Category:Annual Operating Report
MONTHYEARWBL-23-013, 10 CFR 50.46 Annual Report for 20222023-03-29029 March 2023
[Table view]10 CFR 50.46 Annual Report for 2022 WBL-22-008, 10 CFR 50.59 Summary Report2022-04-27027 April 2022 10 CFR 50.59 Summary Report WBL-22-012, Submittal of 10 CFR 50.46 - Annual Report for Watts Bar Nuclear Plant Units 1 and 22022-03-0202 March 2022 Submittal of 10 CFR 50.46 - Annual Report for Watts Bar Nuclear Plant Units 1 and 2 WBL-21-020, Annual Non-Radiological Environmental Operating Report - 20202021-04-20020 April 2021 Annual Non-Radiological Environmental Operating Report - 2020 WBL-21-009, 10 CFR 50.46 Annual Report for Watts Bar Nuclear Plant Units 1 and 22021-03-0404 March 2021 10 CFR 50.46 Annual Report for Watts Bar Nuclear Plant Units 1 and 2 WBL-20-007, 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant Units 1 and 22020-03-0505 March 2020 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant Units 1 and 2 L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 22019-03-0707 March 2019 Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 ML18115A0532018-04-25025 April 2018 Submittal of 10 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Watts Bar Nuclear Plant, Units 1 and 2, Independent Spent Fuel Storage Installation CNL-18-040, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report2018-03-0707 March 2018 Transmittal of 10 CFR 50.46 - 30-Day and Annual Report ML17306A9892017-11-0202 November 2017 Submittal of 10 CFR 50.59 Summary of the Changes, Tests, and Experiments Implemented Report ML17067A0792017-03-0808 March 2017 Submittal of 10 CFR 50.46 - 30-Day and Annual Report CNL-16-057, Transmittal of l0 CFR 50.46 Annual Report2016-03-18018 March 2016 Transmittal of l0 CFR 50.46 Annual Report CNL-15-053, Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model2015-03-30030 March 2015 Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model ML14120A3212014-04-30030 April 2014 Annual Radioactive Effluent Release Report for 2013 ML14119A3322014-04-25025 April 2014 10 CFR 50.46 - Annual Report for 2013 CNL-14-035, CFR 50.46 30-Day Report of Changes & Errors to Calculated Peak Cladding Temperature2014-02-28028 February 2014 CFR 50.46 30-Day Report of Changes & Errors to Calculated Peak Cladding Temperature ML13140A0432013-05-15015 May 2013 Submittal of Annual Radiological Environmental Operating Report - 2012 ML13133A0032013-05-0808 May 2013 Annual Non-Radiological Environmental Operating Report - 2012 ML13120A0052013-04-25025 April 2013 10 CFR 50.46 - 30-Day Report and Annual Report for 2012 ML12137A8702012-05-15015 May 2012 Annual Radiological Environmental Operating Report - 2011 ML11126A1802011-04-28028 April 2011 2010 Annual Radioactive Effluent Release Report, Enclosure 1 ML1112505742011-04-27027 April 2011 Submittal of Annual Report of Changes or Errors Discovered in the Emergency Core Cooling System Evaluation Model for Year 2010 ML1109506832011-04-0101 April 2011 Submittal of Annual Insurance Status Report ML12221A3292010-12-31031 December 2010 City of Dayton Water Department - Annual Water Report Water Testing Performed in 2010 ML1036102792010-12-21021 December 2010 CFR 50.46 Annual Report for Model Year 2009 ML1013802962010-05-12012 May 2010 Annual Radiological Environmental Operating Report - 2009 ML0913902882009-04-30030 April 2009 Annual Radiological Environmental Operating Report ML0912603712008-12-31031 December 2008 Annual Radioactive Effluent Release Report ML0912603742008-01-15015 January 2008 Effluent and Waste Disposal Annual Report, Offsite Dose Calculation Manual ML0712803782007-05-0202 May 2007 Annual Radiological Environmental Operating Report for 2006 ML0712300822007-04-27027 April 2007 Enclosure 1, Watts Bar - 2006 Annual Radioactive Effluent Release Report for the Period January Through December 2006 ML0513803662005-04-30030 April 2005 Annual Environmental Radiological Operating Report ML0413902182004-05-14014 May 2004 Annual Radiological Environmental Operating Report - 2003 ML0413103712004-05-0505 May 2004 Unit 1 - 2003 Annual Nonradiological Environmental Operating Report (Aneor) ML0336000182003-12-18018 December 2003 Emergency Core Cooling System (ECCS) Evaluation Model Changes - 30 Day Report and Annual Report ML0314008112003-05-12012 May 2003 Annual Radiological Environmental Operating Report 2002 ML0214805002002-05-0808 May 2002 Annual Nonradiological Environmental Operating Report 2023-03-29 Category:Letter MONTHYEARML23319A2452024-01-29029 January 2024
[Table view]Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09 |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381 April 25, 2018 10 cFR 72.4 10 cFR 72.48(dX2)
ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048 Subject 10 CFR 72.48 Changes, Tests, and Experiments, BiennialSummary Report Associated with the Watts Bar Nuclear Plant, Units 1 and 2,
!ndependent Spent Fuel Storage lnstallation ln accordance with the requirements of Title 10 of the Code of Federal Regulation (10 CFR) 72.48(d)(2), the Tennessee Valley Authority is providing a summary report of changes, tests, and experiments performed at the Watts Bar Nuclear Plant WBN), Units 1 and 2,lndependent Spent Fuel Storage lnstallation from April 25, 2016 through April 16, 2018. There were no applicable changes, tests, or experiments associated with the WBN Units 1 and 2 lndependent Spent Fuel Storage lnstallation during this reporting period.
There are no new regulatory commitments contained in this letter. Please direct any questions concerning this matter to Kim Hulvey, WBN Licensing Manager, at (423) 365-7720.
Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant cc: see Pag e 2
U.S. Nuclear Regulatory Commission Page 2 April25,2018 cc:
NRC Regional Administrator - Region ll NRC Senior Resident lnspector - Watts Bar Nuclear Plant Robert Carrion - Region ll ISFSI Coordinator