MONTHYEARIR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) 05000414/LER-2024-001, Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan2024-03-0404 March 2024 Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 – Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20234012023-03-0101 March 2023 – Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 05000414/LER-2022-003, Manual Reactor Trip and Auxiliary Feedwater System Actuation2022-12-23023 December 2022 Manual Reactor Trip and Auxiliary Feedwater System Actuation IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl 05000414/LER-2022-002, Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination2022-12-0606 December 2022 Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 2024-09-05
[Table view] Category:Technical Specification
MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change2023-04-24024 April 2023 Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies ML22186A0082022-06-21021 June 2022 SLC Revision to 16.9-22, TS Bases 3.7.7 RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0219, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes2018-12-0404 December 2018 Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes RA-18-0226, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System.2018-11-15015 November 2018 Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing2018-07-19019 July 2018 License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications CNS-18-005, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes2018-02-0808 February 2018 Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. CNS-17-033, Technical Specification Bases Changes2017-06-27027 June 2017 Technical Specification Bases Changes RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process CNS-16-046, Technical Specification Bases Changes, B 3.7 Plant Systems2016-06-14014 June 2016 Technical Specification Bases Changes, B 3.7 Plant Systems CNS-16-031, Technical Specification Bases Changes2016-04-26026 April 2016 Technical Specification Bases Changes CNS-16-015, Technical Specification Bases Changes2016-02-18018 February 2016 Technical Specification Bases Changes CNS-15-098, Technical Specification Bases Changes2015-12-14014 December 2015 Technical Specification Bases Changes RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 MNS-15-022, Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements2015-06-23023 June 2015 Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements CNS-15-054, Submittal of Technical Specification Bases Changes 5.5.142015-06-0202 June 2015 Submittal of Technical Specification Bases Changes 5.5.14 CNS-15-021, Technical Specification Bases Changes Made According to the Provisions of Technical Specification 5.5.14, Technical Specifications (TS) Bases Control Program.2015-03-0909 March 2015 Technical Specification Bases Changes Made According to the Provisions of Technical Specification 5.5.14, Technical Specifications (TS) Bases Control Program. RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area CNS-14-079, Technical Specification Bases Changes2014-06-18018 June 2014 Technical Specification Bases Changes CNS-14-055, Technical Specification Bases Changes2014-05-0505 May 2014 Technical Specification Bases Changes CNS-14-032, Request for Notice of Enforcement Discretion (NOED) Regarding Technical Specifications2014-03-10010 March 2014 Request for Notice of Enforcement Discretion (NOED) Regarding Technical Specifications CNS-14-026, Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System.2014-02-17017 February 2014 Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System. ML13269A0772013-09-23023 September 2013 Submittal of Technical Specification Bases Changes ML13263A3732013-09-18018 September 2013 Technical Specification Bases Changes ML13109A0802013-04-17017 April 2013 Technical Specification Bases Changes ML12314A0152012-11-0606 November 2012 Technical Specification Bases Changes ML12153A3282012-05-31031 May 2012 Proposed Technical Specifications Amendment TS 3.1.3, Moderator Temperature Coefficient (Mtc) TS 5.6.5, Core Operating Limits Report (COLR) License Amendment Request for Conditional Exemption of the End of Cycle (EOC) Mtc Measurement Method ML11335A1482011-11-29029 November 2011 Technical Specification Bases Changes ML11327A1492011-11-22022 November 2011 Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML11171A0422011-06-15015 June 2011 Changes to Technical Specification Bases Pursuant to 10CFR 50.4 ML11138A3042011-05-10010 May 2011 Technical Specification Bases Changes, Pursuant to 1OCFR 50.4 ML1108907012011-03-24024 March 2011 Duke Energy Carolinas - Technical Specification Bases Changes 2024-05-23
[Table view] Category:Bases Change
