| {{#Wiki_filter:}} | | {{#Wiki_filter:I ENOC 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President |
| | -Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3264 June 23, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington D C 20555 |
| | |
| | ==Subject:== |
| | Davis-Besse Nuclear Power Station (DBNPS)Fourteenth Refueling Outage Reactor Head Visual Inspection Results Ladies and Gentlemen: |
| | The purpose of this letter is to provide the FirstEnergy Nuclear Operating Company (FENOC)visual examination results for the DBNPS Reactor Vessel Closure Head (RVCH). During the DBNPS fourteenth refueling outage, completed on April 27, 2006, FENOC performed a bare metal visual inspection of 100 percent of the reactor vessel head penetrations, including 360 degrees around each of the vessel head penetration nozzles. Visual inspection of greater than 95 percent of the RVCH surface was also performed to identify any degradation. |
| | In addition, FENOC performed a visual inspection to identify potential boric acid leaks from the pressure retaining components above the RVCH. These inspections were conducted using VT-2 qualified personnel and procedures. |
| | As identified in a letter from FENOC (Serial Number 1-1400, dated February 3, 2005), inspection conducted during a mid-cycle outage in January 2005 identified a small build-up of material and stains on or near some of the RPV upper head nozzles. The follow-up inspection of these nozzles during the recent refueling outage did not reveal any indications of changing material conditions. |
| | The visual examinations as discussed in the revised Order dated February 20, 2004 (EA-03-009), which established Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors, have been completed. |
| | No evidence of reactor coolant pressure boundary leakage or degradation of RVCH surface was found.Attachment 1, Commitment List, identifies that there are no commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr.Gregory A. Dunn, Manager- FENOC Fleet Licensing, at (330) 315- 7243.Very truly yours, Docket Number 50-346 License Number NPF-3 Serial Number 3264 Page 2 of 2 TSC/CAH Attachment 1 cc: Regional Administrator, NRC Region III NRC/NRR Project Manager NRC Senior Resident Inspector Utility Radiological Safety Board of Ohio Ohio Department of Industrial Relations Docket Number 50-346 License Number NPF-3 Serial Number 3264 Attachment I Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station, Unit Number 1, (DBNPS) in this document. |
| | Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for information and are not regulatory commitments. |
| | If there are any questions or if additional information is required, please contact Mr. Gregory A. Dunn, Manager- FENOC Fleet Licensing, at (330) 315-7243.COMMITMENTS DUE DATE NONE N/A}} |
Revision as of 12:18, 11 November 2018
|
---|
Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] |
Text
I ENOC 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President
-Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3264 June 23, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington D C 20555
Subject:
Davis-Besse Nuclear Power Station (DBNPS)Fourteenth Refueling Outage Reactor Head Visual Inspection Results Ladies and Gentlemen:
The purpose of this letter is to provide the FirstEnergy Nuclear Operating Company (FENOC)visual examination results for the DBNPS Reactor Vessel Closure Head (RVCH). During the DBNPS fourteenth refueling outage, completed on April 27, 2006, FENOC performed a bare metal visual inspection of 100 percent of the reactor vessel head penetrations, including 360 degrees around each of the vessel head penetration nozzles. Visual inspection of greater than 95 percent of the RVCH surface was also performed to identify any degradation.
In addition, FENOC performed a visual inspection to identify potential boric acid leaks from the pressure retaining components above the RVCH. These inspections were conducted using VT-2 qualified personnel and procedures.
As identified in a letter from FENOC (Serial Number 1-1400, dated February 3, 2005), inspection conducted during a mid-cycle outage in January 2005 identified a small build-up of material and stains on or near some of the RPV upper head nozzles. The follow-up inspection of these nozzles during the recent refueling outage did not reveal any indications of changing material conditions.
The visual examinations as discussed in the revised Order dated February 20, 2004 (EA-03-009), which established Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors, have been completed.
No evidence of reactor coolant pressure boundary leakage or degradation of RVCH surface was found.Attachment 1, Commitment List, identifies that there are no commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr.Gregory A. Dunn, Manager- FENOC Fleet Licensing, at (330) 315- 7243.Very truly yours, Docket Number 50-346 License Number NPF-3 Serial Number 3264 Page 2 of 2 TSC/CAH Attachment 1 cc: Regional Administrator, NRC Region III NRC/NRR Project Manager NRC Senior Resident Inspector Utility Radiological Safety Board of Ohio Ohio Department of Industrial Relations Docket Number 50-346 License Number NPF-3 Serial Number 3264 Attachment I Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station, Unit Number 1, (DBNPS) in this document.
Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for information and are not regulatory commitments.
If there are any questions or if additional information is required, please contact Mr. Gregory A. Dunn, Manager- FENOC Fleet Licensing, at (330) 315-7243.COMMITMENTS DUE DATE NONE N/A