L-16-044, Davis-Besse, Unit 1 - ES-301-5: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[L-16-044, ES-301-5]]
{{Adams
| number = ML16217A375
| issue date = 08/02/2016
| title = Davis-Besse, Unit 1 - ES-301-5
| author name =
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| license number =
| contact person =
| case reference number = L-16-044
| package number = ML15274A353
| document type = License-Operator, Part 55 Examination Related Material
| page count = 3
}}
 
=Text=
{{#Wiki_filter:Facility Davis-Besse  Date of Exam 6/13/1 6 thru 6/2 0/1 6    Operating Test No DB NRC 201 6 A P P L I C A N T E V E N T  T Y P E Scenarios 1 2 3  4 Back-up  T O T A L    M      I    N      I    M    U    M(*)  CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P R I U  M A S T E R RX 1 1  4 4  2 2  5 5  1 1 0 NOR    5  5        1 1 1 I/C 2,3,4,6,7,9 3 ,7,9 2,4,6 1,2,3, 7 1,2 1,3 ,7 1,2,3,4,5,6 1,3,5 1,2,4, 6 1,2,3,4,7 2,4 1,3,7  4 4 2 MAJ 8 8 8 6 6 6 7 7 7 6 6 6  2 2 1 TS 2,5  1,4  1,4  2,5    0 2 2  SROI- 1  RX 1    4        2 1 1 0 NOR            0 1 1 1 I/C 2,3,4,6,7,9    1,2    1,2,4, 6    1 2 4 4 2 MAJ 8    6    7    3 2 2 1 TS 2,5            2 0 2 2  SROI- 2  RX  1    2      2 1 1 0 NOR      5      1 1 1 1 I/C  3,7,9    1,3 ,7 1,2,3,4,5,6      1 2 4 4 2 MAJ  8    6 7      3 2 2 1 TS      1,4      2 0 2 2  SROI -3  RX    4    2    2 1 1 0 NOR    5        1 1 1 1 I/C  2,4,6 1,2,3, 7    1,3,5    10 4 4 2 MAJ  8 6    7    3 2 2 1 TS    1,4        2 0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions; Instant SROs (SRO
-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one
-for-one basis.
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
 
Facility      Date of Exam Operating Test No A P P L I C A N T E V E N T  T Y P
E Scenarios 1 2 3  4 Back-up  T O T A L    M      I    N      I    M    U    M(*)  CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P R I U  S RO I -4  RX 1  4    2    3 1 1 0 NOR    5        1 1 1 1 I/C 2,3,4,6,7,9  1,2,3, 7    1,3,5    13 4 4 2 MAJ 8  6    7    3 2 2 1 TS 2,5  1,4        4 0 2 2  SROI-5  RX  1    2      2 1 1 0 NOR      5      1 1 1 1 I/C  3,7,9    1,3,7 1,2,3,4,5,6      12 4 4 2 MAJ  8    6 7      3 2 2 1 TS      1,4      2 0 2 2  SROU -1  RX 1  4        2 1 1 0 NOR    5        1 1 1 1 I/C 2,3,4,6,7,9  1,2,3, 7        10 4 4 2 MAJ 8  6        2 2 2 1 TS 2,5  1,4        4 0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls (ATC)"  and "balance
-of-plant (BOP)" positions;  Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1
-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
 
Facility      Date of Exam Operating Test No A P P L I C A N T E V E N T  T Y P
E Scenarios 1 2 3  4 Back-up  T O T A L    M      I    N      I    M    U    M(*)  CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P R I U  RO- 1  RX    4        1 1 1 0 NOR            0 1 1 1 I/C  2,4,6  1,2    1,2,4, 6    9 4 4 2 MAJ  8  6    7    3 2 2 1 TS            0 0 2 2  RO -2  RX  1          1 1 1 0 NO R      5      1 1 1 1 I/C  3,7,9    1,3,7      6 4 4 2 MAJ  8    6      2 2 2 1 TS            0 0 2 2  RO -3  RX    4        1 1 1 0 NOR            0 1 1 1 I/C  2,4,6  1,2        5 4 4 2 MAJ  8  6        2 2 2 1 TS            0 0 2 2  SUR  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions; Instant SROs (SRO
-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one
-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.}}

