Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML072200466 + (Volume 6, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Chapter 3.1 Reactivity Control Systems)
- ML072200468 + (Volume 7, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.2 Power Distribution Limits)
- ML072200470 + (Volume 8, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation)
- ML072200472 + (Volume 9, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.4 Reactor Coolant System)
- ML032750747 + (Volume B, Revision 2003-06, September 2003)
- ML18017B764 + (Volume Control Tank Level Control Process Control Block Diagram. Sheet 23)
- ML20261A732 + (Volume Control Tank Pressure & Level Control. Sheet 77)
- ML20260F074 + (Volume Control Tank Vent Valve Logic Diagram System:Cv. Actual Drawing NUMBER:6R-17-9-Z-42421 1)
- ML20261M426 + (Volume Control Tank Vent Valve Logic Diagram System:Cv)
- ML091890180 + (Volume I - Main Text, Tables, and Figures Hydrogeological and Geochemical Site Characterization Report)
- ML072120266 + (Volume I, Mclaren/Hart, Inc. Preliminary Assessment/Site Investigation Report - Radiological, Gpu Nuclear, Inc. Oyster Creek Nuclear Generation Station, U.S. Route No. 9, Forked River, Nj, Site Remediation Program Case No. E99575)
- ML090920467 + (Volume II Supplement to Report - Final Survey Results After Decontamination Industrial Reactor Laboratories Facilities, Plainsboro, Nj)
- ML072120268 + (Volume II, Mclaren/Hart, Inc. Preliminary Assessment/Site Investigation Report - Radiological, Gpu Nuclear, Inc. Oyster Creek Nuclear Generation Station, U.S. Route No. 9, Forked River, Nj, Site Remediation Program Case No E99575)
- ML20038A097 + (Volume Reduction Techniques in LOW-LEVEL Radioactive Waste Management)
- ML20133A790 + (Volumes 1 & 2 to Plant Referenced Simulator Certification)
- ML20247L479 + (Volumes 1 & 2, Environ Qualification of Electric Equipment Used in Commercial Nuclear Power Plants,Interim Rept,Results of Test Sequence 1 on Electric Cables W/Cross-Linked Polyethylene Insulation & Neoprene Jacket)
- ML003762651 + (Volumes 26 & 27, Appendixes 6A & 9B of Nine Mile Point Unit 2 Updated Safety Analysis Report)
- ML20114D090 + (Volumes I & II of Advanced Control Room Design Review Guideline:Technical Development)
- ML20134N348 + (Volumes I-III to Technical Support Documentation,Util Resolution Guidance for ECCS Suction Strainer Blockage)
- ML15089A009 + (Volumetric Examination Interval Extension for Reactor Vessel Head Acceptance Review Results (Tac Nos. MF5829 & MF5830))
- 05000455/LER-2022-001-01, Volumetric Examinations of Reactor Pressure Vessel Head Core Exit Thermocouple Penetration P-75 Identified an Indication Attributed to Primary Water Stress Corrosion Cracking + (Volumetric Examinations of Reactor Pressure Vessel Head Core Exit Thermocouple Penetration P-75 Identified an Indication Attributed to Primary Water Stress Corrosion Cracking)
- 05000455/LER-2022-001, Volumetric Examinations of Reactor Pressure Vessel Head Core Exit Thermocouple Penetration P-75 Identified an Indication Attributed to Primary Water Stress Corrosion Cracking + (Volumetric Examinations of Reactor Pressure Vessel Head Core Exit Thermocouple Penetration P-75 Identified an Indication Attributed to Primary Water Stress Corrosion Cracking)
- ML20099C659 + (Voluntary Answers to Portion of Ohio Citizens for Responsible Energy late-filed Thirteenth Set of Interrogatories Re Issue 8.Prof Qualifications of Rj Schmehl & Certificate of Svc Encl.Related Correspondence)
- WM 14-0013, Voluntary Commitment Regarding Containment Coolers at Wolf Creek Generating Station + (Voluntary Commitment Regarding Containment Coolers at Wolf Creek Generating Station)
- ML050670449 + (Voluntary Commitments for Leakage Detection)