MONTHYEARRA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change2023-04-24024 April 2023 Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies ML22186A0082022-06-21021 June 2022 SLC Revision to 16.9-22, TS Bases 3.7.7 RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-18-0219, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes2018-12-0404 December 2018 Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes RA-18-0226, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System.2018-11-15015 November 2018 Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing2018-07-19019 July 2018 License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing CNS-18-005, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes2018-02-0808 February 2018 Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. CNS-17-033, Technical Specification Bases Changes2017-06-27027 June 2017 Technical Specification Bases Changes RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process CNS-16-046, Technical Specification Bases Changes, B 3.7 Plant Systems2016-06-14014 June 2016 Technical Specification Bases Changes, B 3.7 Plant Systems CNS-16-031, Technical Specification Bases Changes2016-04-26026 April 2016 Technical Specification Bases Changes CNS-16-015, Technical Specification Bases Changes2016-02-18018 February 2016 Technical Specification Bases Changes CNS-15-098, Technical Specification Bases Changes2015-12-14014 December 2015 Technical Specification Bases Changes ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 MNS-15-022, Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements2015-06-23023 June 2015 Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements CNS-15-054, Submittal of Technical Specification Bases Changes 5.5.142015-06-0202 June 2015 Submittal of Technical Specification Bases Changes 5.5.14 CNS-15-021, Technical Specification Bases Changes Made According to the Provisions of Technical Specification 5.5.14, Technical Specifications (TS) Bases Control Program.2015-03-0909 March 2015 Technical Specification Bases Changes Made According to the Provisions of Technical Specification 5.5.14, Technical Specifications (TS) Bases Control Program. RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area CNS-14-079, Technical Specification Bases Changes2014-06-18018 June 2014 Technical Specification Bases Changes CNS-14-055, Technical Specification Bases Changes2014-05-0505 May 2014 Technical Specification Bases Changes CNS-14-032, Request for Notice of Enforcement Discretion (NOED) Regarding Technical Specifications2014-03-10010 March 2014 Request for Notice of Enforcement Discretion (NOED) Regarding Technical Specifications CNS-14-026, Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System.2014-02-17017 February 2014 Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System. ML13269A0772013-09-23023 September 2013 Submittal of Technical Specification Bases Changes ML13263A3732013-09-18018 September 2013 Technical Specification Bases Changes ML13109A0802013-04-17017 April 2013 Technical Specification Bases Changes ML12314A0152012-11-0606 November 2012 Technical Specification Bases Changes ML11335A1482011-11-29029 November 2011 Technical Specification Bases Changes ML11327A1492011-11-22022 November 2011 Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML11171A0422011-06-15015 June 2011 Changes to Technical Specification Bases Pursuant to 10CFR 50.4 ML11138A3042011-05-10010 May 2011 Technical Specification Bases Changes, Pursuant to 1OCFR 50.4 ML1108907012011-03-24024 March 2011 Duke Energy Carolinas - Technical Specification Bases Changes ML1019703652010-07-13013 July 2010 Submittal of Technical Specification Bases Changes ML0935600772009-12-15015 December 2009 Technical Specifications Revision Request to Adopt TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity. ML0935005972009-12-14014 December 2009 Units 1 and 2 - License Amendment Request Applicable to Technical Specification 3.8.4, DC Sources-Operating ML0908503412009-03-23023 March 2009 Technical Specification Bases Changes ML0832605732008-11-12012 November 2008 Technical Specification Bases Changes ML0828800982008-10-0808 October 2008 Proposed Technical Specifications and Bases Amendment, TS and Bases Administrative Changes ML0827505012008-09-26026 September 2008 Technical Specification Bases Changes ML0814300052008-05-15015 May 2008 Technical Specification Bases Changes ML0812702282008-04-29029 April 2008 Technical Specification Bases Changes ML0731305512007-11-0707 November 2007 Transmittal of Technical Specification Bases Changes 2023-04-24
[Table view] |
Text
ý- .ý' -I ý.P Duke JAMES R. MORRIS, VICE PRESIDENT krEnergy.
Duke Energy Carolinas, LLC Carolinas Catawba Nuclear Station 4800 Concord Road / CN01 VP York, SC 29745 803-701-4251 803-701-3221 fax March 23, 2009 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Technical Specification Bases Changes Pursuant to 10CFR 50.4, please find attached changes to the Catawba Nuclear Station Technical Specification Bases. These Bases changes were made according to the provisions of 10CFR 50.59.Any questions regarding this information should be directed to L. J. Rudy, Regulatory Compliance, at (803)701-3084.
I certify that I am a duly authorized officer of Duke Energy Corporation and that the information contained herein accurately represents changes made to the Technical Specification Bases since the previous submittal.
