W3F1-2017-0031, Entergy Operations, Inc. Second Six Month Status Notification in Response to Confirmatory Order EA-15-100

From kanterella
(Redirected from W3F1-2017-0031)
Jump to navigation Jump to search
Entergy Operations, Inc. Second Six Month Status Notification in Response to Confirmatory Order EA-15-100
ML17096A150
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/06/2017
From: Chisum M
Entergy Operations
To:
Document Control Desk, NRC Region 4
References
EA-15-100, W3F1-2017-0031
Download: ML17096A150 (10)


Text

Entergy Operations, Inc.

ntergy Tel 504 739 6660 Fax 504 739 6678 Michael R. Chisum Site Vice President Waterford 3 W3F1 -201 7-003 1 April 6, 2017 Mr. Anton Vegel U.S. Nuclear Regulatory Commision Region IV Director, Division of Reactor Safety 1600 East Lamar Blvd.,

Arlington, Texas 76011-4511

SUBJECT:

Entergy Operations, Inc. Second Six Month Status Notification in Response to Confirmatory Order EA-1 5-1 00 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38

REFERENCE:

Confirmatory Order Related to NRC Report No. 05000382/201 6007 and NRC Investigative Report 4-2014-017; Waterford Steam Electric Station, Unit 3, dated April 6, 2016 (ML16098A302)

Dear Mr. Vegel:

On April 6, 2016, the Nuclear Regulatory Commission (NRC) issued the referenced Confirmatory Order to Entergy Operations, Inc. (EOI). The Confirmatory Order requires EOI to submit written notifications to the NRC on the status of each item in the Confirmatory Order at intervals of six months, until the terms of the Confirmatory Order are completed.

The purpose of this letter is to provide the second six month status notification pursuant to Section V, Item G.1, of the Confirmatory Order. The attachment delineates progress made in implementing the requirements of the Confirmatory Order.

This letter contains no new commitments and no revisions to existing commitments.

If you have any questions, please contact John P. Jarrell, Regulatory Assurance Manager, at 504.739.6685.

I declare under penalty of perjury that the foregoing is true and correct; executed on April 6, 2017.

Sincerely, Michael R. Chisum M RC/J PJ/SW M ATTACHMENT: Waterford 3 Steam Electric Station (WF3) Second Six Month Status Report for the Implementation of Order EA-15-100

W3F1-2017-0031 Page 2 cc: Mr. Kriss Kenndy Regional Administrator U. S. NRC, Region IV RidsRgn4MailCenter@nrc.gov NRC Senior Resident Inspector for Waterford 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov NRC Project Manager for Waterford 3 April.Pulvirenti@nrc.gov Document Control Desk U.S. Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746

W3F1-2017-0031 Attachment Attachment to W3F1-2017-0031 Waterford Steam Electric Station, Unit 3 (WF3) Second Six Month Status Report for the Implementation of Confirmatory Order EA-15-100 (7 pages)

Waterford 3 Steam Electric Station (WF3) Second Six Month Status Report for the Implementation of Order EA-15-100 Attachment to W3F1-2017-0031 Page 1 of 7 Action Target Completion Date Activity Status Accordingly, pursuant to Sections 104b, 161b, 161i, 161o, 182, and 186 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202 and 10 CFR Part 50, IT IS HEREBY ORDERED, THAT:

A.1 Entergy will retain an industrial psychologist, or similarly qualified person, and within 9 months of the issuance date of the Confirmatory Order, will complete a review of those integrity events within the Entergy Nuclear Fleet over the past 5 years to look for January 6, 2017 COMPLETE common themes or causes associated with the events and to recommend actions that Entergy can take to prevent similar events in the future.

A.1.1 This review will also include an evaluation of previous fleet-wide training effectiveness. January 6, 2017 COMPLETE A.1.2 Entergy will share the results of this review and any contemplated actions with the NRC. January 6, 2017 COMPLETE A.2 Within 18 months of the issuance date of the Confirmatory Order, if the review reveals general industry insights/lessons learned, Entergy will share those insights with the October 6, 2017 ON TRACK industry in an appropriate industry forum to be determined based on consultation with the NRC.

Status of Actions:

A.1 Entergy contracted Aubrey Daniels International (ADI) that assembled a team of experts which included two psychologists to perform a review of integrity events within the Entergy Nuclear Fleet. This review went back to January 2011 and included, but was not limited to:

all NRC issued Traditional Violations that were classified as willful; Employee Concerns Cases; Ethics Cases; Access Authorization denied access files; Safety Conscience Work Environment survey results; Organization Health survey results; and Root or Apparent Causes where integrity was a potential contributor. This review was completed by ADI on January 5, 2017, and included information as described above. This action is COMPLETE.

A.1.1 The review of fleet wide training effectiveness was included as part of the evaluation and report as described in action A.1. This action is COMPLETE.

A.1.2 An overview of the results and contemplated generic actions from the ADI report was provided to Region IV on January 6, 2017. This action is COMPLETE.

