Volume I - Main Text, Tables, and Figures Hydrogeological and Geochemical Site Characterization Report
ML091890180
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/31/2002
From:
MFG Consulting Scientist & Engineers
To:
Office of New Reactors, Sequoyah Fuels Corp
References
Download: ML091890180 (239)


Text

r VOLUME I MAIN TEXT, TABLES, AND FIGURES, HYDROIGEOLOGICAL AND GEOCHEMIC AL.

'SITE CHARACTERIZATION REPORT Prepared For:

Sequoyah Fuels Corporation 1-40 & Highway 10 Gore, Oklahoma 74435 Prepared By:

consulting scientists and engineers 3801 Autom a'tion Way, Suite 100 Fort Collins, Colorado 80525:

October 2002 S.

.M=MMM MMMMMMMMMM

TABLE OF CONTENTS EXECUTIVE SUMM ARY ....................................................................................................... ES-1

1.0 INTRODUCTION

....................................................................................................... 1 1.1 Previous Studies and Resources ........................................... *............................... 1 1.2 Report Organization and Section Overview ...................................................... 4 2.0 FACILITY DESCRIPTION .......................................................................................... 5 2.1 Facility Location and Description ...................................................................... 5 2.1.1 M ain Process Building Area (MPB) ...................................................... 6 2.1.2 Solvent Extraction (SX) Building ........................................................... 7 2.1.3 Initial Lime Neutralization Area ............................................................. 7 2.1.4 Solid W aste Burial Area No. 1 (South) ................................................. 8 2.1.5 Emergency Basin ....................................... 8 2.1.6 Sanitary Lagoon .......................................................................................... ,9 2.1.7 Pond 1 Spoils Pile .................................................................................... 9 2.1.8 North Ditch ......................................................................................... 10 2.1.9 Contaminated Equipment Area ............................................................. 10 2.1.10 Fluoride Holding Basin No. 1 (South) ................................................. 11 2.1.11 Fluoride Holding Basin No. 2 (North) ................................................. 11 2.1.12 Fluoride Clarifier and Settling Basins (South) ...................................... 12 2.1.13 Fluoride Sludge Burial Area ................................................................. 13 2.1.14 South Yellowcake (SYC) Sump .......................................................... 13 2.1.15 Clarifier A Basin Area ......................................................................... 14 2.1.16 Pond 2 .............................................................................................. 15 2.1.17 Area West of Pond No. 2 ...................................................................... 16 2.1.18 Solid W aste Burial Area No. 2 (North) ................................................. 16 2.1.19 Yellowcake Storage Pad (YSP) ............................................................. 17 2.1.20 Fertilizer Pond Area ............................................................................. 18 2.1.21 Former Raffi nate Treatment Area ........................................................ 19 2.1.22 Combination Stream ............................................................................. 19 2.1.23 Present Lime Neutralization Area ........................................................ 21 2.1.24 DUF 4 Building Area ............................................................................ 21 2.1.25 Tank Farm and Cylinder Storage Area ................................. ..................... 22 2.1.26 South Perimeter Area ........................................................................... 22 2.1.27 Scrap M etal Storage Area .................................................................... 23 2.1.28 Drainage/Runoff Areas ........................................................................ 24 2.2 Operational History ........................................................................................... 24 2.2.1 Fertilizer Program ................................................................................. 25 2.3 Physical Characteristics of Facility ................................................................. .25

.2.3.1 Surface Features .................................................................................... 25 2.3.2 Surface W ater Hydrology .................................................................... 25 2.3.3 Climatology and M eteorology ............................................................. 27 3.0 DECOM M ISSIONING PLAN ...................................................................................... 29 4.0 SITE INVESTIGATION ............................................................................................... 31 Sequoyah Fuels Corporation MFG Inc

,PA,. ,.,. . October 2002

4.1 Borehole Drilling, Sampling, and Monitoring Well Installation ....................... 32 4.1.1 Drilling and Construction Methods .......................... 32 4.1.2 Borehole and Monitoring Well Characteristics and Specifications....... 35 4.2 H ydrologic Testing J............................................................................................... 43 4.3 R esistivity Survey ............................................................................................. 44 4.4 Trenches and Test Pits ..................................................................................... 45 5.0 GEOCHEMICAL TESTING AND ANALYSIS ........................................................ 46 5.1 Introduction ...................................................................................................... 46 5.2 Methods of Mineralogical Analyses ....................................................................... 46 5.3 Methods of Chemical Analyses ........................................................................ 47 5.3.1 Determination of Partition Coefficients (Kd) for Uranium and Arsenic ....47 5.3.2 Laboratory Determination of Partition Coefficients (Kd) ................... 48 5.3.3 Model Derived Kd Values ...................................................................... 51 5.3.4 Geochemical Modeling of Groundwater Using PHREEQC ................. 52 5.4 Mineralogical Testing Results ....................................................................... 53 5.5 Test Results and Geochemical Modeling for Partition Coefficients (Kd and Kd').5 4 5.5.1 Results From Batch Desorption Tests .................................................... 54 5.6 Results of Site Groundwater Geochemical Modeling ..................................... 57 5.7 Distribution of Constituents of Concern .................................................. ............. 59 5.8 Conceptual Geochemical Model ................................. 61 5.9 Site Complexity and Implications for KI .......................................................... 64 6.0 SITE GEOLOGIC, HYDROGEOLOGIC AND GEOCHEMICAL CONDITIONS .....67 6.1 Regional Physiographic and Geologic Setting ................................................. 67 6.2 Site Physiography and Geology .................................. 68 6.2.1 Soils ............................................................................................ . . 69 6.2.2 Fill Material .......................................... 69 6.2.3 Terrace D eposits ................................................................................... 70 6.2.4 A lluvium ............................................................................. ....................... 70 6.2.5 C olluvium ............................................................................................. 70 6.2.6 Akota Formation ....................................... 71 6.3 Regional Hydrogeology.................................................................................. 75 7.0 SITE HYDROGEOLOGIC CONCEPTUAL MODEL ............................................... 75 7.1- Hydrostratigraphic Model .................................................................................. 76 7.2 Groundwater Occurrence ................................................................................. 78 7.3 C O C Transport .................................................................................................. 80 8.0 HYDROGEOLOGIC NUMERICAL MODEL ............................................................ 82 8.1 Groundw ater V istas ......................................................................................... 82 8.2 Groundw ater Flow M odel 82 8...........................

8.3 Solute Transport M odel ................................................................................... 83 8.4 Groundwater Flow Model Design ................................ 83 8.4.1 M odel Grid.................... I....................................................................... 84 8.4.2 Boundary Conditions .................................................................................. 85 8.4.3 Flow Model Parameters ...................................................................... 89 8.4.4 Flow Model Calibration ........................................................................ 91 8.4.5 Predictive Scenario ............................... ............................................... 93 Sequoyah Fuels Corporation MFG Inc

, , - . . .- ii October 2002

8.5 Solute Transport M odel ................................................................................... 93 8.5.1 Mathematical Approach .................................. 94 8.5.2 Transport Model Parameters ................................................................. 94 8.5.3 One-Dimensional Transport Analysis .................................................... 95 8.5.4 Transport M odel Calibration .................................................................. 97 8.5.5 Prediction Simulations.................................... 101 8.5.6 Transport M odel Predictions .................................................................... 101 8.5.7 Sensitivity Analysis ................................................................................. 109 9.0 ANALYSIS AND CONCLUSIONS ............................................................................... 111 9.1 Appropriate Protective V alues ............................................................................. 111 9.2 Status of Future Protection from Groundwater .................................................... 114 9.2.1 Stream Concentrations and Conditions .................................................... 114 9.2.2 River Loading and Calculated Concentrations ........................................ 116 9.3 C onclusions .......................................................................................................... 117 10.0 RE FER EN C ES ................................................................................................................ 118 LIST OF TABLES Table 2-1 Annual Average Flow Table 2-2 Stream Flow Calculations Table 2-3 Location and Description of Seeps and Pools Table 4-1 Location Summary Table 4-2 Monitoring Well Survey Information Table 4-3 Borehole Survey Information Table 4-4 Borehole Summary Table 4-5 Monitor Well Completion Data Table 4-6 Monitor Well Development Data Table 4-7 Monitor Well Static Water Levels Table 4-8 Slug Test Results Table 4-9 Average, Maximum, and Minimum Values of Hydraulic Conductivity Table 5-1 Core Samples Used in the Mineralogical and Geochemical Testing Table 5-2 Calculated Kd Values for U and As for all Shale Samples Table 5-3 Saturation Index Values Calculated Using PHREEQC for Important U, As, and F Solid Phases in Selected Wells Table 5-4 Important Uranium-Controlling Minerals in xidized and Reduced Environments (USEPA, 1999)

Figure 5-5 Partition Coefficient (Kd) Values Determined for Arsenic and Uranium in Laboratory Batch Tests Table 5-6 Analytical Results for the Special Groundwater Sampling of Nine Selected Wells (June 2001) 1 Table 5-7 Concentrations of Key Analytes Measured from 1991 to 1995 Sequoyah Fuels Corporation MFG Inc

..... ý ,*ý .--- " f.,,.iii October 2002

Table 5-8 Percentage Distribution of As(V), F, and U(VI) in the form of Aqueous Species for Selected Wells Calculated Using PHREEQC Table 5-9 Wells Used for Estimation of Distribution of COCs Table 5-10 Range of pH Values Recorded from 1991 to 1994 Table 8-1 Model Layer and Corresponding Geologic Layers Table 8-2 Calibrated Conductive Values Table 8-3 Computed versus Observed Heads Table 8-4 Calibrated Uranium K4 Table Table 8-5a Summary of Surface Water Modeling Results - Stream Concentrations and Mass Loading Table 8-5b Summary of Groundwater Modeling Results - Stream Concentrations and Mass Loading Table 8-6 Flow Model Sensitivity Parameters Table 8-7 Transport Model Sensitivity Parameters Table 9-1 Safe and Toxic Concentrations of Uranium in Water Table 9-2 Safe and Toxic Concentrations of Nitrate in Water Table 9-3 Appropriate Protective Standards LIST OF FIGURES C

Figure 2-1 Location Map Figure 2-2 Topographic Map Figure 2-3 Facility Area Designations Figure 2-4 General Facility Layout Figure 2-5 Locations of Facility Drainages and Springs Figure 4-1 SMI Well, Borehole and Geochemical Sampling Locations Figure 4-2 Slug Test Locations Figure 5-1 Uranium Concentrations in the Kd Batch Test Solutions Figure 5-2 Arsenic Concentrations in the Kd Batch Test Solutions Figure 5-3 X-Ray Diffraction Pattern for Shale 1 (Location 7) Comparing the d(001)-Spacing of Untreated and Ethylene Glycol Solvated Samples Figure 5-4 Mineral Saturation Indices for the Shale 1 (Location 7) Batch Test Solutions Figure 5-5 Mineral Saturation Indices for the Shale 2 (Location 8) Batch Test Solutions Figure 5-6 Mineral Saturation Indices for the Shale 3 (Location 8) Batch Test Solutions Figure 5-7 Mineral Saturation Indices for the Shale 4 (Location 8) Batch Test Solutions Figure 5-8 Mineral Saturation Indices for the Shale 3 (Location 9) Batch Test Solutions Figure 5-9 Mineral Saturation Indices for the Shale 4 (Location 9) Batch Test Solutions Figure 5-10 Mineral Saturation Indices for the Shale 1 (Location 10) Batch Test Solutions Figure 5-11 Example of Major Ion Chemistry Changes During the KI Batch Testing Sequoyah Fuels Corporation MFG Inc RýýS" C - APd6 . iv October 2002

Figure 5-12 Isopleth of Nitrate Concentrations in Terrace/Shale 1, 2001 Groundwater Sampling Figure 5-13 Isopleth of Nitrate Concentrations in Shale 2, 2001 Groundwater Sampling Figure 5-14 Isopleth of Nitrate Concentrations in Shale 3, 2001 Groundwater Sampling Figure 5-15 Isopleth of Nitrate Concentrations in Shale 4, 2001 Groundwater Sampling Figure 5-16 Isopleth of Nitrate Concentrations in Shale 5, 2001 Groundwater Sampling Figure 5-17 Isopleth of Nitrate Concentrations in Alluvium, 2001 Groundwater Sampling Figure 5-18 Isopleth of Uranium Concentrations in Terrace/Shale 1, 2001 Groundwater Sampling Figure 5-19 Isopleth of Uranium Concentrations in Shale 2, 2001 Groundwater Sampling Figure 5-20 Isopleth of Uranium Concentrations in Shale 3, 2001 Groundwater Sampling Figure 5-21 Isopleth of Uranium Concentrations in Shale 4, 2001 Groundwater Sampling Figure 5-22 Isopleth of Uranium Concentrations in Shale 5, 2001 Groundwater Sampling Figure 5-23 Isopleth of Uranium Concentrations in Alluvium, 2001 Groundwater Sampling Figure 5-24 Isopleth of Arsenic Concentrations in Terrace/Shale 1, 2001 Groundwater Sampling Figure 5-25 Isopleth of Arsenic Concentrations in Shale 2, 2001 Groundwater Sampling Figure 5-26 Isopleth of Arsenic Concentrations in Shale 3, 2001 Groundwater Sampling Figure 5-27 Isopleth of Arsenic Concentrations in Shale 4, 2001 Groundwater Sampling Figure 5-28 Isopleth of Arsenic Concentrations in Shale 5, 2001 Groundwater Sampling Figure 5-29 Isopleth of Arsenic Concentrations in Alluvium, 2001 Groundwater Sampling Figure 5-30 Isopleth of Fluoride Concentrations in Terrace/Shale 1, 2001 Groundwater Sampling Figure 5- 31 Isopleth of Fluoride Concentrations in Shale 2, 2001 Groundwater Sampling Figure 5-32 Isopleth of Fluoride Concentrations in Shale 3, 2001 Groundwater Sampling Figure 5-33 Isopleth of Fluoride Concentrations in Shale 4, 2001 Groundwater Sampling Figure 5-34 Isopleth of Fluoride Concentrations in Shale 5, 2001 Groundwater Sampling Figure 5-35 Isopleth of Fluoride Concentrations in Alluvium, 2001 Groundwater Sampling Figure 5-36 Trilinear Diagram for Selected Well Waters Figure 6-1 Regional Geologic Provinces Figure 6-2 Regional Geologic Map Figure 6-2a Explanation of Geologic Map Figure 6-3 Correlation of Upper Mississippian and Lower Pennsylvanian Formations Figure 6-4 Locations of Local Faults Figure 6-5 Site Topographical Surface Figure 6-6 Regional Hydrological Units Figure 6-6a Explanation of Regional Hydrological Units Figure 7-1 Hydrostratigraphic Model Bedrock Geology Map Figure 7-2 Geologic Cross-Section Locations Figure 7-3 Layer 1, Hydrostratigraphic Model Cross Section A-A' Figure 7-4 Layer 2, Hydrostratigraphic Model Cross Section B-B' Figure 7-5 Layer 3, Hydrostratigraphic Model Cross Section C-C' Figure 7-6 "Layer 4, Hydrostratigraphic Model Cross Section D-D' Sequoyah Fuels Corporation MFG Inc v October 2002

Figure 7-7 Layer 5, Hydrostratigraphic Model Cross Section E-E' Figure 7-8 Layer 6, Hydrostratigraphic Model Cross Section F-F' Figure 7-9 Potentiometric Surface Shale 1, June 2001 Figure 7-10 Potentiometric Surface Shale 2, June 2001 Figure 7-11 Potentiometric Surface Shale 3, June 2001 Figure 7-12 Potentiometric Surface Shale 4, June 2001 Figure 7-13 Potentiometric Surface Alluvium, June 2001 Figure 7-14 Conceptualized Hydrogeology Figure 8-1 Model Domain Figure 8-2 Model Grid Cross-Section Figure 8-3 Layer 1 Hydrologic Units Figure 8-4 Layer 2 Hydrologic Units Figure 8-5 Layer 3 Hydrologic Units Figure 8-6 Layer 4 Hydrologic Units Figure 8-7 Layer 5 Hydrologic Units Figure 8-8 Layer 6 Hydrologic Units Figure 8-9 Layer 1 Recharge Rates Figure 8-10 Layer 1 Evapotranspiration Rates Figure 8-11 Layer 1 Boundary Conditions Figure 8-12 Layer 2 Boundary Conditions Figure 8-13 Layer 3 Boundary Conditions Figure 8-14 Layer 4 Boundary Conditions Figure 8-15 Layer 5 Boundary Conditions Figure 8-16 Layer 6 Boundary Conditions Figure 8-17 Location of High Conductivity Cells Figure 8-18 Layer 1 Calibrated Heads Figure 8-19 Layer 2 Calibrated Heads Figure 8-20 Layer 3 Calibrated Heads Figure 8-21 Layer 4 Calibrated Heads Figure 8-22 Layer 5 Calibrated Heads Figure 8-23 Layer 6 Calibrated Heads Figure 8-24 Observed vs. Calculated Heads Figure 8-25 Post Decommissioning Topography Figure 8-26 Layer 1 Long-term Heads Figure 8-27 Layer 2 Long-term Heads Figure 8-28 Layer 3"Long-term Heads Figure 8-29 Layer 4 Long-term Heads Figure 8-30 Layer 5 Long-term Heads Figure 8-31 Layer 6 Long-term Heads Figure 8-32 One Dimensional Transport Analysis, Well 2322A Figure 8-33 One Dimensional Transport Analysis, Well 2341 Figure 8-34 One Dimensional Transport Analysis, Well 2354 Figure 8-35 One Dimensional Transport Analysis, Well 2356 Figure 8-36 One Dimensional Transport Analysis, Well MW095A Figure 8-37 Nitrate Calibration Initial Concentrations Layer 1 Sequoyah Fuels Corporation MFG Inc vi October 2002

Figure 8-38 Nitrate Calibration Initial Concentrations Layer 2 Figure 8-39 Nitrate Calibration Initial Concentrations Layer 3 Figure 8-40 Nitrate Calibration Initial Concentrations Layer 4 Figure 8-41 Nitrate Calibration Initial Concentrations Layer 5 Figure 8-42 Uranium Calibration Initial Concentrations Layer 1 Figure 8-43 Uranium Calibration Initial Concentrations Layer 2 Figure 8-44 Uranium Calibration Initial Concentrations Layer 3 Figure 8-45 Uranium Calibration Initial Concentrations Layer 4 Figure 8-46 Uranium Calibration Initial Concentrations Layer 5 Figure 8-47 Arsenic Calibration Initial Concentrations Layer 1 Figure 8-48 Arsenic Calibration Initial Concentrations Layer 2 Figure 8-49 Arsenic Calibration Initial Concentrations Layer 3 Figure 8-50 Arsenic Calibration Initial Concentrations Layer 4 Figure 8-51 Arsenic Calibration Initial Concentrations Layer 5 Figure 8-52 Modeled Nitrate Maximum Initial Concentrations Figure 8-53 Modeled Nitrate Maximum Concentrations 5 Years Figure 8-54 Modeled Nitrate Maximum Concentrations 25 Years Figure 8-55 Modeled Nitrate Maximum Concentration 50 Years Figure 8-56 Modeled Nitrate Maximum Concentration 100 Years Figure 8-57 Nitrate Concentrations at Observation Point 1 Figure 8-58 Nitrate Concentrations at Observation Point 2 Figure 8-59 Nitrate Concentrations at Observation Point 3 Figure 8-60 Nitrate Concentrations at Observation Point 4 Figure 8-61 Nitrate Concentrations at Observation Point 5 Figure 8-62 Nitrate Concentrations at Observation Point 6 Figure 8-63 Modeled Arsenic Maximum Initial Concentrations Figure 8-64 Modeled Arsenic Maximum Concentrations 5 Years Figure 8-65 Modeled Arsenic Maximum Concentrations 25 Years Figure 8-66 Modeled Arsenic Maximum Concentrations 50 Years Figure 8-67 Modeled Arsenic Maximum Concentrations 100 Years Figure 8-68 Modeled Arsenic Concentration at Observation Point 1 Figure 8-69 Modeled Arsenic Concentration at Observation Point 2 Figure 8-70 Modeled Arsenic Concentration at Observation Point 3 Figure 8-71 Modeled Arsenic Concentration at Observation Point 4 Figure 8-72 Modeled Arsenic Concentration at Observation Point 5 Figure 8-73 Modeled Arsenic Concentration at Observation Point 6 Figure 8-74 Modeled Arsenic Concentration at Observation Point 7 Figure 8-75 Modeled Arsenic Concentration at Observation Point 8 Figure 8-76 Modeled Uranium Maximum Initial Concentrations Figure 8-77 Modeled Uranium Maximum Concentrations 50 Years Figure 8-78 Modeled Uranium Maximum Concentrations 100 Years Figure 8-79 Modeled Uranium Maximum Concentrations 250 Years Figure 8-80 Modeled Uranium Maximum Concentrations 500 Years Figure 8-81 Uranium Concentrations at Observation Points 4 and 5 Figure 8-82 Arsenic Concentrations in Streams Figure 8-83 Nitrate Concentrations in Streams Sequoyah Fuels Corporation MFG Inc

" -i73-fl- C . R.Pýf'. C..... - ii i vii October 2002

Figure 8-84 Uranium Concentrations in Streams Figure 8-85 Nitrate Concentrations in Seeps Figure 8-86 Modeled Arsenic Concentration at Seeps Figure 8-87 Uranium Concentrations in Seeps Figure 8-88 Nitrate Mass Loading to River Figure 8-89 Arsenic Mass Loading to River Figure 8-90 Uranium Concentrations at Observation Points 1, 2 and 3 Figure 8-91 Uranium Mass Loading to River Figure 8-92 Composite Scaled Flow Sensitivity Figure 8-93 Flow Modeled Scale Sensitivity Figure 8-94 Composite Scaled Transport Sensitivity APPENDICES Appendix A Hydrogeological Characterization Work Plan, SOPs and Health and Safety Plan Appendix B Supplemental Data Collection Trip Report Appendix C Boring Logs and Well Installation Diagrams Appendix D Electrical Resistivity Survey Appendix E Laboratory Chemical Analysis Report Sheets Appendix F Transport Calibration Chemographs Appendix G Borehole Data for EVS Model Appendix H EVSTRIMI.EXE Appendix I Vegetation Water Balance Estimates for Sequoyah Site Appendix J Hydrologic Test Data Appendix K Sufficient Yield Memo Sequoyah Fuels Corporation MFG Inc PNrp C-R-0-.C nt. R, 6Ld. viii October 2002

EXECUTIVE

SUMMARY

The Sequoyah Fuels Corporation (SFC) facility (Facility) is a 600-acre parcel of land located in Sequoyah County in mid-eastern Oklahoma. The Facility is bounded on the north by private

'property, on the east by State Highway 10, on the south by Interstate 40 and on the west by U.S.

Government-owned land that is adjacent to the Illinois and Arkansas River tributaries of the Robert S. Kerr Reservoir. The geology at the Facility consists of alluvial, and colluvial deposits underlain by an interbedded sequence of well-cemented sandstones, and fissile shales.

SFC conducted uranium conversion operations at the Facility from 1970 to 1993. Operations included conversion of uranium ore concentrates into uranium hexafluoride, and reduction of depleted uranium hexafluoride to depleted uranium tetrafluoride. Additional operations included bulk storage of chemicals, electrolytic production of fluorine from hydrofluoric acid, treatment and storage of liquid waste streams, and a land-treatment program utilizing waste ammonium nitrate solution as fertilizer on SFC property.

In August of 1990, SFC notified the Nuclear Regulatory Commission (NRC) that uranium had been discovered in soils during excavation of underground storage tanks. In late 1990, the NRC issued an Order Modifying License to SFC, which allowed for further investigation and prevention of additional releases of licensed materials. SFC was also charged with the development of a comprehensive Facility Environmental Investigation (FEI) plan. The FEI plan, completed in mid-October 1990, expanded the investigation and monitoring program throughout the Facility area.

In February of 1993, SFC notified the NRC of its intent to discontinue production and submitted to the NRC a preliminary plan for completion of decommissioning the Facility that included the definition of the extent of contamination throughout the Facility and a hydrogeologic transport model to determine future migration of contaminants.

SFC completed a Site Characterization Report to address NRC objectives in December of 1998.

In August of 1993, SFC signed a Resource Conservation Recovery Act (RCRA) Section 3008(h)

Administrative Order on Consent with the Environmental Protection Agency. As a result, SFC Sequoyah Fuels Corporation MFG Inc.

-- R.*. ,...* -- ES-1 October 2002

was required to conduct an RCRA Facility Investigation (RFI) to establish the amount and location of hazardous wastes and constituents at or from the Facility, and to gather information necessary for the Corrective Measures Study. The RFI was completed in 1997.

In February 2001, SFC determined that the hydrogeologic transport model was inadequate, and retained Shepherd Miller, Inc. ([SMI], now MFG, Inc. [MFG]) to re-evaluate the model. The evaluation led to a revised hydrogeologic transport model based on a more robust conceptual model was required to sufficiently predict the long-term migration of constituents of concern (COC). This conclusion was founded on the need to better address the controls of the complex hydrostratigraphy and geochemistry on COC transport.

The objective of the MFG hydrological and geochemical site characterization investigation is to estimate the long-term, post closure chemical conditions of groundwater and surface water surrounding Facility. The investigation consisted of three primary tasks 1) site investigation of geological, hydrological, and geochemical conditions, 2) development of revised conceptual model for the migration of three COCs (uranium, arsenic, and nitrate), and 3) prediction of long-term, post closure COC concentrations in groundwater and surface water with numerical groundwater flow and solute transport models.

The site investigation was developed to more accurately characterize the hydrogeology and geochemistry of individual stratigraphic units underlying the Facility. Specifically, stratigraphic information at various Facility locations was acquired from borehole core logging and bedrock outcroppings. Numerous single well tests were designed to evaluate the hydrogeologic properties of the hydrostratigraphic units. Analyses of groundwater and lithologic samples were performed inorder to assess site geochemical conditions in the stratigraphic units. Additionally, specific Facility features were investigated with various methods including electrical resistivity geophysical surveying, trench and test pit excavation, and additional groundwater and lithologic chemical analyses.

The site conceptual model for COC migration was based on data collected from the MFG site investigation, other Facility investigations, and SFC hydrologic and geochemical database. The models have been designed based on the conceptual model framework, and have been calibrated Sequoyah Fuels Corporation MFG Inc.

.... ..... .... ES-2 October 2002

to observed hydrologic and geochemical conditions. The models simulate 1,000-year predictive scenarios based on steady-state flow conditions and current distributions of COCs dissolved in groundwater, The simulations incorporate post-decommissioning modifications to topography, flow field, and COC source materials to more accurately represent future conditions. Modeling results were evaluated to estimate potential future COC concentrations and mass loading at exposure points, including the 001, 004, 005, and 007 stream drainages, groundwater seeps, and the Robert S. Kerr Reservoir.

