Pages that link to "Fee W"
← Fee W
The following pages link to Fee W:
Displaying 50 items.
- ML19249A298 (← links)
- ML19242A133 (← links)
- ML19260D681 (← links)
- ML19296B295 (← links)
- ML19290B839 (← links)
- ML19296B296 (← links)
- ML19305E336 (← links)
- ML19323A759 (← links)
- ML19351D371 (← links)
- ML19343D005 (← links)
- ML19338E933 (← links)
- ML19320D314 (← links)
- ML20008E564 (← links)
- ML20083N652 (← links)
- ML20099B783 (← links)
- ML20095G910 (← links)
- ML20107E532 (← links)
- ML20137V237 (← links)
- ML20135G622 (← links)
- ML20138N666 (← links)
- ML20138K672 (← links)
- ML20134G638 (← links)
- ML20132F238 (← links)
- ML20132D391 (← links)
- ML20132B821 (← links)
- ML20126A794 (← links)
- ML20138B132 (← links)
- ML20135J029 (← links)
- ML20135G608 (← links)
- ML20134G635 (← links)
- ML20132H164 (← links)
- ML20132F571 (← links)
- ML20132F558 (← links)
- ML20132F243 (← links)
- ML20132B576 (← links)
- ML20236D643 (← links)
- A05947, Contends That Unit 1 Fully Complies W/Requirements of 10CFR50.44 W/O Need to Install Hydrogen Recombiners or Purge/Nitrogen Repressurization Sys,Per NRC 860812 Request (← links)
- B12284, Application for Amend to License DPR-65,providing Limiting Conditions & Surveillance Requirements in Accordance W/ NUREG-0737 & Generic Ltr 83-37.Fee Paid (← links)
- B12117, Forwards Review of Topic 1.12 of Isap, Control Room Habitability & Topic 1.55 Radiation Protection Plans (NUREG-0737,Item II.D.3.4 & Item III.D.3.1,respectively) (← links)
- B12259, Forwards Endorsement 97 to Nelia Policy NF-151 & Endorsement 85 to Maelu Policy MF-39 (← links)
- B11850, Provides Justification for Not Qualifying Accumulator Nitrogen Vent Valves for Submergence.Compliance W/Branch Technical Position Rsb 5-1 Does Not Require That Valves Be Qualified for post-LOCA Submergence (← links)
- B12073, Forwards Change to Initial Test Program Described in FSAR, Section 14,including Summary of Safety Evaluation.Change Will Be Included in Subsequent Amend to FSAR (← links)
- A05342, Forwards Comments on Draft Low Power License.Expresses Appreciation for Making Draft License Available for Review & for NRC Effort in Supporting Scheduled Fuel Load Date of 851115 (← links)
- B11796, Forwards Response to Generic Ltr 85-09 Requesting Proposed Tech Specs Needed to Meet Requirements of Generic Ltr 83-28, Item 4.3 Re Reactor Trip Sys Reliability.No Changes to Tech Specs Required (← links)
- A05620, Responds to NRC Re Violations Noted in Insp Rept 50-423/85-74.Corrective Actions:Closeout Insps Performed on Containment Recirculating Sys & Emergency Diesel Generator a Crankcase & Fuel Oil Spill Terminated & Contained (← links)
- B12015, Forwards Changes to Initial Test Program,Per License Condition 2.C(10).Requirement for Reactor Trip Test at 50% Plateau & Ref to pseudo-ejected Rod Test Deleted & Note to Test 25 Added.Changes Will Be Included in FSAR Amend (← links)
- B11696, Forwards Review of Integrated Safety Assessment Program Topic 1.10, Emergency Response Facilities Instrumentation, Per 850517 Commitment (← links)
- B11823, Forwards Amend 16 to FSAR for Millstone Nuclear Power Station,Unit 3.Responses to Selected Requests for Addl Info Also Encl (← links)
- B11681, Forwards Summary of Integrated Safety Assessment Program Topic 1.17, Replacement of Motor-Operated Valves, Which Was Evaluated for Public Safety Impacts,Per 850731 Request. Safety Impact Scores Considered Preliminary (← links)
- B11994, Requests Exemption from Requirements of App J to 10CFR50. Util Has Initiated Detailed Evaluation of Scope & Schedule for Mods Required to Achieve Compliance W/App J as Part of Facility Isap (← links)