| {{#Wiki_filter:INDIANA Indiana Michigan PowerMICHIGAN Cook Nuclear PlantPOWER" One Cook PlaceBridgman, Mi 49106A unit oftAmerican Electric Power IndlianaMichiganPowef cumNovember 9, 2012 AEP-NRC-2012-10110 CFR 50.90Docket Nos.: 50-31550-316U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D. C. 20555-0001Donald C. Cook Nuclear Plant Units 1 and 2Response to Second-Round Request for Additional Information Item 54.b, and Submittal of RevisedTables Regarding the Application for Amendment to Transition to National Fire ProtectionAssociation Standard 805 (TAC Nos. ME6629 and ME6630)This letter provides Indiana Michigan Power Company's (A&M's) response to the remaining questionfrom the second round of U. S. Nuclear Regulatory Commission (NRC) requests for additionalinformation (RAls) regarding a proposed license amendment to transition the Donald C. CookNuclear Plant (CNP), Units 1 and 2, to an National Fire Protection Association Standard 805(NFPA 805) based fire protection program.Documents referenced in this transmittal letter are identified in Enclosure 2. By Reference 1 and 2,I&M proposed to amend CNP Units 1 and 2 Facility Operating Licenses DPR-58 and DPR-74 toadopt a new fire protection program based on NFPA 805, in accordance with 10 CFR 50.48(a)and (c). Reference 1, Enclosure 2, hereafter referred to as the Transition Report, providedinformation associated with the CNP transition to NFPA 805. By References 3 and 4, the NRCtransmitted the first round of RAIs regarding the proposed amendment. References 5, 6, and 7transmitted I&M's responses to the Reference 3 and 4 RAIs. By Reference 8, the NRC transmitteda second round of RAIs. Reference 9 provided I&M's responses to the Reference 8 second-roundRAIs, except for RAI-54.b. Reference 8 and 9 documented A&M's intention to provide the responseto RAI-54.b no later than November 9, 2012. This letter provides I&M's response to RAI-54.b.Reference 9 also documented I&M's intention to provide two revised tables to replace tables thatwere included in the Transition Report provided in the original amendment request (Reference 1).The first table, Table B-i, "Transition of Fundamental Fire Protection Program and Design Elements(NFPA 805, Chapter 3)," has been revised to incorporate changes identified in Reference 9 andchanges resulting from responses to the first round of RAIs, along with the necessary re-pagination.Security-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.Enclosures 3 and 5 to this letter contain security-related information.Upon removal of Enclosures 3 and 5, this letter and other enclosures are uncontrolled. | | {{#Wiki_filter:INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWER" One Cook Place Bridgman, Mi 49106 A unit oftAmerican Electric Power IndlianaMichiganPowef cum November 9, 2012 AEP-NRC-2012-101 10 CFR 50.90 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Response to Second-Round Request for Additional Information Item 54.b, and Submittal of Revised Tables Regarding the Application for Amendment to Transition to National Fire Protection Association Standard 805 (TAC Nos. ME6629 and ME6630)This letter provides Indiana Michigan Power Company's (A&M's) response to the remaining question from the second round of U. S. Nuclear Regulatory Commission (NRC) requests for additional information (RAls) regarding a proposed license amendment to transition the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2, to an National Fire Protection Association Standard 805 (NFPA 805) based fire protection program.Documents referenced in this transmittal letter are identified in Enclosure |
| U. S. Nuclear Regulatory Commission AEP-NRC-2012-101Page 2The second table, Table W2, "Fire Initiating Event Scenarios Contributing More than 1% of theCalculated Fire Risk for Unit 2," has been revised to correct a discrepancy in which risk relatedvalues in the three right columns of the table were inadvertently transposed.Enclosure 1 to this letter provides an affirmation statement. Enclosure 2 identifies documentsreferenced in this letter and Enclosure 3. Enclosure 3 provides I&M's response to Reference 8,RAI-54.b. Enclosure 4 provides a revised Table B-1. Enclosure 5 provides a revised Table W2.Copies of this letter and its enclosures are being transmitted to the Michigan Public ServiceCommission and Michigan Department of Environmental Quality, in accordance with therequirements of 10 CFR 50.91. This letter contains no new or modified regulatorycommitments. Should you have any questions regarding this proposed amendment, pleasecontact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely,Michael H. CarlsonSite Support Services Vice