ML080250092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML080250092
| number = ML080250092
| issue date = 01/28/2008
| issue date = 01/28/2008
| title = Oconee, Units 1, 2, and 3 - Summary of 01/17/2008 Conference Call to Discuss Upcoming License Amendment Request for Digital Upgrade to the Reactor Protective System and Engineered Safeguards Protective System
| title = Summary of 01/17/2008 Conference Call to Discuss Upcoming License Amendment Request for Digital Upgrade to the Reactor Protective System and Engineered Safeguards Protective System
| author name = Olshan L N
| author name = Olshan L N
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
Line 14: Line 14:
| page count = 4
| page count = 4
| project = TAC:MD2471, TAC:MD2472, TAC:MD2473
| project = TAC:MD2471, TAC:MD2472, TAC:MD2473
| stage = Request
| stage = Other
}}
}}



Revision as of 04:50, 10 February 2019

Summary of 01/17/2008 Conference Call to Discuss Upcoming License Amendment Request for Digital Upgrade to the Reactor Protective System and Engineered Safeguards Protective System
ML080250092
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/28/2008
From: Olshan L N
NRC/NRR/ADRO/DORL/LPLII-1
To:
Duke Power Co
Olshan L N, NRR/DORL, 415-1419
References
TAC MD2471, TAC MD2472, TAC MD2473
Download: ML080250092 (4)


Text

January 28, 2008LICENSEE:DUKE POWER COMPANY LLC (DUKE)

FACILITY:OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

SUBJECT:

SUMMARY

OF JANUARY 17, 2008, CONFERENCE CALL TO DISCUSSUPCOMING LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO THE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS.

MD2471, MD2472, AND MD2473)On January 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) and Duke (the licensee)conducted a conference call to discuss the upcoming LAR for a digital upgrade to RPS/ESPS at Oconee, specifically, the documents that should be docketed when the LAR is submitted.

Enclosed is a list of the conference call participants.During the meeting that was held on December 12, 2007 (meeting summary available underAgencywide Documents Access and Management System (ADAMS) accession number ML073550278), the NRC staff stated that it would provide to the licensee a list of the technical documents that should be submitted on the docket along with the LAR. By e-mail dated December 21, 2007 (ML080240255), the NRC staff provided the list of documents to the licensee. The licensee inserted the documents contained in the NRC's list into a table and correlated these documents to the applicable Duke/AREVA documents. The licensee provided this table to the NRC by e-mail dated January 15, 2008 (ML080240253).During the conference call, the NRC staff and the licensee first discussed the documentsprinted in bold and agreed that these documents would be provided on the docket along with the LAR. The NRC staff and the licensee agreed that the remaining documents on the list would be made available to the NRC staff, but would not have to be docketed along with the LAR. However, the NRC staff stated that some of these documents might have to be docketed at a later time if the NRC staff determined that information in these documents would be referenced in the NRC staff's safety evaluation. The licensee agreed to docket any of these documents that the NRC staff requested to be docketed./RA/Leonard N. Olshan, Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287

Enclosure:

List of Participantscc w/encl: See next page January 28, 2008LICENSEE:DUKE POWER COMPANY LLC (DUKE)FACILITY:OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

SUBJECT:

SUMMARY

OF JANUARY 17, 2008, CONFERENCE CALL TO DISCUSSUPCOMING LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO THE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS.

MD2471, MD2472, AND MD2473)On January 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) and Duke (the licensee)conducted a conference call to discuss the upcoming LAR for a digital upgrade to RPS/ESPS at Oconee, specifically, the documents that should be docketed when the LAR is submitted.

Enclosed is a list of the conference call participants.During the meeting that was held on December 12, 2007 (meeting summary available underAgencywide Documents Access and Management System (ADAMS) accession number ML073550278), the NRC staff stated that it would provide to the licensee a list of the technical documents that should be submitted on the docket along with the LAR. By e-mail dated December 21, 2007 (ML080240255), the NRC staff provided the list of documents to the licensee. The licensee inserted the documents contained in the NRC's list into a table and correlated these documents to the applicable Duke/AREVA documents. The licensee provided this table to the NRC by e-mail dated January 15, 2008 (ML080240253).During the conference call, the NRC staff and the licensee first discussed the documentsprinted in bold and agreed that these documents would be provided on the docket along with the LAR. The NRC staff and the licensee agreed that the remaining documents on the list would be made available to the NRC staff, but would not have to be docketed along with the LAR. However, the NRC staff stated that some of these documents might have to be docketed at a later time if the NRC staff determined that information in these documents would be referenced in the NRC staff's safety evaluation. The licensee agreed to docket any of these documents that the NRC staff requested to be docketed./RA/Leonard N. Olshan, Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287

Enclosure:

List of Participantscc w/encl: See next pageDistribution

PUBLICRidsNrrLAMO'Brien (hard copy)RidsAcrsAcnwMailCenter LPL2-1 R/FRidsNrrPMLOlshan (hard copy)RidsRgn2MailCenter (JMoorman)RidsNrrDorlLpl2-1 (MWong)RidsOgcRp RidsNrrDorlDpr Mcox, EDO. Rgn IITLiu, NRRWKemper IAhmedPLoeserAccession Number: ML080250092OFFICENRR/LPL2-1/PMNRR/LPL2-1/LANRR/LPL2-1/BC (A)NAMELolshanMO'BrienMWongDATE 1/28/08 1/28/08 1 /28/08OFFICIAL RECORD COPY EnclosurePARTICIPANTS IN THE JANUARY 17, 2008, CONFERENCE CALL WITH DUKE POWER COMPANY LLC (DUKE)TO DISCUSS THE UPCOMING LICENSE AMENDMENT REQUEST FOR DIGITAL UPGRADETO REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVESYSTEM NRC DUKEW. KemperR. GillI. AhmedB. Shingleton P. Loeser L. OlshanOTHERM. Burzynski, AREVAC. Doyel, AREVA Oconee Nuclear Station, Units 1, 2, and 3 cc:

Mr. Bruce H. HamiltonVice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672Ms. Lisa F. VaughnAssociate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202Manager, LISNUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035Senior Resident InspectorU.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672Mr. Henry Porter, DirectorDivision of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708Mr. Michael A. SchoppmanFramatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209Mr. B. G. DavenportRegulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672Mr. Leonard G. GreenAssistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602Mr. R. L. Gill, Jr.Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202Division of Radiation ProtectionNC Dept of Environment, Health, & Natural

Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721Mr. Peter R. Harden, IVVP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210Mr. Henry BarronGroup Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006Mr. Charles BrinkmanDirector, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852Ms. Kathryn B. NolanSenior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202