ML20132B821
| ML20132B821 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/12/1985 |
| From: | Fee W, Opeka J NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19273A575 | List: |
| References | |
| RTR-NUREG-0737 A02959, A04818, NUDOCS 8509260309 | |
| Download: ML20132B821 (2) | |
Text
-
We NORTHEAST UTILITIES con r.i ore,c... s.icen str
- t. Bernn. Conn.ci cut
)r'eI5Ud i$eNcN=~
P.O. BOX 270
.vm **v wa c~~
HARTFORD. CONNECTICUT 06141-0270 k
L j [.[E[$C',$~.
(203) 665-5000 September 12,1985 Docket No. 50-423 A02939 A04818 Director of Nuclear Reactor Regulation Mr. B. J. Youngblood, Chief Licensing Branch No. I Division of Licensing Washington, D. C. 20535
References:
(1)
- 3. F. Opeka letter to B. J. Youngblood, dated August 13, 1985.
(2)
W. G. Counsil letter to B. J. Youngblood, dated November 1, 1984.
(3)
B. J. Youngblood letter to W. G. Counsil, dated April 11, 1985, transmitting Supplement No. I to the Safety Evaluation Report for Millstone Nuclear Power Station, Unit No. 3.
Dear Mr. Youngblood:
Millstone Nuclear Power Station, Unit No. 3 Supplement I to NUREG-0737 Control Room Design Review Addendum No. I to the Summary Report in Reference (1), Northeast Nuclear Energy Company (NNECO) indicated that the Control Room Design Review (CRDR) Addendum Report was scheduled to be submitted on or about September 3,1985.
Accordingly, we hereby submit Addendum No. I to the CRDR Summary Report.
This Addendum Report addresses the six (6) items identified in the CRDR Summary Report (which was submitted in Reference (2)) as addendum items, the four (4) items contained in Section 18.1 of Reference (3), and other items delineated in Appendix 1 of Reference (3).
We trust that this submittal provides sufficient information to allow the NRC Staff to determine whether a pre-implementation audit is necessary. If deemed necessary by the NRC Staff, we are prepared to support a pre-implementation audit at any time during September,1985.
As indicated in the attached Addendum Report, eleven (11) checklist items pertaining to the environmental, communications, and computer surveys are not yet completed, but are scheduled to be completed by the end of October,1985.
Since pertinent design documents have already been reviewed by the CRDR core team, we do not expect that any safety significant Human Engineering C4: I 3
g92gogg0$p9 poy y,ufgo#7 a
g m
J
=
t b
t.
Discrepancies (HEDs) will be identified. All HEDs identified will be evaluated in accordance with the CRDR methodology and summarized in a subsequent addendum report, which will be submitted prior to fuel load.
We do not believe that receipt of our next addendum report is necessary to allow the NRC Staff to remove the CRDR as an outstanding item in Reference (3). We believe sufficient information exists in this submittal to allow that to occur.
Most of the information contained in Enclosures I and 2 in Attachment No.1 is 4
of the type which the Westinghouse Electric Corporation customarily maintains in confidence and withholds from pub!!c disclosure. This information has been handled and classified proprietary by the Westinghouse Electric Corporation, and we hereby make application for withholding Enclosures I and 2 in Attachment No. I from public disclosure pursuant to 10CFR2.790.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY et. al.
BY NORTHEAST NUCLEAR ENERGY COMPANY Their Agent L/8 KF. Opeka Senior Vice President l
l f.W
]
By: W. F. Fee Executive Vice President i
j cc:
Dr. S. N. Saba (NRC Human Factors Engineering Branch)
STATE OF CONNECTICUT )
i
) ss. Berlin COUNTY OF HARTFORD )
Then personally appeared before me W. F. Fee, who being duly sworn, did state that he is Executive Vice President of Northeast Nuclear Energy Company, an Applicant herein, that he is authorized to execute and file the foregoing Information in the name and on behalf of the Applicants herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.
s f
_~
W otaryPubll[