PLA-6155, Susquehanna - Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Letter type:PLA
| document type = Letter type:PLA
| page count = 2
| page count = 2
| project =
| stage = Supplement
}}
}}



Revision as of 14:26, 10 February 2019

Susquehanna - Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement
ML070610371
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/13/2007
From: McKinney B T
Susquehanna
To:
Document Control Desk, NRC/NRR/ADRO
References
PLA-6155
Download: ML070610371 (2)


Text

Britt T. McKInney Sr. Vice President

& Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com an--p .m*T FEB t 3 2007 Proprietary Information Enclosed U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 CONSTANT PRESSURE POWER UPRATE -SUPPLEMENT PLA-6155 Docket Nos. 50-387 and 50-388 References.

1) PPL Letter PLA-6076, B. T. McKinney (PPL) to USNRC,"Proposed License Amendment Numbers 285for Unit 1 Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate, "dated October 11, 2006.Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TS) to increase the maximum power level authorized from 3489 megawatts thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP).In a teleconference held January 31, 2007, the NRC staff requested PPL submit the enclosed reports to assist with the review of the Reference 1 application.

Enclosure 1 provides a proprietary version of the requested reports.There are no new regulatory commitments associated with the submittal of these reports.PPL has reviewed the "No Significant Hazards Consideration" and the "Enviro nmental Consideration" submitted with Reference 1 relative to this supplemental information.

We have determined that there are no changes required to either of these documents.

A&D( Document Control Desk PLA-6155 The enclosed reports are considered to be proprietary by AREVA NP, Inc. As such, AREVA NP, Inc. requests that they be withheld from public disclosure in accordance with 10 CFR 2.390 (a) 4 and 9.17 (a) 4. An Affidavit supporting this request is provided in Enclosure 1.If you have any questions or require additional information, please contact Mr. Michael H. rowthers at (610) 774-7766.B. T. McKinney Enclosure 1: AREVA NP, INC. Reports Copy: NRC Region I Mr. C. R. Welch, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. R. Janati, DEP/BRP