A.2 Entergy is currently reviewing the report from ADI and developing specific fleet actions to implement. Once complete, Entergy will share insights with the industry in an appropriate industry forum. This action is ON TRACK to complete by October 6, 2017

Waterford 3 Steam Electric Station (WF3) Second Six Month Status Report for the Implementation of Order EA-15-100 Attachment to W3F1-2017-0031 Page 2 of 7 Action Target Completion Date Activity Status B.1 In December 2014, Entergy issued Procedure EN-OM-126, Management and Oversight of Supplemental Personnel, to enhance Entergys management and oversight of supplemental workers. Within 9 months of the issuance date of the January 6, 2017 COMPLETE Confirmatory Order, Entergy will conduct an effectiveness review of implementation of Procedure EN-OM-126 at all Entergy Nuclear Fleet sites.

B.1.1 Entergy will share the results of this review and its proposed actions to address January 6, 2017 COMPLETE any identified performance gaps with the NRC.

Status of Actions:

B.1 Entergy contracted Talisman International (Talisman) to perform an effectiveness review of the implementation of EN-OM-126 (Management and Oversight of Supplemental Personnel) at all Entergy Nuclear Fleet sites. Talisman reviewed Entergys procedures for oversight of supplemental personnel and reviewed the performance of supplemental personnel as documented in approximately 3 1/2 years of significant corrective action documents. Subsequently, two-person teams conducted onsite visits at each one of the eight Entergy reactor sites. This review was completed on September 26, 2016. This action is COMPLETE B.1.1 An overview of the results of the assessment was provided to Region IV on January 6, 2017. This overview summarized the full report issued by Talisman and recommended corrective actions. This action is COMPLETE.

Waterford 3 Steam Electric Station (WF3) Second Six Month Status Report for the Implementation of Order EA-15-100 Attachment to W3F1-2017-0031 Page 3 of 7 Action Target Completion Date Activity Status C.1 Within 6 months of the issuance date of the Confirmatory Order, Entergy will assign a corporate lead for governance and oversight of the Entergy Nuclear Fleet fire watch October 6, 2016 COMPLETE program.

C.1.1 In conjunction with this assignment, Entergy will issue an Entergy Nuclear Fleet procedure or revise an existing procedure, as appropriate, to provide the common October 6, 2016 COMPLETE requirements for Entergy Nuclear Fleet fire watch programs.

C.1.2 The responsibilities of the lead will include ensuring the consistent application of the October 6, 2016 COMPLETE subject procedure across the Entergy Nuclear Fleet.

Status of Actions:

C.1 Corporate lead for Governance and Oversight of the Entergy Nuclear Fleet Fire Watch program has been established as the General Manager Plant Operations, Fleet Operations. This guidance has been established in a new fleet procedure EN-OP-139 (Fire Watch Program) which was issued with an effective date of September 8, 2016. This action is COMPLETE.

C.1.1 New Fleet Procedure EN-OP-139 provides the common requirements for Entergy Nuclear Fleet fire watch programs. This action is COMPLETE.

C.1.2 New Fleet Procedure EN-OP-139 establishes the responsibilities of the fleet fire watch lead, which will ensure the consistent application of the subject procedure across the Entergy Nuclear Fleet. This action is COMPLETE.

Waterford 3 Steam Electric Station (WF3) Second Six Month Status Report for the Implementation of Order EA-15-100 Attachment to W3F1-2017-0031 Page 4 of 7 Action Target Completion Date Activity Status D. Within 3 months of the issuance date of the Confirmatory Order, Entergy will revise the appropriate Entergy Nuclear Fleet procedure to provide a process to address requests for the reinstatement of unescorted access authorization for a worker whose unescorted access has been temporarily placed on hold or assigned some other July 6, 2016 Complete comparable interim status. The revision must ensure that the Access Authorization Reviewing Official has the relevant information and appropriate approvals before deciding whether to reinstate the workers unescorted access.

Status of Actions:

D. Corporate procedure EN-NS-101-04 (Processing Potentially Disqualifying Information [PDI]) has been revised with an effective date of July 6, 2016, to provide guidance to address requests for the reinstatement of unescorted access authorization for a worker whose unescorted access has been temporarily placed on hold. This procedure requires that the Reviewing Official be provided all relevant information regarding the investigation and justification for reinstatement of plant access. This action is COMPLETE.

Waterford 3 Steam Electric Station (WF3) Second Six Month Status Report for the Implementation of Order EA-15-100 Attachment to W3F1-2017-0031 Page 5 of 7 Action Target Completion Date Activity Status E.1 Within 6 months of the issuance date of the Confirmatory Order, Entergy will review and revise, as necessary, Entergy Nuclear Fleet supervisor training to ensure that it October 6, 2016 COMPLETE addresses the responsibilities and actions of supervisors who become aware of facts and circumstances potentially impacting a persons trustworthiness and reliability.

E.2 If Entergy determines revisions to the supervisory training are necessary; the training April 6, 2017 COMPLETE will be delivered within 12 months of the issuance date of the Confirmatory Order.

E.3 Additionally, within 2 months of the issuance date of the Confirmatory Order, Entergy will develop and publish a communication to all supervisors at its Entergy Nuclear June 6, 2016 COMPLETE Fleet sites reminding them of their responsibility to report issues impacting workers trustworthiness and reliability to access authorization personnel.

