINEifsteamdumpto

condenser available:

a.CHECK condenser AVAILABLE:*c-s CONDENSER INTERLOCK permissiveLIT[M-4A,E6l*At leastoneIntact S/G MSIV OPEN, b.PLACEsteamdumpsin

STEAM PRESS mode: 1)PLACEsteamdumpsinOFF.

2)ENSURE steamdumpsin steam pressure mode , 3)ENSUREzerooutput(demand).

4)PLACEsteamdumpsinON.

5)ADJUSTsteamdump controller

setpointto84%(1005psig)inAUTO,a,USE atmosphericreliefsIn AUTOandsetfor84%(1005psig).

IF atmospheric

reliefs NOT functioninginAUTO, THEN USE manual control of atmospheric

reliefs,IFlocalcontrolof

atmospheric

reliefs is necessary, THEN DISPATCH personnel to dump steamUSINGEA-1-2,Local

Control of SIG PORVs.GOTO NotepriortoStep

12.----Page11of15

SQN REACTOR TRIP RESPONSE I ES-O.1____-'-

I STEP II ACTION/EXPECTED

RESPONSE II RESPONSE NOT OBTAINED NOTELoop2RCPand

assoc iated spray valve will provide adequate spray flowforRCS pressurecontrol.IfLoop

2isnot available , all three remainingRCPsmaybe requiredtoensure adequatesprayflow.

12 CHECK RCP#2 RUNNING.PERFORM the following:a.IFNORCPsrunning, THEN ENSUREallRCS dilution STOPPED.b.ATIEMPTto start RCP(s)to provide normal pz r spray: 1)ESTABLISH conditions

forstartingRCP(s)

USING EA-68-2, Establishing

RCP Start Conditions.

2)IFRCPstart

conditions

established, THEN START RCP#2 (if available)ORRCPs#1,3, and 4.IFNORCPcanbe

started , THEN MONITOR natural circulation

USING EA-68-6, Monito ring Natural Circulation

Conditions.

IFnatural circulat ion CANNOT be verified, THEN RAISE steam dump rate.Page12of15

SQN REACTORTRIPRESPONSE

I ES-O.1 Rev.30---------------------------------

I STEP II ACTION/EXPECTED

RESPONSE II RESPONSE NOT OBTAINED 13.MONITORifsourcerange

channels-shouldbereinstated:

a.CHECK intermediaterangefluxlessthan10*

4%power on operable channels.b.CHECKsourcerange

channels REINSTATED

.C.SELECToneSRMandoneIRMon

NR-45 recorder.d.ENSURE audio countrateoperation.

e.RESET shutdown monitor alarmsetpoints.[M-13]

f.WHEN shutdown monitor ALARMLEDsdark ANDHIGHFLUXAT

SHUTDOWN bistablelightsdark, THEN PLACE HIGH FLUX AT SHUTDOWNalarmblock

switches in NORMAL.[M-13]a.TOStep14-.b.REINSTATEsourcerange

channels by simultaneously

placing bothSRMTRIP RESET-BLOCK

switches to RESET position.[M-4]Page13of15

SQN[REACTOR TRIP RESPONSE I ES-O.1____..1.R_e_v_, 3_0_I STEP II ACTION/EXPECTED

RESPONSEIIRESPONSENOT

OBTAINED14.SHUTDOWNunnecessaryplant

equipment:*REFERTO O-GQ-12 , RealignmentOfSecondaryEquipmentFollowing

ReactorlTurbine

Trip.15.MAINTAINstableplantconditions

a.Pressurizerpressureat2235psig(normalrange2210psigto2260psig)

b.Pressurizerlevelat25%(normalrange20%to30%)

c.SIG narrowrangelevelsbetween10%and50%

d.ReStemperatureat547

°F(between540°F

and 550°F):*T-avgif any Rep running OR.*T-cold if all Reps stopped.16.PERFORMEA-0-9,PostTrip

Administrative

Requirements

andRecoveryAct

ions.Page14of15

SQNREACTORTRIP

RESPONSE I ES-0.1 Rev.30 I STEP II ACTION/EXPECTED

RESPONSEII RESPONSE NOT OBTAINED 17.DETERMINEifnaturalcirculationcooldownisrequired

a.CHECKatleastoneRCPRUNNING.a.IFplantcooldownrequiredwithNORCPavailable, THENGOTOES-0.2,Natural

Circulation

Cooldown.--IIIIl_--DONOTCONTINUEthis

procedureUNTILatleastoneRCPrestarted

., b.CHECK at leastone AFW pump AVAILABLE.

c.SELECT appropr iate procedure:*O*GO-6,PowerReductionfrom30%ReactorPowertoHot

Standby (if maintaining

hot standby)OR*0-GO-7,UnitShutdownfromHotStandbytoColdShutdown

OR*other appropriate

procedureasdeterminedbyShift

ManagerorTSC(ifmanned).d.GOTOappropriate

plant procedure.