The model results indicate that nitrate is the dominant COC at the facility. The nitrate plume appears to be mature and is the result of 20 years of release from activities at the Facility. Nitrate is a conservatively transported COC, i.e., no retardation is applied to solute velocity. Therefore, most of the existing nitrate discharges to the river within 100 years.

Uranium contamination is restricted to the vicinity of the Process Area. Unlike nitrate, uranium transport is retarded by the interaction between the solute and the aquifer matrix. Although significant uranium contamination exists in the terrace materials, uranium has likely reprecipitated as uranium minerals in the unsaturated zone and little additional uranium is assumed to enter the aquifer system. Uranium transport occurs in three primary areas of the Facility. Uranium contamination in the vicinity of the MPB is situated on a local groundwater divide. Migration south follows the gravel/fill area and progresses toward the stormwater pond.

This plume disperses to less than 100 mg/L within 500 years. The northern portion of this plume follows the 005 drainage discharges to the river, and is flushed from the Facility within 1,000 years.

The remaining uranium plume emanates from the Solid Waste Burial Areas. This plume is transported down the 007 drainage. This plume is also flushed from the aquifer system within 1,000 years. No modeled discharges to the river from any of the aforementioned plumes exceed the uranium MCL of 30 [tg/L after 750 years.

Arsenic is present in the aquifer material in a large portion of the facility. The primary areas of arsenic contamination are Pond 2 and Fluoride Burial Areas. Significant concentration reduction Sequoyah Fuels Corporation MFG Inc.

.... .,$ ,. .,,,.ES-3 RO October 2002

occurs through dispersion of the plumes. The entire arsenic plume either discharges to the river system or disperses below the 10 tg/L MCL concentration within 200 years.

In order to conduct a screening-level assessment of the potential risk to aquatic biota and to human or other terrestrial receptors, the available Federal and Oklahoma State criteria values for the protection of human health and aquatic life were compiled for nitrate, arsenic, and uranium.

If there were not promulgated values, other guidance values and/or values from the scientific literature were compiled and synthesized to derive a protective concentration. The maximum predicted concentrations of nitrate, arsenic, and uranium in the Site streams were compared to these values to determine, on a screening-level basis, if there was any potential risk. Similar comparisons were conducted for loadings of these constituents to the Arkansas and Illinois rivers. In all cases, predicted concentrations of the constituents were below protective criteria for both humans and aquatic life.

Sequoyah Fuels Corporation MFG Inc.

ES-4 October 2002

1.0 INTRODUCTION

1.1 Previous Studies and Resources Sequoyah Fuel Corporation (SFC) conducted uranium conversion operations at its Gore, Oklahoma facility (Facility) from 1970 to 1993. SFC notified the Nuclear Regulatory Commission (NRC) in August of 1990 that uranium had been discovered in soils during excavation of underground storage tanks within the restricted boundary. The NRC initiated an investigation and SFC began an initial characterization of the area surrounding the contaminated soils, retaining Roberts/Schornick and Associates, Inc. (RSA) to assist with the process.

In late 1990, the NRC issued an Order Modifying License (OML) to SFC, which allowed for further investigation and prevention of additional releases of licensed materials from the Main Process Building (MPB) and for the development of a comprehensive Facility Environmental Investigation (FEI) plan. At this point, SFC expanded the characterization investigation to include the MPB and an extensive soil and groundwater monitoring well installation program began (RSA, 1991).

The FEI plan, completed in mid-October 1990, expanded the investigation and monitoring program throughout the SFC Facility area. Implementation of the FEI plan included extensive monitoring of the surface water, groundwater and soils, as well as analysis of possible contamination of underground utility trenches and the Combination Stream Drain (CSD). Only isolated and limited amounts of licensed material were detected throughout the Facility during the investigation. Details of the investigation, its findings, and corrective action taken as a result of the findings are reported in the SFC Facility Environmental Investigation Findings Report (RSA, 1991).

In February of 1993, SFC notified the NRC of its intent to discontinue production and submitted to the NRC a preliminary plan for completion of decommissioning (PPCD) for the Facility. To properly decommission the Facility, SFC determined the extent of contamination throughout the Facility and developed a hydrogeologic transport model to determine future migration of contaminants.

Sequoyah Fuels Corporation MFG Inc.

- ," 6ý 1 October 2002

In August of 1993, SFC signed a Resource Conservation Recovery Act (RCRA) Section 3008 (h) Administrative Order on Consent (AOC) with the Environmental Protection Agency (EPA).

As a result, SFC was required to conduct an RCRA Facility Investigation (RFI) to establish the amount and location of hazardous wastes and constituents at or from the Facility and to gather information necessary for the Corrective Measures Study (CMS): The RFI, published in 1997, includes detailed information on Facility description and history, local geology and hydrogeology, monitoring activities, extent and concentration of Facility contamination, and the effects of contamination on the surrounding area and its inhabitants (SFC, 1997).

In December of 1998, SFC completed a site Characterization Report (SCR) to address the NRC objectives of:

0 Quantifying physical, radiological and non-RCA chemical contamination characteristics and the extent of contaminant distribution a Quantifying environmental parameters affecting potential human exposure for both existing and possible future contamination

  • Supporting evaluation of decommissioning action alternatives and detailed planning of the selected decommissioning and remediation approach Activities for the SCR were designed to obtain information to characterize the source(s) of contamination, establish the level of contamination in the environment where releases had occurred, and finalize environmental setting characterization to support decommissioning planning.

By February 2001, SFC determined that the site hydrogeologic model was inadequate, and retained Shepherd Miller, Inc. ([SMI], now MFG, Inc. [MFG]) to re-evaluate the conceptual model to assess its deficiencies.

In March 2001, SMI submitted the Database Review and Conceptual Model Revision Report to SFC. In the report, SMI first reviewed the contents of the SFC hydrogeologic and geochemical databases to better understand the hydrogeologic and geochemical transport system at the Facility. Several previous investigations provided a significant amount of hydrogeologic and geochemical data. These investigations included: 1) the SFC Facility Environmental Sequoyah Fuels Corporation MFG Inc.

.,U ., .... az..

,ý 2 October 2002

Investigation Findings Report (RSA, 1991), 2) the SFC Site Characterization Report (SFC, 1998a), and 3) the SFC Final RCRA Facility Investigation (SFC, 1997). Furthermore, groundwater monitoring at the Facility has been ongoing for more than 20 years as part of SFC's Source Materials License. This groundwater monitoring created a large database that SMI used to evaluate the site conceptual model.

Subsequent to the review of the SFC databases, SMI updated the geochemical conceptual model by preparing two-dimensional contour maps of the key constituents (uranium, arsenic, and nitrate) within the key hydrostratigraphic units. As a result of this review, SMI determined that additional site characterization efforts were needed to obtain the data necessary to support groundwater flow and constituent modeling at the Facility, and to refine the geochemical and hydrogeological site conceptual models. These characterization efforts included hydrogeologic, geochemical, and geophysical investigations. The site hydrogeologic investigation was performed to acquire additional data on the extent and depths of the various stratigraphic units, and to acquire data to characterize the hydrologic properties of the various hydrological units.

Data collected during the site characterization efforts supplemented data from previous studies to help refine the hydrogeologic physical and conceptual model. The geochemical investigation included the collection of data needed to understand the geochemical processes controlling constituent migration and to determine site-specific distribution coefficients for arsenic and uranium to support geochemical transport modeling. Additional site characterization efforts included a geophysical investigation to determine the existence and location of a suspected paleochannel at the Facility.

This report presents the results of the on-site investigation, the geochemical testing and analysis to date, and the development and results of the hydrogeologic physical and conceptual model.

The data and analysis obtained in this study has supported SMI in developing a groundwater flow and transport model, allowing for the delineation of the impact of key constituents on the environment, both in the present and in the future.

Sequoyah Fuels Corporation MFG Inc.

Pqm - .. -.. -- ," ý, 3 October 2002

1.2 Report Organization and Section Overview This report presents information developed by SFC, including the results of the most recent site characterization, in support of a revised site hydrogeochemical conceptual model. This revised model is the basis for comprehensive site groundwater flow and transport models, which evaluate the potential future concentrations of site-derived constituents at potential exposure points. The results of this predictive modeling provide a technical basis for the groundwater component of the site closure plan.

Section 2.0 presents a summary description of the site Facilities. Operational history and features relevant to the site characterization and modeling effort are presented to set the physical and operations context for the site conceptual model. Section 3.0 presents a summary of the existing site Decommissioning Plan that describes the future site configuration and conditions to set the future physical and operations context for the predictive modeling. Section 4.0 presents a description of the recent site investigation, including descriptions of drilling, well installation and hydrological studies undertaken to more fully characterize the site hydrologic conditions in support of the revised site conceptual model. Section 5.0 presents the geochemical studies undertaken to more fully characterize the site geochemical and constituent transport conditions in support of the site transport model. This section also presents the most current understanding of the distribution of the constituents of concern (COCs) in the groundwater system. Section 6.0 presents the most current understanding of the site geologic and hydrogeologic conditions based on previous studies and the recent site investigation results. Section 7.0 integrates the most current understanding of site conditions into a revised site conceptual model. Section 8.0 presents the design, configuration, calibration and results of the flow and transport models.

Section 9.0 summarizes the results of the previous sections, evaluates the modeling results in the context of protective human and ecological standards and provides conclusions regarding the results of the predicted future conditions.

Sequoyah Fuels Corporation MFG Inc.

4 October 2002

J 2.0 FACILITY DESCRIPTION 2.1 Facility Location and Description The SFC facility (Facility) is a 600-acre parcel of land within the SFC Facility containing the Process Area and the Industrial Area. The Facility is located in Sequoyah County in mid-eastern Oklahoma about 150 miles east of Oklahoma City, Oklahoma, 40 miles west of Fort Smith, Arkansas, 25 miles southeast of Muskogee, Oklahoma, and 2.5 miles southeast of Gore, Oklahoma in Section 21 of Township 12 North, Range 21 East. Figure 2-1 shows the location of the Facility. The Facility is bounded on the north by private property, on the east by State Highway 10, on the south by Interstate 40 (1-40) and on the west by U.S. Government-owned land (managed by the U.S. Army Corps of Engineers [COE]) adjacent to the Illinois and Arkansas River tributaries of the Robert S. Kerr Reservoir. Figure 2-2 shows the topography of the Facility and surrounding area.

The Facility lies within the approximately 1,550-acre property owned by SFC. This property extends eastward from Highway 10 north of Interstate 40, and approximately 370 acres south of Interstate 40. Most of the uranium-processing operations were conducted on an 85-acre portion of the Facility that is commonly referred to as the "Process Area." SFC uses an additional 115 acres to manage storm water and store by-product materials. The Process Area and additional management areas are collectively referred to as the "Industrial Area." A location map of Facility designations is included in Figure 2-3. Most of the land outside of the Industrial Area is either used for grazing cattle or forage production, or is forested.

The majority of processing operations were conducted within the Process Area. A general Facility layout is presented in Figure 2-4. The conversion of uranium ore concentrates into uranium hexafluoride (UF 6) was conducted in the MPB, the Miscellaneous Digestion Building, and the Solvent Extraction (SX) Building. The reduction of depleted uranium hexafluoride (DUF 6) to depleted uranium tetrafluoride (DUF 4) was conducted in the DUF 4 building. Feed material for processing was stored on the yellowcake storage pad. Additional facilities at the Facility included bulk storage of chemicals such as ammonia (NH 3), hydrofluoric acid (HF),

nitric acid (HNO3), and sulfuric acid (142504), a facility for electrolytic production of fluorine Sequoyah Fuels Corporation MFG Inc.

. R, a.-"

- , 5 October 2002

from HIF, treatment systems and storage ponds for liquid waste streams, and a land-treatment program utilizing waste ammonium nitrate solution as fertilizer on SFC property.

The SCR (SFC, 1998a) and FEI (RSA, 1991) provide thorough descriptions of Facility operations, along with the identification of source characteristics associated with various processes. This section summarizes the identification of the sources of potential contamination.

The contamination found at the Facility is a result of uranium processing activities that took place during the operation of the plant (SFC, 1998a). Throughout the operating life of the plant, on-going evaluations of the impact of plant operations, including airborne and liquid discharges, and soil and groundwater sampling, occurred. The FEI (RSA, 1991) was a comprehensive, focused evaluation describing the processing activities and identifying sources of potential contamination.

2.1.1 Main Process Building Area (MPB)

The MIPB is located near the eastern edge of the Process Area. The MPB is the largest building at the Facility and contained the major UF6 conversion processing operation and fluorine generation facilities, and a chemical process laboratory. Plant operations began in 1970 and ceased in 1992. Numerous leaks and spills occurred throughout the Process Area during operation of the Facility, releasing uranium-bearing materials from process systems or containers (SFC, 1998a). Sources of contamination in the MPB included the gaseous, liquid and solid compounds associated with operation of the Facility. A large amount of UF 6 was released from an overfilled cylinder that ruptured just north of the MPB. The UF 4 ash receivers removed from the MPB were sources of contamination to adjacent areas. Releases of UF4 ash would have been in a solid powder form.

Soil samples have been collected from locations in and around the MPB with sample depths ranging from the surface to 79 feet. The maximum uranium concentration observed was approximately 7,100 pCi/g (SFC, 1998a), with 92.1 percent of the samples containing less than 110 pCi/g. The soils underlying the MPB area are impacted to depths of 15 feet by uranium, and to a lesser degree, by nitrate and fluoride. The highest concentrations of these contaminants Sequoyah Fuels Corporation MFG Inc.

. ,....._ c..,.,

. ". , 6 October 2002

occur near the western portion of the unit, consistent with known leaks and spills that have occurred in the UF 6 Plant 2.1.2 Solvent Extraction (SX) Building The Solvent Extraction (SX) Building is located approximately 150 feet west of the MPB.

Operations began in 1970 and ceased in 1992. The SX Building operations involved the separation of uranium and impurities such as heavy metals using a hexane solvent and tributylphosphate to float the impurities for easier removal. Numerous leaks and spills occurred during operation of the SX Building, resulting in the release of uranium bearing materials from process systems or containers. During 1990, uranium contaminated water was discovered adjacent to the SX Building in an open excavation. Water samples collected from the excavated area averaged 1.6 g/L uranium, with a maximum concentration of 8.2 g/L (SFC, 1998a). Soil removed from the area had an average uranium concentration of 1,500 pCi/g (SFC, 1998a). A French drain was installed during the excavation of a solvent extraction tank. Contaminated rock from Pond 2 and contaminated limestone were used as backfill in the French drain.

Soil samples have been collected from locations around the SX Building, with sample depths ranging from the surface to 79 feet deep. The maximum uranium concentration observed was approximately 7,500 pCi/g; most samples analyzed contained less than 110 pCi/g. The soils underlying the SX Building are impacted by nitrate, fluoride and uranium, particularly in the northern portion of the unit around the SX Vault, where there are impacts to over 30 feet (SFC, 1998a).

2.1.3 Initial Lime Neutralization Area The Initial Lime Neutralization Area is located southwest of the Decorative Pond, approximately 150 feet south of the main Facility entrance road. Lime neutralization of scrubber wash water was conducted in this area for a brief time after plant startup until completion of the Fluoride Settling Basins in 1971, when the scrubber wash water was re-routed for neutralization through these settling basins. Hydrogen fluoride scrubber wash water was discharged on top of a large limestone pile. Fluoride and uranium significantly impacted the soils in the Initial Lime Sequoyah Fuels Corporation MFG Inc.

. 7 October 2002

Neutralization Area. In 1992, the majority of the contaminated soil was removed and placed in the Interim Storage Cell, effectively removing the source of contaminants from the area. The maximum uranium concentration observed in soil samples taken from in and around this location was approximately 61 pCi/g.

2.1.4 Solid Waste Burial Area No. 1 (South)

The Solid Waste Burial Area No. 1 (South) is located within the Process Area north of the Emergency Basin. The burial area operated from September 1970 to January 1981 and was used for disposal of low-level radioactive waste materials such as equipment, drums, and other solids.

Soil samples were collected from locations in and around the Solid Waste Burial Area No. 1 (South) at depths ranging from the surface to 34 feet (SFC, 1998a). 'The maximum observed uranium concentration of approximately 1,060 pCi/g, with 90.6 percent of samples containing less than 110 pCi/g. Based on plant records, the Solid Waste Burial Area No. 1 (South) contains approximately 43,000 cubic feet of low-level wastes containing about 0.64 Ci (945 kg) of natural uranium (SFC, 1998a). The soil covering the burial area is impacted near the surface by uranium from the materials that were formerly stored on the ground in this area.

2.1.5 Emergency Basin The Emergency Basin is located within the Process Area just west of the North Ditch (see Section 2.1.8). The Emergency Basin is unlined and has an estimated capacity of 133,300 cubic feet. The Emergency Basin was constructed in 1969 to provide temporary storage of surface water runoff from controlled areas in the plant. The basin has also been used for the containment of accidental spills, wash-down of surrounding pads, and the contents of sump and pits, including the North Yellowcake Sump and the North Ditch.

Soil samples from around the basin to depths of 4.5 feet contain a maximum uranium concentration of 3,500 pCi/g. Sediment at the bottom of the pond has uranium concentrations between 1,600 and 6,000 pCi/g. Soils underlying the basin are assumed to be impacted from exposure to the sediment in the basin and from liquids seeping down from the basin. Full extent of contamination will not be known until sediments at the bottom of the basin are removed.

Sequoyah Fuels Corporation MFG Inc.

,. ~ 8 October 2002

2.1.6 Sanitary Lagoon The Sanitary Lagoon is located in the Process Area west of the MPB and SX Building. It was built in 1971 and was used for microbiological oxidation of wastewater from toilets, lavatories, showers, and laundry facilities. The lagoon water was discharged via the Combination Stream (Section 2.1.22). The lagoon was drained after production ceased and a synthetic liner was installed to eliminate any potential hydraulic. head caused by impounded rainwater. The lagoon has a capacity of approximately 129,000 cubic feet. During 1990, uranium contaminated water was discovered adjacent to the SX Building in an open excavation and potentially contributed uranium to the Sanitary Lagoon. The sludges in the Sanitary Lagoon are comprised primarily of solids derived from microbial oxidation of domestic wastewater. Concentrations in these sludges ranged from approximately 2,300 pCi/g to 26,000 pCi/g uranium, 7 to 440 ýtg/g nitrate and 160 to 5,200 gg/g fluoride.

Soil samples have been collected from several locations around the Sanitary Lagoon with sample depths ranging from the surface to 29 feet. The maximum uranium concentration observed was approximately 6,200 pCi/g, 92 percent of samples collected had uranium concentrations less than 110 pCi/g. The soils underlying the Sanitary Lagoon are impacted from exposure to the sludge and liquid contained in the Sanitary Lagoon. The extent of the impact will be determined once the sludges are removed. Soils surrounding the unit are impacted, primarily by uranium, generally at depths of less than 5 feet.

2.1.7 Pond 1 Spoils Pile The Pond 1 Spoils Pile is located west of the Emergency Basin and Sanitary Lagoon. This area consists of residual clays removed from the old raffinate Pond 1 during construction of Clarifier A Basin in May 1980. The spoils pile consists of approximately 437,000 cubic feet of residual material from, Pond 1 and cover soil. Soil samples were collected from locations in and around the Spoils Pile at depths ranging from the surface to 38 feet. The maximum uranium concentration observed was approximately 15 pCi/g._ Fluoride, nitrate, and uranium impact the soils in the area surrounding the Pond 1 Spoils Pile. The impact is generally less than a depth of 5 feet.

Sequoyah Fuels Corporation MFG Inc.

. 9 October 2002

2.1.8 North Ditch The North Ditch is located within the Process Area, immediately east of the Emergency Basin.

The North Ditch was constructed in 1972 when an additional berm was added to the north end of the Emergency Basin retaining dike and has an estimated capacity of 12,500 cubic feet. The North Ditch is primarily utilized to contain storm water runoff. Historically storm water runoff was pumped to the Combination Stream, water presently in the North Ditch gravity drains to the Emergency Basin. In 1979, SFC concluded that a drain tile from the new tank farm was a source of uranium in the North Ditch. The drain tile that was suspected of containing uranium was subsequently removed. In February 1982, a pipeline ruptured and resulted in the release of approximately 3,000 gallons of raffinate into the North Ditch. A significant amount of uranyl fluoride washed into the North Ditch following the 1986 UF 6 release (see section 2.2.1). Much of this material remains in the North Ditch and probably contributes to soil and groundwater contamination in the area. During 1992, a leak of dilute HF from the HF Off-gas Scrubber system occurred, draining approximately 300 gallons of fluid to the surrounding area. The fluids and wash water drained to the North Ditch.

Soil samples have been collected from several locations around the North Ditch, with sample depths ranging from the surface to 5 feet. The maximum uramnum concentration observed was approximately 510 pCi/g, with 77.4 percent of samples analyzed containing less than 110 pCi/g.

The soils underlying the basin are assumed to be impacted from exposurel to the sediment and liquid contained in the North Ditch. The extent of the impact will not be known until sediment from the basin bottom has been removed. Soils surrounding the unit are impacted, primarily by uranium, generally at depths of less than 5 feet.

2.1.9 Contaminated Equipment Area The Contaminated Equipment Area is located to the east of the North Ditch and the Solid Waste Burial Area No. 1 within the Process Area. The Contaminated Equipment Area includes an incinerator and the Solid Waste Management Building. Contaminated scrap materials were previously stored in this unit. The Solid Waste Management Building was constructed in 1989 Sequoyah Fuels Corporation MFG Inc.

..... I A"- 10 October 2002

and is approximately 30 feet by 50 feet. The building provides an enclosed area to sort trash and compact low-level radioactive waste. No sources are currently contained in this area.

Soil samples have been collected in and around this unit at depths ranging from the surface to 40 feet. The maximum uranium concentration observed was approximately 12,200 pCi/g, with 83.2 percent of analyses containing less than 110 pCi/g. The soils in the Contaminated Equipment Area are impacted by uranium and fluoride generally to depths of less than 3 feet. Soils surrounding the unit are impacted, primarily by uranium, generally at depths of less than 5 feet.

Significant soil impacts are present southeast of the Solid Waste Management Building (SFC, 1998a).

2.1.10 Fluoride Holding Basin No. 1 (South)

The Fluoride Sludge Holding Basin No. 1 is located south of the Fluoride Settling Basins. The holding basin was constructed in 1981 to hold calcium fluoride (CaF 2) sludge generated from the Lime Neutralization Area. Fluoride Holding Basin No. 1 (South) is constructed of clay and as an estimated capacity of 186,800 cubic feet. The sludges in Fluoride Holding Basin No.' 1 (South) are comprised of CaF 2 solids derived from the neutralization of HF off-gas scrubber water with calcium oxide (lime). The underlying soils are probably impacted from exposure to the sludge and liquid contained in Fluoride Sludge Holding Basin No.1 (South). The extent of the impact will be determined by the sludges have been removed from the basin bottom.

Soil samples have been collected in and around this unit, with sample depths ranging from the surface to 28 feet. The maximum uranium concentration observed was approximately 320 pCi/g, with 78.8 percent of analyses containing less than 35 pCi/g. Fluoride Holding Basin No. 1 (South) contains an estimated 171,400 cubic feet of calcium fluoride sludge with a uranium content of about 0.82 Ci (1,224 kg) of natural uranium. Soils surrounding the basin are slightly impacted by fluoride and uranium in the surface layer.

2.1.11 Fluoride Holding Basin No. 2 (North)

The Fluoride Sludge Holding Basin No. 2 is located in the northwest comer of the Facility west of Solid Waste Burial Area No. 2 and north of the Pond 1 Spoils Pile. The basin is clay-lined Sequoyah Fuels Corporation MFG Inc.

C... w..*. .... R,. 11 October 2002

basin and has an estimated capacity of 201,000 cubic feet. The basin was built in 1985 to store CaF 2 sludge from the lime neutralization process. The basin was originally hypalon-lined and temporarily used upon completion for storing treated raffinate. The treated raffinate was transferred to the Clarifier Basins and the liner was removed. The basin has since been used for storage of calcium fluoride sludge.

Soil samples have been collected around the basin, with sample depths ranging from the surface to 30 feet. All of the samples analyzed contained less than 110 pCi/g of uranium. Fluoride Holding Basin No. 2 contains an estimated 186,000 cubic feet of calcium fluoride sludge with a uranium content of about 1.02 Ci (1,522 kg) of natural uranium. Soils surrounding the basin are slightly impacted by fluoride and uranium in the surface layer.

2.1.12 Fluoride Clarifier and SettlingBasins (South)

The Fluoride Clarifier and Settling Basins (South) is located south of Clarifier A Basin Area and west/northwest of Fluoride Sludge Burial Area. The unit consists of three separate basins, a fluoride clarifier and two settling basins, which were built in 1971. Estimated capacities are 102,100 cubic feet and 46,800 cubic feet for the fluoride clarifier and each settling basin, respectively. None of these basins have synthetic liners. The settling basins were designed to allow CaF 2 solids from the lime neutralization process to settle. After the solids settle, the liquid was decanted and flowed to the fluoride clarifier. Liquid from the fluoride clarifier was routed to the Combination Stream (see Section 2.1.22).

Soil samples have been collected from three locations around the Fluoride Clarifier and Settling Basins. Sample depths ranged from the surface to 32 feet deep. The maximum uranium concentration observed was approximately 54 pCi/g. The Fluoride Settling Basins No. 1 and No.

2 and the Fluoride Clarifier contain an estimated 114,300 cubic feet of calcium fluoride sludge with a uranium content of about 0.92 Ci (1365 kg) of natural uranium. Soils surrounding the basin are slightly impacted by fluoride and uranium in the surface layer.

Sequoyah Fuels Corporation MFG Inc.

12 October 2002

2.1.13 Fluoride Sludge Burial Area The Fluoride Sludge Burial Area is located directly east and south of the Fluoride Settling Basins and, prior to 1981, was used for the burial of CaF 2 sludge. This area consists of three distinct sections. The northern section measures approximately 100 feet by 200 feet. The second section is located directly south of the East and West Pits and measures approximately 50 feet by 275 feet. The third section is located at the southwest comer of the area and contains CaF2 sludge that has not been buried and is currently used for the retention of sludge. None of these areas are lined. Materials other than CaF 2 , such as UF 4 ash and drums of hardened yellowcake, are probably buried in these areas. A total of 96,830 cubic feet of fluoride sludge was buried, with a total activity of 1.5 curies of natural uranium.

