LIC-09-0032, Transmittal of 2008 Fort Calhoun Station (FCS) Radiological Effluent Release Report and Radiological Environment Operating Report

From kanterella
Jump to navigation Jump to search
Transmittal of 2008 Fort Calhoun Station (FCS) Radiological Effluent Release Report and Radiological Environment Operating Report
ML091280370
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/24/2009
From: Matthews T C
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-09-0032
Download: ML091280370 (1)


Text

Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 April 24, 2009 LIC-09-0032 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Reference:

Docket No. 50-285

SUBJECT:

2008 Fort Calhoun Station (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report Pursuant to Fort Calhoun Station (FCS), Unit No. 1 Technical Specifications (TS) 5.9.4.a and 5.9.4.b, the Omaha Public Power District (OPPD) provides the enclosed two reports. The first report is the Annual Radiological Effluent Release Report for January 1, 2008, through December 31, 2008. This report is submitted in accordance with TS Section 5.9.4.a and is presented in the format outlined in Regulatory Guide 1.21, Revision 1. The report provides the results of quarterly dose calculations performed in accordance with the Offsite Dose Calculation Manual (ODCM).The second report is the Annual Radiological Environmental Operating Report (REOP) for January 1, 2008, through December 31, 2008. This report is submitted in accordance with TS Section 5.9.4.b and is consistent with the objectives specified in Section 5 of the ODCM.No commitments to the NRC are made in this letter.Please contact Mr. Timothy R. Dukarski at 402-533-7126 if you have any questions.

Sincerely, T. C. Matthews Manager -Nuclear Licensing TCM/mle

Enclosures:

1. Annual Radiological Effluent Release Report 2. Annual Radiological Environmental Operating Report c: E. E. Collins, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager (w/o Enclosures)

J. D. Hanna, NRC Senior Resident Inspector T. J. Wolff, American Nuclear Insurers Fmplovyent with Eaual Onjortunitv 4171