ML15098A124: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML15098A124 | |||
| issue date = 03/30/2015 | |||
| title = Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model | |||
| author name = Shea J W | |||
| author affiliation = Tennessee Valley Authority | |||
| addressee name = | |||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | |||
| docket = 05000390, 05000391 | |||
| license number = CPPR-0092, NPF-090 | |||
| contact person = | |||
| case reference number = CNL-15-053 | |||
| document report number = L44 150330 001 | |||
| document type = Annual Operating Report, Letter | |||
| page count = 14 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:}} |
Revision as of 06:53, 17 March 2019
ML15098A124 | |
Person / Time | |
---|---|
Site: | Watts Bar ![]() |
Issue date: | 03/30/2015 |
From: | Shea J W Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CNL-15-053 L44 150330 001 | |
Download: ML15098A124 (14) | |
Similar Documents at Watts Bar | |
---|---|
Category:Annual Operating Report
MONTHYEARWBL-23-013, 10 CFR 50.46 Annual Report for 20222023-03-29029 March 2023
[Table view]10 CFR 50.46 Annual Report for 2022 WBL-22-008, 10 CFR 50.59 Summary Report2022-04-27027 April 2022 10 CFR 50.59 Summary Report WBL-22-012, Submittal of 10 CFR 50.46 - Annual Report for Watts Bar Nuclear Plant Units 1 and 22022-03-0202 March 2022 Submittal of 10 CFR 50.46 - Annual Report for Watts Bar Nuclear Plant Units 1 and 2 WBL-21-020, Annual Non-Radiological Environmental Operating Report - 20202021-04-20020 April 2021 Annual Non-Radiological Environmental Operating Report - 2020 WBL-21-009, 10 CFR 50.46 Annual Report for Watts Bar Nuclear Plant Units 1 and 22021-03-0404 March 2021 10 CFR 50.46 Annual Report for Watts Bar Nuclear Plant Units 1 and 2 WBL-20-007, 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant Units 1 and 22020-03-0505 March 2020 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant Units 1 and 2 L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 22019-03-0707 March 2019 Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 ML18115A0532018-04-25025 April 2018 Submittal of 10 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Watts Bar Nuclear Plant, Units 1 and 2, Independent Spent Fuel Storage Installation CNL-18-040, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report2018-03-0707 March 2018 Transmittal of 10 CFR 50.46 - 30-Day and Annual Report ML17306A9892017-11-0202 November 2017 Submittal of 10 CFR 50.59 Summary of the Changes, Tests, and Experiments Implemented Report ML17067A0792017-03-0808 March 2017 Submittal of 10 CFR 50.46 - 30-Day and Annual Report CNL-16-057, Transmittal of l0 CFR 50.46 Annual Report2016-03-18018 March 2016 Transmittal of l0 CFR 50.46 Annual Report CNL-15-053, Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model2015-03-30030 March 2015 Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model ML14120A3212014-04-30030 April 2014 Annual Radioactive Effluent Release Report for 2013 ML14119A3322014-04-25025 April 2014 10 CFR 50.46 - Annual Report for 2013 CNL-14-035, CFR 50.46 30-Day Report of Changes & Errors to Calculated Peak Cladding Temperature2014-02-28028 February 2014 CFR 50.46 30-Day Report of Changes & Errors to Calculated Peak Cladding Temperature ML13140A0432013-05-15015 May 2013 Submittal of Annual Radiological Environmental Operating Report - 2012 ML13133A0032013-05-0808 May 2013 Annual Non-Radiological Environmental Operating Report - 2012 ML13120A0052013-04-25025 April 2013 10 CFR 50.46 - 30-Day Report and Annual Report for 2012 ML12137A8702012-05-15015 May 2012 Annual Radiological Environmental Operating Report - 2011 ML11126A1802011-04-28028 April 2011 2010 Annual Radioactive Effluent Release Report, Enclosure 1 ML1112505742011-04-27027 April 2011 Submittal of Annual Report of Changes or Errors Discovered in the Emergency Core Cooling System Evaluation Model for Year 2010 ML1109506832011-04-0101 April 2011 Submittal of Annual Insurance Status Report ML12221A3292010-12-31031 December 2010 City of Dayton Water Department - Annual Water Report Water Testing Performed in 2010 ML1036102792010-12-21021 December 2010 CFR 50.46 Annual Report for Model Year 2009 ML1013802962010-05-12012 May 2010 Annual Radiological Environmental Operating Report - 2009 ML0913902882009-04-30030 April 2009 Annual Radiological Environmental Operating Report ML0912603712008-12-31031 December 2008 Annual Radioactive Effluent Release Report ML0912603742008-01-15015 January 2008 Effluent and Waste Disposal Annual Report, Offsite Dose Calculation Manual ML0712803782007-05-0202 May 2007 Annual Radiological Environmental Operating Report for 2006 ML0712300822007-04-27027 April 2007 Enclosure 1, Watts Bar - 2006 Annual Radioactive Effluent Release Report for the Period January Through December 2006 ML0513803662005-04-30030 April 2005 Annual Environmental Radiological Operating Report ML0413902182004-05-14014 May 2004 Annual Radiological Environmental Operating Report - 2003 ML0413103712004-05-0505 May 2004 Unit 1 - 2003 Annual Nonradiological Environmental Operating Report (Aneor) ML0336000182003-12-18018 December 2003 Emergency Core Cooling System (ECCS) Evaluation Model Changes - 30 Day Report and Annual Report ML0314008112003-05-12012 May 2003 Annual Radiological Environmental Operating Report 2002 ML0214805002002-05-0808 May 2002 Annual Nonradiological Environmental Operating Report 2023-03-29 Category:Letter MONTHYEARML23319A2452024-01-29029 January 2024
[Table view]Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML15098A124&oldid=1356459"