ML20083N652
| ML20083N652 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/05/1984 |
| From: | Counsil W, Fee W NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20083N656 | List: |
| References | |
| RTR-NUREG-0737 A02959, NUDOCS 8404190252 | |
| Download: ML20083N652 (2) | |
Text
-
General Offices e Seiden Street, Berkn, Connecticut NOItTHEAST UTILITIES t
vY Es7ac=c cowa=
H'ARTFORD, CONNECTICUT 06141-0270 I
,a [1"[",C #a".ma co--
(203) 666-6911 L
L J
Ap.il 5,1984 Docket No. 50-423 A02959 Director of Nuclear Reactor Regulation Attn:
Mr. B. 3. Youngblood, Chief Licensing Branch #1 U.S. Nuclear Regulatory Commission Washington, D.C. 20555
References:
(1)
W. G. Counsil letter to B. 3. Youngblood, dated January 11, 1984.
(2)
B. 3. Youngblood letter to W. G. Counsil, dated December 20, 1983.
Gentlemen:
Millstone Nuclear Power Station, Unit No. 3 Draf t SER, Chapter 18.0
(
Transmittal of The Safety Parameter Display System Safety Analysis Report in Reference (1), Northeast Nuclear Energy Company submitted an integrated schedule for Millstone Unit No. 3 to implement the provisions of Supplement I to NUREG-0737. Included in that schedule was a commitment to provide the NRC Staff with a Safety Analysis Report for the Safety Parameter Display System (SPDS) by April 2,19b4.
The purpose of this submittal is to fulfill that commitment, thus closing out one of the two open items within Chapter 18.0 of the NRC Draf t SER (Reference (2)).
It is our understanding, per handouts received at the February 22,1983 regional workshop on Supplement I to NUREG-0737, that the NRC Staff will indicate acceptance of the SPDS SAR within approximately two months.
Since we have already provided the NRC Staff with our SPDS implementation schedule in Reference (1), we have not included one in this submittal. We do intend to provide the NRC Staff with periodic (i.e., approximately every six (6) months) status reports regarding Supplement I to NUREG-0737 as identified in Reference (1).
The submittal of the CRDR Summary Report by November 1,1984 should close out the remaining open item within Chapter 18.0 of the NRC Draft SER. Based 03 paumw s
upon this commitment, we believe it is appropriate that this item be listed as confirmatory in the NRC final SER.
Should you have any questions, please feel free to contact us.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY W.' G. Sounsil Senior Vice President o
a By: W. F. Fee Executive Vice President Engineering and Operations STATE OF CONNECTICUT -)
) ss. Berlin COUNTY OF HARTFORD
)
Then personally appeared before me W. F. Fee, who being duly sworn, did state that he is Executive Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the' Licensees herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.