ML081560501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML081560501
| number = ML081560501
| issue date = 07/16/2008
| issue date = 07/16/2008
| title = Shearon Harris, Unit 1 - Final Report: Results of the NRC Staff Review of Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association Standard NFA-805, Performance-Based Standard for Fire Prote
| title = Final Report: Results of the NRC Staff Review of Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association Standard NFA-805, Performance-Based Standard for Fire Protection ...
| author name = Vaaler M G
| author name = Vaaler M G
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2

Revision as of 02:27, 10 February 2019

Final Report: Results of the NRC Staff Review of Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association Standard NFA-805, Performance-Based Standard for Fire Protection ...
ML081560501
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/16/2008
From: Vaaler M G
NRC/NRR/ADRO/DORL/LPLII-2
To: Donahue J W
Progress Energy Carolinas
Vaaler, Marlayna, NRR/DORL 415-1998
References
NFPA 805, TAC MC5630
Download: ML081560501 (4)


Text

July 16, 2008

Joseph W. Donahue, Vice President Nuclear Engineering & Services Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - FINAL REPORT: RESULTS OF THE NRC STAFF REVIEW OF THE FIRE PROBABILISTIC RISK ASSESSMENT MODEL TO SUPPORT IMPLEMENTATION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA-805, "PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" (TAC NO. MC5630)

Dear Mr. Donahue:

This letter is to provide you with the final report of the U.S. Nuclear Regulatory Commission's review of the Shearon Harris Nuclear Power Plant, Unit 1, fire probabilistic risk assessment model. The final report, dated March 28, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080650420), is provided in the enclosure. This report supersedes the draft report provided on March 10, 2008 (enclosure to ADAMS Accession No. ML080650403), in its entirety.

The results documented in the final report are essentially unchanged from the draft report, although users should verify this when addressing specific technical facts and observations.

If you have any questions regarding this matter, please contact me at (301) 415-3178.

Sincerely, /RA/ Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

As stated

cc w/enclosure: See next page

ML080650403), in its entirety.

The results documented in the final report are essentially unchanged from the draft report, although users should verify this when addressing specific technical facts and observations.

If you have any questions regarding this matter, please contact me at (301) 415-3178.

Sincerely, /RA/ Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

As stated cc w/enclosure: See next page DISTRIBUTION

PUBLIC DRA r/f RidsNrrPMMVaaler RidsNrrLACSola RidsNrrDorlLpl2-2 RidsNrrDraAfpb RidsOgcRp RidsAcrsAcnw&mMailCenter RidsRgn2MailCenter (RMusser) SLaur PLain AKlein, NRR ADAMS Accession No.: (Letter) ML081560501 (Encl) ML080650420 (Pkg) ML080650382 NRR-106 OFFICE NRR/ADES/DRA NRR/ADES/DRA/AFPB BC:NRR/ADES/DRA/AFPBNAME SLaur PLain AKlein DATE 6/4/2008 7/1/2008 7/10/2008 OFFICE DD:NRR/ADES/DRA PM:NRR/ADRO/DORL BC:NRR/ADRO/DORL NAME MCunningham MVaaler FSaba for TBoyce DATE 7/14/2008 6/4/2008 7/16/2008 Mr. Joseph Donahue Shearon Harris Nuclear Power Plant, Progress Energy Unit No. 1 cc:

Mr. Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

Mr. Kelvin Henderson Plant General Manager Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc. P. O. Box 165, Mail Zone 3 New Hill, North Carolina 27562-0165

Mr. Chris L. Burton Director of Site Operations Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.

Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc. P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

Ms. Phyllis N. Mentel, Manager Support Services Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc. P. O. Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165

Resident Inspector / Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998

Mr. J. Paul Fulford Manager, Performance Evaluation and Regulatory Affairs PEB 5 Progress Energy Carolinas, Inc. Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. John H. O'Neill, Jr. Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street NW.

Washington, DC 20037-1128 Mr. John D. Runkle, Attorney at Law Post Office Box 3793 Chapel Hill, North Carolina 27515-3793 David T. Conley Associate General Counsel II - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510

Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211

Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7221 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Tony Gurley, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, North Carolina 27602 Mr. Carl Thompson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312

Mr. Jim Warren NC Waste Awareness & Reduction Network Post Office Box 61051 Durham, North Carolina 27715-1051