James R. Morris Attachment A4o(www. duke-energy.
com U.S. Nuclear Regulatory Commission March 23, 2009 Page 2 xc: Luis Reyes U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 J. H. Thompson, NRR Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 A.T. Sabisch Senior Resident Inspector Catawba Nuclear Station U.S. Nuclear Regulatory Commission March 23, 2009 Page 3 bxc: w/o attachment NCMPA-1 NCEMC PMPA w/attachment Electronic Licensing Library EC050 RGC File CN01RC Master File CN-801.01 CN04DM SDuke DUKE ENERGY CAROLINAS, LLC Catawba Nuclear Station rbEnergy 4800 Concord Road Carolinas York, SC 29745 March 18, 2009 Re: Catawba Nuclear Station Technical Specifications Bases Please replace the corresponding pages in your copy of the Catawba Technical Specifications Manual as follows: REMOVE THESE PAGES INSERT THESE PAGES LIST OF EFFECTIVE PAGES Page 31 Page 31 TAB 3.8.3 B 3.8.3-5 thru B 3.8.3-8 B 3.8.3-5 thru B 3.8.3-8 TAB 3.8.4 B 3.8.4-7 thru B 3.8.4-8 B 3.8.4-7 thru B 3.8.4-8 If you have any questions concerning the contents of thisTechnical Specification update, contact Betty Aldridge at (803)701-3758., Randy Hart Manager, Regulatory Compliance www. duke-energy, com Page Number B 3.8.1-25 B 3.8.1-26 B 3.8.1-27 B 3.8.2-1 B 3.8.2-2 B 3.8.2-3 B 3.8.2-4 B 3.8.2-5 B 3.8.2-6 B 3.8.3-1 B 3.8.3-2 B 3.8.3-3 B 3.8.3-4 B 3.8.3-5 B 3.8.3-6 B 3.8.3-7 B 3.8.3-8 B 3.8.4-1 B 3.8.4-2.B 3.8.4-3 B 3.8.4-4 B 3.8.4-5 B 3.8.4-6 B 3.8.4-7 B 3.8.4-8 B 3.8.4-9 B 3.8.4-10 B 3.8.5-1 B 3.8.5-2 B 3.8.5-3 B 3.8.6-1 B 3.8.6-2 Amendment Revision 0 Revision 0 Revision 2 Revision 0 Revision 0 Revision 0 Revision 1 Revision 2 Revision 1 Revision 1 Revision 0 Revision 1 Revision 0 Revision 1 Revision 2 Revision 1 Revision 3.Revision 0 Revision 1 Revision 0 Revision 1 Revision 3 Revision 4 Revision 7 Revision 7 Revision 6 Revision 1 Revision 0 Revision 2 Revision 1 Revision 2 Revision 1 Revision Date 9/30/98 9/30/98 6/25/07 9/30/98 9/30/98 9/30/98 5/10/05 5/10/05 5/10/05 1/15/99 9/30/98 1/15/99 9/30/98 1/15/99 3/11/09 7/10/03 3/11/09 9/30/98 2/26/99 9/30/98 4/27/99 4/27/05 4/27/05 4/27/05 3/11/09 10/06/05 3/29/05 9/30/98 7/29/03 7/29/03 4/27/05 4/27/05 Catawba Units 1 and 2 Page 31 3/11/09 Diesel Fuel Oil, Lube Oil and Starting Air B 3.8.3 BASES ACTIONS (continued) for reasons other than addressed by Conditions A through E, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable.
SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate inventory of fuel oil in the storage tanks to support each DG's operation for 7 days at full load. The 7 day period is sufficient time to place the unit in a safe shutdown condition and to bring in replenishment fuel from an offsite location.The 31 day Frequency is adequate to ensure that a sufficient supply of fuel oil is available, since low level alarms are provided and unit operators would be aware of any large uses of fuel oil during this period.SR 3.8.3.2 This Surveillance ensures that sufficient lube oil inventory is available to support at least 7 days of full load operation for each DG. The 400 gal requirement is based on the DG manufacturer consumption values for the run time of the DG. In order to account for the lube oil sump tank inventory decrease that occurs when the DG is started, the 400 gal requirement shall be met with the Surveillance conducted while the DG is running.A 31 day Frequency is adequate to ensure that a sufficient lube oil supply is available, since DG starts and run time are closely monitored by the unit staff.SR 3.8.3.3 The tests listed below are a means of determining whether new fuel oil is of the appropriate grade and has not been contaminated with substances that would have an immediate, detrimental impact on diesel engine combustion.