Soil samples have been collected near or around this unit with sample depths ranging from the surface to 26 feet deep. The maximum uranium concentration observed was approximately 7.7 pCi/g. Based on plant records, the Fluoride Sludge Burial Area contains approximately 96,380 cubic feet of buried CaF 2 sludge with a uranium content of 1.52 Ci (2,268 kg) of natural uranium, with an additional an 57,200 cubic feet of CaF2 sludge containing 1.55 Ci (2,300 kg) of natural uranium.

2.1.14 South Yellowcake (SYC) Sump The South Yellowcake (SYC) Sump is located inside the Process Area directly south of the Yellowcake Storage Pad. It- was built in 1980 to receive surface water runoff from the Yellowcake Pad. The sediments contained in the SYC Sump are comprised of soils and debris collected from surface water runoff from the Yellowcake Pad.

Soil samples have been collected from locations in and around this unit with sample depths ranging from the surface to 25 feet. The maximum uranium concentration observed was approximately 160 pCi/g, and 95.2 percent of the samples analyzed had less than 110 pCi/g. The soils underlying the sump may be impacted by leakage from the sump, however, the extent of any impacts will not be determined until the sump structure has been removed. The soils surrounding the sump have been impacted by uranium.

Sequoyah Fuels Corporation MFG Inc.

.,13 October 2002

2.1.15 Clarifier A Basin Area The Clarifier Basin Area is located directly north of the Fluoride Settling Basins and east of Pond

2. It consists of the Clarifier A Basins, the New Barium Chloride (BaC1) Mixing Area (WPC Building), and the Centrifuge Building. The Clarifier A Basins consist of four clay and hypalon-lined ponds. The basins received raffinate from the solvent extraction process. The raffinate was treated with ammonia and barium chloride to precipitate metals and radionuclides within these ponds. A pipeline then transferred the treated ammonium nitrate solution to the fertilizer ponds. Raffinate sludge accumulated in the bottom of the basins. The raffinate sludge was shipped off-site for additional uranium recovery until 1992. The remainder of the sludge is stored in the clarifier area. The WPC Building is located south of the Clarifier Basins. JIt was built in 1982 to house a research project that attempted to solidify raffinate sludge in asphalt (WPC Project). The experiment lasted for less than one year and afterwards the building was used for storage until 1992. In 1992, the building was used for mixing and storing BaCl, and was utilized for raffinate treatment until 1995. The Centrifuge Building is located south of the Clarifier basins and was built in 1989. The metal- building housed four de-watering tanks that were used in a centrifuge process that attempted to de-water the raffinate sludge by-product prior to disposition. Prior to construction of Clarifier A in 1980, one'surface impoundment, Pond 1, existed in this area. As with the Clarifier A Basins, Pond 1 was utilized to treat raffinate from the SX Building. Raffinate was transferred to Pond 1 via a trough. Spills or leaks that occurred from the trough would have flowed toward the 005 Stream pathway. A valve in a raffinate sludge transfer line located on top of the centrifuge building failed and released material outside the building. The ground near the northeast comer of the building was impacted.

Soil samples have been collected from locations in and around this unit with sampling depths ranging from the surface to 44 feet deep. The maximum uranium concentration observed was approximately 210 pCi/g, with 98.1 percent of the samples analyzed containing less than 110 pCi/g. The sludge in Clarifier A Basin currently contains about 37.1 Ci (54,861 kg) of natural uranium. The synthetic liners in the Clarifier Basins have been damaged in the past, impacting the clay liner and possibly some of the underlying soil. Fluoride, nitrate, and uranium impact the soils surrounding the Clarifier basins.

Sequoyah Fuels Corporation MFG Inc.

.... .... ý ,..

0.,.. 14 October 2002

2.1.16 Pond 2 Pond 2 is located west of the Clarifier Basins and the Fluoride Settling Basins. The pond was constructed in 1971 and has an estimated total capacity of 2,963,000 cubic feet. Pond 2 contained raffinate and sludge by-products until it was taken out of service in the early 1980s due to historically documented leaks. Also discarded into Pond 2 were contaminated rock, yellowcake drums, soda ash, anode blades, drum liners, electrolyte sludge, and laboratory waste.

After 1991 sludge and residual clays from Pond 2 were removed and transferred to the hypalon-lined Pond 4. Pond 2 was then covered with a synthetic liner and the southwest corner of the berm was breached to allow rainfall to drain. This action was intended to help eliminate any potential hydraulic head caused by impounded rainwater.

Leakage from Pond 2 was first noted in an adjacent monitor well in May 1974. Continuous monitoring of Pond 2 subsequently began, which included installation of additional monitoring wells, implementing revised sampling techniques and conducting geophysical surveys. In March 1984, Facility personnel discovered the presence of nitrates in concentrations up to 1,000 mg/L in seeps approximately 500 feet south of Pond 2. Based on the location of the seeps and the magnitude of nitrate contamination in the area, two collection trenches and flow barrier slurry walls were constructed to intercept contaminated groundwater. All recovered groundwater was pumped back into Pond 2. In 1985, a french drain system was installed on the southern end of Pond 2. This system was designed with an automatic pumping system to keep the area de-watered. The French drain system was constructed with a gravel-filled trench connected to a buried concrete tank installed approximately 4 feet below ground level. Groundwater collected from the trench gravity flowed into the tank and was subsequently pumped back to Pond 2.

Pumping was discontinued prior to 1990 after the area failed to yield enough water to pump. In 1991, liquids in the pond were removed and the pond sludges were removed to levels that exhibited uranium levels less than 2,000 pCi/g. Intermittent pumping was resumed during 1995 and automated pumping began in 1997. A high-density polyethylene (HDPE) liner was then placed over the remaining sludges. In addition, a portion of the west pond embankment was breached to facilitate gravity drainage of rainwater.

Sequoyah Fuels Corporation MFG Inc.

. . * . c~... .,. 15 October 2002

Soil samples have been collected from locations in and around Pond 2, with sample depths ranging from the surface to 40 feet. The maximum uranium concentration observed was approximately 49 pCi/g. The impacted clay liner and residual sludge in the bottom and sides of Pond 2 is estimated to be 749,000 cubic feet, which contains approximately 10.8 Ci (16,074 kg) of natural uranium. The soils surrounding the basin do not appear to be impacted by uranium, but have probably been impacted by nitrate.

2.1.17 Area West of Pond No. 2 A natural drainage ditch was previously located west of Pond 2 outside of the restricted area boundary. This drainage was designated as permitted 004 Outfall and was used for storm water drainage that discharged from the Facility via a concrete culvert. The drainage area was backfilled during the storm water collection trench project in 1989 and a French drain type recovery system was simultaneously installed within the natural drainage area. The French drain consisted of a gravel-filled east to west trench connected to a concrete tank buried approximately 30 feet below the present ground elevation. An automatic pumping system was installed in the tank and pumping from the recovery system, Ditch West of Pond 2 (DWP2), began that same year. Water recovered from the collection system typically averages less than 3.4 pCi/L of uranium and 250 mg/L of nitrate.

Soil samples have been collected from locations in and around the area west of Pond 2 with sample depths ranging from the surface to 46 feet. The maximum -uranium concentration observed was approximately 3.9 pCi/g. A gamma scan was performed west of Pond 2 in 1996.

The soils in the area west of Pond 2 are not impacted based on the sampling conducted to date.

2.1.18 Solid Waste Burial Area No. 2 (North)

The Solid Waste Burial Area No. 2 (North) is a fenced area approximately 250 by 300 feet in size located north of Solid Waste Burial Area No. 1 and east of Fluoride Holding Basin No. 2.

The Burial Area operated for a brief time between late 1979 and early 1980. Only a small area (75 feet by 75 feet) in the southeast comer of the entire fenced area is believed to contain buried material. An incident occurred during February 1984 where approximately 15,000 gallons of Sequoyah Fuels Corporation MFG Inc.

16 October 2002

surface Water from the excavated portion of the Burial Area was released to the northwest. An estimate was made that between 8 and 10 pounds of uranium were released during this event.

Equipment stored in this unit has also contributed to contamination of surface soils.

Soil samples have been collected from locations in and around the Burial Area unit, with sample depths ranging from the surface to 40 feet. The maximum uranium concentration observed was approximately 5,060 pCi/g. About 89 percent of the uranium analyses were less than 110 pCi/g.

Based on plant records, Solid Waste Burial Area No. 2 (North) contains approximately 8,100 cubic feet of low-level wastes with a natural uranium content of about 0.04 Ci (60 kg). The soil near the surface was impacted by uranium from the materials that were formerly stored on the ground in this area. This soil was removed and placed in the Interim Storage Cell. Clean soil was spread over the burial area to limit impacts to storm water runoff.

2.1.19 Yellowcake Storage Pad (YSP)

The Yellowcake Storage Pad (YSP) lies within the Process Area north of the Decorative Pond and west of the MPB. The YSP has existed since plant start-up in 1970 and was primarily used for storage of uranium yellowcake contained in 55-gallon drums. A portion of the YSP is presently used for storage of contaminated equipment.

Located just north of the YSP is the ADU/Miscellaneous Digestion Building. The ADU/Miscellaneous Digestion Building was built in 1977 to handle uranium slurry.

Modifications to the building in 1978 and 1983 allowed room for drum handling equipment along with the uranium slurry unloading station and the miscellaneous digestion equipment.

Acidic or corrosive liquids used in the process deteriorated concrete floors in the ADU/Miscellaneous Digestion Building and provided pathways for process materials to enter the soils beneath the floor of this building.

The North Yellowcake (NYC) Sump is located immediately east of the ADU/Miscellaneous Digestion Building. The sump is constructed of concrete and measures approximately 28 feet square by 5 feet deep. It receives surface water runoff from the YSP. The sludges in the NYC Sump were deposited in the basin during storm water runoff from the YSP.

Sequoyah Fuels Corporation MFG Inc.

17 October 2002

Soil samples have been collected from locations in and around the YSP, with sample depths ranging from the surface to 44 feet. The maximum uranium concentration observed was approximately 1,070 pCi/g, 94.9 percent of samples analyzed, however, had uranium concentrations less than 110 pCi/g. The YSP Area is currently being used as an interim storage location for an estimate 100,000 cubic feet of miscellaneous scrap metal and failed equipmefit containing an estimated 0.15 Ci (220 kg) of natural uranium. The NYC Sump has historically contained uranium-impacted sediments. The soils under the YSP are impacted by uranium since drummed yellowcake was stored directly on the ground for some period of time. Samples collected to date indicate some impacts are present. Additionally, the soils under the ADU/Miscellaneous Digest Building and the North Yellowcake Sump are expected to be impacted by leakage from these and adjacent facilities such as SX Building and the MPB.

2.1.20 Fertilizer Pond Area The Fertilizer Pond Area is located several hundred yards south of the MPB, and consists of five ponds each with a capacity of approximately two million cubic feet. All the ponds are clay and hypalon-lined with leak detection underdrains under the hypalon liner, and were constructed between 1978 and 1985. Four ponds (Ponds 3E, 3W, 5 and 6) were used to store ammonium nitrate fertilizer that was transferred from the Clarifier basins. Pond 4 was utilized for storage of raffinate sludge from Pond 2. The fertilizer loadout area is also located within this unit. Pond 3E was the first in the series of ponds to receive treated liquid from the clarification process.

Sediment that collected on the bottom contained residual amounts of uranium. Pond 3E was posted as a radioactive materials area until the sediment was removed and placed into Pond 4.

Pond 4 was also posted as a radioactive materials area. Currently Ponds 3W, 4 and 6 are empty.

Storm water that accumulates in these ponds is transferred to Pond 3E where the water is sampled and eventually discharged through a permitted outfall. Pond 5 is still used for storing small quantities of dilute ammonium nitrate fertilizer where it is land applied during growing season.

Soil samples have been collected from locations in and around this the pond area, with sample depths ranging from the surface to 6 feet. The maximum uranium concentration observed was Sequoyah Fuels Corporation MFG Inc.

,, _,.,,..-R. .i,. 18 October 2002

approximately 39 pCi/g. A gamma scan completed between 1995 and 1998 indicates impacted soils exist outside of Pond 4. Soils around the Fertilizer Pond Area are also impacted by nitrate.

2.1.21 Former Raffinate Treatment Area The Former Raffinate Treatment Area is located between the Clarifier A and the YSP. The raffinate treatment area was operated from 1970 to the mid-1980s, and consisted of several large tanks which were used for pilot studies and processing of various raffinate solutions and ammonium nitrate solutions. The Former BaCl Mixing area is located northeast of the former raffinate treatment area and east of the Clarifier Basins. Leaks and spills of raffinate were reported to have occurred in this area. In 1982, an estimated 3,000 gallons of raffinate were released when a transfer pipeline that extends from the solvent extraction area to the raffinate storage area ruptured. The material was released to 005 Stream located northwest of the Facility.

Uranium concentrations of the released material were reported to be 74,470 pCi/L.

Soil samples have been collected from locations in and around this the raffinate storage area, with sample depths ranging from the surface to 4.5 feet. The maximum uranium concentration observed was approximately 215 pCi/g, with 95.0 percent of the samples analyzed containing less than 110 pCi/g uranium. Soils in the Former Raffinate Treatment Area have been impacted by fluoride, nitrate and uranium from the former operations and from nearby units.

2.1.22 Combination Stream The Combination Stream is a gravity-flow reinforced concrete pipe ranging in size from 12 to 30 inches nominal diameter, at depths ranging from 5 to 30 feet below the ground surface. The Combination Stream was used to transport various discharges to permitted 001 Outfall. These discharges included contact and non-contact over-flow water from the re-circulating cooling water system, cooling water emergency system effluent, MPB roof drain storm water, fire water drains, steam boiler blow-down, decanted water softener blowdown, Yellowcake Pad storm water runoff, treated sanitary wastewater, excess raw water, fluoride treatment effluent, and other miscellaneous storm water from the Process Area. Contributions to the Combination Stream are made at 10 junction manholes at various locations along the Combination Stream. A major flow Sequoyah Fuels Corporation MFG Inc.

.r... ...- * .. .... ,(R$. 19 October 2002

contribution occurs at the equalization basin overflow weir into the main sump located on the southeast side of the cooling water tower. Smaller flow contributors are plumbed directly into portions of the Combination Stream. The discharge from 001 Outfall, located at the south edge of the Process Area, is routed by pipeline southwest to the headwaters of the Robert S. Kerr Reservoir. The pipeline was installed in 1989 to convey the Combination Stream discharge to an unnamed tributary that flowed to the receiving waters, and in 1996 the pipeline was extended to the east bank of the headwaters of the Robert S. Kerr Reservoir. Prior to construction of the pipeline the Combination Stream, discharge from 001 Outfall was originally a surface flow that meandered to the west and eventually to the headwaters of the Robert S. Kerr Reservoir. The Storm Water Reservoir covers part of this historical drainage outfall.

Two Combination Stream investigations, one internal and one external, were performed during the FEI. The internal investigation identified all contributing waste streams to the Combination Stream and clarified the operational dynamics of the Combination Stream. The Combination Stream characterization investigation determined that the major uranium loading is from the cooling tower equalization basin. Other potential sources of inflow with the greatest uranium concentration include the sanitary sump and cooling water hot side basin sump. The internal investigation also determined that no measurable infiltration or exfiltration was occurring into or out of the Combination Stream, respectively. The external investigation of the Combination Stream studied and monitored trench backfill. The external investigation identified the SX Building area as the probable major contributor of uranium to the Combination Stream trench.

Results of the soil samples collected from boreholes completed into the Combination Stream trench backfill show concentrations are at or near background from the surface to the top of the Combination Stream pipe, and vary from less than 34 to 510 pCi/g uranium.

Soil samples have been collected from locations in and around the Combination Stream, with sample depths ranging from the surface to 32.5 feet. The maximum uranium concentration observed was approximately 510 pCi/g, 93.7 percent of samples analyzed, however, contained less 110 pCi/g. A gamma scan for the Combination Stream was completed during 1995. The scan determined that impacted soils are present in the Combination Stream above the Storm Water Reservoir. Fluoride and uranium impact the Combination Stream trench backfill in the Sequoyah Fuels Corporation . MFG Inc.

. 20 October 2002

Process Area. The historical pathway downstream of the outfall station also has been impacted as indicated by sample results and the gamma scan.

2.1.23 Present Lime Neutralization Area The Present Lime Neutralization Area is located in the far northeast comer of the Yellowcake Storage Area. The Area was constructed in 1970 and is a curbed area originally consisting of four tanks used to neutralize both raffinate and HF through the use of lime. The original tanks in the Lime Neutralization Area included a 2,200-gallon lime storage tank, a 1,000-gallon lime slurry tank, a 450-gallon raffinate neutralization tank, and a 3,000-gallon HF neutralization tank.

No records of releases or remedial actions were discovered in the research of the Area.

Soil samples have been collected from locations in and around the Area, with sample depths ranging from the surface to 2 feet deep. The maximum uranium concentration observed was approximately 350 pCi/g. Fluoride and uranium impact the soil in the Present Lime Neutralization Area.

2.1.24 DUF 4 Building Area The DU-F4 building and adjacent concrete storage pad area are located near the northeast comer of the Process Area. The DUF4 building was built in 1984 and housed the process equipment to chemically react DUF 6 with hydrogen (H2) to produce DUF 4 and anhydrous hydrofluoric acid (AHF). The dry product was placed in 55-gallon drums and the recovered AHF was condensed to a liquid and sent to a holding tank south of the DUF 4 building. The steam condensate from the DUF 4 plant discharged to the sanitary lagoon through an underground sanitary sewer pipeline.

Review of information on file indicates that uranium-bearing materials were released from process systems or containers, with some of the incidents resulting in extensive contamination.

Soil samples have been collected from locations in and around the DUF 4 building, with sample depths ranging from the surface to 45 feet. The maximum uranium concentration observed was approximately 68 pCi/g. Fluoride and uranium impact the soils in the areas around the DUF4 Building. Based on historical use of the area prior to construction of the DUF 4 building, there may be some limited uranium impact under the concrete pad areas and the floor of the building.

Sequoyah Fuels Corporation MFG Inc.

.. --. .21 October 2002

2.1.25 Tank Farm and Cylinder Storage Area The South Tank Farm is located immediately north of the MPB and was part of the original construction completed in 1969. The South Tank Farm area is lined with a limestone rock curb for neutralization in case of a spill or upset. Rainfall collected in the curbed area is discharged to the North Ditch. The tank farm consisted of two anhydrous HF storage tanks, two NH 3 storage tanks, and three HNO 3 storage tanks. All of these tanks except for one had a capacity of 15,000 gallons. One of the HNO 3 tanks had a capacity of 18,000 gallons. All of the tanks within the South Tank Farm have been emptied. The North Tank Farm is located north of the South Tank Farm and was built in 1975. The area consists of chemical tanks, a diesel fuel tank and an emergency water supply tank. The North Tank Farm Area is lined with a limestone rock curb for neutralization in case of a spill or upset. The North Tank Farm consisted of two 15,000 gallon 40 percent HNO 3 tanks, one 15,000-gallon anhydrous HF, and one 15,000-gallon aqueous HF tank. Accumulated rainwater drains into the North Ditch. The diesel fuel tank has an earthen berm and rainfall is discharged to the North Ditch. The remainder of the area drains naturally to the North Ditch. Review of information on file indicates that there were incidents in which uranium-bearing materials were released from process systems or containers. The HNO 3 tanks were occasionally overfilled, resulting in HNO 3 running over into the limestone containment.

Soil samples have been collected from locations in and around the Tank Farm and Cylinder Storage Area, with sample depths ranging from the surface to 46 feet. The maximum uranium concentration observed was approximately 650 pCi/g. Of the samples analyzed, 96.5 percent contained less than less than 110 pCi/g of uranium. The soils in the Tank Farm and Cylinder Storage Area are impacted by uranium, primarily in the area just north of the MPB. Additional near surface impact is expected under the concrete pads.

2.1.26 South Perimeter Area The primary feature of the South Perimeter Area is a storm water reservoir that was completed in 1991. The Storm Water Reservoir has a capacity of 8,960,000 cubic feet and covers 16 acres.

The reservoir was constructed to control nitrate and ammonia exceedances through the storm water outfalls. The reservoir was designed to collect storm water from the Process Area to Sequoyah Fuels Corporation MFG Inc.

. . . . . 22 October 2002

facilitate a reduction of nutrient levels by biological processes prior to discharge. In 1990, SFC constructed a collection trench around the Process Area to divert surface water runoff from the northern and western portions of the Process Area through 008 Outfall. Currently the storm water reservoir collects water from non-Process Areas only.

Soil samples have been collected from locations in and around the storm water reservoir, with sample depths ranging from the surface to 30 feet. The maximum uranium concentration observed was approximately 120 pCi/g, and 99.4 percent of samples analyzed contained less than 110 pCi/g. A gamma scan around the storm water reservoir was completed between 1995 and 1998. The results indicate the potential for impacted soils associated with intermittent drainages and identified an area with slightly elevated readings in the just north of Pond 4 and west of Pond 6. Soils in the South Perimeter Area just south of the Initial Lime Neutralization Area have limited impact from fluoride and uranium.

2.1.27 Scrap Metal Storage Area The Scrap Metal Storage Area and the Interim Storage Cell are, located north of the DUF 4 Building Area. The area was used to store leftover construction materials such as pipe, beams, and siding that were previously stored near the North Tank Farm, as well as some radiologically contaminated equipment.. In 1991, SFC began plans to consolidate, stabilize and store contaminated soils on-site on an interim basis, pending future treatment or disposal. The selected interim storage method was an above-ground containment cell. The Interim Storage Cell was constructed on an existing concrete pad (north cylinder pad) at the north end of the Process Area. The wall structure of the cell is formed from concrete inverted-tee sections. A 38-mil thick liner was placed on the bottom of the storage cell. A geotextile fabric was used for added strength and physical protection of the liner. Several drums of dirt and gravel containing uranium-bearing materials leaked on the north cylinder pad. Soil samples collected from the impacted area indicate a maximum uranium concentration of 765 pCi/g. Soils were placed into the Interim Storage Cell in the fall of 1991.

Soil samples have been collected from locations in and around the Scrap Metal Storage Area, with sample depths ranging from the surface to 36 feet. The maximum uranium concentration Sequoyah Fuels Corporation MFG Inc.

.. , , .. , . 23 October 2002

observed was approximately 1,560 pCi/g, 93.3 percent of the uranium analyses, however, were less than 110 pCi/g. The Interim Storage Cell contains approximately 154,800 cubic feet of contaminated soils and other materials with an estimated 2.84 Ci of natural uranium.

2.1.28 Drainage/Runoff Areas There are several drainage areas that historically originated in or near the Process Area and flow towards the headwaters of the Robert S. Kerr Reservoir. These drainage pathways consist of permitted 004, 005, 007 and 008 outfalls. 004, 005, and 007 outfalls have been inactive since the construction of a surface water runoff collection trench in June 1990. The collection trench conveys the storm water that previously exited the Process Area via these outfalls to permitted 008 Outfall. Sediment samples have been collected from several locations from the 004 Stream, with sample depths ranging from the surface to 0.3 feet. The maximum uranium concentration observed was approximately 6.1 pCi/g. Sediment samples have been collected from locations from the 005 Stream, with sample depths ranging from the surface to 0.3 feet. The maximum uranium concentration observed was approximately 520 pCi/g, with 75 percent of the 'samples analyzed containing less than 110 pCi/g. Sediment samples were collected from the 007 Stream, with sample depths ranging from the surface to 0.3 feet. The maximum uranium concentration observed was approximately 80 pCi/g, with 72.7 percent of the samples analyzed containing less than 35 pCi/g. Sediment samples were collected from the 008 Stream, with sample depths ranging from the surface to 0.2 feet. The maximum uranium concentration observed was approximately 7 pCi/g. A gamma scan for the various streams was completed during 1995. The results of the scan are consistent with the historical assessment and soil samples from this unit; i.e. indicative of impacted soils in 005 Outfall and possibly the upper portion of 007 Outfall.

2.2 Operational History In 1986, a shipping container containing heated UF 6 ruptured, releasing several tons of gaseous UF 6 into the air (SFC, 1998a). The gaseous UF 6 reacted with water vapor in the air, forming a uranyl fluoride precipitate that quickly settled to the ground. Building surfaces, including the MPB, and several acres of ground were contaminated with uranium by this release. Some of the contamination was cleaned up immediately following the accident, however impacts still exist in Sequoyah Fuels Corporation MFG Inc.

V,,-- , ,... --1c-

--a,. ,", 24 October 2002

some areas between the MPB and the Facility Boundary near Highway 10. A significant amount of uranyl fluoride precipitate washed into the North Ditch and Emergency Basin. Most of this material remains there and contributes to the soil and groundwater contamination in the area.

2.2.1 Fertilizer Program A byproduct of the UF6 processing at the Facility was a dilute aqueous solution of ammonium nitrate. After treatment to reduce radionuclide concentrations, this solution was applied as a fertilizer primarily to grasslands.

The fertilizer solution used in the program had lower concentrations of trace elements than commercially available nitrogen fertilizer, with the exception or copper, nickel and molybdenum.

The contributions of trace elements from fertilizer to the soil and forage were small in relation to inputs from other necessary fertilizers and soil amendments. No increases in concentration of trace metals or radionuclides over background soils, surface waters, or groundwater could be attributed to fertilizer program 2.3 Physical Characteristics of Facility 2.3.1 Surface Features The Facility is situated on gently rolling to level land with several steep slopes to the northwest and wooded lands to the north and south. Elevations on or near the Facility range from 460 feet above mean sea level (amsl) for the normal pool elevation of the Robert S. Kerr Reservoir to nearly 700 feet amsl (Figure 2-2). Slopes over most of the upland areas of the Facility are less than seven percent. Steeper slopes in creek ravines and on hillsides average roughly 28 percent.

Near the Robert S. Kerr Reservoir, slopes are very steep. This area is owned by the federal government and is administrated by the COE. Most of the 600 acres occupied by the Facility are used as pasture land and for forage production in conjunction with the fertilizer program.

2.3.2 Surface Water Hydrology The Facility is located on the east bank of the Illinois River tributary of the Robert S. Kerr Reservoir. Southwest of the Facility the Illinois River joins with the Arkansas River tributary of Sequoyah Fuels Corporation MFG Inc.

. .....-- 25 October 2002

the Robert S. Kerr Reservoir. Flow in the Illinois River arm of the Robert S. Kerr Reservoir is regulated by releases from the Tenkiller River Reservoir, which is located on the Illinois River approximately seven miles upstream from the Facility. As shown in Table 2-1, the annual average flow of the Illinois River at the gauging station between the Tenkiller Reservoir and the Facility is 1,610 cubic feet per second (cfs).

