| | number = ML14091B128 | | | number = ML14091B128 |
| | issue date = 04/01/2014 | | | issue date = 04/01/2014 |
| | title = Arkansas Nuclear One - NRC Augmented Inspection Team Follow-up Inspection Report 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow Findings | | | title = NRC Augmented Inspection Team Follow-up Inspection Report 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow Findings |
| | author name = Browning J G | | | author name = Browning J G |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
|
---|
Category:Legal-Affidavit
MONTHYEAR1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) ML23020A9442023-01-20020 January 2023 Enclosure 3: Affidavit 2CAN122103, Relief Request ANO2-RR-21-002, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Submittal of Analyses - Affidavits and Calculation Summary Sheet2021-11-19019 November 2021 Relief Request ANO2-RR-21-002, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Submittal of Analyses - Affidavits and Calculation Summary Sheet 2CAN102102, Relief Request ANO2-R&R-012: Support the Repair of the Reactor Vessel Closure Head Penetration 462021-10-10010 October 2021 Relief Request ANO2-R&R-012: Support the Repair of the Reactor Vessel Closure Head Penetration 46 0CAN092101, Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-09-14014 September 2021 Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping 0CAN052103, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency .2021-05-25025 May 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency . 0CAN022101, Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-02-22022 February 2021 Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping 2CAN032001, Response to Request for Additional Information Related to License Amendment Request to Revise the Control Element Assembly Drop Times2020-03-11011 March 2020 Response to Request for Additional Information Related to License Amendment Request to Revise the Control Element Assembly Drop Times 1CAN121601, Arkansas Nuclear One Unit 1, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan2016-12-21021 December 2016 Arkansas Nuclear One Unit 1, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan 1CAN121601, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan2016-12-21021 December 2016 Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan 1CAN121502, Evaluations Described Response to Requests for Additional Information 3, 5, 6(a), and 7, Reactor Vessel Internals Aging Management Program Plan2015-12-30030 December 2015 Evaluations Described Response to Requests for Additional Information 3, 5, 6(a), and 7, Reactor Vessel Internals Aging Management Program Plan ML15278A0242015-09-28028 September 2015 Attachment 2, Areva Document ANP-3417NP, Revision 0, MRP-227-A Applicant / Licensee Action Item No. 7 Analysis for Arkansas Nuclear One, Unit 1 (Non-Proprietary), Attachment 3, Affidavit, and Attachment 4, List of Commitments 2CAN051504, Revised Affidavit for Request for Relief ANO2-ISI-0162015-05-19019 May 2015 Revised Affidavit for Request for Relief ANO2-ISI-016 1CAN031504, Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-03-25025 March 2015 Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN031504, Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-03-25025 March 2015 Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits ML15041A0742015-02-0606 February 2015 ANP-3300Q1NP, Rev. 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1, Attachment 2 to 1CAN0 2CAN111402, Unit 2, Revised Affidavit for Request for Relief ANO2-ISI-0162014-11-11011 November 2014 Unit 2, Revised Affidavit for Request for Relief ANO2-ISI-016 2CAN041402, Successive Examination Plans, Request for Relief ANO2-ISI-016. Weld Scan Plans & Preliminary Coverage Estimates, Pdqs Number 783 & Affidavit Enclosed2014-04-15015 April 2014 Successive Examination Plans, Request for Relief ANO2-ISI-016. Weld Scan Plans & Preliminary Coverage Estimates, Pdqs Number 783 & Affidavit Enclosed 0CAN041401, NRC Augmented Inspection Team Follow-up Inspection Report 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow Findings2014-04-0101 April 2014 NRC Augmented Inspection Team Follow-up Inspection Report 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow Findings 0CAN071303, Units 1 and 2, Augmented Inspection Team Information Request2013-07-31031 July 2013 Units 1 and 2, Augmented Inspection Team Information Request ML12038A1772012-02-0303 February 2012 Units 1 and 2, HI-STORM 100 Cask System, Thermal Validation Test Using Air Mass Flow Rate ML0935005322009-12-11011 December 2009 Affidavit from Gayle F. Elliot, Manager of Product Licensing for Areva, Np Inc ML0828300342008-08-20020 August 2008 Affidavit of Gayle F. Elliott, for Areva Np Inc., Regarding NRC Presentation of August 2008 ML0627703182006-09-28028 September 2006 Transmittal of Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Proprietary/Non-Proprietary) ML0514603882005-05-10010 May 2005 Units 1 and 2, Request for Additional Information Concerning Request for Exemption from Holtec International Certificate of Compliance 2CAN010402, Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection2004-01-16016 January 2004 Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection ML15350A2151985-09-0505 September 1985 Overview Description of Core Operating Limit Supervisory System (Colss)(Rev 00-NP to CEN-312-NP) 2023-06-08
[Table view] Category:Letter
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20243012024-02-27027 February 2024 NRC Initial Operator Licensing Examination Approval 05000313/2024301 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times 2024-09-09
[Table view] |
See also: IR 05000313/2013012
Text
0CAN041401April 1, 2014U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555SUBJECT: Arkansas Nuclear One - NRC Augmented Inspection Team Follow-up InspectionReport 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow
FindingsDear Sir or Madam:On March 24, 2014, the Nuclear Regulatory Commission (NRC) provided the results of thesubject inspection in a letter (ML14083A409) to members of the Entergy Operations, Inc.(Entergy) management team at Arkansas Nuclear One (ANO). The results included theidentification of apparent greater than green violations.Previously, at the February 10, 2014, exit meeting, Entergy requested a regulatory conferenceto discuss the apparent violations. The regulatory conference is currently scheduled for May 1,2014, from 1-5 pm at the NRC Region IV office in Arlington, Texas, and is open to the public.Much of the information that will be provided in the regulatory conference is consideredproprietary to Entergy; therefore, Entergy requests that portions of the regulatory conference beclosed to members of the public in accordance with 10 CFR 2.390. Entergy requests that theclosed portion of the regulatory conference be a 2-hour block preceding the open portion of themeeting. An affidavit by Entergy supporting the request for closure of a portion of the regulatoryconference is provided in attachment to this letter.This letter contains no new regulatory commitments. Should you have any questionsconcerning this letter, or require additional information, please contact Stephenie Pyle at
479.858.4704.