If results from these tests are within acceptable limits, the fuel oil may be added to the storage tanks without concern for contaminating the entire volume of fuel oil in the storage tanks. These Catawba Units 1 and 2 B 3.8.3-5 Revision No. 1 Catawba Units 1 and 2 B 3.8.3-5 Revision No. 1 Diesel Fuel Oil, Lube Oil and Starting Air B 3.8.3 BASES SURVEILLANCE REQUIREMENTS (continued) tests are to be conducted prior to adding the new fuel to the storage tank(s). The tests, limits, and applicable ASTM Standards are as follows: a. Sample the new fuel oil in accordance with ASTM D4057 (Ref. 7);b. Verify in accordance with the tests specified in ASTM D975 (Ref. 7)that the sample has a kinematic viscosity at 40°C of >_ 1.9 centistokes and _< 4.1 centistokes, and a flash point of _> 125°F; and c. Verify that the new fuel oil has a clear and bright appearance with proper color when tested in accordance with ASTM D4176 (Ref. 7) or a -water and sediment content within limits when tested in accordance with ASTM D2709; and d. Verify that the new fuel oil has an absolute specific gravity at 60/60'F of > 0.83 and < 0.89 when tested in accordance with ASTM D1298 or an API gravity at 60'F of > 270 and < 390 when tested in accordance with ASTM D287 (Ref. 7).Failure to meet any of the above limits, except for clear and bright, is cause for rejecting the fuel oil, but does not represent a failure to meet the LCO concern since the fuel oil is not added to the storage tanks. If the fuel oil fails on clear and bright, it may be accepted if it passes water and sediment.
The specifications for water and sediment recognize that a small amount of water and sediment is acceptable.
Thus, this test may be used after a clear and bright test to provide a more quantitative result.Within 31 days following the initial new fuel oil sample, the fuel oil is analyzed to establish that the other properties specified in Table 1 of ASTM D975 (Ref. 7) are met for new fuel oil when tested in accordance with ASTM D975 (Ref. 7). The 31 day period is acceptable because the fuel oil properties of interest, even if they were not within stated limits, would not have an immediate effect on DG operation.
This Surveillance ensures the availability of high quality fuel oil for the DGs.Fuel oil degradation during long term storage shows up as an increase in particulate, due mostly to oxidation.
The presence of particulate does not mean the fuel oil will not burn properly in a diesel engine. The particulate can cause fouling of filters and fuel oil injection equipment, however, which can cause engine failure.Particulate concentrations should be determined based on ASTM D6217 (Ref. 7). This test method is used for assessing the mass quantity of Catawba Units 1 and 2 B 3.8.3-6 Revision No. 2 Diesel Fuel Oil, Lube Oil and Starting Air B 3.8.3 , JI-RVltII ANCL RH(_-QUI-LMCN-IS (continued) particulates in middle distillate fuels, which includes 2-D diesel fuel. This method involves a gravimetric determination of total particulate concentration in the fuel oil and has a limit of 10 mg/l. For those designs in which the total stored fuel oil volume is contained in two or more interconnected tanks, each tank must be considered and tested separately.
The Frequency of this test takes into consideration fuel oil degradation trends that indicate that particulate concentration is unlikely to change significantly between Frequency intervals.
SR 3.8.3.4 This Surveillance ensures that, without the aid of the refill compressor, sufficient air start capacity for each DG is available.
The system design requirements provide for a minimum of five engine start cycles without recharging.
A start cycle is defined by the DG vendor, but usually is measured in terms of time (seconds of cranking) or engine cranking speed. The pressure specified in this SR is intended to reflect the lowest value at which the five starts can be accomplished.
The 31 day Frequency takes into account the capacity, capability, redundancy, and diversity of the AC sources and other indications available in the control room, including alarms, to alert the operator to below normal air start pressure.SR 3.8.3.5 Microbiological fouling is a major causeof fuel oil degradation.
There are numerous-bacteria that can grow in fuel oil and cause fouling, but all must have a water environment in order to survive. Removal of water from the fuel storage tanks once every 31 days. eliminates the necessary environment for bacterial survival.
This is the most effective means of controlling microbiological fouling. In addition, it eliminates the potential for water entrainment in the fuel oil during DG operation.
Water may come from any of several sources, including condensation, ground water, rain water, and contaminated fuel oil, and from breakdown of the fuel oil by bacteria-Frequent checking for and removal of accumulated water minimizes fouling and provides data regarding the watertight integrity of the fuel oil system. The Surveillance Frequencies are established by Catawba Units 1 and 2 B 3.8.3-7 Revision No. I Diesel Fuel Oil, Lube Oil and Starting Air B 3.8.3 BASES SURVEILLANCE REQUIREMENTS (continued)
Regulatory Guide 1.137 (Ref. 2). This SR is for preventive maintenance.