Significant differences occur in water quality between the Illinois and Arkansas Rivers. The Illinois River flows through a rugged, rocky watershed throughout much of its course in northeastern Oklahoma and is fed largely by releases from Lake Tenkiller Ferry Reservoir and from steep, spring-fed streams. This results in relatively clear waters, with an average specific conductance of 170 microsiemen per centimeter (pS/cm). In contrast, the Arkansas River, which acquires sediment from farming areas along its course in Colorado, Kansas, and Oklahoma, resulting in relatively turbid waters. Specific conductance values from the Robert S. Kerr Reservoir dam are about 600 [tS/cm (SFC, 1998a).

The Process Area is located on an upland area approximately 100 feet in elevation higher than the surface elevation of the Robert S. Kerr Reservoir. Relatively steep (40 percent average) surface gradients occur between the Process Area and the Robert S. Kerr Reservoir or between the floodplain area to in the southwest portion of the SFC property. Several small ephemeral streams drain the Industrial Area to the Robert S. Kerr Reservoir, including the 001, 004, 005, 007, 008, and 009 streams (Figure 2-5), and the drainage associated with the Storm Water Reservoir. Several other drainages affect the SFC property. One stream, hereafter referred to as Creek A, drains the area south of the Fertilizer Ponds, this stream bends northwestward and follows along the eastern edge of the Agland area, and eventually joins with water from the Storm Water Reservoir drainage. A small, northeast flowing stream occurs 'east of Highway 10, this stream closely parallels the Carlile School Fault and drains much of the eastern portions of the SFC property (Figure 2-2). This small stream empties into Salt Branch (Figure 2-2), a northwestward flowing drainage that closely parallels the SFC northernmost property boundary.

Some discharge monitoring has been conducted in the drainages, however insufficient data is available to establish a representative value of annual mean discharge for each stream. Stream Sequoyah Fuels Corporation MFG Inc.

.... .* - ...a- 26 October 2002

flow for selected site drainages has been estimated by applying an empirical stream flow model (Harlin, 2001). The model calculates mean annual stream flow based on drainage area, and is expressed as:

2 QU =AD 0.89 cfs/mi Where:

Qu = mean annual stream flow AD = Drainage Area Stream flow has been calculated for 001, 004, 005, and 007 streams based on drainage areas digitized from surface topography data provided by SFC. The results are presented in Table 2-2.

A facility inspection on August 27, 2001 conducted by Craig Harlin and Scott Munson of SFC identified and located three seeps in the drainage areas of the Facility. These seeps were identified by a seep and associated pool in the 005 and 008 outfalls, and with a pool in the 007 Outfall. The locations of the seeps are presented in Figure 2-5 and descriptions of the seeps are included in Table 2-3.

2.3.3 Climatology and Meteorology Sequoyah County has a warm, temperate, continental climate. Storms bring ample precipitation when moisture-laden air from the Gulf of Mexico meets cooler, dryer air from the western and northern regions. The most variable weather occurs in the spring, when local storms can be severe and bring large amounts of precipitation. The mean annual temperature is -61.50 F. The monthly average ranges from 400 F in January to 82' F in July. The average daily range in temperature is 240 F. The lowest temperature on record was -19' F in January 1930 and the highest was 115' F in August 1936. The mean annual precipitation ranges from 42.9 inches in the town of Sallisaw, to approximately 44.1 inches in the northeastern part of Sequoyah County.

The seasonal distribution of rainfall is fairly even, with 31 percent in spring, 26 percent in summer, 23 percent in fall and 20 percent in winter.

Sequoyah Fuels Corporation MFG Inc.

. , - R,, ., 27 October 2002

The average amount of snowfall from November through April is about 5.2 inches. Lake evaporation averages about 47.5 inches annually. Of this, 72 percent occurs from May through October. Based on the precipitation and lake evaporation values, there is a net annual evaporation rate of about 4 inches in the SFC area.

The most severe storms occur in the spring, although thunderstorms are also frequent during the summer months. Strong winds, heavy precipitation, and intense lightning may be associated with these storms.

The nearest Sequoyah County weather station is in the town of Sallisaw, Oklahoma. There is no national weather station in the immediate vicinity. Meteorological data may be obtained from the national weather station at Tulsa, Oklahoma, about 70 miles northwest, and at Fort Smith, Arkansas, about 40 miles east. Fort Smith, Arkansas is the closest data station having similar topographic and climatological characteristics as the Facility.

Sequoyah Fuels Corporation MFG Inc.

ftflln C1.. R...r, Cb..i.. fi d 28 October 2002

3.0 DECOMMISSIONING PLAN In 1996, a study of remediation alternatives was submitted in the Final Decommissioning Alternatives Study Report [FDASR] (SFC, 1998b). This study identified an on-site disposal cell as the preferred decommissioning and waste management alternative. As part of the closure process for the SFC Facility, several site characterization studies, briefly summarized in Section 1.1 of this report, also have been performed. The most recent of these studies, submitted to NRC in 1998 (SFC, 1998a), included technical analysis and description of the Facility's radiological contamination. In 1999, SFC resubmitted the Decommissioning Plan (SFC, 1999) that incorporated the technical specifications of the selected reclamation alternative screened in the FDASR.

Based on current site characterization data, it is expected that approximately 5.1 million cubic feet of radiologically and/or chemically impacted materials will be addressed during the decommissioning of the SFC Facility (SFC, 1999). This material is to be placed in an on-site engineered disposal cell.

The conceptual design of the engineered disposal cell includes excavation of Facility soils above the site-specific derived concentration guideline levels (DCGLs) (>1 10 pCi/g natural uranium, 12 pCi/g Th-230, 1.8 pCi/g Ra-226), solidification and stabilization (S/S) of highly impacted soils (>440 pCi/g) with fly ash and cement and placement in a 10-acre monolithic cell with an engineered cover. The engineered cover consists of a 48-inch thick rock layer successively underlain by a 6-inch bedding layer, a 6-inch sand filter layer, a 6-inch gravel drainage layer and a 48-inch thick compacted clay infiltration and radon barrier. The clay barrier is designed to have a hydraulic conductivity of 1 xl0-7 cm/sec or less while the S/S materials are expected to have hydraulic conductivities on the order of 1.9 x10 6 cm/sec to 5 x10-5 cm/sec (SFC, 1998b).

The proposed design does not include an engineered liner but rather relies on evapotranspiration, the low permeability and high drainage characteristics of the engineered cover and the low permeability characteristics of the S/S wastes and underlying geologic materials to reduce infiltration and seepage. The estimated annual average steady-state seepage though the infiltration/radon barrier and out the bottom of the disposal cell is estimated to be 1.18 inches or slightly more than 317,000 gallons. The gravel drainage layer is anticipated to intercept Sequoyah Fuels Corporation MFG Inc.

,12,,- - ,..*- ,&--- 29 October 2002

approximately 19 inches of infiltration per year. This intercepted water will be collected in a drainage ditch on the east side of the cell or will flow away from the cell as sheet flow on the cell north, west and south aspects.

A treatability study evaluated the leaching characteristics of the S/S materials using a modified version of the American National Standard for the Measurement of the Leachability of Solidified Low-Level Radioactive Wastes by a Short Term Procedure (ANSJIANS-16.1),(Earth Sciences Consultants, 1998). This study, performed on a variety of S/S feedstock samples of the various decommissioning materials, indicated that there is essentially no significant leaching of uranium or arsenic from the S/S materials. This is an expected result given the high pH buffering capacity and the high cation exchange capacity of the fly ash and cement matrix associated with the S/S materials as well as the low mobility of these constituents in the natural environment.

The S/S materials are not anticipated to have high nitrate concentrations and therefore are not anticipated to contribute significant amounts of nitrate to the seepage waters from the disposal cell.

The NRC is currently conducting an environmental review of the proposed decommissioning alternative and will develop an environmental impact statement (EIS) to determine whether the alternative proposed by the company for remediation of the Facility is acceptable. The EIS will evaluate the potential impacts of the licensee's proposal, including the effects on water resources, air quality, ecological resources, socioeconomic and community resources, human health, noise, and environmental justice. The EIS will also discuss the option of disposing of the contaminated material off-site in a licensed disposal facility.

Sequoyah Fuels Corporation MFG Inc.

,.- ,.m ,-. 30 October 2002

4.0 SITE INVESTIGATION SMI performed a site characterization investigation to more accurately characterize the hydrogeology and geochemistry of the Facility. Specifically, SMI acquired stratigraphic information at various site locations, data to characterize the hydrologic properties of the various hydrological units on the site, and rock samples for geochemical testing and analysis. The primary field investigation, included borehole core logging, rock sampling, hydrological unit testing, and groundwater sampling, and was conducted at SFC from May 14, 2001 to June 6,.

2001. Furthermore, SMI contracted Hasbrouck Geophysics, Inc, of Montrose, Colorado, to perform an electrical resistivity geophysical survey at selected Facility locations. This work was performed pursuant to the Hydrogeochemical Characterization Work Plan for the Sequoyah Fuels Company site, Gore, Oklahoma, (SMI, 2001). The 'Workplan, along with the Health and Safety Plan used during the field study, is included in Appendix A.

A supplemental field investigation was conducted from February 7 through February 13, 2002 to address specific issues raised by the NRC. The objectives of the supplemental investigations were to investigate 1) increasing arsenic concentrations in well MW095A, 2) anomalous uranium and arsenic water chemistry data in 005 Stream, and 3) the delineation and characterization of the hydrogeologic and geochemical conditions associated with the subsurface swale near well MWO10. The investigation consi'sted of hydrologic testing of stratigraphic units, geochemical testing of groundwater samples and lithologic materials, and trench/test pit excavation. A complete discussion of the conduct and findings of the supplemental investigation are presented in the Supplemental Data Investigation Trip Report in Appendix B.

The following sections address the specific components of the field investigation including drilling and sampling of boreholes, the installation and hydrologic testing of monitoring wells, and the electrical resistivity testing. Discussion of the geochemical sampling and analysis of borehole materials, test pits, and groundwater is presented in Section 5.0.

Sequoyah Fuels Corporation MFG Inc.

.... ý . , j -.- p 31 October 2002

4.1 Borehole Drilling, Sampling, and Monitoring Well Installation Fourteen boreholes and 11 monitoring wells were installed between May 14, 2001 and June 6, 2001 to facilitate site hydrogeologic and geochemical characterization. The borehole and well locations, the specific stratigraphic units targeted, and specific objectives for the boring locations proposed in the original work plan are included in Appendix A. The locations of the borehole and monitoring wells are shown on Figure 4-1. Boreholes and monitoring wells were numbered sequentially in the order they were drilled starting at borehole 327 (BH-327) and monitoring well 110A (MW1l0A). Table 4-1 summarizes the borehole and monitoring well location information. The coordinates and elevations of the monitoring wells, determined by survey following completion of the monitoring wells, are presented in Table 4-2. Borehole survey information is presented in Table 4-3. A summary of borehole depths and the intervals of geologic units encountered in the boreholes are presented in Table 4-4.

4.1.1 Drilling and Construction Methods 4.1.1.1 Monitoring Well Drilling, Construction, and Development Methods Borehole and monitoring well drilling, monitoring well construction, and well development were performed in accordance with the following standard operating procedures (SOP) specifi&d in the Work Plan (see Appendix A), except where deviations were required due to specific field conditions:

SOP No. 1 Groundwater Monitoring Well Installation SOP No. 2 Monitoring Well Development SOP No. 3 Equipment Decontamination Specific deviations from the methods specified in the SOPs are described under the applicable monitoring well subsection. SOPs are included in Appendix A.

4.1.1.2 Borehole/Monitoring Well Drilling Methods Drilling was performed according to SOP No. 1 (Groundwater Monitoring Well Installation) by Peterson Drilling and Testing, Inc. of Amarillo, Texas. The lithologic boreholes were drilled Sequoyah Fuels Corporation MFG Inc.

.. ... . . ,32 October 2002

using a Mobile B-61 drill rig with hollow stem augers and wireline coring. An Ingersoll Rand T3W drill rig with an air rotary drilling method was used to install monitoring wells.

Fourteen boreholes were drilled with the Mobile B-61 using hollow stem augers and continuously sampled with a 2-foot long Moss split spoon sampler and wireline coring.

Continuous soil samples or rock cores were collected with either split spoon samplers or a 10-foot core barrel. Soil samples collected during hollow stem auger drilling were double bagged in 1-gallon Ziploc plastic bags. Rock core was placed in core boxes. Coring initially utilized air-coring methods but water inflow prevented proper circulation and subsequent coring was done with water. Selected core samples from boreholes BH-330, BH-332, BH-333, BH-334, and BH-339 were double bagged and preserved with dry ice for geochemical testing (see Sections 4.1.2.11 through 4.1.2.14).

The Ingersoll Rand T3W rig used air rotary drilling and casing advance drilling methods to install all monitoring wells, except MWI17 and MW120. MW117 and MW120 were installed utilizing the Mobil B-61 and the hollow stem auger method.

4.1.1.3 Monitoring Well Construction Methods Monitoring wells were constructed according to the methods specified in SOP No. 1. Well completion diagrams that include documentation of the materials used, and dimensions of the well screen, well casing, sand pack, seals, etc., are provided in Appendix C. Table 4-5 presents monitoring well completion details of installed wells. Monitoring wells were constructed in open boreholes or within the hollow stem augers or temporary steel casing advanced during the air rotary drilling. The augers/steel casing was removed incrementally as the monitoring wells were constructed.

Two-inch nominal diameter flush-threaded Schedule 40 PVC blank well casing, slotted well screen, and threaded end caps were installed in the boreholes. The screen slot size for the 2-inch screens was 0.020 inch. All well screen and blank casing were kept in the manufacturer's plastic protective wrapping and stored off the ground until the time of use. Clean gloves were used when handling the screen and casing. The lengths of the blank casing, screen, and bottom caps Sequoyah Fuels Corporation MFG Inc.

P-,.., - ._, ., -- P, d._ 33 October 2002

were measured to the nearest 0.1-foot before installation. Centralizers were installed to ensure proper filterpack installation, except for wells constructed in hollow stem auger boreholes (MW117 and MW120).

Oglebay Norton Sand Company's 10-20 silica sand was installed as the filter pack by gravity placement into the annular space between the PVC casing and the borehole to above the top of the screen. The filter pack was installed through either the hollow stem augers or the temporary steel casing when present. The hollow stem augers or the temporary steel casing were removed incrementally as the filter pack was installed. Filter pack depths and volumes were verified by measuring with a weighted tape. Sand pack depths and volumes were monitored to ensure that any bridging would be detected.

A bentonite seal was installed on top of the filter pack. The bentonite seal was constructed from either bentonite pellets and/or medium chip bentonite. The bentonite pellets consisted of Cetco Coated Tablets 3/8 inch coated bentonite pellets. The depth of the bottom (Top of Sand Depth, Table 4-5) and top of bentonite seal for each monitoring well are provided in Table 4-5. Both bentonite chips and pellets were gravity placed by pouring from the surface. After bentonite installation, water was added if the borehole was dry and the bentonite was allowed to hydrate before proceeding with grout placement. The temporary steel casing/augers were removed incrementally as the bentonite was installed. Bentonite depths were verified using a weighted tape. Bentonite depths and volumes above the filter pack were monitored to ensure that any bridging would be detected.

A cement/bentonite grout surface seal was installed in each monitoring well from the top of the bentonite to the ground surface. The cement/bentonite grout consisted of Class C oil well cement, three to five percent bentonite powder by weight, and approximately eight gallons of water per bag of cement. The grout was installed by pumping through a 2-inch nominal diameter hose that was installed above the top of the bentonite. The temporary steel casing/augers were removed incrementally as the cement/bentonite grout was installed.

Protective steel casings with lockable caps were installed above ground surface after completing each monitoring well. Cement/bentonite grout was installed inside the protective casing to above Sequoyah Fuels Corporation MFG Inc.

... R._ . ".,,.

, 34 October 2002

ground surface and a weep hole was drilled through the protective casing above the top of the grout. The weep hole was drilled to prevent the accumulation of water in the annulus between the PVC well casing and the protective steel casing. A 3-foot diameter cement surface pad was constructed around the protective casing.

4.1.1.4 Monitoring Well Development Methods Development of the monitoring wells was performed according to SOP No. 2 (Monitoring Well Development). Each well was initially surged with a bailer. The entire length of the screen was surged with a bailer starting at the top of the screen and working toward the bottom. After surging, any accumulated sediment at the bottom of the screen was removed using a bailer. The monitoring wells were surged and bailed until sediment production had stabilized or ceased. An electric submersible pump was installed in monitoring wells with sufficient production rate (MW1 10A and MW120) after bailing. The monitoring wells were surged again by alternately turning the pump on to lower the water level and then off to allow partial or full recovery of the water level. After surging, the well was pumped until the turbidity stabilized. A summary of pertinent well development data is provided in Table 4-6. Table 4-7 presents static water level data measured after development. Minimal water production combined with the drilling method (air rotary) resulted in monitoring wells that will continue to yield silt if strongly surged. Great care should be exercised when purging and collecting groundwater samples not to surge the well to minimize silt production.

4.1.2 Borehole and Monitoring Well Characteristics and Specifications Individual monitoring well characteristics and specifications are presented in this section in chronological order of installation. In addition, any deviations from the SOPs are noted. Table 4-5 summarizes as-built data for the installed monitoring wells. Appendix C presents monitoring well completion diagrams. Figure 4-1 shows the borehole/well locations as proposed in the work plan, and the actual locations of the completed monitoring wells and boreholes.

Sequoyah Fuels Corporation MFG Inc.

...... . R .-- .. .,.

u. 35 October 2002

4.1.2.1 Monitoring Well MW11OA and Borehole BH-327 Borehole BH-327 was drilled to 50 feet below ground surface (bgs) at Location No. 4 on May 16, 2001. The borehole log for BH-327 is included in Appendix C. Monitoring well MW1 10A was drilled on May 19, 2001 to a depth of 45 feet bgs with an 8.5-inch nominal outside diameter (OD) air hammer.

Following completion, MW1 1OA was developed by bailing/surging with a bailer followed by surging/purging with a RediFlo2 pump. A total of 80 gallons was purged during development.

Although recovery rates are slow, MW1 1OA could not be bailed completely dry. Static water level measured in MW1 1OA on June 13, 2001 was 19.4 feet below the top of PVC casing, or 533.19 feet amsl.

Monitoring well MW1 1OA was completed as a background monitoring well within the Unit 4 Shale. The Unit 4 Shale was encountered from 24.2 to 40.6 feet bgs in BH-327. The filter pack interval for monitoring well MW1l0A was 32.0 to 45.0 feet bgs. Monitoring wells were originally to be completed in both the Unit 2 and Unit 3 shales. Due to the limited thickness and lack of water in the Unit 2 Shale and the Unit 3 Shale, monitoring wells were not completed in those units at Location No. 4.

4.1.2.2 Monitoring Well MW111A and Borehole BH-328 Borehole BH-328 was drilled to 48 feet bgs at Location No. 2 on May 17, 2001. The borehole log for BH-328 is included in Appendix C. There was no recovery between 20 and 26 feet bgs in BH-328 due to a clayey gravel and excessive water inflow. Monitoring well MW 11A was drilled on May 19, 2001 at Location No. 2 to a depth of 38 feet bgs with an 8.5-inch nominal OD air hammer. The borehole would not remain open for well completion due to water inflow from the alluvium. On May 21, 2001, 8 5/8-inch OD threaded steel casing was installed with a casing hammer to 38.5 feet bgs. Monitoring well MW1 1 A was then completed within the steel casing, incrementally removing the steel casing as the monitoring well was constructed.

Following completion, MW1 1IA was developed by bailing/surging with a bailer. A total of 24.75 gallons was purged during development. Although recovery rates are slow, MW 1 A Sequoyah Fuels Corporation MFG Inc.

. c. ~36 October 2002

could not be bailed completely dry. Static water level measured in MW 11A on June 15, 2001 was 15.17 feet below the top of PVC casing or 465.03 feet amsl.

Monitoring well MW1 1 A was completed within the Unit 4 Shale. The Unit 4 Shale was encountered from about 26 feet to 39.4 feet bgs in BH-328. The filter pack interval for Monitoring Well MW1 1IA was located 28.9 to 38.5 feet bgs.

4.1.2.3 Monitoring Well MW112A and Borehole BH-329 Borehole BH-329 was drilled to 41 feet bgs at Location No. 6 on May 17, 2001. The borehole log for BH-327 is included in Appendix C. Monitoring well MW1 12A was drilled on May 20, 2001 atLocation No. 6 to a depth of 32.4 feet bgs with an 8.5-inch nominal OD air hammer.

Following completion, MW1 12A was developed by bailing/surging with a bailer. A total of 41 gallons was purged during development. Although recovery rates are slow, MW1 12A could not be bailed completely dry. Static water level measured in MW1 12A on June 12, 2001 was 17.11 feet below the top of PVC casing or 465.77 feet amsl.

Monitoring well MW1 12A was completed as a monitoring well within the Unit 4 Shale. The Unit 4 Shale was encountered from 15.2 to 33.0 feet bgs in BH-329. The filter pack interval for Monitoring well MW1 12A was located 18.9 to 32.4 feet bgs. The alluvium at Location No. 6 was found to be dry and an alluvial monitoring well was not installed.

4.1.2.4 Monitoring Well MW113A and Borehole BH- 331 Borehole BH-331 was drilled to 42 feet bgs at Location No. 5 on May 20, 2001. The borehole log for BH-331 is included in Appendix C. Monitor well MW1 13A was drilled on May 21, 2001 at Location No. 5 to a depth of 42.5 feet bgs with an 8.5-inch nominal OD air hammer.

Following comPletion, MW1 13A was developed by bailing/surging with a bailer. A total of 32.5 gallons was purged during development. Although recovery rates are slow, MW1 13A could not be bailed completely dry. Static water level measured in MW1 13A on June 12, 2001 was 2.8 feet below the top of PVC casing or 498.80 feet amsl.

Sequoyah Fuels Corporation MFG Inc.

..... . . c-.. a.. 37 October 2002

Monitoring well MW1 13A was completed as a monitoring well within the Unit 4 Shale. The Unit 4 Shale was encountered from 20.0 to 42.0 feet bgs in BH-33 1. The filter pack interval for Monitoring well MW1 13A was located 22.4 to 41.2 feet bgs. The alluvium at Location No. 5 was found to be dry and an alluvial monitoring well was not installed.

4.1.2.5 Monitoring Well MW114A Monitoring well MW1 14A was the second Unit 4 Shale monitoring well at Location No. 2 (see Section 4.1.2.2). MW114A was drilled on May 23, 2001 at Location No. 2 to a depth of 38.95 feet bgs with a 9-inch nominal OD casing hammer. Monitoring well MW1 14A was drilled using 8 5/8-inch OD threaded steel casing and a casing hammer to 38.95 feet bgs, and was then completed within the steel casing. The casing was removed incrementally as the monitoring well was constructed.

Following completion, MW1 14A was developed by bailing/surging with a bailer. A total of 15.5 gallons was purged during development. Monitoring well MWl 14A was easily bailed dry.

Static water level measured in MW1 14A on June 15, 2001 was 15.34 feet below the.top of PVC casing or 464.749 feet amsl.

Monitoring well MW1 14A was completed within the Unit 4 Shale. The Unit 4 Shale was encountered from about 26 feet to 39.4 feet bgs in BH-328. The filter pack interval for monitoring well MW1 14A was located 29.0 to 38.95 feet bgs.

4.1.2.6 Monitoring Well MW115A and Borehole BH-335 Borehole BH-335 was drilled to 18 feet bgs at Location No. 11 on May 31, 2001. The borehole log for BH-335 is included in Appendix C. Monitor well MW1 15A was drilled on June 1, 2001 at Location No. 11 to a depth of 15.0 feet bgs with an 8.5-inch nominal OD air hammer. A bentonite chip seal was installed from 13.0 to 15.0 feet bgs due to overdrilling.

Following completion, MW1 15A was developed by bailing/surging with a bailer. A total of 0.6 gallons was purged during development. Although there was initially some recovery during Sequoyah Fuels Corporation MFG Inc.

...... ,- .. 38 October 2002

development, the purged water was water added during monitoring well completion. Monitoring well MW1 15A was dry when measured on June 16, 2001.

Monitoring well MW1 15A was completed within the Unit 3 Shale. The Unit 3 Shale was encountered from 5.9 to 13.0 feet bgs in BH-335. The filter pack interval for monitoring well MW1 15A was located 6.0 to 13.0 feet bgs.

4.1.2.7 Monitoring Well MWl16A and Borehole BH-336 Borehole BH-336 was drilled to 20.2 feet bgs at Location No. 14 on June 1, 2001. The borehole log for BH-336 is included in Appendix C. Monitoring well MW1 16A was drilled on June 2, 2001 at Location No. 14 to a depth of 14.2 feet bgs with an 8.5-inch nominal OD air hammer.

Following completion, MW1 16A was developed by bailing/surging with a bailer. A total of 4.5 gallons was purged during development. The purged water was the water added during monitoring well completion. Monitoring well MWI 16A was dry when measured on June 13, 2001.

Monitoring well MW1 16A was completed as a monitoring well within the Unit 2 Shale. The Unit 2 Shale was encountered from 7.5 to 11.0 feet bgs in BH-336. The filter pack interval for Monitoring well MW1 16A was located 7.0 to 14.34 feet bgs. Due to the length of the screen (5 feet) and the limited Unit 2 Shale thickness (3.5 feet), the filter pack extends above Unit 2 Shale into the Unit 1 Sandstone and below the Unit 2 Shale into the Unit 2 Sandstone.

4.1.2.8 Monitoring Well MW117 and Borehole BH-338 Monitoring well MW1 17 was placed at Location No. 12 on June 2, 2001. Heaving sands at 6 feet precluded ready well installation. This initial location for MW 17 was abandoned and designated BH-338. The borehole log for BH-338 is included in Appendix C. MW 17 was installed on approximately 120 feet north of BH-338 to a depth of 15.53 feet bgs on June 2, 2001. MW1 17 was drilled with hollow stem augers with an 8-inch nominal outside diameter. A bentonite chip seal was placed from 14.6 to 15.53 feet bgs due to overdrilling.

Sequoyah Fuels Corporation MFG Inc.

..... .. *. -. 39 October 2002

Following completion, MW1 17 was developed by bailing/surging with a bailer. A total of 6 gallons was purged during development. Monitoring well MW1 17 was bailed dry. Static water level measured in MWl 17 on June 12, 2001 was 12.14 feet below the top of PVC casing or 475.97 feet amsl.

MW- 117 was completed as a monitoring well within the alluvium. Drilling proceeded until bedrock was encountered, and the well was placed in the overlying alluvium. The filter pack interval for monitoring well MW1 17 was located 7.59 to 14.6 feet bgs.

4.1.2.8 Monitoring Well MWI18 Monitoring well MW1 18 was installed on June 2, 2001 at Location No. 1 to a depth of 7.34 feet bgs within the open borehole. Monitoring well MW1 18 was drilled with an 8.5-inch nominal OD air hammer.

