Pages that link to "Burger C"
← Burger C
Jump to navigation
Jump to search
The following pages link to Burger C:
Displayed 50 items.
- IR 05000424/1987070 (← links)
- PNO-II-85-004, on 850107,initial Criticality Achieved.All Parameters within Predicted Ranges.Low Power Testing Proceeding According to Schedule (← links)
- PNO-II-86-021, on 860310,unit Returned to Operation After Being Out of Svc Since 860307 for Repair of Leaking Sludge Lance Cover on Steam Generator.Unit Operating at 100% Power (← links)
- PNO-II-85-107, on 851107,plant Taken out-of-svc After Verification of Turbine High Bearing Temp.Caused by Main Turbine Bearing Failure.Plant Expected to Be Shut Down for 5 to 14 Days for Repairs (← links)
- PNO-II-85-095, on 851011,unit Shut Down Following Failure of One Emergency Diesel Generator to Pass Routine Checks While Down for Maint.Restart Procedures Underway.Pistons & Two Cylinders replaced.Post-repair Review & Testing Completed (← links)
- PNO-II-85-096, on 851018,reactor Shut Down Due to Unidentified RCS Leak of 1.3 Gpm.Cause Under Investigation. Probably Caused by RHR Valve Packing Leak.Plant in Hot Standby for 72 H (← links)
- PNO-II-85-094, on 851007,unit Shut Down Due to Steam Generator Tube Leak.Leakage Amounted to 0.15 Gallon Per Minute & Increasing.Generator Isolated.Shutdown Expected for 10-12 Days (← links)
- PNO-II-85-067, on 850712,main Generator Trip & Reactor Trip Occurred.Caused by Damaged Permanent Magnet Generator. Permanent Magnet Generator Being Replaced & Main Generator Bearings Being Evaluated.Plant to Be Restarted on 850723 (← links)
- ML20148E390 (← links)
- IR 05000425/1988023 (← links)
- IR 05000424/1988017 (← links)
- IR 05000424/1988031 (← links)
- PNO-II-86-014, on 860213,mild Earthquake Felt at Site.Plant Turbine & Auxiliary Bldgs Surveyed & No Damage Found. Preliminary Review of Detection Equipment at Site Indicated No Evidence of Ground Movement or Tremor (← links)
- PNO-II-86-018, on 860225,facility Began Initial Fuel Loading (← links)
- IR 05000425/1988038 (← links)
- ML20151W248 (← links)
- IR 05000424/1988025 (← links)
- ML20150D504 (← links)
- IR 05000425/1988030 (← links)
- IR 05000425/1987051 (← links)
- IR 05000424/1988002 (← links)
- IR 05000424/1988020 (← links)
- IR 05000424/1988044 (← links)
- PNO-II-86-036, on 860515,during Power Escalation Tests at 100% Power,Steam Generator Tube Leak Detected.Unit Out of Svc for 10 Days to Repair Leak (← links)
- PNO-II-86-030, on 860414 & 15,one Pressurizer Level Channel Failed & Unidentified Leak Found During Subsequent Containment Entry,Respectively.Gradual Shutdown Started. Repairs Made During Containment Entry (← links)
- PNO-II-86-033, on 860508,Unit 2 Achieved Initial Criticality. All Parameters Near Anticipated Levels.Region II Based & Resident Inspectors Witnessed Event.Util Issuing News Release (← links)
- PNO-II-86-041, on 860613,25 Gpm Leak Discovered Inside Containment.Caused by 360-degree Crack in Socket Weld to Flange for Variable Orifice Control Valve Outlet Side.Weld Will Be Analyzed by Westinghouse for Metal Fatigue (← links)
- IR 05000425/1988056 (← links)
- PNO-II-85-115, licensee Reported That Transamerica Delaval DG 2B Experienced Two Failures of Main Bearing Number 7 During Test Runs Following tear-down Inspection.Believed That First Failure Due to Inadequately Supported Bearing (← links)
- PNO-II-86-008, on 860123,declared Unusual Event & Began Controlled Shutdown of Plant,Unit 2,due to Computer Calculation of Reactor Coolant Sys Identification Leak 1.5 Gpm (← links)
- IR 05000425/1987041 (← links)
- IR 05000424/1987060 (← links)
- IR 05000424/1989007 (← links)
- IR 05000424/1989010 (← links)
- ML20235L192 (← links)
- IR 05000424/1987049 (← links)
- PNO-II-86-078, on 861021,2 Gallons of Hydrazine Spilled in Turbine Bldg.Caused by Leak in Deionized Water Mixing Valve Overflowing Mix Tank.Spill Cleaned Up (← links)
- PNO-II-86-092, on 861218,licensee Shut Down Unit to Begin Scheduled Refueling Outage 6 Wks Early.Caused by Excessive Vibrations in Reactor Coolant Pump 3B2.During Outage,Reactor Coolant Pumps 3B1,3B2 & 3A1 Will Be Modified (← links)
- PNO-II-86-045A, primary Sys Temp Dropped from 550 F to 465 F in 6 Minutes.Reactor Coolant Pumps Operated Throughout Event.Poor Human Factor Design Features Caused Operators Not to Be in Control (← links)
- PNO-II-86-045, on 860627,four PORVs Opened,Dropping Primary Sys Pressure from 2,235 Psi to 702 Psi & Temp from 550 F to 450 F in 6 Minutes.Cause Under Investigation.Valves Closed & Safety Injection Initiated (← links)
- IR 05000269/1987008 (← links)
- IR 05000269/1987007 (← links)
- PNO-II-86-063, on 860901,plant Shut Down Due to Main Generator Turbine Trip Resulting from phase-to-phase Fault. Investigation of Cause & Full Extent of Damage Continuing. Unit Will Be Out of Svc for at Least 3 Months (← links)
- PNO-II-86-045B, on 860628-0701,augmented Insp Team Sent to Plant.Corrective Action Documented in 860630 Confirmatory Action Ltr Being Monitored by NRC Resident Inspectors.Plant at 6% Power (← links)
- PNO-II-82-088, on 820728,licensee Reported Updated Info Re Failure of shaft-driven Cooling Pump on Emergency Diesel Generator 2.Caused by Sheared Cap Screws & Broken Dowel Pins in Pump Coupling.Cap Screws & Dowel Pins Replaced (← links)
- IR 05000324/1982024 (← links)
- PNO-II-82-085, on 820628,unit Shut Down After Determining That Required Surveillance Test Not Be Performed Prior to Exceeding Limiting Condition for Operation.Shutdown of 10 Days Anticipated (← links)
- PNO-II-82-083, on 820717,three to Five Gallons Per Minute Tube Leak Discovered in Steam Generator A.Reactor Returned to Cold Shutdown & Will Remain Out of Svc Until Repairs Made (← links)
- IR 05000111/1982002 (← links)
- IR 05000324/1982005 (← links)