--IIIIl_--END b.DONOT CONTINUE this procedureUNTILatleastone

AFW pump AVAILABLE.Page15of 1 5

((Page12of12Rev.2CANDIDATECUESHEET(TOBERETURNEDTOEXAMINERUPONCOMPLETIONOFTASK)DIRECTIONTOTRAINEE:Iwillexplaintheinitialconditions,andstatethetasktobeperformed.All

controlroomstepsshallbe

performedforthisJPM,includinganyrequired

communications.Iwillprovideinitiatingcuesandreportsonotheractionswhen

directedbyyou.Ensureyouindicatetomewhenyouunderstandyour

assignedtask.Toindicatethatyouhavecompletedyourassignedtaskreturnthe

handout sheetIprovidedyou

.INITIAL CONDITIONS:Unit1hadbeeninMode5for72hourstorepairaleakonthe

  1. 1SteamLine.Resboronis1400ppmandthepreviousshiftdeterminedthatBTrainRHRboron

concentrationis1450ppm.

Shutdownmarginrequiredboron

concentrationis1200ppm.ATrainRHRpumpneedstobeshutdowntoallowMEGtoaddoiltothemotor.BTrainRHRhasbeencheckedoutlocallybytheAuxil

iaryBldg.AUOandisreadyfor

service.INITIATINGCUES:Youarethe Unit1OATCandtheSROhas

directed you to place B TrainRHRin serviceandtakeA Train RHR out of service.Align B Train injection flowpath to loops 1&4.Notify the SRO when youhaveB TrainRHRin service.

(((J PM B.1.h Page 1 of 1 2 Rev.2 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE

MEASUREB.1.hJPM152

Swap R HR Pumps(ATrain t o B Tra in)With Le ve l int he Pr essur izer Original S igna turesonFile PREPAREDI REVISEDBY: Date l VALIDATEDBY:*Date l APPROV ED BY: Date l (Operations Traini ng Manager)CONCURRED:**Date l (Operations

Representative)*Val idatio nnotrequired

for minor en hancements

, procedureRevchanges

thatdonot affecttheJPM ,orindividualstepchangestha

t do notaffect theflowoftheJPM.**Operations

Concurrence

requi redfornewJ PMsandchanges

thataffecttheflowof theJPM(if not dr i ven by a procedure revision).

(JPM B.1.hPage2of 1 2 Re v.2_.NU CLEAR TRAINING REVISIONIUSAGELOG REVISION DESCRIPTION

OF VDATEPAGES PREPAREDI NUMBER REVISIONAFFECTEDREVISEDBY:0New Y 10/14/98 AllJPKearney pen link 0-SO-74-1Revchangeonly

N 9/21/99 4SRTaylor pen link 0-SO-74-1 Revchangeonly N 8/29/00 4SRTaylor pen link Updated references

Y 2/5/01 2,4GSPoteet pen/inkUpdatedreference

N 12/10 101 3LacyPaule y 1Updatedtocurrentrevisionand

simulator Y 8/25/04 AllMGCroteau commands.Verif y new IC-2satisfa

ctory.2Updatedtocurrentrevi

sionofprocedure.

N 2/5 107 AllRHEvansv-SpecifyiftheJPMchangewillrequ

ire another vaiidation(YorN).

See coversheetforcriteria.

JPM B.1.h Pa ge 3 of 1 2 Rev.2 (SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE

MEASURE Task: Swap RHR Pump s(AT raintoB Train)withLevelinthe Pressurizer

JAIT A task#:0050030101(RO)0050080101(RO)

KiA Ratings: 005K4.03 (2.9/3.2)005K4.10 (3.1/3.1)005A1.01(3.5/3.6)005A1.02 (3.3/3.4)005A4.02 (3.4/3.1)005A4.01 (3.6/3.4)Task Standard:'8"TrainRHRis

placedinservice inject ingtoLoops1&4.