MW1 18 was dry following completion and when the static water level was measured in on June 13, 2001.

Monitoring well MW1 18 was completed within the alluvium. Drilling proceeded until bedrock was encountered, and the well was placed in the overlying alluvium. The filter pack interval for monitoring well MW1 18 was located at 1.5 to 7.34 feet bgs.

4.1.2.9 Monitoring Well MW119A and BH-337 Borehole BH-337 was drilled to 14 feet bgs at Location No. 13 on June 1, 2001. The borehole log for BH-337 is included in Appendix C. Monitor well MW1 19A was drilled on June 2, 2001 at Location No. 13 to a depth of 14.5 feet bgs with an 8.5-inch nominal OD air hammer.

Monitor well MW1 19A is approximately 100 feet west of BH-337.

Following completion, MW1 19A was developed by bailing/surging with a bailer. A total of four gallons was purged during development. The purged water was the water added during monitoring well completion. Monitoring well MW1 19A was dry when measured on June 16, 2001.

Sequoyah Fuels Corporation MFG Inc.

R,,.,.,,..40 October 2002

Monitoring well MWl 19A was completed within the Unit 2 Shale. The Unit 2 Shale was encountered from 7.0 to 10.0 feet bgs in BH-337. Drilling indicated that the Unit 2 Shale was encountered from 7 to 10.9 feet bgs at the MWl 19A location, consequently the filter pack was located 7.0 to 14.0 feet bgs.

4.1.2.10 Monitoring Well MW120 Monitoring well MW120 was the third well installed at Location No. 2. See BH-328 (Appendix C) for the borehole log for Location No. 2. Monitoring well MW120 was drilled to 24.0 feet bgs on June 4, 2001 within the 81/4A-inch outside diameter hollow stem augers. MW120 was completed with alluvium. Heaving sands and filterpack bridging were encountered during well completion.

Following completion, MW120 was developed by bailing/surging with a bailer followed by surging/purging with a RediFlo2 pump. A total of 270 gallons was purged during development.

Static water level measured in MW120 on June 15, 2001 was 14.99 feet below the top of PVC casing or 465.18 feet amsl.

4.1.2.11 BH-330 Borehole BH-330 was drilled to 53.5 feet bgs at Location No. 9 on May 18 and 19, 2001. The borehole log for BH-330 is included in Appendix C. Unit 3 Shale was encountered from 20.4 to 23 feet and Unit 4 Shale was encountered between 29.7 and 46.1 feet. Core samples of Unit 3 Shale and Unit 4 Shale were recovered for geochemical testing.

4.1.2.12 BH-332 Borehole BH-332 was drilled to 16 feet bgs at Location No. 10 on May 19 and 21, 2001. The borehole log for BH-332 is included in Appendix C. Unit 1 Shale was encountered from 10 to 16 feet, and core samples of Unit 1 Shale were recovered for geochemical testing.

Sequoyah Fuels Corporation MFG Inc.

41 October 2002

4.1.2.13 BH-333 and BH-334 Borehole BH-333 was drilled to 28 feet bgs at Location No. 7 on May 20 and 21, 2001. The borehole log for BH-333 is included in Appendix C. Unit 1 Shale was encountered from 4.4 to 19 feet. Split spoon samples of Unit 1 Shale were recovered for geochemical testing. Refusal occurred at 19 feet. Unit 2 Shale was encountered between 25.8 and 27.1 feet, and core samples of Unit 2 Shale were recovered for geochemical testing. The low recovery rates and high degree of difficulty of drilling prompted abandonment of BH-333. Drilling of borehole BH-334 occurred on May 22, 2001. BH-334 is located approximately 15 feet south of BH-333. BH-334 was blind drilled to refusal at 21 feet, when core sampling began. Core sampling occurred from 21 to 23.5 feet, until drilling circulation within the hole was lost. Unit 2 Shale was encountered between 23.0 and 23.5 feet. Core samples of Unit 2 Shale were recovered for geochemical testing. The coring tool was replaced with driving split spoons, but encountered immediate refusal. BH-334 was subsequently abandoned, and no further core sampling occurred at Location No. 7.

4.1.2.14 BH-339 and BH-340 Borehole BH-339 was drilled to 49 feet bgs at Location No. 8 on June 2 and 3, 2001. The borehole log for BH-339 is included in Appendix C. Unit 2 Shale was encountered from 12.5 to 21 feet bgs. Core samples of Unit 2 Shale (1.8 feet) were recovered for geochemical testing.

Unit 3 Shale was encountered between 26.9 and 30 feet. Unit 4 Shale was encountered between 36.5 feet and the bottom of the boring. Core samples of Unit 3 Shale and Unit 4 Shale were recovered for geochemical testing. In an attempt to obtain more core sample from the Unit 2 Shale, Borehole BH-340 was drilled approximately three feet west of BH-339 on June 3, 2001.

BH-340 was blind drilled to refusal at 12 feet, when core sampling began. Sandstone with approximately 0.05 feet of highly weathered, clayey shale (at the bottom of the core) was encountered from 12 to 14 feet. No rock was recovered from 14-15.5 feet and BH-340 was subsequently abandoned without recovery from Unit 2 Shale for geochemical testing.

Sequoyah Fuels Corporation MFG Inc.

..... -- P--- -- RP 42 October 2002

4.2 Hydrologic Testing The hydrologic testing program was conducted in June 2001 in order to evaluate the hydrologic properties and conditions in the shallow geology across the Facility. The work consisted of slug tests and the water level measurements conducted in wells screened in only a single hydrologic unit. Other methods to evaluate hydrologic properties (pumping, tracer tests) were not conducted due the inability to obtain sustainable discharge rates from the majority of the wells at the Facility. Four additional slug tests were performed in wells completed in a single unit as part of the supplemental field investigation. Based on the SMI borehole drilling program and review of previous hydrologic investigations (RSA, 1991), five primary hydrologic units have been identified in the shallow geology at the Facility. These primary hydrologic units are Arkansas/Illinois River alluvium (alluvium), terrace/Unit 1 Shale, Unit 2 Shale, Unit 3 Shale, and Unit 4 Shale. The objective of the SMI hydrologic testing program is to individually evaluate properties and conditions of each of the five primary hydrologic units.

Slug tests were performed on a total of 24 existing and newly installed wells in order to develop representative estimates of horizontal hydraulic conductivity for each of the hydrologic units.

Location of the slug tests is presented in Figure 4-2. Discussion of the field procedures and analytical methodology is presented in Appendices B and C.

Slug tests were also conducted at the Facility by SFC in 1991 (RSA, 1991). Although a total of 35 slug tests were conducted during this investigation, only seven tests were performed in wells that are screened in a single hydrologic unit. Therefore, only these seven wells are included in the evaluation of hydraulic conductivity of the five primary hydrologic units.

Table 4-8 presents the slug test results from each well. Estimates of hydraulic conductivity range from 19.9 ft/day to 0.0042 ft/day. Table 4-9 presents the average, maximum, and minimum calculated conductivity value from each hydrologic unit. The results indicate that the hydrologic units are highly heterogeneous, as the conductivity ranges by as much as three orders of magnitude in a single unit. The variability in conductivity does not appear to represent any geospatial patterns, nor do values appear to relate to any geological features at the Facility. The Sequoyah Fuels Corporation MFG Inc.

P..... . ,,.' "-6.--. 43 October 2002

variability in conductivity can be attributed to heterogeneous (clay, sand, silt) alluvial deposits, and to small-scale fracture patterns in the shale units.

4.3 Resistivity Survey A previous study (RSA, 1991) indicated that high concentrations of uranium existed in wells near the southwest corner of the main process building, mainly in MW010. SFC proposed that the primary cause of the high uranium concentrations might be due to movement from the vicinity of the solvent extraction building through a shallow (less than 30 feet deep), southward trending paleochannel (RSA, 1991). In order to further evaluate this potential transport mechanism, SMI contracted Hasbrouck Geophysics, Inc of Montrose, Colorado, to perform a series of electrical resistivity surveys to aid in locating any possible paleochannels.

The electrical resistivity survey was completed along five east-west trending survey lines from south of the yellowcake storage pad (Line 4, see Line Location Map, Appendix D) to east of the Fertilizer Pond Area (Line 1, see Line Location Map, Appendix D). An additional survey was performed along a line west of Pond 1 (Line 6, see Line Location Map, Appendix D) to constrain any possible eastern extension of the 005 Stream. Complete results of the resistivity survey are included in Appendix D. The survey detected high electrical resistivity at several subsurface locations south of the Process Area. These resistivity anomalies were interpreted as sands or sands with gravel, fluvial-type deposits typically found in paleochannels. SMI completed boreholes BH-336 and BH-337 along resistivity survey lines 1 and 3, respectively, to determine if the high resistivity at these locations represented fluvial-type deposits. No fluvial-type deposits were found at either borehole, therefore it is unlikely that the high resistivity represent paleochannels. It is possible that the high resistivity found may represent well-cemented sandstones (see Appendix D). Furthermore, no groundwater was encountered in these boreholes, therefore no contaminant transport can occur there. The results of the resistivity survey along two survey lines within the Process Area (Lines 4 and 5, Line Location Map, Appendix D) show no evidence of higher resistivity at depth, indicating no paleochannel exists within the Industrial Area downgradient of the restricted area.

Sequoyah Fuels Corporation MFG Inc.

..... a,,. j.i. 44 October 2002

4.4 Trenches and Test Pits Trenches and test pits were excavated in the 005 Stream and MW010 swale areas in order to estimate local stratigraphy and collect groundwater and lithologic samples. In the 005 Stream area a trench was excavated in the fill materials at the head of the 005 Stream between the Emergency Basin and the existing 005 Sump, south of Fluoride Holding Basin No. 2. The buried channel bottom was encountered at approximately six to eight feet deep. Stratigraphy observed in the trench consisted of a hard sandstone unit overlain by one to two feet of clay.

Based on its elevation and lateral occurrence, the sandstone is believed to be Unit 3 Sandstone and the overlying clay is interpreted to be weathered remnants of Unit 3 Shale. Overlying the clay/weathered shale unit is a one-foot thick layer of gravel with clay. This unit is interpreted to be the basal gravel on which fill or gravelly fill material was placed in the old 005 Stream bottom. Small pits were also excavated down to sandstone bedrock along the margins of the 005 stream. Soil and groundwater samples were collected from the trench and the pits.

The excavation of a trench and several test pits was also conducted in the MWO10 swale area.

The swale is essentially a small surface drainage channel that was covered with local fill materials at the time of facility construction and is suspected of significantly influencing groundwater flow. The trench and pit were excavated down to sandstone bedrock or refusal.

Geologic mapping of the material encountered in each pit was conducted. In particular, a lens of well-rounded, well-sorted river gravel was encountered just above sandstone bedrock. Soil and groundwater samples were collected from the gravel and the overlying fill. The potentiometric head in the gravel and overlying fill were also estimated.

Two pits were excavated into un-impacted terrace materials east of Highway 10. Soil and water samples from these locations were collected to develop Kd values for the terrace materials using batch tests. Detailed discussion of results and findings of the supplemental investigation is presented, in Appendix B.

Sequoyah Fuels Corporation MFG Inc.

...... -. . . .. R.o.f.. 45 October 2002

5.0 GEOCHEMICAL TESTING AND ANALYSIS 5.1 Introduction Detailed geochemical analyses of shale and colluvial samples, terrace material and groundwater from the SFC Facility were undertaken to: (1) characterize the sedimentary mineralogy and aqueous geochemistry of the groundwater system, and (2) determine partition coefficients (Kd) for uranium (U) and arsenic (As) that can be used in the hydrologic transport model. These detailed analyses are used in conjunction with the geochemical equilibrium speciation model PHREEQC (Parkhurst and Appelo, 1999) to improve our understanding of the factors controlling the concentrations and transport of U and As in the groundwater system. The mineralogical analyses, geochemical groundwater characterization, and geochemical modeling are integrated to better understand factors controlling fluoride (F), U, As, and nitrate (NO 3) concentrations in groundwater.

5.2 Methods of Mineralogical Analyses Mineralogical analyses were carried out on selected core samples collected from Unit 1, 2, 3, and 4 shales during the May .2001 drilling program (Table 5-1). The SOPs used to collect the samples are outlined in Appendix A. The objectives of these analyses were to characterize the bulk mineralogy of the samples to understand potential mineral-water interactions that might control the concentrations and transport of U and As. The mineralogical analyses were used in conjunction with detailed groundwater analyses and geochemical speciation modeling to improve the conceptual geochemical model for the hydrologic system and to support the basis for predictive constituent transport modeling.

The bulk mineralogical characterization of the shale samples was made using X-ray diffraction (XRD) analysis. The XRD analyses were carried out by SMI personnel at the Department of Geology and Geological Engineering at the Colorado School of Mines (Golden, Colorado). The samples were prepared as oriented mounts and analyzed using an automated Scintag diffractometer, Cu-Ka radiation, and a curved graphite monochromator on the diffracted beam path. Ethylene glycol solvation was carried out to identify possible interstratification of phyllosilicate minerals. The samples were routinely run from 5.0 to 60.0 degrees 20 at 2.00 per Sequoyah Fuels Corporation MFG Inc.

...... . ,ý ... . 46 October 2002

minute. Mineral phases were identified with XRD by comparing distances between diffraction planes to those of reference standards based on International Centre for Diffraction Data (1993).

5.3 Methods of Chemical Analyses Chemical analyses were carried out on solid and water samples collected from the SFC Facility to: (1) determine partition coefficents (K4d) for U and As for use in the hydrologic transport model, and (2) perform geochemical speciation calculations using data collected from groundwater wells to understand potential geochemical controls on U, As, F and NO3 migration through the hydrologic units. Partition coefficients were determined experimentally in the laboratory using two methodologies. Geochemical speciation modeling was carried out using data collected from selected groundwater wells during the SMI field investigation in June 2001.

5.3.1 Determination of Partition Coefficients (Kd) for Uranium and Arsenic The transport of any contaminant in a groundwater system is dependent on hydrological parameters such as advection and dispersion, as well as numerous physiochemical and biological processes, including sorption/desorption, precipitation/dissolution and oxidation/reduction. In sum, these processes determine the rate and extent of contaminant transport within a given system. The simplest and most common method of estimating contaminant retardation (Rf) is based on Kd values (EPA, 1999). Kd is a measure of the partitioning of a contaminant between the solid and aqueous phases and is defined as the ratio of the contaminant concentration associated with the solid phase to the concentration of the contaminant in the aqueous phase at equilibrium as described by equation [1]. The Kd parameter is often used in predicting the potential for contaminant retardation due to adsorption of the dissolved contaminant to the soil matrix.

Kd (mL /Igm) Mass of adsorbate sorbed /gram _ Pg / gm [1]

Mass of adsorbate in solution ug / mL There are certain inherent assumptions associated with the Kd models, many of which are violated in the common procedures used to measure Kd values for use in contaminant transport codes. In addition, there are numerous issues such as chemical nonequilibrium, field variability, Sequoyah Fuels Corporation MFG Inc.

47 October 2002

and the "gravel" and "colloid" issues that make the determination of an appropriate Kd difficult (EPA, 1999). Despite the-many problems associated with determining an appropriate Kd, the partition coefficient is widely used in contaminant transport codes for predicting the rate and extent of contaminant migration.

During the development of the transport model, several methods were used to determine appropriate KI values that could be used to reasonably model arsenic and uranium transport at the Facility. Sections 5.3.2 and 5.3.3 discuss the methodology used during these studies to define a Kd. Sections 5.8 and 5.9 discuss specific conditions present at this site that made the use of a constant, experimentally derived Kd value impractical at this Facility.

5.3.2 Laboratory Determination of Partition Coefficients (Kd) 5.3.2.1 Batch Desorption Tests During the course, of the geochemical characterization, two laboratory methods were used to arrive at Kd values. In the initial site characterization study, laboratory batch tests were used to determine KI values for U and As for use in the hydrologic transport model. Laboratory batch tests are commonly used to measure Kd values because they can be completed quickly for a wide variety of elements and chemical environments (EPA, 1999). Typically, the laboratory batch test consists of equilibrating a known mass of solid with a solution containing a known mass of contaminant (ptg/ml) and determining the quantity of the contaminant sorbed onto the solid phase. One disadvantage of the batch Kd determination is that the method, as described by the EPA (1999), does not accurately simulate desorption of constituents from contaminated soils.

Therefore, the batch test procedure was modified during some experiments to simulate long-term rinsing, or desorption, of U and As from contaminated shales and soils below the SFC Facility as clean upgradient water moves through the hydrologic unit. The Kd values determined with the batch desorption procedure will be denoted as Kd' in this report. No Kd determinations were made for NO 3 since this constituent is assumed to exhibit conservative behavior during transport; this is a highly conservative assumption because NO3 can be degraded by biological reduction.

Fluoride typically also exhibits conservative behavior, unless its solubility is controlled by CaF2.

Sequoyah Fuels Corporation MFG Inc.

. 0-- . - 48 October 2002

The batch testing in the initial characterization study utilized contaminated shale samples collected from Unit 1 Shale (Locations 7 and 10), Unit 2 Shale (Location 8), Unit 3 Shale (Locations 8 and 9), and Unit 4 Shale (Locations 8 and 9) (see Table 5-1 and Drawing 4-1).

These locations were chosen because they typically, contain the highest groundwater concentrations of U and As based on examination of preliminary plume maps. The samples were shipped to Energy Laboratories, Inc. (ELI, Casper, Wyoming), an analytical testing laboratory licensed to handle and store 1le.(2) by-product material. The shale samples were prepared by ELI for use in the batch testing by air-drying, followed by gentle crushing to pass a 10-mesh (2-mm) screen. Groundwater that is representative of background conditions was obtained from an upgradient well screened in Unit 4 Shale (MW1 10) and was used as the liquid phase in the Kd' batch testing. The water was filtered (0.45 jtm pore-size filter), shipped at 4°C directly from the Facility to ELI, and analyzed for dissolved concentrations of major cations, anions, selected trace metals, and pH. Analytical testing results of the water from MW110 are included in Appendix E.

The Kd' batch tests were carried out using a solution to solid ratio of 2:1 (100 mL:50 g). Each shale sample was reacted with six consecutive 100-mL volumes of clean groundwater.

Assuming a shale porosity of 0.33, this equates to 6 pore volumes of flow through the sediment per batch experiment. After the addition of each 100-mL aliquot, the samples were agitated for 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> and the solutions filtered through a 0.45 jim pore-size filter. The supernatant from each batch rinse was analyzed for major anions, cations, and dissolved aluminum (Al), iron (Fe), U, and As. After the sixth 100-mL rinse, the solid was analyzed for total U and As (EPA method 3050). The Kd values (in units of ml/g = L/kg) were then calculated according to the equation

[1].

The chemical compositions of the supernatants were input into the geochemical equilibrium model PHREEQC (Parkhurst and Appelo, 1999) for chemical speciation and calculation of ion activities and saturation indices (SI) for solid phases. Evaluating the SI values calculated using PHREEQC for various mineral phases is used to test if any solubility limits have been exceeded.

In those cases where discrete U and/or As-bearing solid phases are predicted to precipitate, the Sequoyah Fuels Corporation MFG Inc.

..... .. - RM,.- 49 October 2002

empirically determined Kd values are a mixture of both solubility and adsorption processes.

The SI value for a given mineral is defined as:

SI = AP Ksp Where:

IAP = ion activity product in solution Ksp = the solubility constant Therefore, when SI = 0 (equilibrium), or when SI greater than 0, there is a potential for solid phase control. In other words, the determined Kd value under these conditions would represent elemental partitioning based on both precipitation and adsorption, but the empirical value would be valid for the mixed process.

The procedure described above used in the original characterization studies were repeated during the SDCP with minor exceptions. First, each soil/shale sample was rinsed with three consecutive 100-mL volumes of uncontaminated groundwater versus six rinses in the initial investigation. It was shown during the initial characterization studies that uranium and arsenic concentrations reached relatively constant values quickly and that there was very little change from rinse No. 3 to rinse No. 6 (Figures 5-1 and 5-2), so the number of extraction steps was reduced to three for the SDCP. Secondly, uncontaminated water obtained from Facility E-2 was used in the rinses instead of groundwater collected at well MW1 10. In addition, at the conclusion of the rinses, the solid phase was first digested with 0.04 M Hydroxylamine hydrochloride (NH2 OHoHCl) in 25 percent acetic acid (V/V) equilibrated for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at 96 TC, with occasional agitation. Following the hydroxylamine hydrochloride (Ha-HC1) extraction, the solids were analyzed for total metals using the EPA 3050 digestions as was done in the initial geochemical characterization studies.

The Ha-HC1 extraction is designed to provide information on those constituents that are released upon the dissolution of the iron and manganese (hydr)oxide fraction of the solid phase. It is expected that most of the arsenic and uranium, which is removed from solution through sorption, is bound in the hydroxide fraction. Therefore, this additional step was added to determine the amount of arsenic and uranium that was likely to be sorbed versus that which was incorporated Sequoyah Fuels Corporation MFG Inc.

.,. .. , 50 October 2002

into the mineral matrix or is present as a distinct mineral species. Following each digestion, the aqueous phase was analyzed for arsenic, iron, manganese, and uranium.

5.3.2.2 Batch Adsorption Tests Analysis of groundwater samples. collected at the SFC Facility suggest that the Kd' values determined from batch desorption tests during the initial investigation and used in the initial stages of transport modeling did not accurately predict the migration of uranium and arsenic at certain locations within the SFC Facility. In particular, the increasing arsenic levels at MW095A could not be predicted using the Kd' values used in the original model. In addition, uranium concentrations observed at MWO05A were also not predicted by the original model. Therefore, traditional batch adsorption test methods for determining Kd values were used during the SDCP for the revised transport modeling. The supplemental geochemical analysis also included determination of Kd values for colluvial and terrace material that where not determined in the initial characterization studies. The Kd values determined for terrace material would be important for modeling contaminant migration potentially leaching from a storage cell placed on top of this material and for arriving at appropriate clean up levels.

Batch adsorption Kd tests were carried out using a solution to solid ratio of 2:1 (100 ml to 50 g) as was done in the previous desorption tests. Soil samples were wet sieved through 10 mesh

(<2.0 mm) screen and the sieved fraction added to reaction vessels to provide approximately 50 g of soil on a dry weight basis. Background groundwater obtained from trench E-2 was spiked with uranium and/or arsenic to give a final concentration of 0.01, 0.1, and 1.0 mg/L of each of the constituents to be tested. Reactions were allowed to equilibrate for three days. At the end of the equilibration period the aqueous phase was removed, filtered through a 0.45 jim poresize membrane filter and analyzed for uranium and/or arsenic. Following the adsorption tests the soil phase was digested and analyzed as described above.

5.3.3 Model Derived Kd Values As discussed in the introduction to this section, at least some of the impetus for the additional tests done during the SDCP was to experimentally determine K4 values that could more Sequoyah Fuels Corporation MFG Inc.

- R. fi.* -.-- . 51 October 2002

realistically describe the migration of arsenic and uranium as measured in the field. Uranium Kd values determined during the SDCP studies were generally higher than those initially determined in the batch desorption experiments. In addition, while the Kd values for arsenic from the batch adsorption tests' were somewhat lower than those obtained in the desorption studies, they still did not adequately predict the migration of arsenic observed in the field.

An alternative to experimental determination of Kd values is to use a transport model to derive a Kd by fitting model predicted migration of various constituents to historical data. Because the values for KI arrived at via laboratory experimentation were not completely satisfactory for describing the transport of constituents as observed in the field, this approach was ultimately used to develop a "modeled Kd parameter." It should be noted that, while these model-derived values are often referred to as a Kd, it is more appropriate to label them as a transport parameter (TP). The partition coefficient is by definition the ratio of the contaminant concentration associated with the solid to the contaminant concentration in the aqueous phase when the system is at equilibrium. Laboratory methods for determining constant Kd values describe the partitioning of a molecule between the solid and aqueous phases due to reversible sorptive reactions. Fitting field data does not provide an equivalent parameter. The subsurface processes, which account for changes in analyte concentration in the field, are not well defined and the systems are unlikely to be in equilibrium. Thus, the modeled Kd (Kd-mod), arrived at via model fitting, is essentially a bulk transport parameter that incorporates numerous geochemical reactions such as reversible and irreversible sorption/desorption, precipitation/dissolution, co-precipitation, sequestration within organic phases and oxidation/reduction. In addition, hydrogeological parameters not accounted for in the initial model design, such as flow through fractured media, are incorporated into Kd-mod. Values determined for Kd-mod and used in the transport model to describe the migration of arsenic and uranium range between 0.1 to 1.5 mL/g and 0.25 to 0.6 mL/g respectively. A complete description of how these were determined with the model is discussed in Transport Model Calibration (Section 8.5.4).

5.3.4 Geochemical Modeling of Groundwater Using PHREEQC Geochemical modeling of selected Facility groundwaters wells was undertaken to: (1) further assess the validity of the Kd' values by comparing U and As speciation in site groundwater to the Sequoyah Fuels Corporation MFG Inc.

.... . , ,., 52 October 2002

laboratory conditions under which the values were determined, and (2) understand the mechanism controlling U and As migration through the shales. Nine groundwater monitoring wells were sampled and analyzed for a detailed list of constituents to provide input to the geochemical equilibrium speciation model PHREEQC (Parkhurst and Appelo, 1999).

Preliminary maps of the U, As, and NO 3 concentrations in the groundwater were used to select wells where high concentrations' of contaminants might exist, so that representative samples of groundwater from different shale units could be obtained. The nine wells selected for detailed geochemical sampling and analyses were: MW064A (Unit 4 Shale), MW059A (Unit 4 Shale),

MW042A (Unit 2 Shale), MW075 (Unit 1 Shale), MW067A (Unit 4 Shale), MW025 (Unit 1 Shale), MW025A (unit 2 Shale), MW12A (Unit 3 Shale), and MWO12B (Unit 5 Shale) (see Drawing 4-1). The wells were purged using standard procedures (Appendix A) and the temperature, electrical conductivity, and pH were recorded. Oxidation-reduction potential (ORP) measurements were also recorded using a Pt electrode with a Ag/AgCl reference electrode. The accuracy of the electrode was confirmed using ZoBell's Solution prior to sample measurement, and the ORP measurements were converted to Eh (American Public Health Association [APHA], 1992).

Filtered samples (using 0.45 jtm pore-size filters) were preserved according to standard procedures (APHA, 1992) in the field and delivered to Outreach Laboratory (Broken Arrow, Oklahoma). The water samples were analyzed for cations (Ca, Mg, Na, K), anions (Cl, F, SO 4),

metals (Al, As, Si, V, Mn, ferrous iron [Fe(II)], total. dissolved Fe), radionuclides (U, Ra-226),

alkalinity, NO 3, NO2 , NH 3-N, P, S 2 -, total suspended solids (TSS), and organic carbon.