- PMNS20241516, Voluntary Early Warning Systems at Operating Reactors + (Voluntary Early Warning Systems at Operating Reactors)
- BSEP 11-0004, Voluntary Groundwater Protection Plan Report + (Voluntary Groundwater Protection Plan Report)
- BSEP 07-0068, Voluntary Groundwater Protection Plan Report + (Voluntary Groundwater Protection Plan Report)
- ML081050029 + (Voluntary Groundwater Protection Plan Report)
- ML072070294 + (Voluntary Groundwater Protection Submittal)
- ML18078A156 + (Voluntary Industry Initiatives-Safety Cultures)
- ENS 45115 + (Voluntary Notification - Moving Irradiated Steam Dryer in a Shielded Container)
- ENS 43194 + (Voluntary Notification Regarding Radioactive Waste Shipping Cask Configuration)
- ENS 46174 + (Voluntary Notification for an Item of Regulatory Interest)
- ENS 50176 + (Voluntary Notification for an Item of Regulatory Interest)
- ENS 50093 + (Voluntary Notification to Offsite Government Agencies Due to Leak of Water Containing Low Level Tritium Concentration in Accordance with Nei Initiative 07-07)
- ENS 48297 + (Voluntary Offsite Notification with Potential Media Interest)
- ENS 51174 + (Voluntary Report - Information Only)
- PLA-6425, Voluntary Report Consistent with 10 CFR 71.95, PLA-6425 + (Voluntary Report Consistent with 10 CFR 71.95, PLA-6425)
- ENS 40585 + (Voluntary Report Involving Potential Tsc Unavailability During a Dba Loca)
- ENS 40509 + (Voluntary Report of a Press Release)
- ML20115J112 + (Voluntary Report:On 960430,two Unplanned Starts of Emergency Diesel Generator (EDG) 1-2 Occurred.Caused by Failure to Perform Procedural Step to Verify Power Supply to Electrical Busses D1 & D2.Personnel Counseled)
- ML16197A287 + (Voluntary Reporting of High Groundwater Tritium Levels)
- 2CAN089008, Voluntary Rept 50-368/90-V01-00:revises Completion Date for Commitment Date in Voluntary Rept from 900801 to 900831 Re Inadvertent Starting of Emergency Diesel Generator While Attempting to Air Roll Engine During Maint + (Voluntary Rept 50-368/90-V01-00:revises Completion Date for Commitment Date in Voluntary Rept from 900801 to 900831 Re Inadvertent Starting of Emergency Diesel Generator While Attempting to Air Roll Engine During Maint)
- 2CAN089010, Voluntary Rept 50-368/90-V02-00 Re Result of Postulating Failure of Check Valve in LPSI Sys Not Previously Postulated.Caused by Higher Differential Pressure Not Considered.Valve Mfg Consulted + (Voluntary Rept 50-368/90-V02-00 Re Result of Postulating Failure of Check Valve in LPSI Sys Not Previously Postulated.Caused by Higher Differential Pressure Not Considered.Valve Mfg Consulted)
- ML23347A209 + (Voluntary Requests for Data, Information, And/Or Observation)
- L-2018-107, Voluntary Response to NRC RIS 2017-08 + (Voluntary Response to NRC RIS 2017-08)
- ML093230283 + (Voluntary Response to NRC Regulatory Issue Summary 2009-11: Preparation and Scheduling of Operator Licensing Examinations)
- ML092450008 + (Voluntary Response to NRC Regulatory Issue Summary 2009-11: Preparation and Scheduling of Operator Licensing Examinations)
- RS-11-150, Voluntary Response to NRC Regulatory Issue Summary 2011-06, Pre-Application Communication and Voluntary Submittal of Schedule for Future Molybdenum-99 Facility Licensing Actions for NRC Review + (Voluntary Response to NRC Regulatory Issue Summary 2011-06, Pre-Application Communication and Voluntary Submittal of Schedule for Future Molybdenum-99 Facility Licensing Actions for NRC Review)
- PNP 2011-061, Voluntary Response to NRC Regulatory Issue Summary 2011-04: Preparation and Scheduling of Operator Licensing Examinations + (Voluntary Response to NRC Regulatory Issue Summary 2011-04: Preparation and Scheduling of Operator Licensing Examinations)