Pages that link to "Category:Letter type:LIC"
Jump to navigation
Jump to search
The following pages link to Category:Letter type:LIC:
Displayed 50 items.
- COMSECY (← links)
- LIC-09-0054, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2009 to June 30, 2010 (← links)
- LIC-09-0043, Response to Request for Additional Information Concerning License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing Requirements (← links)
- LIC-09-0032, Transmittal of 2008 Fort Calhoun Station (FCS) Radiological Effluent Release Report and Radiological Environment Operating Report (← links)
- LIC-09-0020, Response to NRC Regulatory Issue Summary 2006-21 (← links)
- LIC-09-0029, Omaha Public Power District, 2008 Annual Report (← links)
- LIC-09-0028, Omaha Public Power District - 30-Day Report of a Significant Change/Error in the Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 (← links)
- LIC-08-0106, Omaha Public Power District, Fort Calhoun Station (Fcs), Response to NRC Generic Letter 2008-01 (← links)
- LIC-08-0087, Announcement of New Site Vice President at Fort Calhoun Station (← links)
- LIC-08-0076, Transmittal of Affidavit to Withhold Proprietary Information Enclosed in NRC Trip Report Regarding Fort Calhoun Station Sump Strainer Head Loss Testing During February 18-19, 2008 (← links)
- LIC-08-0069, Letter of Intent to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition (← links)
- LIC-08-0071, Transmittal of Fort Calhoun, Unit 1, Reactor Coolant System Pressure and Temperature Limits Report, Revision 4 (← links)
- LIC-08-0053, Announcement of New Licensing Manager at Fort Calhoun Station (← links)
- LIC-08-0039, Omaha Public Power District Transmittal of 2007 Annual Financial Report (← links)
- LIC-08-0021, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (← links)
- LIC-08-0012, Clarification of Fort Calhoun Station Technical Specification 2.7(2)j (← links)
- LIC-08-0016, Transmittal of Fort Calhoun Station (Fcs), Unit 1, Core Operating Limit Report (Colr), Revision 34 (← links)
- LIC-08-0010, Omaha Public Power District, Response to NRC Bulletin 2007-01 (← links)
- LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release (← links)
- LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy (← links)
- LIC-18-0015, Fort Calhoun Station, Unit 1, Radiological Effluent Release Report and Radiological Environmental Operating Report (← links)
- LIC-17-0076, Fort Calhoun Station, Unit 1 and Independent Spent Fuel Storage Installation Emergency Plan Update (← links)
- LIC-17-0015, License Amendment Request (LAR) 17-03; Removal of Fort Calhoun Station, Unit 1 Dry Cast Loading Limits (← links)
- LIC-17-0002, Fort Calhoun, Unit 1 - Organizational and Management Change (← links)
- LIC-16-0031, Ft. Calhoun, Unit 1 - Annual Report for 2015 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 (← links)
- LIC-16-0013, Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 2015 (← links)
- LIC-16-0007, Ft. Calhoun, Unit 1 - Decommissioning External Trust Fund Audit (← links)
- LIC-16-0005, Management Change for Fort Calhoun Station (Fcs), Unit No. 1 (← links)
- LIC-15-0127, for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications (← links)
- LIC-14-0098, License Amendment Request 14-06 to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors (← links)
- LIC-14-0033, Submittal of Revision 23 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) (← links)
- LIC-14-0002, Omaha Public Power District - Revised In-service Inspection (ISI) and In-service Test (IST) Interval End Dates as a Result of Extended Refueling Outage (← links)
- LIC-13-0164, Integrated Report to Support Restart of Fort Calhoun Station and Post-Restart Commitments for Sustained Improvement (← links)
- LIC-13-0155, Supplemental Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containme (← links)
- LIC-13-0148, Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment (← links)
- LIC-13-0139, Withdrawal of Licensee Event Report 2013-004, Revision 0, for Fort Calhoun Station (← links)
- LIC-13-0122, Withdrawal of Letter Regarding Capability to Perform Offsite Dose Assessment During an Event Involving Multiple Release Sources (← links)
- LIC-13-0105, License Amendment Request (LAR) 13-03, Request to Revise Updated Safety Analysis Report to Allow Implementation of Modification EC 55394, Raw Water Pump Operation and Safety Classification of Components During a Flood (← links)
- LIC-13-0112, Omaha Public Power District, Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations. (← links)
- LIC-13-0104, Reply to NRC Request for Additional Information (RAI) Regarding Exigent License Amendment Request 13-02 Revise Current Licensing Basis to Adopt a Revised Design Basis / Methodology for Addressing Design-Basis Tornado / Tornado Missile Im (← links)
- LIC-13-0061, Omaha Public Power District - Exigent License Amendment Request 13-02 Revise Current Licensing Basis to Adopt a Revised Design Basis / Methodology for Addressing Design-Basis Tornado / Tornado Missile Impact (← links)
- LIC-13-0092, Omaha Public Power District, Special Report on the Containment Tendon Prestressing System; Grease Voids Found in Helical Tendons and Lower Seal Failure on Tendon H-2067 (← links)
- LIC-13-0071, OPPD Commitment to NRC Regarding Request for Work Hours Exemption (← links)
- LIC-13-0044, Omaha Public Power District - Transmittal of Fort Calhoun Station (Fcs), Unit No. 1, Core Operating Limit Report (Colr), Revision 41 (← links)
- LIC-13-0046, Omaha Public Power District Response to NRC RAI Regarding Request for Work Hours Exemption (← links)
- LIC-13-0034, Revision of Commitment Date for Recommendation 2.3, Flooding Walkdown Due to Inaccessible Areas (← links)
- LIC-13-0024, Omaha Public Power District (OPPD) Nuclear Decommissioning Funding Plan for the Fort Calhoun Station Independent Spent Fuel Storage Installation (ISFSI) (← links)
- LIC-13-0022, Withdrawal of Licensee Event Report 2012-011, Revision 0, for the Fort Calhoun Station (← links)
- LIC-13-0016, Omaha Public Power District - Response to Eight Generic Technical Issues Regarding Fort Calhoun Station'S Communication Capability (← links)
- LIC-13-0004, OPPD Response to March 12, 2012, Request for Information, Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach (← links)