Unfiltered samples were also collected and analyzed to assess the potential for colloidal transport of U and As through the hydrologic units. The unfiltered samples were analyzed for TSS, as well as the same suite of metals plus U as for the filtered samples.

5.4 Mineralogical Testing Results X-ray diffraction analyses indicate that the shale samples are composed primarily of quartz (a-SiO2 ), illite (e.g., mica), and 2:1 expanding and non-expanding layer phyllosilicates. Solvation of the sample with ethylene glycol indicates that the phyllosilicates are mainly composed of Sequoyah Fuels Corporation MFG Inc.

53 October 2002

interstratified chlorite-smectite. The shift in the d-spacing from 14.3 A to 15.6 A upon ethylene glycol solvation is characteristic of interstratified chlorite-smectite (Sawhney, 1989). The XRD patterns for shale samples from Unit 1, 2, 3, and 4 shales indicated that all samples contained the same bulk mineralogical composition. A representative diffraction pattern for Unit 1 Shale from Location 7 (See Drawing 4-1) is shown on Figure 5-3.

5.5 Test Results and Geochemical Modeling for Partition Coefficients (Kd and Kd')

5.5.1 Results From Batch Desorption Tests The results of the Kd' batch desorption testing indicate that an adequate number of rinses was performed to simulate the- long-term rinsing (desorption) of U and As from the solid. The concentrations of U (Figure 5-1) and As (Figure 5-2) reached relatively constant values by the 3 rd rinse of the batch testing. Therefore, Kd' values calculated during the initial studies using elemental concentrations of the solid and the liquid from the final rinse are representative of long-term desorption equilibrium conditions, and were considered to be valid measurements for use in the hydrologic transport model. The original laboratory data sheets and quality assurance report are presented in Appendix E. The calculated U and As Kd' values for all shale samples are given in Table 5-2.

Results of the geochemical modeling using PHREEQC show that solubility limits for the common U and As phases were not exceeded, further validating the calculated Kd' values as being representative of desorption processes (Table 5-2). The SI values for the common U minerals given in Table 5-3 were calculated by the model for the batch test solutions for all shale samples. For elements that were below detection in the batch solutions, their detection limits were input into PHREEQC so that conservatively high SI values could be calculated.

The resulting negative SI values (Figures 5-4 through 5-10) show that the solutions were undersaturated with respect to the common U minerals, indicating that adsorption/desorption reactions, rather than precipitation/dissolution reactions, controlled U concentrations during the batch desorption testing. The U(IV) minerals that occur in reduced environments (Table 5-4) are not expected to form under the oxidized conditions encountered during the batch testing; Sequoyah Fuels Corporation MFG Inc.

m. . ... 54 October 2002

however, these U(IV) minerals were included in Table 5-4 and in the analysis of SI values for completeness. Field measurements of Eb show that the groundwater generally has an oxidizing potential. Positive SI values were calculated for tyuyamunite [Ca(U0 2)2(VO 4)2] (Table 5-3) in the Unit 1 Shale (Location 7) batch test solution (Figure 5-4); however this high value results from artificially using the detection limit value (0.10 mg/L) for V in the SI calculation; V was below detection in this solution, and the relatively low KY' value for this sample (Table 5-2) does not indicate that tyuyamunite precipitated during the test. The constant near-equilibrium values for gypsum (CaSOa4 2H 2 0) indicate that gypsum is the controlling mineral phase for SO 4 , the dominant anion in the system.

Similarly for As, geochemical modeling of SI values shows that there were no mineral solubility controls on As concentrations during the initial desorption Kd' testing. In oxidizing waters, such as those encountered in the batch test solutions, As concentrations are typically controlled by adsorption to. and/or co-precipitation with iron oxides (Welch and others, 2000), although in some cases metal arsenates such as scorodite (FeAsOa.2H 20) or calcium arsenate

[Ca 3 (AsO4 )2 .6H 2 0] may act to control aqueous As concentrations. The negative SI values calculated for various metal arsenates and arsenic oxides (Figures 5-4 through 5-10) show that the test solutions were undersaturated with respect to these As minerals.

The chemistry of the major ions during the batch testing was consistent with the known mineralogy of the shales, and indicates that ion exchange is the important process controlling major cation concentrations. Figure 5-11 compares the concentrations of Ca, Na, Mg and K in the initial solution (Rinse 0, from upgradient well MW-110) to those in the six batch test solutions. The results show that as clean water from upgradient reacts with shales at the Facility, there is an ion exchange of Na for Ca and Mg (Figure 5-11). As the chemistry of the exchange sites reaches equilibrium with the clean water, the Ca, Na, and Mg concentrations approach background conditions.

Samples used during the SDCP for Kd analysis were obtained from surface trenches and are listed in Table 5-5. The locations where the samples were collected along with the associated aqueous and solid phase geochemistry of the samples are provided in Appendix G.

Sequoyah Fuels Corporation MFG Inc.

. 55 October 2002

During the initial site characterization studies, Kd' values were determined for samples consisting of shales from the various layers. During the SDCP investigation, adsorption and desorption Kd and Kd' values were determined for shale samples as well as for selected soil materials. During the initial studies it was also assumed that the amount of arsenic contained in the mineralogical fraction of the samples would be small and that the majority of arsenic in the samples would be sorbed to the shale matrix. During the subsequent desorption tests two extraction methods were employed in the analysis of the solid phase in order to validate this assumption. If a large fraction of the arsenic in a sample is present as a distinct mineral phase and therefore not available for desorption, then desorption experiments followed by a total digest could give artificially elevated values for Kd'. Data presented in Table 5-5 suggest that this may be the case.

Values for Kd' determined using the hydroxylamine hydrochloride extraction, which targets iron and manganese (hydr)oxides are between 10 and 100 time lower that those determined with the 3050 digestions. Since it is likely that the majority of sorbed arsenic would partition with the oxide fraction, these data suggest that a large portion of the arsenic in these samples is not sorbed, but rather is present as a distinct mineral phase. This was true for both shale and soil samples and thus also indicates that arsenic Kd' values used in the original transport modeling were not representative of actual site conditions. Greater Kd' values observed in the initial desorption studies suggest that there may have been a significant amount of arsenic associated with the mineral fraction. Therefore the values used previously were likely to have been unrealistically high and would not accurately describe arsenic migration under site conditions.

Uranium Kd' values determined varied considerably less between those determined with the Ha-HCl and the 3050 extractions. This suggests that a greater portion of the U present in the solids was actually sorbed versus present as a distinct mineral phase or sequestered within the organic fraction, or if a secondary U-mineral phase is present it was also released with the oxide fraction.

In general, Kd' values determined for uranium during the SDCP studies, which range from 258 to 4,212 and 108 to 2,176 for Ha-HCL and 3050 extractions respectively, were higher than those determined in the initial tests using only shale samples.

Sequoyah Fuels Corporation MFG Inc.

..... . R_ .. -R,., 56 October 2002

5.5.2 Results From Batch Adsorption Tests Kd values determined for arsenic using traditional batch adsorption tests ranged from 331 to 817 mL/g for the samples tested (Table 5-5). In general this is lower than the Kd' values determined in the previous study using shale materials and about an order of magnitude greater than those determined on similar samples during this study with the Ha-HC1 extraction procedure. Even when comparing results from a single sample (005-04S-1) the Kd and Kd' values determined with the batch adsorption and desorption procedures varied over two orders of magnitude.

Uranium Kd values from adsorption studies varied less from values determined in desorption tests than did the arsenic partition coefficients derived from the two procedures. Kd values for uranium determined from adsorption tests varied from 572 to 2,340 mL/g, which compares closely with those determined on like samples in desorption tests (Table 5-5). In general, they are slightly higher than those determined for shale samples during the initial characterizations studies, which ranged from 11 to 286 mL/g (Table 5-2).

5.6 Results of Site Groundwater Geochemical Modeling Geochemical modeling of selected site groundwater was undertaken to further assess the validity of the Kd' values by comparing U and As speciation in site groundwater to the laboratory conditions under which the Kd' values were determined. In addition, geochemical modeling can provide insight into the potential mechanisms that may be controlling U and As migration through the shales. The results of the detailed groundwater sampling conducted on the nine wells in June 2001 are given in Table 5-6. Examination of filtered (dissolved) versus unfiltered (total) concentrations of Fe, Al, and Mn, indicate that, in most cases, the unfiltered values are substantially higher than those from filtered samples, for these elements. This indicates that there are suspended colloids in the groundwater that have the potential to aid in the movement of adsorbed metals, such as As and U. The presence of suspended colloids of Al, Fe, and Mn (presumably occurring in their oxide and/or hydroxide forms) are an indicator of relatively oxidizing conditions in the groundwater. However, comparison of the filtered versus unfiltered values for As and U do not indicate that colloidal transport is a significant mechanism for migration of these constituents through the hydrologic unit. The inability to detect S2 -, Fe(II), and Sequoyah Fuels Corporation MFG Inc.

57 October 2002

NH 3-N in most samples is consistent with measured Eh values of those samples and are indicative of oxidizing conditions. Based on Eh-pH stability diagrams (Brookins, 1988) both U and As are expected to exist in their oxidized aqueous forms, uranyl (UO2 2+) and arsenate (AsO 43-) for U and As, respectively. However, historical data (Table 5-7) shows that at some locations reducing conditions exist were elevated concentrations of iron and manganese can be found. Reducing conditions should tend to increase the mobility of arsenic via the reduction of Fe and Mn (hydr)oxides to which the arsenic is presumably sorbed. In contrast, reducing conditions will tend to limit the migration of uranium as U(VI) is reduced to U(IV) and precipitated as uraninite (U0 2) (Lovley and others, 1991).

The results from the detailed groundwater sampling that occurred in June 2001 (Table 5-6) were input into the geochemical speciation model PHREEQC. The resulting SI values indicate that common potential minerals controlling U, As, Ra, and F solubility are undersaturated in the site groundwater (Table 5-3). The results from PHREEQC using groundwater quality data from the June 2001 sampling also indicate that virtually 100 percent of the U in groundwater at the locations sampled exists in the oxidized form, U(VI). Undersaturation was also observed for RaSO 4 , eliminating this solid as a control on Ra-226 mobility. This observation is consistent with those of Langmuir and Riese (1985), who point out that concentrations of Ra in waters affected by U milling are usually not high enough to reach saturation with respect to RaSO 4 ;

rather, Ra concentrations in solution are limited to adsorption to mineral surfaces or co-precipitation with other solid phases.

Similarly for As, the selected groundwater is calculated to be undersaturated with respect to the common As minerals, such as the Al-, Fe-, and Ca-arsenates (Table 5-3). Therefore, bulk groundwater conditions as measured at these nine sites are similar to the conditions under which the Kd' values for As were derived in the laboratory. The PHREEQC modeling results (Table 5-

8) also indicate that virtually 100 percent of the total As in solution exists in the oxidized aqueous arsenate form (AsO43). Arsenic, present as arsenate in groundwater and during determination of Kd' values, is controlled by adsorption to mineral surfaces, and not generally controlled through precipitation of discrete As-bearing solid phases. However, subsequent tests conducted during the SDCP in 2002 indicate that a significant fraction of As in the solid phase is Sequoyah Fuels Corporation MFG Inc.

...... 58 October 2002

not amenable to extraction by hydroxylamine hydrochloride and therefore not likely to be associated with the Fe and Mn oxide fraction. This would suggest that while current site conditions do not support As mineral precipitation that a substantial fraction of the As incorporated in the shales is present as a discrete mineral phase or associated with a non-oxide fraction. The SI values in Table 5-3 also show that most of the bulk groundwater is undersaturated with respect to CaF 2 and therefore generally conservative behavior for F, similar to NO3 , is expected.

The calculated aqueous distributions of the dominant U(VI) and As(V) solution species are presented in Table 5-8. The results indicate that the aqueous speciation of As is dominated by H2AsO 4-. Dissolved F- tends to be associated with Al in the lower pH waters (below pH = 5.5);

in higher pH waters, where dissolved Al is low, F exists as the mobile F anion. Aqueous U(VI) indicates that U(VI) exists predominantly as negatively-charged carbonate complexes (Table 5-8). In the presence of P, U may also exist as negatively charged phosphate complexes. Only in areas of low pH (below a pH of approximately 5.0) is the dissolved U species expected to be dominated by UO2 +2 (Table 5-8; Langmuir, 1997).

5.7 Distribution of Constituents of Concern The key COCs identified by SFC for this study are arsenic, natural uranium, nitrate and fluoride.

The current distributions of these COCs were estimated for each hydrostratigraphic unit using the data collected as part of this geochemical study as well as samlle data collected in April, June, and August 2001. Isopleth contour maps showing distribution of COCs is provided in Figures 5-12 through 5-35. Ninety-five monitoring wells have been constructed appropriately to monitor a single hydrostratigraphic unit. Sample data from these wells were primarily used to determine the distribution of the COCs. All other Facility wells have been determined to be constructed such that the well screen and/or filter pack connect more than one hydrostratigraphic unit and, therefore, are not representative of any one unit. Because of the sparse amount of appropriately constructed wells in the hydrostratigraphic units, most notably Unit 3 and 4 shales, data from 46 wells not completed in a single hydrostratigraphic unit were used to supplement the estimation of the distribution of COCs. Table 5-9 presents the wells used to estimate the distribution of the COCs, including wells that were completed in a single hydrostratigraphic unit Sequoyah Fuels Corporation MFG Inc.

...U....-.a .. .. ,Rfij. 59 October 2002

(Primary Wells), along with other monitoring wells used for estimation of distribution of COCs (Secondary Wells). Table 5-9 summarizes the hydrostratigraphic units used in the distribution estimate (Completion), sample dates, and the water quality data from wells used in the distribution estimate. Original analytical data is available through SFC upon request.

Figures 5-12 through 5-17 show that nitrate exceeds the maximum contaminant level (MCL) of 10 mg/L in Unit 1 through 4 shales. Nitrate concentration in groundwater is especially high (between 1,000 and 10,000 mg/L in Unit 2, 3, and4 shales centered on the southwest comer of Pond 2, and in Unit 3 and 4 shales in the Fertilizer Pond Area. Nitrate in the Fertilizer Ponds have probably significantly impacted groundwater in Unit 1 and 2 shales, however a lack of any appropriately completed wells in Unit 1 and 2 shales preclude an estimation of the distribution of nitrate in those units in the Fertilizer Pond Area. Nitrate concentrations exceeded the MCL in five alluvium wells.

Figures 5-18 through 5-23 show that uranium exceeds the site-specific DCGL of 100 ýIg/L (U.S Department of Defense and others, 2000) in Unit 1, 2, and 3 shales. In Unit 1 and 2 shales, uranium exceeds the DCGL in three relatively small areas, one centered just northeast of the SX Building, one centered on the southeast comer of the MPB, and on centered on Solid Waste Burial Area No. 2. In Unit 3 Shale, uranium exceeds the DCGL in two very small areas, one just east of the SX Building and one just northeast of Solid Waste Burial Area No. 2. The highest uranium concentrations are found in groundwater near the SX Building. Uranium concentrations exceeding the DCGL were not recorded in any area outside of the Process Area.

Figures 5-24 through 5-29 show that arsenic exceeds the MCL of 0.05 mg/L in Unit 1 through 4 shales. In Unit 1 Shale, arsenic exceeds the MCL in two broad areas, one crescent-shaped area centered on the Emergency Basin, and another in the southern portions of the Process Area. In Unit 2, 3, and 4 shales, arsenic exceeds the MCL broad areas centered on the southwest comer of Pond 2. Highest arsenic concentration recorded was 3.35 mg/L, in MW-057A, near the southwest comer of Pond 2. Arsenic concentrations exceeding the MCL was not recorded in any well completed in Unit 4 Shale west of the Process Area, nor in the alluvium in the southwest portions of the Facility.

Sequoyah Fuels Corporation MFG Inc.

...... .--- 60 October 2002

Figures"5-30 through 5-35 show that fluoride exceeds the MCL of 4 mg/L in only a few relatively small, isolated locations in Unit 1 through 4 shales. In Unit 1 Shale, fluoride exceeds 4 mg/L near the southeast comer of the North Ditch and also just north of Clarifier A Basin 1. In Unit 2 and 3 shales, fluoride exceeds 4 mg/L in a small area centered on the southwest comer of Pond 2. In Unit 4 Shale, fluoride exceeds the MCL in a small area just east of Fluoride Holding Basin No. 1. Maximum fluoride concentration recorded was 7.6 mg/L.

Fluoride concentrations only slightly exceed the MCL in very limited, small areas of the shale units in the Industrial Area. Fluoride also behaves conservatively and is relatively mobile in groundwater, therefore the fluoride derived from any available higher concentration source will tend to be readily diluted with groundwater concentrations below the MCL. From the sources available, fluoride will not impact any surface water exposure point with concentrations above the MCL, therefore fluoride will be removed from any further consideration as a COC.

5.8 Conceptual Geochemical Model Processing operations at the SFC Facility utilized yellowcake (U308) in the stepwise production of UF 6. Intermediate solid compounds such as U0 2(NO3)2, U03, U02, and UF 4 , were produced.

Various chemicals, such as H 2 SO 4 , HNO 3, HF, NH 3, BaC12, CaO, and limestone were stored on-site and used in the process. Major by-products of the operation were NH 4NO 3, CaF 2 , and raffinate sludge. During the operative years, known releases of U0 2(NO3) 2, NH 3, NH 4N0 3, and As occurred from corrosion of storage containers, overflows, on-site burial of wastes, and leakage from unlined ditches and storage ponds. Neutralization of scrubber water with limestone was another source of aqueous F, U, and elevated in Ca and Mg. The U, As, F, and N released were predominantly in their oxidized, mobile forms and a portion of these constituents migrated into shale units of the terrace and shallow bedrock groundwater system beneath the Facility.

Mineralogical analyses of the shale units indicate that the reactive minerals present are largely phyllosilicate clays. Phyllosilicates exhibit negatively-charged edge surfaces that are capable of retaining cations through electrostatic forces (Bohn and others, 1985). Based on the predominance of phyllosilicate clays in the shale, ion exchange is likely an important process controlling constituent migration through the hydrologic units. Hydrous ferric oxide is Sequoyah Fuels Corporation MFG Inc.

..... c- -.'.R" .. . 61 October 2002

undoubtedly present in the shales (as indicated by brown and yellow colors), but was not identified in the mineralogical analysis due to the low concentrations. However, extractions performed on samples during the SDCP using hydroxylamine hydrochloride indicate that there is a significant amount of Fe and Mn in the oxide fraction. Hydrous ferric oxide is a naturally dominant adsorbent because of its tendency to be finely dispersed and to exist as both ubiquitous coatings on mineral particles and as discrete oxide particles (Jenne, 1968; Dzombak and Morel, 1990).

Due to the high influx of Ca-rich and Mg-rich waters (Mg most likely being present as an impurity in limestone) into the shale units, groundwater at the site exhibits a distinctly different ionic composition compared to upgradient water. Figure 5-36 shows that the upgradient water (MW-1 10) is a Na-SO 4 type water, and hydrological unit materials upgradient are in equilibrium with this water. site groundwater, however, is Ca-Mg-SO 4 type water, with a few waters having a high percentage of CI as the anion component (Figure 5-36). ,The results of the batch tests indicate that as upgradient water moves through the hydrological unit, exchange of Na will occur for Ca (and to a lesser extent, Mg), removing Na from solution and releasing Ca + Mg (Figure 5-11). As the exchange sites on the clays continue to equilibrate with fresh upgradient water, the water will trend back toward Na-S0 4-type water. Sulfate concentrations remain relatively constant due to their control by gypsum solubility.

Of the contaminants of concern, U, As, F, and N were released primarily in their oxidized forms during process operations. Nitrogen, primarily as NO3 , may be biologically reduced but in the absence of organic carbon, tends to behave conservatively in groundwater. Analytical results for NO2- and NH 3-N at the nine wells examined in the 2001 sampling indicate, however, that only very limited N reduction occurs (Table 5-6). Similarly, F is not strongly adsorbed, and is very mobile in groundwater when not controlled by CaF2 precipitation, as shown in Table 5-3.

During the initial characterization studies modeling of groundwater collected from a limited set of wells suggested that arsenic exists primarily in various protonated forms of arsenate [As(V)]

(Table 5-8). The adsorptive capacity of hydrous ferric oxide and of functional groups on surfaces of other oxide minerals is high (Pierce and Moore, 1982) and therefore high Kd' values were measured for As during the initial study (Table 5-2). However, as described above, Sequoyah Fuels Corporation MFG Inc.

.. .... ,,.. 62 October 2002

elevated levels of As associated with the mineral fraction of the samples likely resulted in artificially high Kd' values during the initial studies. As previously noted, these high Kd' values did not appear to accurately reflect As transport at some locations at the site. Specifically, this was true for elevated levels of As observed at well MW095A. One possible explanation for this anomaly was the formation and migration of organic-arsenic complexes. SFC personnel have indicated that significant amounts of the organic compounds tributylphosphate (C 12H 27PO 4) and hexane (C 6H 14), which were associated with the solvent extraction process, were deposited in Pond 2. This has led to speculation that the arsenic in Pond 2 may have formed organic-arsenic complexes or possibly ammonium-arsenic complexes that could migrate at a less retarded rate than the uncomplexed arsenic. Therefore, analytical testing of water samples for arsenic speciation (As III, As V, mononmethylarsonic acid [MIMAs], dimethylarsinic acid [DMAs],

thioarsenates, and other organoarsenicals) was undertaken. Results from these studies proved inconclusive, however, due to analytical problems encountered during attempts to quantify the As species present. Details of these studies and results are provided in Appendix G. A second possibility is that organic compounds entering the aquifer produced reducing conditions.

Naturally occurring arsenic compounds, such as, scoridite and As sorbed to Fe and Mn (hydr)oxides within the shales would be mobilized under these conditions. Data presented in Table 5-7 suggests that in some areas of the site, reductive dissolution of iron and manganese oxides has resulted in increases in As concentrations. For example, wells MW042, MW059A, MW061A, MW064A, MW087, and MW102A have elevated levels of As, Fe, and Mn but concentrations of U that is below the detection limit. This is what would be expected in reducing environments as As adsorbed onto Fe and Mn (hydr)oxides is liberated by reductive dissolution reactions and U(VI) id reduced to U(IV) and precipitated as U0 2.

Geochemical modeling done during the initial investigation indicated that uranium tends to exist primarily as carbonate species, or sometimes complexed with phosphate (Table 5-8). These negatively charged species are not as strongly adsorbed and are highly soluble (Duff and Amrhein, 1996). The two primary controls on the transport of the uranyl ion are pH and carbonate concentration (Langmuir, 1997). However, in addition to ion exchange reactions, precipitation of secondary uranium mineral phases may contribute substantially to the control on U transport. A recent report published by the NRC suggests that precipitation of uranium Sequoyah Fuels Corporation MFG Inc.

.. z.... . ....

  • 63 October 2002

minerals is the primary sink for U, followed by adsorption (Jove Colon and others, 2001). These studies examined migration of uranium plumes associated with both natural U deposits and U mining and mill-tailings sites. Uranium concentrations greater than about 10-6 molar fall within the stability fields of schoepite [(U0 2 )8 (OH)1 2 (H 2 0) 12 ] and bequerilite

[Ca(U0 2 ) 6 0 4 (OH)6 (H 2 0)8], which are thought to be primary controls on U migration under near neutral, oxidizing conditions. Under reducing conditions where U(IV) becomes the stable U species, uraninite (U02) becomes the dominant mineral phase controlling U solubility and transport.

5.9 Site Complexity and Implications for Kd Nearly all reaction transport models have used the partition coefficient or "constant Kd" approach to describe the effects of sorption processes on solute transport. However, more sophisticated treatments such as Langmuir and Freundlich isotherms and surface complexation models are available that can more accurately describe these reactions (Davis and Kent, 1990; Zachara and Smith, 1994). The KI approach is reported to work best for trace amounts of non-ionized, hydrophobic organic molecules (Stumm and Morgan, 1996) and is often too simplistic to represent sorption of ionic species within soil and sedimentary environments (Domenico and Schwartz, 1998; Reardon, 1981). Kd values for metal ions typically vary over many orders of magnitude, depending on solution pH and composition as well as the nature of the solid matrix (Davis and Kent, 1990). Thus, in complex, highly heterogeneous environments, the incorporation of a laboratory-derived KI that can accurately reflect solute transport is problematic. Under these conditions a model-derived "transport factor" may be more appropriate. However, it should be realized that such transport factors describe the movement of contaminants under historical conditions when they are determined using historical data. As Facility conditions change (e.g. pH, saturation conditions), the transport factors will likely also change.

The Sequoyah Fuels Facility is geologically and geochemically complex and highly heterogeneous. In addition, the complex geochemical environment has evolved with time and with changes in site activity. For example, pH values measured at various locations at the Facility from 1991 to 1994 vary over seven orders of magnitude from 4.3 to 11.9 with an average Sequoyah Fuels Corporation MFG Inc.

.... . ,.,.,,,.-- A... 64 October 2002

value of 7.2 (Table 5-10). These wide variations in pH dramatically affect the physiochemical properties of solid and aqueous phase constituents. Arsenate (As5+) is strongly sorbed to iron hydroxides and many clay minerals at pH values below about 7.5 but is desorbed as pH values greater than 7.5. In contrast, arsenite (As 3+) while tending to adsorb less strongly at low pH values, tends to remain adsorbed under more alkaline conditions (Raven and others, 1998; Pierce and Moore, 1980). Likewise, uranium also shows the greatest adsorption in the near neutral pH range, from about 6.0 to 7.5, and is sorbed to a much lesser extent outside this range (Langmuir, 1997). Thus, determination of a single Kd with laboratory experiments performed over a limited pH range cannot adequately represent a Facility with this complexity.

While somewhat limited with respect to certain parameters, historical water quality data suggest that redox conditions also change significantly across the Facility. Changing redox chemistry is also likely to affect the mobility of arsenic and uranium. Under oxidizing conditions, As(V) and U(VI) are expected to be the predominant species present, whereas under reducing conditions As(IlI) and U(IV) should be the stable species. As previously noted, the adsorptive properties of arsenic vary considerably for the oxidized and reduced forms due to the ionic species each forms.