In-Plant_x Evaluation

Method: Simulator_...L:>..__Performer: NAME Start time_Performance

Rating: SAT UNS AT Performance

Time Fini sh t ime_DATE-(Evaluator:________----1_SIGNATURE COMMENTS

(JPM B.1.h Page4of12Rev.2 SPECIAL INSTRUCTIONS

TO EVALUATOR:

1.Sequenced steps identifiedbyan"s" 2.Initialize

IC-2.Ensure A TrainRHRisin servicewithflow aligned through FCV-63-93 to Loops 2&3.3.A Console operatorwillbe requiredatsteps4 , 8 ,&10.4.An extra operatorwillbe required to acknowledge

alarms and monitorS/Glevels,RCS

temp, RCSpress..5.Any UNSAT requires comments 6.Ensure operator performs the following required actions for SELF-CHECKING;

a.Identifies

the correctunit,train

, component , etc.b.Reviews the intendedactionand expected response.c.Compares the actual responsetothe expected response.Validation

Time:CR.11 minutes Local_Tools/Equipment/Procedures

Needed: 0-SO-74-1 , Section 8.3.2 REFERENCES:

0-SO-74-1 Reference Title Residual Heat RemovalSstemRevNo.61==========================

=======================================

READ TO OPERATOR Directions

to Trainee: I will explaintheini tial conditions

,andstatethe

tasktobe performed.Allcontrolroom

stepsshallbe performedforthisJPM

.I will provide initiatingcuesandreportson

otheractionswhen

directedbyyou.When you complete the task successfully

, the objectiveforthisjob

performance

measurewillbe satisfied.

Ensure you indicatetomewhenyou

understand

your assigned task.To indicatethatyou have completed your assigned taskreturnthe handout sheet I providedyouandtoindicatecompletion

of your answertoa knowledge questionreturnthewritten

copyofthe questiontome.INITIAL CONDITIONS:

1.Unit 1 hadbeeninMode5for72hoursto

repairaleakonthe#1SteamLine.2.RCS boronis1400ppmandthe

previous shift determinedthatBTrainRHRboron

concentrationis1450 ppm.3.Shutdown marginrequiredboron

concentration

is 1200 ppm.4.A Train RHR pumpneedstobe shutdowntoallowMEGtoaddoiltothemotor.5.B TrainRHRhasbeen

checked out locallybytheAUXiliaryBldg.AUOandisreadyfor

service.INITIATING

CUES:YouaretheUnit1

OATCandtheSROhas

directedyoutoplaceBTrainRHRin

service and takeATrainRHRoutof service.AlignB Train injection flowpathtoloops1&4.

NotifytheSROwhenyouhaveBTrainRHRin

service.

JPMB.1.hPage5of12 Rev.2 SAT/UNSAT STEP/STANDA

RD Job Performance

C he cklist:-ST EP 1.:Obtaincopyof0-SO-74-1anddetermineappropriatesection

-SAT-UNSA T STANDARD: Operatorobtainsacopyof

0-SO-74-1andgoestoSection8

.3.2.Start Time__COMMENTS: STEP 2.:[1)IF adjustmenti s requiredo nCCSflowthroug

hRHRHxs , THEN-SAT ENSURE[FCV-70-153)

RH R H x BCCSout let is THRO TTLED.-UNSA T N OTE: Opera tor may decide t o ke ep FCV-70-153 Open STANDAR D: Operato rensuresHS-70-153hasaRED&GREEN lightLIT with fiow indicatedon0-M-27 A.COMMENTS: ISTEP3.:[2)ENSURE[FCV-74-28)RHRH xBOut let is CL OSED.-SA T-UNSAT S TANDARD: Opera torensuresFCV-74-28 R HR H xBOutlet C LOSED , FIC-74-28@100%.90MM ENTS:STEP4.:[3)STARTRHRPump B-Bwith[HS-74-20A).-SAT-UNSAT S TANDARD: Operatorstarts1B-B

RHRPump,verifiesRE

D light LIT on H S.This stepi s criticalt o place theB train RH R Pumpinservice.Critical St ep COMMENTS: (c

(Job Performance

Checklist:

STEP/STANDARD

JPM B.1.hPage6of12Rev.2 SAT/UNSAT l S TEP 5.:[4]VERIFY[FC V*74*24]RHR PumpB-BminiflowOPENS

-SAT OR-UNSAT greaterthan500gpminindicated

onFI-74-24.Cue: IF dispatched:

FI*74*24 indicates-550 gpm.STANDARD: Operator verif iesFCV-74-24isopenbyRed

lightLI TonhandswitchorcheckswithAUO

locallytoverify>500gpmflowindicatedonlocalflow

indicator F[-47-24.COMMENTS:STEP6.:[5]IFaligningTrainBRHRcoolingto

loops1and4,THENPERFORMthe

-SA T following:

[aJ ENSURE[FCV-63-94]OP EN.-UNSAT[b]ADJU ST[FCV-74-28]

toestablishflowfromtrainBRHR

.[cJ ADJUST[FCV-74-16]AND[FCV-74-32]toreduceTrainARHR

flow.STANDARD: Operator performsthefollowing:

Critical Step*ENSURE FCV*63*94 OP EN*ADJUS T FCV*74*28RHRHxBOutletOPEN,usingF

IC-74-28 C LOSE FCV-74-16RHRHxAOutle

t , place FIC-74-16@0%.This stepis criticalto aligntheB train RHR Pump flow path to the RCS.COMMENTS:

(Job Performance

Chec klist: STEP/STANDAR DJPMB.1.hPage7of12 Rev.2 SAT/UNSAT c ST EP 7.:[d]VER IFY FCV-74-12 RH RPumpA-AminiflowOPENS

-SAT OR-UNSAT greater th an500gpminindicatedonFI-74

-12.Cue: IF dispatched

FI-74-12indicates-55 0 gpm.STANDARD: OperatorverifiesFCV-74-12isopenbyRedlightLITonhandswitcho

rcheckswithAUO

locallytoverify

>500gpmflowindicatedonlocalflow

indica tor F I-47-12.COMMENTS:STEP8.:[e]CLOSE[FCV-74-33]RHRHxAOutlet.

-SAT-UNSAT STANDARD: OperatorclosesFCV-74

-33.This step is crit ical to iso late A train Critical Step RHR from B trainRHR.C OMMENTS:--S T EP9.:[f]ENSURE[FCV-74-35]RHRHxBOutletOPEN.-SAT STANDARD: Operator ensures FCV*74*35RHRHxBOutletOPEN.-UNSAT COMMENTS:

JP M B.1.h Page8of1 2Rev.2 SAT/UNSATSTEP/STANDARD

J ob PerformanceChecklis

t:--STEP10.:[9]OPEN[VLV*74-531]RHRH xBtoLetdown H x.-SAT NOTE: Console operator needs to modify remote functionRHR04to100.

-UNSAT Cue:OpenHCV*74*531 asanAUO local/y.STANDARD:Operatordirectsa n AUOtoOPENHCV-74-5 31RHRH x B to Letdo wn C ritical Step H x.This step is crilicalto

align B train RHR Pump for CVCS letdown.COM MENTS: STE P 1 1.:[h]STOPRHRPumpA-Awith[HS-74

-10A].-S AT-UNSAT STANDARD: Operator stopsRHRpump1A*A, verifiesGRE

EN ligh tonhandswitch.This step is critical to remove the A train RHR Pump from serv ice.Cr itical StepSTEP12.:[i]OPEN[HCV-74

-37]RHRH x B Bypass.-S AT NOTE: Console operator needs to modify remote fu nction RHR07to100.

-UNSAT Cue: Open HCV*74*37 asanAUO locally (including

IV).Cri tical Step STANDARD: Operator directs an AUOtoOPENHCV*74-37RHRH xBBypass.This stepiscr it ical to aligntheB trainRHRHX bypass valve so operator can controlHX outlet temperature.

COMMENTS: ((

STE P 13.: Ul C LOSEIHCV-74-36!RH

R HxA Bypass.-S AT NOTE: Console operator needs to mod ify r emo te fu nctionRHR06to O.-UNSAT Cue: Close HCV-74-36 asanAUO loc ally (including IV).C ritical Step STANDARD:Operatordirects anAUOtoCLOSEHCV-74-36RHRHxA Bypass.Th is step is critical to isol atetheA trainRHRHX bypass valve.COMMENTS:STEP14.:[k]CLOSE[HCV-74-530]RHRH xA-AtoLetdo

wn H x.-S AT NOTE: Co nsole operator needs to modify remote func tionRHR03to O.-UNS AT Cue: Close HCV-74*530 as an AUO locally (including

IV).STANDARD: Operator directsanAUOt o closeHCV-74-530.This step is critical t o isola te the A train RHR flow path to CVCS letdown.COMM E N T S: STEP 15.:[I]ENSURE[FCV*63-93]CLOSED.-SA T-UNS AT S TANDARD: Operator ensuresFC V-6 3-9 3 CLOSED.This stepisc ritical to isolate Critic al Step the A trainRHRRCSi njection low path..COMMENTS: ((Jo b P erformance

