Line 2: |
Line 2: |
| | number = ML13179A095 | | | number = ML13179A095 |
| | issue date = 06/27/2013 | | | issue date = 06/27/2013 |
| | title = 2013/06/27 NRR E-mail Capture - Davis-Besse Nuclear Power Station Request for Alternative RR-A37 - Request for Additional Information (TAC No. MF0752) | | | title = Davis-Besse Nuclear Power Station Request for Alternative RR-A37 - Request for Additional Information |
| | author name = Purnell B A | | | author name = Purnell B A |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
Revision as of 02:28, 8 February 2019
|
---|
Category:E-Mail
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] |
Text
1 NRR-PMDAPEm Resource From:Purnell, Blake Sent: Thursday, June 27, 2013 10:56 AM To: phlashley@firstenergycorp.com Cc: cjheintz@firstenergycorp.com; 'j hofelich@firstenergycorp.com'
Subject:
Davis-Besse Nuclear Power Station Request fo r Alternative RR-A37 - Request for Additional Information (TAC No. MF0752)
Attachments:
Davis-Besse Relief RR-A37 RAI (MF0752).pdf Mr. Phil Lashley:
By letter dated February 27, 2013, FirstEnergy Nuclear Operating Company (the licensee) submitted Request No. RR-A37 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13059A315) for U.S. Nuclear Regulatory Commission (NRC) review and authorization. The proposed alternative requests acceptance of limited examination coverage of the Cold Leg 1-2 Drain Nozzle to Pipe dissimilar metal butt weld and the associated full structural weld overlay at Davis-Besse Nuclear Power Station. The NRC staff has reviewed your request and has determined that additional information is needed to
complete the review. In order to support the schedule for NRC review of your request, please provide a response to the attached request for additional information within 30 days of the date of this email.
This email serves as the official NRC request for additional information and a copy of this email will be placed into ADAMS and made pub licly available.
Docket No. 50-346
Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
ph: 301-415-1380
Hearing Identifier: NRR_PMDA Email Number: 738 Mail Envelope Properties (Blake.Purnell@nrc.gov20130627105500)
Subject:
Davis-Besse Nuclear Power Station Request for Alternative RR-A37 - Request for Additional Information (TAC No. MF0752) Sent Date: 6/27/2013 10:55:31 AM Received Date: 6/27/2013 10:55:00 AM From: Purnell, Blake Created By: Blake.Purnell@nrc.gov Recipients: "cjheintz@firstenergycorp.com" <cjheintz@firstenergycorp.com> Tracking Status: None
"'jhofelich@firstenergycorp.com'" <jhofelich@firstenergycorp.com> Tracking Status: None "phlashley@firstenergycorp.com" <phlashley@firstenergycorp.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1263 6/27/2013 10:55:00 AM Davis-Besse Relief RR-A37 RAI (MF0752).pdf 77170 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION REQUEST NO. RR-A37 FIRSTENERGY NUCLEAR OPERATING COMPANY DAVIS-BESSE NUCLEAR POWER STATION DOCKET NO. 50-346 TAC NO. MF0752 By letter dated February 27, 2013, FirstEnergy Nuclear Operating Company (the licensee) submitted Request No. RR-A37 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13059A315) for U.S. Nuclear Regulatory Commission (NRC) review and authorization. The proposed alternative requests acceptance of limited examination coverage of the Cold Leg 1-2 Drain Nozzle to Pipe dissimilar metal butt weld (DMBW) and the associated full structural weld overlay (FSWOL) at Davis-Besse Nuclear Power Station. In order to complete the review, the NRC staff requests additional information.
- 1. The licensee states in Proposed Alternative and Basis for Use: Based on radiological survey results from the spring 2012 refueling outage, this work would occur within radiation fields with dose rates up to 500 milli-Rem per hour, resulting in a significant increase in occupational radiation exposure [dose] to personnel. The Examination Data Sheet for the examination performed on May 15, 2012, indicated that the examination required nearly one hour, but the UT Examination Summary documented a total dose of 32 milli-Rem for the examination.
- a. Explain the apparent discrepancy in the dose rate and the total radiological dose. b. Justify why the dose incurred would present a hardship.
- 2. The NRC staff is unable to determine the exact volumes that were examined and the part of the required volume that was not examined from the drawings provided in the proposed alternative.
Provide clear scale drawings (with scale indicated) of the subject DMBW, including weld butter and FSWOL indicated. Clearly show the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case N-770-1 required examination volume and the volume of material interrogated by the examination in the axial and circumferential scan directions.
- 3. Provide a table detailing the scan coverage achieved for each of the following:
- a. carbon steel nozzle; b. stainless steel elbow;
- c. susceptible weld metal; and d. full structural weld overlay.
Provide values for scans in the circumferential and axial directions.
- 4. The licensee states that limitations imposed by the weld geometry resulted in incomplete scan coverage. Describe these limitations and their effects on scan coverage.
- 5. The technical report detailing the preservice examination of Cold Leg Drain Nozzle 1-2 (ISI Component ID RC-40-CCA-18-3-FW9) FSWOL in 2010, Summary of Weld Overlay Ultrasonic Examinations for Reactor Coolant Pump Suction and Discharge Welds, Core Flood Nozzle Welds, and Cold Leg Drain Line Welds at Davis-Besse Nuclear Power Station, Unit 1 (ADAMS Accession No. ML101230641), states 100 percent axial scan coverage and 80.1 percent circumferential scan coverage of the ASME Code Case N-740 [8] required volume, as documented in the Relief Request [5], was achieved during the examinations.
- a. Why does the current examination not achieve 100 percent coverage for scans in the axial direction and at least 80 percent coverage for scans in the circumferential direction? b. Provide a detailed explanation for the differences in examination coverage between the preservice and the current inservice examination.
- 6. Provide a copy of the Performance Demonstration Qualification Summary (PDQS) for the UT examination procedure used. Describe any limitations of the ASME Code,Section XI, Appendix VIII qualified examination procedure.
- 7. Was the subject inservice examination performed by team scanning?