The oxidized and reduced forms of uranium also exhibit dramatically different geochemical properties. The oxidized uranyl ion forms numerous aqueous complexes with carbonate, phosphate, fluoride and sulfate. The uranyl carbonate complexes are responsible for much of the observed uranium transport in oxidized neutral pH environments (Langmuir, 1997). In contrast, the reduced uranous ion, while also capable of forming aqueous complexes tends to form solid phase products with limited solubility (e.g. uraninite [U0 2]). Thus, mildly reducing conditions, which is typical of metal reduction (e.g. manganese, iron, and uranium) will tend to cause the precipitation and sequestration of uranium. In contrast, the reduction of manganese and iron (hydr)oxides under these conditions would tend to release arsenic that is sorbed to these manganese and iron phases. Under more strongly reducing conditions (e.g. sulfidogenic) arsenic can also be expected to form highly insoluble arsenic sulfide and be removed from the aqueous phase.

An additional complication is the potential for mineral precipitation reactions to take place under field conditions with changes in soil moisture content (e.g. as conditions go from saturated to Sequoyah Fuels Corporation MFG Inc.

., .' 1 --

ý ,.,,.. 65 October 2002

unsaturated), which cannot be duplicated in the lab. Localized interfacial precipitation of secondary uranyl minerals in undersaturated fluid conditions is thought to be a plausible mechanism for explaining the formation of these phases associated with natural ore deposits (Jove Colon and others, 2001). Analysis of numerous uranium plumes has lead to the conclusion that U migration over the short-term is limited by sorption and precipitation reactions along with dilution. Over the long-term, weathering processes and formation of secondary uranyl mineral phases appears to limit the extent of uranium transport. These control factors are unlikely to be duplicated with laboratory experimentation.

From the above-described geochemical considerations, it should be evident that describing the transport of an ionic species with a laboratory derived Kd is difficult, if not impossible. Thus, a more appropriate method to describe the transport of arsenic and uranium for a site as complex as the SFC Facility is via a model-derived transport factor, which incorporates numerous geochemical and hydrodynamic processes..

Sequoyah Fuels Corporation MFG Inc.

PI.fl. .. d a.. .. r. .. fm .Sde 66 October 2002

6.0 SITE GEOLOGIC, HYDROGEOLOGIC AND GEOCHEMICAL CONDITIONS Based on data from this recent site investigation and previous studies, the following describes the current understanding of the geologic, hydrogeologic and geochemical conditions at the SFC Facility.

6.1 Regional Physiographic and Geologic Setting The Sequoyah Fuels Corporation property is located near the northern edge of the Arkoma Basin, on the southwest flank of the Ozark Uplift (Figure 6-1). The Arkoma Basin is an arcuate structural depression that extends from the Gulf coastal plain in central Arkansas westward to the Arbuckle Mountains in south central Oklahoma. The Ozark Uplift is a large structural feature extending from east central Missouri to northeast Arkansas and northeast Oklahoma. For geographic reference, the Ouachita Mountains are about 50 miles south of the site. Bedrock formations underlying the area consist of Ordovician, Silurian, Devonian, Mississippian, and Pennsylvanian- aged rocks, mostly limestones, shales, and sandstones. A regional geologic map is presented in Figure 6-2. A regional stratigraphic column correlating upper Mississippian and lower Pennsylvanian formations and members in Arkansas and Oklahoma is presented in Figure 6-3. The Facility lies in an area of facies transition from the southwestern Ozark region to the Arkoma Basin. A passive, continental margin existed in the area of the Facility between the Cambrian through Mississippian, and *rocks deposited during that time represent shallow continental shelf sediments, mostly limestones and dolomites with some terrestrial clastic sediments derived from the Ozark region to the north. By Pennsylvanian time, a northward-advancing continental terrain to the south created a convergent plate margin, and the region was warped, creating a foreland basin above the stable continental craton. Sandstones, siltstones, and shales accumulated in fluvial, delta, and tidal flat systems that prograded southwestward from sources to the north and the northeast (the Ozark region).

Geological formations regionally dip southwest to southeast (SFC, 1997, Miller and others, 1989), at dips of less 20', and commonly at only one or four degrees. The most prominent structural feature in the immediate area of the Facility is the Carlile School Fault (CSF), which trends northeast to southwest and is located approximately 5,000 feet southeast of the MPB Sequoyah Fuels Corporation MFG Inc.

....... d .. ,, .... . ,,,.," 67 October 2002

(Figure 6-4). The CSF is a nearly vertical normal fault, downdropped to the south. The fault is less than one mile in length, and has a displacement of less than 100 feet. The plane of the fault is not exposed, but it is revealed as a series of low, hummocky, parallel erosional ridges, consisting of nearly vertical beds of sandstone. The fault lies hydrologically upgradient and geologically up-dip from the Process Area. There is no surface evidence that the CSF connects with any other faults. The Marble City Fault, located approximately 2.5 miles south of the MPB (Figure 6-4), is in the area of the Mulberry Fault, one of the primary structural features identified by the Oklahoma Geological Survey. Both structures were developed in early Pennsylvanian time, and are not considered to be capable faults (NRC, 1998). The most recent documented subsurface movement in the region has occurred within the last 2,000 years along the Meers Fault System in southwest Oklahoma. This fault system is consistent with measured seismic events, and is approximately 200 miles from the Facility. Measured seismic activity is concentrated in south-central Oklahoma corresponding with the Meers Fault System and the central Oklahoma Fault Zone, over 150 miles from the Facility. The most significant recent regional tectonic movement occurred in the New Madrid area of Missouri, during the first half of the 1 9 th century. Based on general seismicity information, the Facility is within a region of low seismicity, classified as a Zone 1 area by COE (1982).

6.2 Site Physiography and Geology The Facility is situated on gently rolling to level land, bounded on the west by the Arkansas and Illinois Rivers and to the north by the Salt Branch. Elevations on or near the Facility range from 460 feet amsl at the Illinois River to about 585 feet amsl near the northeast comer of the property (Figure 6-5). The Process Area is situated on a broad, local topographic high that extends eastward from the Process Area and has elevations of greater than 540 feet. The land surface drops steeply to the north, west, and southwest of the Process Area. Slopes on upland areas are generally less than about seven percent. The steeper slopes in the creek ravines and on hillsides surrounding the Industrial Area average about 28 percent. Several small, intermittent streams that flow outward from the Process Area bisect the property. Most of the streams that flow westward from the Industrial Area are relatively short and incise deep ravines before reaching the Robert S. Kerr Reservoir. Streams that trend southward from the Facility tend to form Sequoyah Fuels Corporation MFG Inc.

.-,, 68 October 2002

relatively shallow channels before turning westward towards the Robert S. Kerr Reservoir.

Relatively low-lying and level land occurs south and west of the Fertilizer Pond Area.

The bedrock immediately underlying the site includes the sandstones, siltstones, and shales of the Pennsylvanian-age Atoka Formation (Figure 6-2). The Pennsylvanian-age Wapanuka Limestone underlies the Atoka Formation. The Atoka Formation is overlain by Quatemary-age unconsolidated sediments, including terrace deposits, which occur primarily in the Process Area, colluvium on the slopes extending outward from the Process Area, and alluvial deposits adjacent to the Arkansas River. Soils are ubiquitous throughout the site, consisting mostly of loams and silty loams up to about six feet thick. Man-made fill material is present in various areas, mostly in the Process Area and as surface impoundment material south of the Process Area.

6.2.1 Soils Soils on the site consist mostly of loams and silty loams. Soil thickness range from zero to approximately six feet, and are commonly about one to two feet thick (SFC, 1997; this study). A detailed description of Facility soils is given in the Final RFI (SFC, 1997). The soils consist mostly of clay and silt, and are similar lithologically to underlying terrace, alluvium, or colluvium deposits. Because of this similar lithology, the hydrologic properties of the soils are believed to be similar to the underlying terrace, alluvium, or colluvium deposits, and the soils were not differentiated from the underlying deposits.

6.2.2 Fill Material Small amounts of fill material are found in various locations on the Facility (SFC, 1997). Fill material within the Process Area is found within buried utility lines, and as a sub-base to concrete floors, concrete and asphalt roads, and concrete storage pads. The fill material within buried trenches ranges from 0 to 20 feet thick, and consists mostly of silty sand and silty gravel, overlain by silty clays and/or weathered shale fill. Fill material beneath concrete floors, concrete pads, and roadways have a maximum thickness of about 1.5 feet, and consists mostly of silty sand, sandy clay, sandy gravel, silty clays, and weathered shale. Fill material is also found in surface impoundment dikes throughout the property. Impoundment dikes reach a thickness of up Sequoyah Fuels Corporation MFG Inc.

..... ...-- a u.-,- 69 October 2002

to 20 feet and consist mostly of clayey silts with minor amounts of gravel in some impoundments. The fill material consists mostly of clay and silt, and is similar lithologically to underlying terrace, alluvium, or colluvium deposits.

6.2.3 Terrace Deposits Unconsolidated deposits overlying Unit 1 Shale are identified as terrace deposits. Quaternary-age terrace deposits consist mostly of clay and silts, with lesser amounts of sandy silts, silty clays, gravelly silty clays, gravelly sandy clays, gravelly clays, and silty sandy clays. Terrace deposits are remnants of alluvial deposition during Pleistocene high water stages of the Illinois and Arkansas Rivers. Subsequent downcutting of these river systems has left these deposits high above present day river valleys. Terrace deposits range from 0 to 16.5 feet thick, averaging about 8 feet thick throughout the Process Area. Terrace deposits are relatively thicker just to the southwest of the MPB, but thin rapidly to less than 2 feet north of the MPB. Terrace deposits exceed 10 feet in thickness in the north-central part of the Process Area, including the Sanitary Lagoon, Emergency Basin, North Ditch, the Interim Storage Cell, and the DUF4 Building.

Terrace deposits also exceed 10 feet in thickness in the area of the Sub-Station and extending eastward from the Process Area.

6.2.4 Alluvium Fluvial deposits associated with recent (Holocene) activity of the Illinois and Arkansas Rivers are identified as alluvium. Alluvium is found primarily in the southwest portions of the site, adjacent to the Illinois/Arkansas River. Alluvium consists mostly of silt, silty clay, and sandy gravel, with lesser amounts of silty sand and gravel. Alluvium thickness ranges from 0 feet to greater than 35 feet thick, with the greatest thickness found near the westernmost extent of the site boundaries. The alluvium ranges from about 15 to about 25 feet thick in the Agland area west and southwest of the Fertilizer Pond Area.

6.2.5 Colluvium Colluvium deposits include all unconsolidated sediment in the site not identified as either terrace or alluvium deposits. These deposits include, but are not limited to, fluvial deposits along Sequoyah Fuels Corporation MFG Inc.

... j.. . -*. * .,. 70 October 2002

smaller streams and outflows, subaerial sediment gravity flows and mass waste deposits, found mostly on the slopes, surrounding the Process Area and in outfall drainages, and in-situ deposits formed by breakdown of older rocks by weathering and erosion. Colluvium typically consists of silts, clays, and/or sands with varying amounts of gravel. Colluvium thickness ranges from 0 to over 20 feet; most colluvium deposits are less than 6 feet thick. The colluvium deposits with the maximum thickness are found in stream drainages south of the Fertilizer Pond Area.

Colluvium deposits found on the slopes adjacent to the Industrial Area tend to be fairly thin, and are generally less than 3 feet thick.

6.2.6 Akota Formation The geologic units that directly underlie the Facility are a series of alternating shale and sandstone units of the Atoka Formation. Locally, the near surface members of the Atoka Formation have been named, in order of descending stratigraphic position, Unit 1 Shale, Unit 1 Sandstone, Unit 2 Shale, Unit 2 Sandstone, Unit 3 Shale, Unit 3 Sandstone, Unit 4 Shale, Unit 4 Sandstone, and Unit 5 Shale. Data from injection monitor well, 2331, located just east of Clarifier A, indicates a series of alternating shales, sandstones, and siltstones to approximately 390 feet bgs. The Spiro Sandstone is the basal member of the Atoka Formation (Sutherland, 1988), and locally occurs from about 300 to 390 feet bgs and is a salt-water bearing unit (SFC, 1997). The base of the Atoka Formation lies unconformably on the Wapanucka limestone (Figure 6-3). The nearest surface exposure of the Wapanucka limestone occurs approximately 10 miles northeast of the facility (SFC, 1997).

The Unit 1 Shale is grayish black to dark grayish brown, soft, fissile, typically silty and sandy near contact with underlying sandstone. Typically Unit 1 Shale is highly weathered, weathering to a brownish or reddish yellow clay or silty clay with remnants of laminated, gray shale. XRD analysis shows Unit 1 Shale consists of quartz, chlorite, interstratified chlorite-smectite, and illite. Unit 1 Shale is laterally continuous under much of the central and eastern portion of the Industrial Area, and extends eastward from the Industrial Area. Unit 1 Shale attains a maximum thickness of approximately 14 feet in the northeast comer of the Yellowcake Storage Area. Unit 1 Shale exceeds 10 feet thick in most of the Yellowcake Storage Area, centered on and northeast of the MPB, and in a small area east of the south guardhouse. An outlier, up to 15.5 feet thick, of Sequoyah Fuels Corporation MFG Inc.

..... ... -. .71 October 2002

Unit 1 Shale is found near the northern end of the Facility. This outlier and two other thin outliers in the Fertilizer Pond Area are clearly isolated from the main body of Unit 1 Shale residing in the Industrial Area.

The Unit 1 Sandstone is a quartz arenite, consisting of greater than 90 percent very fine to medium grained, subrounded to rounded quartz, with occasional minor silt and gravel. Unit 1 Sandstone is typically pale brownto dark gray, hard to very hard, and is highly cemented with calcite, iron oxide, and/or silica cement. Near contact with underlying Unit 2 Shale, Unit 1 Sandstone commonly becomes silty, poorly cemented, and soft. The Unit 1 Sandstone ranges from very slightly to highly fractured, with the most intensely fractured sandstone containing closely spaced (<2 cm spacing) wide (0.5-1mm) fractures. Fractures are unfilled or calcite filled.

Unit 1 Sandstone underlies most "of the Industrial Area, extends eastward from the Industrial Area, and is found as an isolated, outlier under the Fertilizer Pond Area. Unit 1 Sandstone is thickest in the SX Building area., Unit 1 Sandstone exceeds four feet in thickness in an areaý centered on the SX Building and extending southeastward to the south guardhouse, and in another small area centered on the northeast comer of Pond 2. Typically Unit 1 Sandstone is between 2 and 3 feet thick, and thins rapidly at its outer edges.

Unit 2 Shale is dark gray to grayish black, soft, fissile, and commonly silty or sandy, with occasional, thin sandstone lenses. Unit 2 Shale is highly weathered, weathering to a yellow brown or brownish gray clay or silty clay with remnants of laminated, gray shale. The clay tends to be very soft, plastic, and moist. XRD analysis shows that Unit 2 Shale consists of quartz, chlorite, and illite. Unit 2 Shale is laterally continuous under most of the Industrial Area, extending westward to the Facility boundary, south to the Fertilizer Pond Area, and east and southeast of Highway 10. Unit 2 Shale is partially bisected by the 001, 005, and 007 streams.

Unit 2 Shale is commonly between 4 and 6 feet thick, with a maximum thickness east of the Industrial Area. Unit 2 Shale exceeds 8 feet in thickness in an area along the northernmost part of the site, and in a small area in the' northeast portion of the Fertilizer Pond Area. Unit 2 Shale is generally thinner than 3 feet in the easternmost portions of the Industrial Area.

Unit 2 Sandstone is a quartz arenite, consisting of greater than 90 percent very fine to fine grained, subrounded to rounded quartz, with little to no silt or gravel. Unit 2 Sandstone is Sequoyah Fuels Corporation MFG Inc.

, . 72 October 2002

typically brownish gray to very dark gray, moderately hard to very hard, and is highly cemented, mostly with silica cement. Unit 2 Sandstone, becomes shaley near the contact with the underlying Unit 3 Shale. Unit 2 Sandstone ranges from slightly to highly fractured, with the most intensely fractured sandstone containing closely spaced (<2 cm spacing) wide (0.5-1mm) fractures. Fractures are unfilled or filled with clay or calcite. Like Unit 2 Shale, Unit 2 Sandstone is laterally continuous under most of the Industrial Area, extending westward to the Facility boundary, south to the Fertilizer Pond Area, and east and southeast of Highway 10. Unit 2 Sandstone is partially bisected by the 001, 005, and 007 streams and is generally thickest along the eastern boundary of the, Facility. The thickness exceeds 10 feet near Fertilizer Pond 4 (maximum thickness of 14 feet), south of the Decorative Pond, south of the DUF 4 building, and just north of the northeast corner of the Industrial Area. Unit 2 Sandstone is over 6 feet thick in large areas near the Fertilizer Pond Area, south and southeast of the Decorative Pond, and in the northern portions of the Industrial Area. Unit 2 Sandstone is generally less than 4 feet thick west and southwest of the SX Building, and on site east of the Facility boundary.

Unit 3 Shale is dark gray to grayish black, soft, fissile, and commonly silty or sandy, with occasional, thin sandstone lenses. Unit 3 Shale weathers to a yellow brown or olive brown clay or silty clay with remnants of laminated, gray shale. The clay tends to be very soft, plastic, and wet. XRD analysis shows that Unit 3 Shale consists of quartz, chlorite, and illite. Unit 3 Shale is laterally discontinuous within its aereal limits, commonly grading laterally to a shaley sandstone before pinching out entirely in some locations. Unit 3 Shale extends westward to the Facility boundary, south to the Fertilizer Pond Area, and east and southeast of Highway 10. Unit 3 Shale is partially bisected by the 001, 005, and 007 streams, is commonly between 2 and 4 feet thick, and is thickest south of the DUF 4 building (maximum 18.5 feet thick). Unit 3, Shale exceeds 6 feet thick in only two other locations, an area west and southwest of Pond 2, and in the Yellowcake Storage Area. Unit 3 Shale pinches out and is completely missing in a large area extending southward from the southeast corner of the Industrial Area, and in smaller areas centered on the Fluoride Clarifier, the Emergency Basin, the northwest corner of Pond 2, and Pond 6.

Sequoyah Fuels Corporation MFG Inc.

73 October 2002

Unit 3 Sandstone is a quartz arenite, consisting of greater than 90 percent very fine subrounded to rounded quartz, with little to no silt or gravel. Unit 3 Sandstone is typically gray to very dark gray, moderately hard to very hard, and is highly cemented, mostly with silica cement. Unit 3 Sandstone is generally massive with occasional, very tight fractures, commonly calcite cemented. Unit 3 Sandstone commonly becomes shaley near the contact with the underlying Unit 4 Shale. Unit 3 Sandstone is laterally continuous under most of site, except for the southwest and southernmost portions of the property, where it is not found. Unit 3 Sandstone is slightly bisected by the 005 and 007 streams, and is bisected by the 001 Stream under the storm water reservoir (Figure 4-1). Unit 3 Sandstone is commonly between about 4 and 8 feet thick, and is thickest in the central and eastern portions of the Industrial Area, where it exceeds 10 feet.

Maximum thickness (15.6 feet) of Unit 3 Sandstone is found near the northeast comer of the Administration Building. Unit 3 Sandstone also exceeds 10 feet thick southwest of the Pond 2 and in the easternmost portions of the SFC.

Unit 4 Shale is dark gray to black, soft to very soft, and very thinly laminated to fissile. Unit 4 Shale weathers to a yellow brown to light brown silty clay with remnants of laminated, gray shale. Unit 4 Shale commonly becomes hard, brittle, and sandy near its base. Thin intervals of very hard, pyritized Unit 4 Shale are found at widely scattered locations, mostly east of the Industrial Area and south of the Fertilizer Pond Area. XRD analysis shows Unit 4 Shale consists of quartz, chlorite, and illite. Unit 4 Shale is laterally continuous throughout most of the site, and ranges from 0 feet thick at the southwest comer of the property, to almost 40 feet thick under the hill at the southernmost Facility boundary. Under most of the Industrial Area Unit 4 Shale is between 16 and 18 feet thick, and is between 13 and 19 feet thick under most of the Fertilizer Pond Area. Unit 4 Shale exceeds 20 feet thick in the following areas, in the southernmost Pond 2, the Agland area, the northwest comer of the property, and in the southernmost portions of the property.

Unit 4 Sandstone is a quartz arenite, consisting of greater than 90 percent very fine, subrounded to rounded quartz, with little to no silt or gravel. Unit 4 Sandstone is typically light gray to dark gray, hard to very hard and dense. Unit 4 Sandstone is slightly to moderately fractured, and most commonly contains widely to very widely spaced, thin, calcite filled fractures. Unit 4 Sandstone Sequoyah Fuels Corporation MFG Inc.

. . ,.,.,,..*- ,.,,.,..74 October 2002

is laterally continuous under most of site, and is commonly between about 8 and 14 feet thick.

Unit 4 Sandstone is thickest (about 18 feet thick) along the Illinois River just south of the 005 Stream, and is less than 8 feet thick north of the Fluoride Holding Basin No. 2, and at the southwestern portion of the property.

Unit 5 Shale is dark gray to grayish black, soft, and fissile. Unit 5 Shale is laterally continuous under the site. Ten boreholes have penetrated Unit 5 Shale, and based on this limited lithological data, the thickness of Unit 5 Shale exceeds 22 feet under the entire Facility.

6.3 Regional Hydrogeology Regional groundwater flow in the area of the Facility is generally westward towards the Illinois or Arkansas Rivers. Groundwater in the region occurs principally in alluvium along the Arkansas and Illinois rivers and some terrace deposits along the Arkansas River. Water quality in alluvium and terrace deposits is generally good to excellent, but most of the water samples are hard to very hard (median hardness 255 parts per million [ppm]), making the water suitable for irrigation (Marcher, 1969). The only major bedrock hydrological unit near the Facility occurs approximately 10 miles northeast- of the Facility in the Mississippian-age Keokuk and Reed Springs formations (Figure 6-6 and 6-6a). This hydrological unit is considered to be moderately favorable for groundwater supplies, yielding as much as 20 gpm, locally more (Marcher, 1969).

The Akota Formation produces limited quantities of groundwater. Most wells in the Akota Formation yield only a fraction of a gallon per minute to a few gallons per minute (Marcher, 1969). Water quality is generally considered poor to fair, with 57 percent of the wells tested containing more than 250 ppm sulfate, 10 percent contained more than 250 ppm chloride, and 53 percent contained more than 500 ppm total dissolved solids (Marcher, 1969).

7.0 SITE HYDROGEOLOGIC CONCEPTUAL MODEL Data and interpretations generated during the course of this investigation, as well as data and conclusions presented in previous investigations at the Facility, have allowed for a development of a comprehensive site hydrogeologic conceptual model. Facility lithologic and topographic data were used to develop an extensive site hydrostratigraphic model that incorporates detailed Sequoyah Fuels Corporation MFG Inc.

, - 75 October 2002

interpretations of the lateral extent and layer thickness of surface cover and bedrock units across the Facility. Groundwater flow and COC transport through the hydrologic units have been defined based on the review of potentiometric, hydraulic, and geochemical data. The combination of these data presents a detailed depiction of the migration of the site-derived COCs and the potential point of exposure pathways. These interpretations provide the conceptual framework on which the numerical modeling results are based.

7.1 Hydrostratigraphic Model A three-dimensional hydrostratigraphic model of the shallow geology at the Facility and surrounding watershed has been developed with Environmental Visualization System (EVS) software developed by the Ctech Development Corporation. EVS incorporates a three-dimensional spatial interpolation scheme (kriging) that assigns calculated layer elevations of multiple geologic surfaces to points across a model domain grid. The model has been generated with site data and includes 10 geologic layers from surface Quaternary deposits stratigraphically down to Unit 5 Shale. The site data used to generate the model include lithologic data from boreholes, survey data from outcrop exposures, and topographic data of the ground surface. A detailed discussion of the lithologic data and the development of the hydrostratigraphic model is presented in Appendix H. EVS input and output files are presented on the CD included with this report. The lateral extent of the model is bounded on the west by Illinois and Arkansas Rivers, on the northwest by the Salt Branch drainage, and on the southeast by the drainage paralleling the Carlile School Fault.

It was observed during model development that the kriging algorithm produced significant inaccuracies near topographic surfaces. The program's tendency is to warp the subsurface geologic boundaries to mimic the topographic features of the Facility. A Fortran program, evstrim.exe, was created to allow independent kriging of the geologic surfaces and the alluvial/topographic surfaces. The program was used to trim the subsurface geologic model to the bottom of the alluvial layer (model layer 1) and then combines the file into one geologic model. The resulting geologic framework more accurately depicted the conceptual geologic model interpreted from site data and field observations. The evstrim.exe code is presented in Appendix I.

Sequoyah Fuels Corporation MFG Inc.

... . . ,...n..*.. ".6. 76 October 2002

The hydrostratigraphic model is presented in Figures 7-1 to 7-8. Figure 7-1 presents a bedrock geology map of the hydrostratigraphic units that subcrop below the Quaternary surface deposits.

The presence of the bedrock units is strongly dependent upon surface topography. The stratigraphically higher units (Unit 1 Shale through Unit 3 Sandstone) are only found in areas of relatively high elevation, such as in the vicinity of the Process Area. In the lower lying portions of the Facility, such as the Agland and the bottoms of drainages adjacent to the Robert S. Kerr Reservoir, the stratigraphically higher units have been eroded away, leaving stratigraphically lower units (Unit 4 Shale through Unit 5 Shale) as the uppermost bedrock units. Along the Robert S. Kerr Reservoir, Unit 5 Shale is the uppermost bedrock unit adjacent to the northern Facility, and Unit 4 Sandstone is the uppermost bedrock to the south, in the Agland area.

The terrace, colluvium, and alluvium deposits are treated as a single unit in the hydrostratigraphic model and are named Quaternary surface deposits (Figures 7-3 to 7-8). For the purpose of the hydrostratigraphic model these units are treated as a single unit because they form a relatively continuous layer of similar age that overlies older bedrock formations. It should be noted, however, that these deposits are considered to be distinct hydrologic units due to their differing depositional mechanisms and hydraulic properties.

Figures 7-3 through 7-8 present selected cross-sections of the model. The cross-section locations are presented in Figure 7-2. Sections A-A', B-B', and C-C' trend north-south, and are generally perpendicular to groundwater flow. Sections D-D' and E-E' trend east-west, and are generally parallel to groundwater flow. Section F-F' trends northeast-southwest. The general westward dip of the bedrock, towards the Robert S. Kerr Reservoir, is clearly displayed in these cross-sections.

In general, the stratigraphically higher units, Unit 1 Shale, Unit 1 Sandstone, Unit 2 Shale, Unit 2 Sandstone, Unit 3 Shale, and Unit 3 Sandstone, are relatively thin and are not laterally extensive across the model domain. Unit 1 Shale, where present, is typically about six feet thick, however near the Emergency Pond and the Yellowcake Storage Pad Unit 1 Shale is greater than 10 feet thick. The stratigraphic units from Unit 1 Sandstone downward through Unit 3 Sandstone are each generally less than three feet thick. The Unit 3 Shale frequently pinches out entirely, and Sequoyah Fuels Corporation MFG Inc.