Checklist: STE P/STANDARD

JP M B.1.h Page9of12Rev.2 SAT/UNSAT

(Job Performance

Checklist:

STEP/STANDARDJPMB.1.hPage10of12

Rev.2 SAT/UNSAT cSTEP16.:[6]IFaligningRHRcoolingtoloops2and3,THENPERFORMthe

-SAT following:

-UNSAT NOTE: Step is NA'd, initiating

Cues direct alignment to loops1&4.STANDARD: Ope ratorNA'sthestep.

COMMENTS:STEP17.:[7]THROTTLEoneorbothofthefollowingtomaintaindesiredcooling

-SATrate:(N/Aifnotthrottled)

-UNSAT FCV-74-28,RHRHxBOutlet,FCV-74-32,RHRHxBypass.

Critical Step STAI\!DARD

Operatorthrottlesopen

FCV-74-28and/orFCV-74-32tostabilizeRCS

temperatureandestab lishRHRf lowrates at approximatelythesamevaluesthatwerep

resentpriortotheflowpathrealignment.

This step is critical to control RCS coold own rate.COMMENTS: I I STEPWHENinjectionflowis

>1250gpm,THENVERIFY[FCV-74-24]RHR

-SATPumpB-Bminiflowis

CLOSED.-UNSAT STANDARD: Operator verifies FCV-74-24closed,GREENlightLITonhandswitch

.COMMENTS:

(JobPerfo rmance Checklist:

STEP/STANDARD JPM B.1.hPage11o f 12 Rev.2 SAT/UNSA T c (STEP19.:[9]IFcoolingwateristobere

movedfromTrainAHx, TH EN-SAT CLOSE[FCV-70-15 61.-UNSAT Cue:Leave coo ling water alignedtoATrai

n at its currentfJowrate

.STANDARD: OperatorNA'sstep.COMMENTS:STEP20.:NotifyU1USthatBtrainofR

HRIsinservicetoloops1&4a

ndAt rain of-SA TRHRhasbeenremovedfromservice

.-UNSAT STANDARD: None.StopTime__90MMENTS:---EndofJPM

0-50-74-1Rev:61 Page 132of20 4RESIDUALHEATREMOVALSYSTEM

1 ,2 SQN[---l--__---'------


'(Uni t_Date_8.3.2 Placing Train B in Service and RemovingTrainA from Service.CAUTIONCCS

flow should be adjusted to provide adequate flow through theRHRHxto preventRHRHxCCS outlet temperature

from exceeding 145°F.TheRHRHxCCS

outlet temperature

alarm will comeina 115°F.NOTEThefollowingstepsmay requireoperatorsinbothheatexchangerroomsandoneouts

idethepumprooms

.[1]IFadjustment isrequ iredonCCSflowthroughRHRH xs , THENENSURE[FCV-70-153]RHRH

xsccs outlet i s THROTTLED.[2]ENSURE[FCV-74-28]RHRHx

BOutletisCLOSED

.CAUTION 1 Failure to maintain shutdown cooling flow rate foranRHR pump at the maximum possible could result in reduced thrust bearing life.[C.3]CAUTION2 NOTE If RHR pressure downstream

of pumps exceeds 600 psig ,thenRHR discharge pressure must be reduced below 600 psigorRHR isolated fromtheRCS within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.RHRmotorlowerbearingoillevelwillincreaseafterpumpisstartedandmayincreaseabovesightglass.Thepresenceofoilcanbeverifiedbyagoldentintinsightglass

.[3]STARTRHRPump

B-B with[HS-74-20Al[4]VERIFY[FCV-74-24]RHRPu

mp B-B miniflow OPENS OR g reaterthan500gpm

i s indicatedonFI-74-24.

(SQN 1,2 Unit_RESIDUAL HEATREMOVALSYSTEM

0-SO-74-1Rev:61Page133of204Date_8.3.2 Placing TrainBin Service and Removing Train A from Service (Continued)CAUTION1CAUTION2 NOTE To reduce vibration acrossFCV*74-16andFCV-74-28(RHRHx Outlet Valves), RHR must be aligned to only two cold legs with one train in service.Operating RHR pumps in parallel(HCV-74-36andHCV-74-37OPENOR74-530and74-531OPEN)andon

miniflow for>10 minutes may result in pump damageduetoone pump dead-heading

.[C.2][C.13]Step5[b]a nd[c]maybeperformed togethertoensurecontinuousflo

w del iveredtoRCS.(([5]IFaligningTrainBRHRcoolingtoloops1and4

, THENPERFORMthefollowing

[a]ENSURE[FCV*63-94]

OPEN.[b]ADJUST[FCV-74

-28]toestabl ishflowfrom Tra in B RHR.[c]ADJUST[FCV

-74-16]AND[FCV-74-32]toreduceTrainARHRflo w.[d]VERIFY[FCV-74-12]RHRPumpA-A

miniflow OPENS ORgreaterthan5

00gpmisindicatedonFI-74-24

.

(SQNRESIDUALHEAT

0-SO-74-1REMOVALSYSTEMRev:61 1 ,2Page1 34 of 204 Un it_Date_(8.3.2Placing TrainBin Service and Removing Train A from Service (Contin ued)telCLOSE[FCV

-74-331 RHRHxA Outlet.[f)E NSURE[FCV-74-35]

RH R H xBOutlet OPE N.[g)OPEN[VLV-74-531]RHRH x B toLetdownH x.CV[h)STOPRHRPumpA-A with[HS-74-10AJ.

[i)OPEN[HCV-74

-37]RHRHxBBypass.CV[j]CLOSE[HCV-74-36]RHRH

x A Bypass.C V[k]CLOSE[VLV-74-530]

RHRHxA toLetdown H x.1" CV[I]ENSURE[FCV-63-93]C

LOSED.

(SQNRESIDUALHEAT

0-50-74-1REMOVALSYSTEMRev:61 1 ,2 Page 135o f 2 04 Unit_Date_8.3.2P lacing T rainBinServ ice and Removing TrainA fromServ ice (Conti n u e d)CAUTION 1CAUTION2 NOTE To reduce v ibratio n across FCV-74-16andFCV-74-28(RHRHxO utlet Valves), RHR must be aligned too nly two cold legs with one trainin service.Operat ing RHR pumps in parallel(HCV-74-36andHCV-74-37 OPENOR74-530and74-531OPEN)a

nd on miniflow f or>10 minu tes may result in pump damageduetoone pump dead-heading.[C.2)[C.13)

Step 6[d)and[e)m aybeperfo rmed t oge the r t o en sure continuous fl ow deliveredtoRCS.[6]IF aligningTrainBRHR coolingt o loops2an d 3 , THEN PERFORM the following:[a)ENSURE[FCV-63-93)OPE

N.[b]ENSURE[FCV-74-33]R

HR H xAOutletOPEN.[c]ENSURE[FCV-74-35)RHRH xBOutletOPEN.[d]ADJUST[FCV-74-28)to

est ab lish TrainBRHRflow.[e]ADJUST[FCV-74-161 and[FCV-7 4-321 t o reduce T ra inA RHRfl ow.[f]VERIFY[FCV-74-12]

RHRPumpA-A miniflowOPENSorgreaterthan500gpmis

indicated o n FI-74-24.[g)OPEN[VLV-74-5311RHRHx B (toLetdown H x.1" CV

0-SO-74-1Rev:61 Page136of204 RESIDUAL HEAT REMOVAL SYSTEM 1 ,2-------------------'------------'(Unit_Date_8.3.2 Placing TrainBin Service a nd Removing Train A fromSe rvice (Continued)

c[h]STOPRHR PumpA-A w ith[HS-74-10A].

[i]OPEN[HCV-74-37]RHRH xBBypass.1 st cv[j]CLOSE[HCV-74-361

RHRH xABypass.1" cv[k]CLOSE[VLV-74*530]RHRH x AtoLetdownH

x.1 st c v[I]ENSURE[FCV-63-94]

CLOSED.NOTE One o r bo th ofth e valves i n thene xt st epmaybeth rottledtomaintainRCSatdesiredtemperature.

[7]THROTTLEoneorbothoft

he followingt o m a intain de s ire d cool ing rate (N/A ifnotthrottled): VALVE NO.FUNCTION INITIALS FCV-74-28RHR HxBOutlet FCV*74*32 RHR H x B ypass[8]WHEN injection fl ow i s>1250g pm , THEN VERIFY[FCV-74-24]RHRPump B-B miniflow i s CLOSED.([9]IFcooling

water istoberemovedfromTrainAHx, THEN CLOSE[FCV-70-156].E NDOFTEXT