U-602816, Informs That Util Will Host Open House on 971011 to Promote Family Awareness & to Increase Employee Morale.Compensatory Measures Will Be Taken to Ensure That Requirements of Physical Security Plan Remain in Place.Actions,Discussed

From kanterella
Jump to navigation Jump to search
Informs That Util Will Host Open House on 971011 to Promote Family Awareness & to Increase Employee Morale.Compensatory Measures Will Be Taken to Ensure That Requirements of Physical Security Plan Remain in Place.Actions,Discussed
ML20210V323
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/08/1997
From: Sipek J
ILLINOIS POWER CO.
To: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
U-602816, NUDOCS 9709230263
Download: ML20210V323 (4)


Text

]uSuc-PRIORITY ROUTING onnois now or$n.uky

.lSt ..__ j Srcord - Chnbn9 Pog Staron

'R A_ 6 RC chnton. it st727 IFRA J[WEtC q+l W Tei 217 935-88a$

ILLIN915 j oo..,n v. sin.,

P6WER i@liL A_EA_. oi oa-U-602816

'-$ "o

m. cm., DNMS  ! PAO  ;

DRMA 1 8E.160 l

)

September 8, 1997 FILE /5/4 Docket No. 50-461 Mr. A. Bill Beach Regional Administrator, Region 111 i U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 l

Subject:

Clinton Power Station Open House and Plant Tour l

Dear Mr. Beach:

To promote family awareness and to increase employee morale, Clinton Power i Station (CPS) will host an open house on October 11,1997. Illinois Power (IP) employe:s working at CPS and their immediate familier as well as approximately 300 non-CPS IP employees have been invited to attend. This event will mark the seventh year that CPS has hosted an open house.

The open house will consist of tours of the Protected Area and oflimited Vital Areas utilizing established and controlled tour routes. Tours will be conducted between 7:00 a.m. and 1:00 p.m. on October 11,1997.

CPS has evaluated the Physical Security Plar. and will take compensatory measures to ensure that the requirements of the Physical Security Plan concerning access requirements and ewort requirements in both the protected area and vital area will remain in place. Additionally, clean areas will be established within the power block to enable a relaxation of radiological control measures. Alternative measu es will be established to enable effective site evacuation of visitors participating in the open house.

The specific details of the open house are included in the attachment to this letter. The plans for the open house have been discussed by Mr. C. S Williamson, Clinton Power Station, Assistant Supervisor - Security, and Terry Madeda of your staff. j

\

9709230263 970908 upppp i '

^ "

E" "2 s m.,

.sse s , ,

o

U-603816

. . Page 2 of 2 This letter is to provide Region Ill an overview of the CPS plan for the employee open hoore. Thus, a reply from the Nuclear Regulatory Commission is not expected.

Sincerely yours,

)) h seph . Sipek irector-Licensing BGS/krk Attachment cc: T. Madeda, Region III, USNRC '

G. Wright, Region III, USNRC NRC Resident Office, V-690 J

Attachment

, ,. to U-602816 I

Page1of2 The following actions will be taken by Illinois Power (IP) in support of the plant open house scheduled for October 11,1997.

l l

[ The Crkft Security Portal (CSP) will be activated on October 11,1997, at approximately l

[ 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />. The CSP will remain operational during the open house for the purpose of 1 processing family members into the protected area. 1 Within the protected area, the tour route will consist of entering the power block through either the Senice Building door or the north Radwaste Building door. Non-vital areas authorized to tour within the protected area include the Radwaste Building elevation 737',

the Maintenance shops and offices on elevation 762', the Service Building, and the Plant Support Building. Within the Power Block, physical barriers will be constmetel to establish a clean area. Additionally, Radiation Protection and Security Force Members (SFM) will be patrolling the tour route. Dosimetry will not be issued to family members due to establishment of radiological"cled' areas. All family members and their escort I

will process through the CSP Gamma-10 personnel contamination monitors +r to exiting the protected area.

The vital areas authorized to be toured will be the Division II Diesel Generator on the 737' elevation of the Diesel Generator Building and the 828' elevation of the Containment

, Building. To facilitate the tour of the vital areas, five SFMs and one plant employee will

be utilized to maintain integrity of the physical barriers designating the vital area tour route; two armed SFMs will be posted by security door 429 to verify proper access authorization and to log personnelin/out; one armed SFM will be posted in the Control Building elevator to ensure no one deviates from the tour route; one SFM will be posted at the physical barrier at 828' elevation of control outside the entrance to Containment; l and one SFM will be posted inside 828' Containment In addition, one plant employee j will be positioned inside 737' elevation of Diesel Generator to observe the physical barrier set up to view the Division II Diesel. Zone 1 access is required to enter power block vital areas. This effort will serve as a record of everyone entermg the vital area and combined with SFMs obsening the barriers and running the elevator will adequately provide observation of the Containment boundary down to 737' elevation of the Control Building.

Physical barriers will be provided along the tour route to prevent straying from the established tour routes.

The SFMs positioned et the above locations provide continual observation of the physical barrier. In accordance with the Physical Security Plan, the visitor / escort ratio of five to one will be maintained in the vital area and ten to one in the protected area. Escorts will be employees who, through normal duties at CPS, have been granted the appropriate sital area access. In the event of an emergency or the unavailability of the west Control Building elevator, the stairwell immediately adjacent to the elevator will be available as a clean area, radiologically. If necessary, SFMs will be posted at each elevation of the stairwell between 737' and 828' to prevent straying from the tour route and to maintain barrier integrity.

l e , l Attachment l to U-602816 Page 2 of 2 Specifically designed visitor badges stating " Escort Required At All Times" will be utilized to control visitors during the protected area tours. These visitors badges have been specially numbered and will provide adequate accountacility in the event of an evacuation.

Information regarding visitor / escort responsibilities will be presented to both the visitor and to the escort through the issuance of an Escort Brierng Card designated for the tour only. Prior to entering the protected area, all personnel will be logged into the protected -

area.

Family members participating in the tour will be pre-identified on Visitor Access Logs, thereby facilitating the processing of visitors. Additionally, a member of CPS Security management will be positioned at the Craft Security Portal for the duration of the tour Security Force Members will be advised to be especially alert for fitness for duty evaluations. Fitness for duty questions shall be referred to the Supervisor -

Security / designee.