The presence of water does not necessarily represent failure of this SR, provided the accumulated water is removed during performance of the Surveillance.
REFERENCES
- 1. UFSAR, Section 9.5.4.2.2. Regulatory Guide 1.137.3. ANSI N195-1976, Appendix B.4. UFSAR, Chapter 6.5. UFSAR, Chapter 15.6. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 7. ASTM Standards:
D4057; D975; D1298; D4176; D2709; D6217;and D287.8. UFSAR, Section 18.2.4.9. Catawba License Renewal Commitments, CNS-1274.00-00-0016, Section 4.5.Catawba Units 1 and 2 B 3.8.3-8 Revision No. 3 DC Sources-Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)
Operating experience has shown that these components usually pass the SR when performed at the 18 month Frequency.
Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
SR 3.8.4.5 and SR 3.8.4.6 Visual inspection and resistance measurements of intercell, interrack, intertier, and terminal connections provide an indication of physical damage or abnormal deterioration that could indicate degraded battery condition.
The anticorrosion material, as recommended by the manufacturer for the batteries, is used to help ensure good electrical connections and to reduce terminal deterioration.
The visual inspection for corrosion is not intended to require removal of and inspection under each terminal connection.
The removal of visible corrosion is a preventive maintenance SR. The presence of visible corrosion does not necessarily represent a failure of this SR provided visible corrosion is removed during performance of SR 3.8.4.5.For the DG batteries utilizing nickel cadmium cells, the cell-to-cell terminal pole screws should be set from 14 to 15 foot-pounds of torque.Operating experience has shown that these components usually pass the SR when performed at the 18 month Frequency.
Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
SR 3.8.4.7 This SR requires that each battery charger for the DC channel be capable of supplying at least 200 amps and at least 75 amps for the DG chargers.
All chargers shall be tested at a voltage of at least 125 V for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. These requirements are based on the design capacity of the chargers (Ref. 4). According to Regulatory Guide 1.32 (Ref. 10), the battery charger supply is required to be based on the largest combined demands of the various steady state loads and the charging capacity to restore the battery from the design minimum charge state to the fully charged state, irrespective of the status of the unit during these demand occurrences.
The minimum required amperes and duration ensures that these requirements can be satisfied.
The Surveillance Frequency is acceptable, given the unit conditions required to perform the test and the other administrative controls existing to ensure adequate charger performance during these 18 month intervals.
In addition, this Frequency is intended to be consistent with expected fuel cycle lengths,.Catawba Units I and 2 B 3.8.4-7 I Revision No. 7 DC Sources-Operating B 3.8.4 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.8.4.8 A battery service test is a special test of battery capability, as found, to satisfy the design requirements (battery duty cycle) of the DC electrical power system. The vital battery's actual duty cycle is identified in calculation CNC-1381.05-00-0011, 125 VDC Vital Instrumentation and Control Power System Battery and Battery Charger Sizing Calculation.
The test duty cycle is the actual duty cycle adjusted for the temperature correction factor for 601F operation, and a design margin of typically 10 to 15% for load addition.
The minimum DC battery terminal voltage is determined through Calculation CNC-1381.05-00-0149, 125 VDC Vital I&C Power System (EPL) Voltage Drop.Analysis.
The DG battery's actual duty cycle is identified in calculation CNC-1381.05-00-0050, 125 VDC Diesel Generator Battery and Battery Charger Sizing Calculation.
The test duty cycle is the actual duty cycle adjusted for the temperature correction factor for 601F operation, and a design margin of typically 10 to 15% for load addition.
The minimum DG battery terminal voltage is*determined through Calculations CNC-1381.05-00-0235, Unit 1 125 VDC Essential Diesel Power System (EPQ) Voltage Drop Analysis and CNC-1381.05-00-0236, Unit 2 125 VDC Essential Diesel Power System (EPQ)Voltage Drop Analysis. (Note: The duty cycle in the UFSAR is used for battery Sizing and includes the temperature factor of 11%, a design margin of 15%, and an aging factor of 25%.)Except for performing SR 3.8.4.8 for the DC channel batteries with the unit on line, the Surveillance Frequency of 18 months is consistent with the recommendations of Regulatory Guide 1.32 (Ref. 10), which states that the battery service test should be performed during refueling operations or at some other outage, with intervals between tests, not to exceed 18 months.This SR is modified by two Notes. Note 1 allows the performance of a modified performance discharge test in lieu of a service test.Catawba Units 1 and 2 B 3.8.4-8 Revision No. 7