ML13086A475
| ML13086A475 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/27/2013 |
| From: | Michael Mahoney Division of Operating Reactor Licensing |
| To: | Lashley P FirstEnergy Corp |
| References | |
| TAC MF0750, TAC MF0752, TAC MF0756 | |
| Download: ML13086A475 (3) | |
Text
1 NRR-PMDAPEm Resource From:
Mahoney, Michael Sent:
Wednesday, March 27, 2013 11:44 AM To:
'phlashley@firstenergycorp.com' Cc:
'kmnesser@firstenergycorp.com'; Bowman, Gregory; Hoffman, Keith; Cumblidge, Stephen; Bedi, Gurjendra
Subject:
Acceptance Review Results Davis-Besse - 10 CFR 50.55a Requests for Alternatives RP-5 (TAC No. MF0756), RR-A36 (TAC No. MF0750), and RR-A37 (TAC No. MF0752)
March 27, 2013 Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, Unit No. 1 FirstEnergy Nuclear Operating Company
Dear Mr. Lashley,
By letter L-13-067 dated February 27, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13059A321), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted Title 10 to the Code of Federal Regulations (10 CFR) 50.55a request, RP-5 and by letter L-13-076 dated February 27, 2013 (ADAMS Accession No. ML13029A315), FENOC submitted 10 CFR 50.55a requests, RR-A37 and RR-A37, regarding inservice pump and valve testing for the Davis-Besse Nuclear Power Plant, Unit 1 (DBNPS). These proposed requests support DBNPSs fourth 10-year inservice and testing program for pumps and valves. This acceptance review is for RP-5, RR-A36, and RR-A37, only.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this application. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of 10 CFR, the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed requests in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me. A copy of this email will be made publicly available in ADAMS.
Docket No. 50-346 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Project Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensing
2 Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV
Hearing Identifier:
NRR_PMDA Email Number:
648 Mail Envelope Properties (A41C2340DAB39B44AD0B9623285CB333C97D76E17A)
Subject:
Acceptance Review Results Davis-Besse - 10 CFR 50.55a Requests for Alternatives RP-5 (TAC No. MF0756), RR-A36 (TAC No. MF0750), and RR-A37 (TAC No. MF0752)
Sent Date:
3/27/2013 11:44:29 AM Received Date:
3/27/2013 11:44:30 AM From:
Mahoney, Michael Created By:
Michael.Mahoney@nrc.gov Recipients:
"'kmnesser@firstenergycorp.com'" <kmnesser@firstenergycorp.com>
Tracking Status: None "Bowman, Gregory" <Gregory.Bowman@nrc.gov>
Tracking Status: None "Hoffman, Keith" <Keith.Hoffman@nrc.gov>
Tracking Status: None "Cumblidge, Stephen" <Stephen.Cumblidge@nrc.gov>
Tracking Status: None "Bedi, Gurjendra" <Gurjendra.Bedi@nrc.gov>
Tracking Status: None
"'phlashley@firstenergycorp.com'" <phlashley@firstenergycorp.com>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 2758 3/27/2013 11:44:30 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: