Millstone: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
|state=Connecticut | |state=Connecticut | ||
|town=Waterford | |town=Waterford | ||
|ISFSI docket=07200047 | |||
|mapping location=41° 18' 38.60" N, 72° 10' 3.64" W | |mapping location=41° 18' 38.60" N, 72° 10' 3.64" W | ||
|company=Dominion | |company=Dominion |
Revision as of 18:54, 10 September 2018
Company | Dominion |
---|---|
Where | Waterford, Connecticut |
Regulatory | |
Region | NRC Region 1 |
ISFSI docket | 07200047 |
wikipedia link | |
Docket | 05000245 |
---|---|
Unit type | GE-3 |
Status | |
Commission | October 7, 1970 |
Decommission | July 21, 1998 |
Docket | 05000336 |
---|---|
Licensed Power Level (Thermal) | 2,700 MWt |
Unit type | CE |
Containment | Ambient Pressure |
Status | |
Commission | September 26, 1975 |
NRC Website | |
Docket | 05000423 |
---|---|
Licensed Power Level (Thermal) | 3,650 MWt |
Unit type | W-4-LP |
Containment | Subatmospheric |
Status | |
NRC Website | |