PresidentJRW/kmhEnclosures:1. Affirmation.2. Identification of Documents Referenced in this Letter.3. Response to RAI-54.b.4. Revised Table B-A, "Transition of Fundamental Fire Protection Program and DesignElements (NFPA 805, Chapter 3)."5. Revised Table W2, "Fire Initiating Event Scenarios Contributing More than 1% of theCalculated Fire Risk for Unit 2."c: C. A. Casto, NRC Region IIIJ. T. King, MPSCS. M. Krawec, AEP Ft. Wayne, w/o enclosuresMDEQ -RMD/RPSNRC Resident InspectorT. J. Wengert, NRC Washington, DCSecurity-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.Enclosures 3 and 5 to this letter contain security-related information.Upon removal of Enclosures 3 and 5, this letter and other enclosures are uncontrolled. | | : 2. By Reference 1 and 2, I&M proposed to amend CNP Units 1 and 2 Facility Operating Licenses DPR-58 and DPR-74 to adopt a new fire protection program based on NFPA 805, in accordance with 10 CFR 50.48(a)and (c). Reference 1, Enclosure 2, hereafter referred to as the Transition Report, provided information associated with the CNP transition to NFPA 805. By References 3 and 4, the NRC transmitted the first round of RAIs regarding the proposed amendment. |
| }} | | References 5, 6, and 7 transmitted I&M's responses to the Reference 3 and 4 RAIs. By Reference 8, the NRC transmitted a second round of RAIs. Reference 9 provided I&M's responses to the Reference 8 second-round RAIs, except for RAI-54.b. |
| | Reference 8 and 9 documented A&M's intention to provide the response to RAI-54.b no later than November 9, 2012. This letter provides I&M's response to RAI-54.b.Reference 9 also documented I&M's intention to provide two revised tables to replace tables that were included in the Transition Report provided in the original amendment request (Reference 1).The first table, Table B-i, "Transition of Fundamental Fire Protection Program and Design Elements (NFPA 805, Chapter 3)," has been revised to incorporate changes identified in Reference 9 and changes resulting from responses to the first round of RAIs, along with the necessary re-pagination. |
| | Security-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.Enclosures 3 and 5 to this letter contain security-related information. |
| | Upon removal of Enclosures 3 and 5, this letter and other enclosures are uncontrolled. |
| | U. S. Nuclear Regulatory Commission AEP-NRC-2012-101 Page 2 The second table, Table W2, "Fire Initiating Event Scenarios Contributing More than 1% of the Calculated Fire Risk for Unit 2," has been revised to correct a discrepancy in which risk related values in the three right columns of the table were inadvertently transposed. |
| | Enclosure 1 to this letter provides an affirmation statement. |
| | Enclosure 2 identifies documents referenced in this letter and Enclosure |
| | : 3. Enclosure 3 provides I&M's response to Reference 8, RAI-54.b. |
| | Enclosure 4 provides a revised Table B-1. Enclosure 5 provides a revised Table W2.Copies of this letter and its enclosures are being transmitted to the Michigan Public Service Commission and Michigan Department of Environmental Quality, in accordance with the requirements of 10 CFR 50.91. This letter contains no new or modified regulatory commitments. |
| | Should you have any questions regarding this proposed amendment, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely, Michael H. Carlson Site Support Services Vice President JRW/kmh |
| | |
| | ==Enclosures:== |
| | : 1. Affirmation. |
| | : 2. Identification of Documents Referenced in this Letter.3. Response to RAI-54.b.4. Revised Table B-A, "Transition of Fundamental Fire Protection Program and Design Elements (NFPA 805, Chapter 3)." 5. Revised Table W2, "Fire Initiating Event Scenarios Contributing More than 1% of the Calculated Fire Risk for Unit 2." c: C. A. Casto, NRC Region III J. T. King, MPSC S. M. Krawec, AEP Ft. Wayne, w/o enclosures MDEQ -RMD/RPS NRC Resident Inspector T. J. Wengert, NRC Washington, DC Security-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.Enclosures 3 and 5 to this letter contain security-related information. |
| | Upon removal of Enclosures 3 and 5, this letter and other enclosures are uncontrolled.}} |
Letter Sequence Request |
---|
|
|
