ML16224A243: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16224A243
| number = ML16224A243
| issue date = 08/03/2016
| issue date = 08/03/2016
| title = Brunswick Steam Electric Plant Unit Nos. 1 and 2 - Technical Specification (TS) Revisions to the TS Bases
| title = Technical Specification (TS) Revisions to the TS Bases
| author name = Pope A H
| author name = Pope A H
| author affiliation = Duke Energy Progress, Inc
| author affiliation = Duke Energy Progress, Inc
Line 15: Line 15:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:eL_-..DUKE August 3, 2016 Serial: BSEP 16-0067 U.S. Nuclear Regulatory Commission.
ATTN: Document Control Desk Washington, DC 20555-0001
==Subject:==
Brunswick Steam Electric Plant, Unit Nos. 1 and. 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Submittal of Technical Specification Bases Ladies and Gentlemen:
Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 As specified by Technical Specification (TS) 5.5.10, for the. Brunswick Steam Electric Plant (BSEP), Units Nos. 1 and 2; Duke Energy Progr.ess, Inc., is providing the latest revisions to the TS Bases for each BSEP unit. These updates are being provided in the form of a complete *electronic copy of the TS Bases for each unit and are contained in the enclosed CD-ROM. The* enclosed TS Bases include those changes that have been incorporated since the last submittal of TS Bases to the NRG (i.e., Revision 85 through 88 to the BSEP, Unit 1 TS Bases, and Revisions 84 through 88 to the BSEP, Unit 2 TS Bases). No regulatory commitments are contained iri this letter. Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager -Regulatory.Affairs, at (910) 457-2487.
Sincerely, (\ *. *tb_*. [)f. Pope Director -Organizational Effectiveness
* Brunswick Steam Electric Plant MAT/mat U.S. Nuclear Regulatory Commission Page 2 of 2 Enclosure One (1) CD-ROM labeled Brunswick Technical Specification Bases Updates August 2016 CD-ROM Components:
U1 Bases.pdf 2, 146,594 bytes U2Bases.pdf 2, 100,593 bytes cc (with enclosure):
U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission Publicly Available Publicly Available ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 1 555 Rockville Pike Rockville, MD 20852-2738 Andrew.Hon@nrc.gov U.S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRG Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair -North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net Mr. W. Lee Cox, Ill, Section Chief (Electronic Copy Only) Radiation Protection Section North Carolina Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov ,
One (1) CD-ROM labeled BSEP 16-0067 Enclosure Brunswick Technical Specification Bases Updates August 2016}}

Latest revision as of 21:00, 6 February 2019

Technical Specification (TS) Revisions to the TS Bases
ML16224A243
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/03/2016
From: Pope A H
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16224A234 List:
References
BSEP 16-0067
Download: ML16224A243 (3)


Text

eL_-..DUKE August 3, 2016 Serial: BSEP 16-0067 U.S. Nuclear Regulatory Commission.

ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and. 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Submittal of Technical Specification Bases Ladies and Gentlemen:

Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 As specified by Technical Specification (TS) 5.5.10, for the. Brunswick Steam Electric Plant (BSEP), Units Nos. 1 and 2; Duke Energy Progr.ess, Inc., is providing the latest revisions to the TS Bases for each BSEP unit. These updates are being provided in the form of a complete *electronic copy of the TS Bases for each unit and are contained in the enclosed CD-ROM. The* enclosed TS Bases include those changes that have been incorporated since the last submittal of TS Bases to the NRG (i.e., Revision 85 through 88 to the BSEP, Unit 1 TS Bases, and Revisions 84 through 88 to the BSEP, Unit 2 TS Bases). No regulatory commitments are contained iri this letter. Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager -Regulatory.Affairs, at (910) 457-2487.

Sincerely, (\ *. *tb_*. [)f. Pope Director -Organizational Effectiveness

  • Brunswick Steam Electric Plant MAT/mat U.S. Nuclear Regulatory Commission Page 2 of 2 Enclosure One (1) CD-ROM labeled Brunswick Technical Specification Bases Updates August 2016 CD-ROM Components:

U1 Bases.pdf 2, 146,594 bytes U2Bases.pdf 2, 100,593 bytes cc (with enclosure):

U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission Publicly Available Publicly Available ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 1 555 Rockville Pike Rockville, MD 20852-2738 Andrew.Hon@nrc.gov U.S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRG Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair -North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net Mr. W. Lee Cox, Ill, Section Chief (Electronic Copy Only) Radiation Protection Section North Carolina Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov ,

One (1) CD-ROM labeled BSEP 16-0067 Enclosure Brunswick Technical Specification Bases Updates August 2016