Sincerely,Original signed by Jeremy G. BrowningJGB/rmcAttachment: Affidavit from Entergy, dated April 1, 2014Entergy Operations, Inc.1448 S.R. 333Russellville, AR 72802Tel 479-858-3110Jeremy G.BrowningVice President, OperationsArkansas Nuclear One
0CAN041401Page 2 of 2cc: Mr. Marc L. DapasRegional AdministratorU. S. Nuclear Regulatory Commission, Region IV1600 East Lamar BoulevardArlington, TX 76011-4511NRC Senior Resident InspectorArkansas Nuclear OneP.O. Box 310London, AR 72847U. S. Nuclear Regulatory CommissionAttn: Mr. Peter Bamford
MS O-8B3One White Flint North
11555 Rockville PikeRockville, MD 20852
Attachment to0CAN041401Affidavit from Entergy, dated April 1, 2014
Attachment to
0CAN041401Page 1 of 2UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONIn the Matter of:
))Entergy Operations Inc.
)Docket Nos. 50-313 & 50-368ANO Unit 1
)ANO Unit 2
)AFFIDAVITI, Jeremy Browning, being duly sworn, hereby depose and say that I am the Site Vice Presidentof the Arkansas Nuclear One Nuclear plant, which is operated by Entergy Operations Inc.("Entergy"); that I am duly authorized to sign and file with the Nuclear Regulatory Commission(NRC) this affidavit on behalf of Entergy; and state:
1.I am authorized to execute this affidavit on behalf of Entergy Operations Inc.
2.Much of the information that Entergy will present to the NRC during the regulatoryconference to be conducted in the above-captioned dockets and related to the ANO-1Stator Drop Event of March 31, 2013, was prepared as Attorney Work Product related toresolution of commercial claims and disputes arising out of that event and containscommercial information that should be held in confidence by the NRC pursuant to10 CFR §§ 2.390(a)(4) and 9.17(a)(4), because:
a.This information is and has been held in confidence by Entergy. A sub-set of theinformation that will be presented at the regulatory conference has beenproduced to third parties on a limited basis and then only subject to non-disclosure protections. It is being provided to other government agencies onlypursuant to similar non-disclosure requests.
b.This information is of a type that is held in confidence by Entergy, and there is arational basis for doing so because the information relates to ongoing commercialclaims and disputes.
c.This information is not available in public sources and could not be gatheredreadily from other publicly available information.
d.Public disclosure of this information would create substantial harm to Entergy'sability to engage in confidential resolution of these claims and disputes.
e.Previously, in connection with Docket 50-313, Entergy produced the Root CauseEvaluation, dated July 22, 2013, associated with the ANO-1 Stator Drop Event;this documentation has been withheld from public disclosure pursuant to therequirements of 10 CFR §§ 2.390(a)(4) and 9.17(a)(4) for the same reason asdescribed above in Paragraphs 2(a)-2(d).
3.Accordingly, Entergy requests that any regulatory conference in the above-captioneddockets be conducted as non-public, confidential conferences pursuant to therequirements found at 10 CFR §§ 2.390(a) (4) and 9.17(a) (4).
Attachment to
0CAN041401Page 2 of 2I declare under penalty of perjury that the foregoing is true and correct.Executed on April 1, 2014.Executed in Accord with 10 CFR § 2.304(d)Original Signed by Jeremy G. BrowningJeremy Browning
Site Vice President, ANOEntergy Operations Inc.1448 SR 333
Russellville, AR 72802
479-858-3110jbrow17@entergy.com