MONTHYEARML11188A1452011-07-0101 July 2011 Request for License Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML11256A0302011-09-0202 September 2011 Supplement to Request for License Amendment to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML11255A0222011-09-13013 September 2011 Informs Licensee That Application for Amendment to Change Fire Protection Licensing Basis to NFPA 805 Is Acceptable for Review Project stage: Other ML1131302622011-11-0808 November 2011 List of Plant Components for Walkdown Project stage: Other ML1131302612011-11-0808 November 2011 Additional Questions/Comments on the Monitoring Program, Documentation, Etc Project stage: Other ML1131302602011-11-0808 November 2011 Questions and Comments About the Probabilistic Risk Analysis Project stage: Acceptance Review ML1131302592011-11-0808 November 2011 Questions and Issues to Be Addressed During the Audit Project stage: Acceptance Review ML1131302492011-11-0808 November 2011 E-mail Transmitting 4 NRC Staff Documents to Support the Audit of the Proposed Conversion of the Fire Protection Program to NFPA 805 Project stage: Other ML1131204962011-11-0808 November 2011 Transmit Audit Plan for the Proposed Amendment Converting the Fire Protection Program to NFPA 805 Project stage: Other ML1131205002011-11-0808 November 2011 Audit Plan - D.C. Cook Proposed Amendment to Convert Fire Protection Program to NFPA 805 Project stage: Other ML1135607092012-01-27027 January 2012 Letter Transmitting an RAI on the Application for Amendment to Transition the Fire Protection Program to NFPA 805 Project stage: RAI ML12017A2512012-01-27027 January 2012 RAI for the Proposed Amendment to Transition the Fire Protection Program to NFPA 805 Project stage: RAI AEP-NRC-2012-29, Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-04-27027 April 2012 Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI AEP-NRC-2012-58, Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-08-0909 August 2012 Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI ML12230A3032012-08-14014 August 2012 Draft Redacted Second-round RAI Re NFPA 805 Amendment Project stage: Draft RAI ML12255A3952012-09-0606 September 2012 Redacted Draft Second-Round RAI the Proposed NFPA 805 Amendment Project stage: Draft Approval ML12285A1792012-10-11011 October 2012 D C Cook NFPA 805 RAI Project stage: Other ML12276A3002012-10-11011 October 2012 RAI on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Standard 805 Project stage: RAI AEP-NRC-2012-92, Response to Second Round Request for Additional Information Regarding Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-10-15015 October 2012 Response to Second Round Request for Additional Information Regarding Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request ML12326A9992012-11-0909 November 2012 Donald C, Cook, Units 1 and 2 - Enclosure 1, 2 & 4 to AEP-NRC-2012-101, Response to Second-Round RAI Item 54.b, and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard Project stage: Request ML12326B0002012-11-0909 November 2012 Donald C, Cook, Units 1 and 2 - Enclosure 4 (Cont.) to AEP-NRC-2012-101, Response to Second-Round RAI Item 54.b, and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard Project stage: Request ML12326A9982012-11-0909 November 2012 Donald C. Cook, Units 1 and 2 - Response to Second-Round Request for Additional Information Item 54.b and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard 805 Project stage: Request ML12345A3272012-12-13013 December 2012 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI ML13028A1132013-01-14014 January 2013 Response to Third Round Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request AEP-NRC-2013-09, Revised Response to First Round Request for Additional Information Re Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-02-0101 February 2013 Revised Response to First Round Request for Additional Information Re Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request ML13014A5492013-02-0101 February 2013 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI ML13085A1842013-04-22022 April 2013 Review and Conclusion of Indiana Michigan Power Company'S Resolution of Facts and Observations in Support of DC Cook'S Transition to NFPA 805 Project stage: Other ML13085A2462013-04-22022 April 2013 DC Cook Table V-1 & V-2 Record of Review March 22 2013 Project stage: Request ML13085A1902013-04-22022 April 2013 DC Cook Table U Record of Review March 22 2013 Project stage: Other AEP-NRC-2013-17, Response to a Request for Additional Information (RAI 29.01, 61, and 62) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-05-0101 May 2013 Response to a Request for Additional Information (RAI 29.01, 61, and 62) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI AEP-NRC-2013-55, Response to a Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 TAC (ME6629 and ME6630).2013-06-21021 June 2013 Response to a Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 TAC (ME6629 and ME6630). Project stage: Response to RAI ML13210A2042013-09-0606 September 2013 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI AEP-NRC-2013-75, Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-09-16016 September 2013 Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI ML13140A3982013-10-24024 October 2013 Issuance of Amendment Nos. 322 and 305 - Transition to NFPA 805 Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) and NFPA 805 Project stage: Approval 2012-08-14
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 2024-09-09
[Table view] |
Text
INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWER" One Cook Place Bridgman, Mi 49106 A unit oftAmerican Electric Power IndlianaMichiganPowef cum November 9, 2012 AEP-NRC-2012-101 10 CFR 50.90 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Response to Second-Round Request for Additional Information Item 54.b, and Submittal of Revised Tables Regarding the Application for Amendment to Transition to National Fire Protection Association Standard 805 (TAC Nos. ME6629 and ME6630)This letter provides Indiana Michigan Power Company's (A&M's) response to the remaining question from the second round of U. S. Nuclear Regulatory Commission (NRC) requests for additional information (RAls) regarding a proposed license amendment to transition the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2, to an National Fire Protection Association Standard 805 (NFPA 805) based fire protection program.Documents referenced in this transmittal letter are identified in Enclosure
- 2. By Reference 1 and 2, I&M proposed to amend CNP Units 1 and 2 Facility Operating Licenses DPR-58 and DPR-74 to adopt a new fire protection program based on NFPA 805, in accordance with 10 CFR 50.48(a)and (c). Reference 1, Enclosure 2, hereafter referred to as the Transition Report, provided information associated with the CNP transition to NFPA 805. By References 3 and 4, the NRC transmitted the first round of RAIs regarding the proposed amendment.
References 5, 6, and 7 transmitted I&M's responses to the Reference 3 and 4 RAIs. By Reference 8, the NRC transmitted a second round of RAIs. Reference 9 provided I&M's responses to the Reference 8 second-round RAIs, except for RAI-54.b.
Reference 8 and 9 documented A&M's intention to provide the response to RAI-54.b no later than November 9, 2012. This letter provides I&M's response to RAI-54.b.Reference 9 also documented I&M's intention to provide two revised tables to replace tables that were included in the Transition Report provided in the original amendment request (Reference 1).The first table, Table B-i, "Transition of Fundamental Fire Protection Program and Design Elements (NFPA 805, Chapter 3)," has been revised to incorporate changes identified in Reference 9 and changes resulting from responses to the first round of RAIs, along with the necessary re-pagination.
Security-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.Enclosures 3 and 5 to this letter contain security-related information.
Upon removal of Enclosures 3 and 5, this letter and other enclosures are uncontrolled.
U. S. Nuclear Regulatory Commission AEP-NRC-2012-101 Page 2 The second table, Table W2, "Fire Initiating Event Scenarios Contributing More than 1% of the Calculated Fire Risk for Unit 2," has been revised to correct a discrepancy in which risk related values in the three right columns of the table were inadvertently transposed.
Enclosure 1 to this letter provides an affirmation statement.
Enclosure 2 identifies documents referenced in this letter and Enclosure
- 3. Enclosure 3 provides I&M's response to Reference 8, RAI-54.b.
Enclosure 4 provides a revised Table B-1. Enclosure 5 provides a revised Table W2.Copies of this letter and its enclosures are being transmitted to the Michigan Public Service Commission and Michigan Department of Environmental Quality, in accordance with the requirements of 10 CFR 50.91. This letter contains no new or modified regulatory commitments.
Should you have any questions regarding this proposed amendment, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely, Michael H. Carlson Site Support Services Vice President JRW/kmh
Enclosures:
- 1. Affirmation.
- 2. Identification of Documents Referenced in this Letter.3. Response to RAI-54.b.4. Revised Table B-A, "Transition of Fundamental Fire Protection Program and Design Elements (NFPA 805, Chapter 3)." 5. Revised Table W2, "Fire Initiating Event Scenarios Contributing More than 1% of the Calculated Fire Risk for Unit 2." c: C. A. Casto, NRC Region III J. T. King, MPSC S. M. Krawec, AEP Ft. Wayne, w/o enclosures MDEQ -RMD/RPS NRC Resident Inspector T. J. Wengert, NRC Washington, DC Security-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.Enclosures 3 and 5 to this letter contain security-related information.
Upon removal of Enclosures 3 and 5, this letter and other enclosures are uncontrolled.