Revision as of 03:58, 2 February 2019

Davis-Besse, Unit 1 - ES-301-5
ML16217A375
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/2016
From:
Operations Branch III
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML15274A353 List:
References
L-16-044
Download: ML16217A375 (3)


Text

Facility Davis-Besse Date of Exam 6/13/1 6 thru 6/2 0/1 6 Operating Test No DB NRC 201 6 A P P L I C A N T E V E N T T Y P E Scenarios 1 2 3 4 Back-up T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U M A S T E R RX 1 1 4 4 2 2 5 5 1 1 0 NOR 5 5 1 1 1 I/C 2,3,4,6,7,9 3 ,7,9 2,4,6 1,2,3, 7 1,2 1,3 ,7 1,2,3,4,5,6 1,3,5 1,2,4, 6 1,2,3,4,7 2,4 1,3,7 4 4 2 MAJ 8 8 8 6 6 6 7 7 7 6 6 6 2 2 1 TS 2,5 1,4 1,4 2,5 0 2 2 SROI- 1 RX 1 4 2 1 1 0 NOR 0 1 1 1 I/C 2,3,4,6,7,9 1,2 1,2,4, 6 1 2 4 4 2 MAJ 8 6 7 3 2 2 1 TS 2,5 2 0 2 2 SROI- 2 RX 1 2 2 1 1 0 NOR 5 1 1 1 1 I/C 3,7,9 1,3 ,7 1,2,3,4,5,6 1 2 4 4 2 MAJ 8 6 7 3 2 2 1 TS 1,4 2 0 2 2 SROI -3 RX 4 2 2 1 1 0 NOR 5 1 1 1 1 I/C 2,4,6 1,2,3, 7 1,3,5 10 4 4 2 MAJ 8 6 7 3 2 2 1 TS 1,4 2 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES

-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at

-the-controls" (ATC) and "balance

-of-plant" (BOP) positions; Instant SROs (SRO

-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO

-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one

-for-one basis.

3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO

-I applicants in either the ATC or BOP position to best evaluate the SRO

-I in manipulating plant controls.

Facility Date of Exam Operating Test No A P P L I C A N T E V E N T T Y P

E Scenarios 1 2 3 4 Back-up T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U S RO I -4 RX 1 4 2 3 1 1 0 NOR 5 1 1 1 1 I/C 2,3,4,6,7,9 1,2,3, 7 1,3,5 13 4 4 2 MAJ 8 6 7 3 2 2 1 TS 2,5 1,4 4 0 2 2 SROI-5 RX 1 2 2 1 1 0 NOR 5 1 1 1 1 I/C 3,7,9 1,3,7 1,2,3,4,5,6 12 4 4 2 MAJ 8 6 7 3 2 2 1 TS 1,4 2 0 2 2 SROU -1 RX 1 4 2 1 1 0 NOR 5 1 1 1 1 I/C 2,3,4,6,7,9 1,2,3, 7 10 4 4 2 MAJ 8 6 2 2 2 1 TS 2,5 1,4 4 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES

-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at

-the-controls (ATC)" and "balance

-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1

-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right hand columns.

4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO

-I applicants in either the ATC or BOP position to best evaluate the SRO

-I in manipulating plant controls.

Facility Date of Exam Operating Test No A P P L I C A N T E V E N T T Y P

E Scenarios 1 2 3 4 Back-up T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO- 1 RX 4 1 1 1 0 NOR 0 1 1 1 I/C 2,4,6 1,2 1,2,4, 6 9 4 4 2 MAJ 8 6 7 3 2 2 1 TS 0 0 2 2 RO -2 RX 1 1 1 1 0 NO R 5 1 1 1 1 I/C 3,7,9 1,3,7 6 4 4 2 MAJ 8 6 2 2 2 1 TS 0 0 2 2 RO -3 RX 4 1 1 1 0 NOR 0 1 1 1 I/C 2,4,6 1,2 5 4 4 2 MAJ 8 6 2 2 2 1 TS 0 0 2 2 SUR RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES

-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at

-the-controls" (ATC) and "balance

-of-plant" (BOP) positions; Instant SROs (SRO

-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO

-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one

-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO

-I applicants in either the ATC or BOP position to best evaluate the SRO

-I in manipulating plant controls.