List of Plant Components for Walkdown
ML113130262
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/08/2011
From: Lain P
NRC/NRR/DRA/AFPB
To:
Tam P
References
TAC ME6629, TAC ME6630
Download: ML113130262 (1)


Text

D.C. Cook NFPA 805 Site Audit Walkdown Areas November 8, 2011 1:00 to 5:00 pm Fire Modeling

1. Fire area AA43 and AA1-138 and discuss the following:
a. How the heat load was calculated for the specific area?
b. Ventilation method
c. Target selection
d. Damage calculation
e. Model selected
f. Range of validity
g. Uncertainty
h. Integration into Fire PRA
i. Any internal (contractor-EPM) documents/procedures used for analysis (e.g. EPM-DP-FP-001, Detailed Fire Modeling)

Fire Protection/Safe Shutdown/PRA

[Security-related information deleted]