Status of Actions:

E.1 Entergy Nuclear Fleet Training developed and incorporated into the supervisor training curricula a requirement to complete a familiarization guide specifically requiring a review of, and a discussion of, EN-NS-101 (Unescorted Access Authorization Program). This familiarization guide also requires a discussion with the AA/FFD supervisor regarding the responsibilities and actions of supervisors who become aware of facts and circumstances potentially impacting a persons trustworthiness and reliability. This action is COMPLETE.

E.2 It was determined that no changes to the current model of supervisor initial training were required as a result of this Confirmatory Order.

No gap training is necessary as no revisions were made to the current model of supervisor initial training. This action is COMPLETE.

E.3 Entergy Nuclear Fleet Training developed a Computer Based Training course that was required to be completed by all Supervisors and above. The computer based training course specifically covers the supervisors responsibility to report issues impacting workers trustworthiness and reliability to access authorization personnel. This action is COMPLETE.

Waterford 3 Steam Electric Station (WF3) Second Six Month Status Report for the Implementation of Order EA-15-100 Attachment to W3F1-2017-0031 Page 6 of 7 Action Target Completion Date Activity Status F.1 Within 3 months of the issuance date of the Confirmatory Order, Entergy will have conducted a briefing of all fire watch personnel, at each of its Entergy Nuclear Fleet July 6, 2016 COMPLETE sites, on the importance of the fire watch activity to the nuclear safety of the facility.

F.1.2 In addition, within 3 months of the issuance date of the Confirmatory Order, this July 6, 2016 COMPLETE briefing will be incorporated as part of new fire watch personnel training.

F.2 Within 9 months of the issuance date of the Confirmatory Order, Entergy will perform a review of other tasks where the importance of the task to reactor safety may not be January 6, 2017 COMPLETE apparent to the personnel performing the task and conduct similar training.

Status of Actions:

F.1 A briefing was conducted for all qualified fire watch personnel at each of the Entergy Nuclear sites on the importance of fire watch activities at their site. Briefing included the importance to nuclear safety and the reasons as to why their tours were being conducted. This action is COMPLETE.

F.1.2 The computer based training that is required for all hot work and fire watch personnel was updated to include the briefing conducted in Action F.1 for all newly qualifying fire watches. This requirement has been incorporated into all future fire watch qualifications. This action is COMPLETE.

F.2 A review of other tasks where the importance of the task to reactor safety may not be apparent to the personnel performing the task has been completed. Based on the review of individual program training requirements and qualifications, only two groups did not have training already established prior to the confirmatory order being issues. The two groups, Supervisors and Hot work/Fire Watch personnel received the training after the issuance of confirmatory order. Hot Work / Fire Watch personnel where briefed on the requirements and reactor safety significance of their job and all newly hired individuals are required to complete the revised fire watch CBT. This action is COMPLETE.

F.3 An additional corrective action was added to CR-WF3-2016-0201 based on issues found with Non-Licensed Operator round. Based on the investigation results of this issue, Waterford 3 will review the Confirmatory Order and the actions associated with it to assess if those actions could have prevented the issue with Operator Rounds identified in February 2017. Additional actions will be issued as necessary and these will be provided to the NRC. This action is ON TRACK to complete by July 18, 2017.

Waterford 3 Steam Electric Station (WF3) Second Six Month Status Report for the Implementation of Order EA-15-100 Attachment to W3F1-2017-0031 Page 7 of 7 Action Target Completion Date Activity Status G.1 Unless otherwise specified, Entergy will submit written notification to the Director, Division of Reactor Safety, USNRC Region IV, 1600 East Lamar Blvd., Arlington, Texas 76011-4511, at intervals not to exceed 6 months until the terms of this October 6, 2016 COMPLETE Confirmatory Order are completed, providing a status of each item in the Order. (6 month)

G.1.1 Unless otherwise specified, Entergy will submit written notification to the Director, Division of Reactor Safety, USNRC Region IV, 1600 East Lamar Blvd., Arlington, Texas 76011-4511, at intervals not to exceed 6 months until the terms of this April 6, 2017 COMPLETE Confirmatory Order are completed, providing a status of each item in the Order. (12 Month)

G.1.2 Unless otherwise specified, Entergy will submit written notification to the Director, Division of Reactor Safety, USNRC Region IV, 1600 East Lamar Blvd., Arlington, Texas 76011-4511, at intervals not to exceed 6 months until the terms of this October 6, 2017 ON TRACK Confirmatory Order are completed, providing a status of each item in the Order. (18 Months)

G.2 Entergy will provide its basis for concluding that the terms of the Confirmatory Order October 6, 2017 ON TRACK have been satisfied, to the NRC, in writing.

G.1 Written notification was submitted to the Director, Division of Reactor Safety, USNRC Region IV on October 6, 2016, per Waterford 3 letter W3F1-2016-0062. This action is COMPLETE.

G.1.1 This submittal satisfies this action. This action is COMPLETE.

G.1.2 This action is ON TRACK to complete by October 6, 2017.

G.2 This action is ON TRACK to complete by October 6, 2017.