......... --.,.t.-. ,. ,77 October 2002

the other stratigraphically upper units commonly thin to less than one foot thick. In contrast, the deeper units, Unit 4 Shale, Unit 4 Sandstone, and Unit 5 Shale, are laterally extensive across the model domain, and typically have thicknesses greater than 10 feet.

7.2 Groundwater Occurrence Groundwater originates from precipitation, irrigation and the fire water suppression system that infiltrates through the Quaternary surface cover. The fire water suppression system had numerous leaks and is estimated to supply approximately 7,500 ft3/day to the surface deposits in the Process Area. Once precipitation has entered the subsurface it migrates downward through the bedrock units and flows radially away from the potentiometric high that corresponds to the topographic high in the pastureland east of Highway 10. Subsurface flow discharges to the surface waters that surround the watershed including Robert S. Kerr Reservoir to the west, Salt Branch to the north, and the Salt Branch tributary that parallels the Carlile School Fault to the east. June 2001 potentiometric surface maps for the hydrologic units are presented in Figures 7-9 through 7-13. A conceptualized schematic of the site hydrogeology is displayed in Figure 7-14.

The stratigraphic units from the surface down to, and including, Unit 5 Shale are not connected to regional groundwater flow upgradient of the watershed defined above. Based on the hydrostratigraphic model, bedrock units above and including Unit 4 Sandstone are not laterally extensive across the Salt Branch drainage, and are therefore disconnected from upgradient groundwater flow in this area. Unit 5 Shale is partially continuous across Salt Branch, but it is likely that upgradient groundwater flow in Unit 5 Shale discharges to the Salt Branch creating a hydrologic divide. Along the Salt Branch tributary, east of the Facility, all units except Unit 4 Shale through Unit 5 Shale have been disconnected by erosion. Similar to Salt Branch, this drainage also acts as a hydrologic divide, as indicated by the Unit 4 Shale potentiometric surface map (Figure 7-12). Therefore, upgradient flow will discharge to this drainage and not impact the hydrogeology underlying the Facility.

The Carlile School Fault, where it trends through Salt Branch tributary drainage (Figure 6-4), is not significant to the Facility hydrogeology because it is located in a discharge zone of the Sequoyah Fuels Corporation MFG Inc.

........ . . *,...,.-, .P.s,, 78 October 2002

Facility watershed. Therefore, any groundwater being diverted or transmitted by the fault in this area would flow down drainage, away from the Facility. In the extreme southeast comer of the Facility, where the fault leaves the Salt Branch tributary, a hydrologic divide is not present.

However, any flow across the fault in this area is likely to be greatly restricted by the lateral discontinuity and near vertical dip of geologic layers resulting from vertical displacement along the fault and also by the near vertical dip of the geologic layers adjacent to the fault (SFC, 1997).

Underlying the Facility, flow is generally to the west, and primarily occurs through the fissile shale units. The transmissivity of the shale units is highly heterogeneous due to large variations in unit thickness and hydraulic conductivity. The slug testing results indicate that the hydraulic conductivity varies from two to three orders of magnitude in individual shale units (Appendix J and Table 4-9). Overall the measured conductivity of the shale units ranges from 1.88 ft/day to 0.00416 ft/day. The shale conductivity is strongly dependent on the degree of fissility within the in the individual units, and the extent of the fissility in the shales appear to be spatially random.

The distribution of conductivity does not appear to represent a spatial pattern, nor does it appear to be related to any geologic features at the Facility. The most poignant evidence indicating the randomness of shale conductivity is the slug test results from wells MWI11A and MW114A.

These wells were both completed in Unit 4 Shale, with a lateral separation of approximately 20 feet (Figure 4-1). The calculated conductivity of MWI 11A is more than an order of magnitude greater than the results at MW1 14A (Table 4-8).

Groundwater in the shale units discharge laterally to streams that flow to the Robert S. Kerr Reservoir, hillside colluvium, and/or to Arkansas/Illinois River alluvium; additionally the hydrostratigraphic model indicates that Unit 5 Shale discharges directly to the Robert S. Kerr Reservoir adjacent to the northern portion of the Facility. The horizontal hydraulic gradient in the terrace/Unit 1 Shale in the MPB area is approximately 0.008 ft/ft. In the deeper shale units, the horizontal gradient ranges from 0.01 to 0.04 ft/ft across the Facility. Groundwater in the colluvium and alluvium also discharges to the Robert S. Kerr Reservoir and its tributaries. The horizontal hydraulic gradient in the alluvium ranges from 0.0059 to 0.0081 ft/ft (Figure 7-13).

Minor flow also occurs in the terrace deposits in areas where it is partially saturated.

Sequoyah Fuels Corporation MFG Inc.

.. *-- 79 October 2002

The sandstone units are highly cemented and transmit insignificant volumes of groundwater relative to the shale units. Estimates of vertical hydraulic conductivity of Unit 4 Sandstone range from 2.25x10-5 ft/d to 4.75x10 5 ft/day (SFC, 1998a) are several orders of magnitude smaller than observed in the shale units. However, localized zones of dense, unfilled fractures have been observed in lithologic core samples, suggesting that preferential pathways through the sandstone units may exist. Because the fracture zones do not appear to be laterally extensive, it is likely that groundwater, transmission through fractures in the sandstones is primarily vertical, with no significant lateral transmission of groundwater occurring.

A downward vertical gradient persists between all of the bedrock units over the majority of the Facility. The observed downward gradient ranges between 0.08 and 0.35 ft/ft. The vertical flow component is significantly smaller than the horizontal component due to the extremely low vertical conductivity of the sandstone units. Vertical groundwater flow also occurs through the hundreds of wells and boreholes that are completed in multiple shale units across the Facility.

These features act as vertical conduits that hydraulically connect shale units that would be naturally buffered by the sandstone units. They are distributed over the entire Facility, excluding the Agland, but have the greatest density in the vicinity of the Process Area, Solid Waste Burial Areas, the Fertilizer Pond Area, and Pond 2.

7.3 COC Transport Solute transport pathways primarily follow groundwater flow paths through the subsurface.

COCs are laterally transported through the upper fractured shale units where they discharge to the hillside colluvium or directly to surface water. COC mass in the upper shale units is also discharged downward to lower shale units in localized areas where sandstone is fractured and also through the wells and boreholes that were completed in multiple shale units. Lateral COC transport through the sandstone units is negligible due to their extremely low hydraulic conductivity and effective porosity.

The movement of uranium and arsenic through the subsurface is retarded by chemical adsorption/desorption reactions that limit the respective solute velocities. The velocity of any Sequoyah Fuels Corporation MFG Inc.

.. R.. .. ,.,.,. 80 October 2002

solute in groundwater is given by the groundwater velocity divided by the solute specific retardation factor.

Nitrate is an anion and has a negligible affinity to shales and sandstones that consist primarily of silica (no charge) and clay minerals (negative charge). As such, a conservative retardation factor for nitrate is 1, and the average solute velocity for nitrate is the same as the groundwater velocity. Nitrate, therefore, is significantly more mobile than uranium and arsenic.

Sequoyah Fuels Corporation MFG Inc.

81 October 2002

8.0 HYDROGEOLOGIC NUMERICAL MODEL Groundwater flow and solute transport modeling of the site was conducted in order to predict the future migration of site-derived COCs. The design of the flow and transport models is based on the hydrogeologic conceptual model discussed in Section 7.0. The models simulate 1,000-year predictive scenarios based on steady-state flow conditions and current distributions of COCs dissolved in groundwater. The predictive scenarios incorporate post-decommissioning modifications to topography, flow field, and COC source materials to more accurately represent future conditions. Modeling results were evaluated to estimate potential future concentrations at exposure points, and surface water and groundwater source loading to Robert S. Kerr Reservoir.

8.1 Groundwater Vistas Groundwater Vistas Version 3.09 (Rumbaugh and Rumbaugh, 2001) is a pre- and post-processing modeling environment for Microsoft Windows that couples a model design system with comprehensive graphical analysis tools. This program provides visualization of model development and results, and allows for enhanced model quality and accuracy. Although Groundwater Vistas supports a wide variety of flow and transport models, it was used in this project for the development of MODFLOW and MT3DMS modeling files and for processing modeling results.

8.2 Groundwater Flow Model The USGS three-dimensional finite difference model, MODFLOW 96, (McDonald and Harbaugh, 1988) was used as the flow model for simulating flow at the Facility. The McDonald-Harbaugh model is a finite difference groundwater flow model developed by the USGS. It is widely used and well documented. It is a true three-dimensional flow model, except for the assumption that the vertical component of flow is aligned with gravity. It has the capability of simulating a heterogeneous aquifer with evapotranspiration, variable well pumpage, drains, rivers, variable recharge, and different boundary conditions under either artesian or water table conditions.

Sequoyah Fuels Corporation MFG Inc.

Uý ..

R.- 82 October 2002

8.3 Solute Transport Model MT3DMS (Zheng and Wang, 1999) is a three-dimensional multi-species transport code originally written under contract to the EPA and later modified for the COE. The code has been extensively tested is widely used and accepted. MT3DMS has comprehensive capabilities for simulating advection, dispersion and chemical reactions of contaminants in groundwater flow systems.

MT3DMS is developed for use with any block-centered finite-difference flow model such as MODFLOW. The results from the MODFLOW flow model can be directly imported into the transport simulation. After the flow field is developed by MODFLOW, the information needed for the transport model can be saved and then subsequently used by the transport model.

MT3DMS is based on a modular structure to permit simulation of transport components independently or jointly. MT3DMS interfaces directly with the USGS finite-difference groundwater flow model, MODFLOW, for the head solution, and supports all the hydrologic and discretization features of MODFLOW. MT3DMS has been widely accepted by practitioners and researchers alike and applied in numerous field-scale modeling studies in the United States and throughout the world. The MT3DMS code has a comprehensive set of solution options, including the method of characteristics (MOC), the modified method of characteristics (MMOC),

a hybrid of these two methods (HMOC), the standard finite-difference method (FDM), and the third order total variation diminishing (TVD) method.

One limitation with MT3DMS is the inability to use the river and stream package simultaneously. Simulating rivers and ponds, boundaries typically simulated using the river package, with constant head nodes circumvented this difficulty.

8.4 Groundwater Flow Model Design The groundwater flow regime at the Facility was simulated based on the conceptual model described in Section 7.0. The model was initially designed and calibrated to represent current (pre-decommissioning) steady-state conditions. The model was then modified to incorporate post-decommissioning modifications to accurately represent the future hydraulic flow field.

Sequoyah Fuels Corporation MFG Inc.

..... . .. . . 83 October 2002

8.4.1 Model Grid The grid framework was imported directly to MODFLOW from the hydrostratigraphic model discussed in Section 7.1. The model domain, shown in Figure 8-1, consists of 122 columns, 123 rows, and 6 layers. A cross-section of the model grid displaying this design is presented in Figure 8-2. Grid spacing for the central portion of the flow model is 50 feet. A telescoping grid was implemented on the fringes of the model domain to reduce model computations in areas where less resolution of hydraulic head is required. In these areas, the grid spacing was expanded to 100 and 200 feet.

Figures 7-1 through 7-8, which display the hydrostratigraphic model, are also accurate representations of the model layer geometry. As with the hydrostratigraphic model, Layer 1 represents the Quaternary surface deposits that consist of the terrace deposits in the processing area, the colluvial material on the steeper slopes of the Facility, and the alluvium located in the river bottomlands. Layers 2 through 6 are representative of Unit 1, 2, 3, 4, and 5 Shale, respectively. The model domain is designed as a quasi-three dimensional system where the low-permeability sandstone units are implicitly modeled. In this approach, the sandstone units are only represented by vertical conductance between shale units. Vertical water fluxes between shale units are calculated based upon sandstone vertical hydraulic conductivity and thickness (i.e.

distance between shale units). No lateral water flux or lateral solute transport is calculated in the sandstone units. The bottom of model Layer 6 (Unit 5 Shale) is modeled as a no-flow boundary.

Model layers and the corresponding geologic units are related in Figures 8-3 through 8-8 and in Table 8-1.

In low-lying areas where upper bedrock units have been eroded away, colluvium or alluvium directly overlies lower bedrock units. Because finite difference models do not allow complete pinching out of a model layer, there are active cells in layers where the respective bedrock unit does not exist. Cells in these areas of the domain could not be modeled as inactive because it would disconnect the hydraulic communication between the underlying bedrock unit and the overlying surface deposits. Therefore, in order to retain vertical hydraulic connection, cells in layers where the bedrock unit has been eroded away have been assigned the properties of the overlying surface deposit unit. The layer thickness of these cells is 0.2 feet.

Sequoyah Fuels Corporation MFG Inc.

.. ..... ., 84 October 2002

8.4.2 Boundary Conditions Hydrogeologic boundary conditions that are incorporated in the model domain include recharge, evapotranspiration, streams, rivers, ponds, drains, and no-flow boundaries. Figures 8-9 through 8-16 present the boundary conditions incorporated into the model layers.

The shallow groundwater system at the Facility is bounded by no-flow boundaries that hydraulically separate the area of concern near the site from the surrounding groundwater system. These boundaries include groundwater divides and the Carlile School Fault. Areas of the model domain that are separated from the site by no-flow boundaries are not significant to the hydrogeology of the site, and therefore, are simulated with no-flow cells. Of the 90,036 total model cells, 65,451 (73 percent) are active. Groundwater divides areas of discharge or recharge that control the flow of an aquifer. Divides are typically formed by the discharge of groundwater to creeks and rivers, and recharge from precipitation and infiltration. Areas representing discharge divides include the Arkansas and Illinois Rivers, and the Salt Branch.

The southeastern portion of the model, including the tributary of the Salt Branch, lie within the area faulted by the Carlile School Fault. The fault has been interpreted as a no-flow zone. The local hydrogeology in the vicinity of the faulted area appears to be controlled by the tributary of the Salt Branch, which is a local discharge zone. If groundwater were being discharged across the fault, it would discharge into the Salt Branch or its tributary.

8.4.2.1 Recharge Arial recharge resulting from the infiltration of precipitation is modeled based on a percentage of average annual rainfall measured in the nearby town of Sallisaw, Oklahoma. The average annual rainfall was calculated to be 42 inches per year. Rainfall occurring at the Facility percolates as recharge, flows overland to streams and ponds as runoff, or evaporates. The percentage of rainfall contributing to recharge is estimated to be approximately 5 percent, or 2.2 inches per year (5.0x10-4 feet per day). The recharge rate is increased in the valley bottoms and Oak woodland areas. During precipitation events, valley bottoms collect large amounts of runoff from higher elevations, which result in localized areas of higher infiltration. The dense Sequoyah Fuels Corporation MFG Inc.

....- ,.. 85 October 2002

vegetation in the woodland areas restricts runoff, which creates a greater percentage of precipitation available for recharge. Recharge rates in the valley bottoms and Oak woodland were estimated during model calibration to be 7.9 inches per year (1.8x 10-3 feet per day).

Recharge to the shallow groundwater system is increased by some operational practices at the Facility. Irrigation water plus the natural recharge in the Agland area is equal to an average annual rate of 7.9 inches per year (1.8x10 3 feet per day). The leaky fire water system in the Process Area also increases the recharge to the subsurface. Accurate leakage rates to the groundwater system are not available, but the total recharge rate in the Process Area was estimated to be 3.8 inches per year (8.7x10 4 feet per day) during model calibration. This equates to 7,500 ft3/day of recharge attributable to the fire water suppression system. The distribution of modeled recharge rates is presented in Figure 8-9.

8.4.2.3 Evapotranspiration Three vegetation types were identified relating to evapotranspiration (ET) at the Facility. These included the Oak woodland, Bluestem prairie grasslands and Bermuda grass pasturelands. A detailed discussion of the derivation of ET rates and extinction depths are presented in Appendix K. These values were used as initial estimates of ET rate and extinction depth in the Evapotranspiration Package. The final model values of ET rate and extinction depth were estimated during model calibration. The calibrated values of ET rate for the Oak woodland, Bluestem prairie grasslands and Bermuda grass pasturelands, are 5.0x 10-3 , 3.0x 10-3 , 2.4x 10-2 feet per day, respectively. Calibrated values of extinction depth are, 5.0, 3.0, and 6.5 feet, respectively. The extinction depth, as used in the MODFLOW Evapotranspiration Package, is the depth at which evapotranspiration no longer occurs.

The distribution of the vegetation types was determined based on site inspection and evaluation of aerial photographs. The distribution of the three different vegetation types used in the model is presented in Figure 8-10.

Sequoyah Fuels Corporation MFG Inc.

. ,.. -- I'm 86 October 2002

8.4.2.3 Streams The several streams that exist on the Facility have been simulated using the either the Prudic Stream Package for MODFLOW or Constant Head Cells. Stream characteristics were based on field observations. Stream locations were obtained from drawings provided by the Facility, and are presented in Figure 2-5. The stream locations as simulated by the model are presented in Figure 8-11.

The Prudic package for MODFLOW was used to simulate 001, 004, 005, and 007 streams, as well as Creek A, located south of the Fertilizer Pond Area, and the unnamed streams north of the Storm Water Reservoir. The Prudic package calculates stream flow and stage using the Manning Equation and stream dimensions. The Manning Equation requires a roughness coefficient, stream cross-sectional area, stream slope, and stream hydraulic radius to calculate stream flow in each reach of a modeled stream segment. Flows from upstream tributaries are summed and used as initial flow in the first reach of the downstream segment.

The hydraulic radius and the cross-sectional area of the stream are calculated based on the stream width and the groundwater elevation. Initial surface water elevations and the streambed elevations were calculated using a FORTRAN 77 program. The program is designed to read the elevation of the land surface in the stream cell from a binary file containing Layer 1 elevation saved by Groundwater Vistas and to calculate the stream elevation based on an initial stage estimate of one foot.

The slope of each stream reach was calculated using site topographic survey information provided by SFC. These data were used instead of available USGS topographic maps because additional work completed by the Facility has resulted in more accurate topographic data. The average stream width was estimated to be five feet based on field observation. Mannings coefficient was estimated to be 0.025 for a natural stream (Daugherty and others, 1985).

Calibrated roughness coefficients ranged from 0.04 in the grassy areas to 0.001 where flow was over smooth bedrock.

Sequoyah Fuels Corporation MFG Inc.

... .,**- ,,.-. R, ,,,. 87 October 2002

Stream stage is calculated based on the Manning calculated stream flow and stream cross-sectional area. Surface water-groundwater exchange is then calculated in a similar manner as the river package with stream head, stream width, stream length, streambed thickness, and streambed hydraulic conductivity.

The value of stream cell conductance was estimated during calibration to 100 ft2 /day. Calculated stream flow was used as a calibration target for 001/Creek A, 004, 005, and 007 streams. The estimated flows for these streams is discussed and presented in Section 2.3.2. Stream parameters were adjusted during model calibration until calculated stream flow approached these estimates.

The Salt Branch and its tributary (Figure 2-2) were simulated using constant head nodes because an estimation of flow in these streams is not necessary. Observed stream flow data are not available for comparison with calculated values. Also, the evaluation of predicted surface water COC concentration is not necessary because the COCs are not transported toward these streams.

The constant head elevation representing each stream segment is equal to the top of model Layer 1 (ground surface) for each node.

8.4.2.4 Rivers MT3DMS does not allow for the simultaneous execution of the Prudic Package (streams) and River Package in the same simulation. It was determined that simulating stream-aquifer interaction with the Prudic Package is of greater importance than simulating the Illinois and Arkansas River-aquifer interaction with the River Package. Therefore, the Illinois and Arkansas Rivers are simulated using Constant Head Cells (Figures 8-11 through 8-16). A constant elevation of 460 feet amsl was applied to all Robert S. Kerr Reservoir nodes based on review of USGS topographic maps of the area and the mean pool elevation reported by the COE (RSA, 1991). The simulation results using the constant head package were compared to the simulation using the river package. The results were nearly indistinguishable.

8.4.2.5 Ponds Three site surface water impoundments, the Storm Water Reservoir, Decorative Pond, and Emergency Basin/North Ditch, are simulated with Constant Head Cells (Figures 8-11 through 8-Sequoyah Fuels Corporation MFG Inc.

.-. ,,, 88 October 2002

15). The ponds are simulated in the appropriate model layers based on review of the hydrostratigraphic model (Section 7.0). The Storm Water Reservoir is simulated in model layers 1 through 5 (colluvium, Unit 3 Shale, and Unit 4 Shale) at an elevation of 510 feet amsl. 'The Decorative Pond is simulated in model Layers 1 and 2 (terrace and Unit 1 Shale) at an elevation of 540 feet arnsl. The Emergency Basin/North Ditch is simulated in model Layer 1 (terrace) at an elevation of 550 feet amsl.

8.4.2.5 Drains There are four groundwater drains simulated within the model domain with the Drain Package (Figures 8-11 and 8-12). The CSD is described in detail in Section 2.1.22. The pipe bedding serves as a preferential groundwater pathway from the Process Area to 001 Outfall. The pipe bedding was installed on the surface of Unit 1 Sandstone and the drain was therefore simulated in Unit 1 Shale (model Layer 2). The second arm of the CSD, which runs east west from south of the MPB to the emergency catch basin, is also simulated in Unit 1 Shale (model Layer 2).

Two groundwater drains in the terrace deposits are located near the northwest corner of Pond 2 and along the southern edge of Pond 2. An additional drain is located on top of Unit 1 Sandstone, the along the 005 stream, between the Emergency Basin and the 005 Outfall. French drain systems located adjacent to pond 2 and in the 005 stream were simulated in Layer 1. An additional French drain in the 005 stream was simulated in Layer 2. The Drain Package parameters for all of the simulated groundwater drains were estimated during model calibration.

8.4.3 Flow Model Parameters Equivalent porous media (EPM) modeling methods have been applied to simulate groundwater flow through the fractured shale and sandstone units. The EPM approach replaces the primary and secondary hydraulic properties associated with a fractured porous medium with effective hydraulic properties that are representative of a single porous medium with comparable water fluxes and velocities. The validity of EPM use increases proportionally with the degree of fracture interconnectivity and decreases in fracture spacing. Therefore, the EPM approach is Sequoyah Fuels Corporation MFG Inc.

.. .... .,.* . u-. 89 October 2002

considered to be valid for the shale units that consist of dense, fissile-like fractures that have a high degree of interconnectivity.

The modeled hydraulic conductivity for each shale unit is based on the analyses of the slug tests described in Section 4.2. Slug test results are summarized in Table 4-8. For each shale unit, 'the average measured value was used as an initial value in model calibration.' The average values were adjusted within the observed range of variation in order to achieve an acceptable model calibration. Vertical hydraulic conductivity for each shale unit was estimated to be 10 percent of the calibrated horizontal hydraulic conductivity value. The calibrated hydraulic conductivity value for each hydrologic unit is presented in Table 8-2. As discussed in Section 7.2, the slug test results indicate large heterogeneities in the shale units that appear to be random in nature.

An extraordinarily large number of closely spaced conductivity estimates would be necessary to accurately depict the variation in the shale units. Therefore, each unit was assigned a single value that is considered to be representative of the average hydraulic conductivity of each respective shale unit.

The hydraulic conductivity of the Arkansas/Illinois River floodplain alluvium was estimated from a single slug test conducted at well MW120. The results of the slug test indicate that the hydraulic conductivity is approximately 5 ft/day. During flow model calibration, it was observed that 5 ft/day resulted in a steeper gradient in the alluvium than is observed. The alluvium hydraulic conductivity value was increased to 50 ft/day, and resulted in a more representative gradient in the alluvium. A conductivity value of 50 ft/day is within the typical range of alluvial sediments (Freeze and Cherry, 1979).

Measurements of sandstone hydraulic conductivity have only been conducted in Unit 4 Sandstone. Estimates of vertical conductivity of Unit 4 Sandstone range from 2.50x10-5 to 4.75x10-5 ft/day. The mean value of 3.63x10 5 was used as an initial estimate for all of the sandstone units, and was independently varied during calibration.

The hydraulic effects of the wells and borings completed in multiple shale units were simulated by distributing cells with high vertical conductivities across the Facility. The cells form vertical columns of high conductivity media in Layers 1 through 5 (Quaternary surface cover to Unit 4 Sequoyah Fuels Corporation MFG Inc.

.. i., , 90 October 2002

Shale). The vertical conductivity of the cells is 0.05 ft/day. The horizontal conductivity of the cells is 0.5 ft/day. Vertical leakance was adjusted to 0.05 ft/day in the high conductivity locations. Each high conductivity cell is 50 feet by 50 feet, and therefore represents multiple vertical conduits. Highly conductive cells were located based on the spatial distribution and density of the wells and borings completed in multiple shale units based on data provided by SFC. Figure 8-17 presents locations of the modeled high conductivity cells in relation to the distribution of the wells and borings completed in multiple shale units. The majority of the high conductivity cells are located in the vicinity of the Process Area. They are also located near the Solid Waste Burial Areas, the Fertilizer Pond Area, and Pond 2.

8.4.4 Flow Model Calibration The objective of the calibration process is to refine the numerical model by adjusting model input parameters so that model output more accurately represents observed data. The model was calibrated to the average annual groundwater elevations measured in 69 wells. These wells were selected because they are screened in one shale layer and the sand pack did not extend to an adjacent shale layer. Wells that are screened in multiple wells or in hydraulic communication with adjacent shale units via the sand pack were considered to provide unreliable head estimates.

The model was also compared to stream flow values as estimated by Oklahoma Department of Environmental Quality (OKDEQ) mean annual flow per unit drainage area model and site inspection (Section 2.3.2)

Figures 8-18 through 8-23 display calibrated head maps of each model layer. Model calibration targets and residuals (observed head minus calculated head) are presented in Table 8-3.

Calibration statistics including mean residual (MR), mean absolute residual (MAR), and standard deviation (SD) are also presented in Table 8-3. The MR and MAR are -1.51 feet and 3.48 feet, respectively. The value of SD is 5.00 feet. The mass balance error of the calibrated model is 0.49 percent.

A plot of observed heads versus calculated heads is presented in Figure 8-24. Generally, the points on Figure 8-24 trend on a 1:1 slope indicating that residuals are consistent over the total range of calculated heads. No other trends are evident that suggest a pattern in the residuals.

Sequoyah Fuels Corporation MFG Inc.

P....,,,,, a- 91 October 2002

Calibration quality can be quantified by evaluating the calibration residuals in relation to the overall model response. (Anderson and Woessner, 1992). Values of residual error (RE) have been calculated by dividing absolute residuals by the range in calculated head in the model domain, 123.74 feet (Table 8-3). Prior to calibration, criteria were established to assess the quality of the calibration. Calculated heads with RE less than 0.050 (i.e. 5 percent error) are considered to be good. Values of RE between 0.050 and 0.100 are considered to be satisfactory.

The values of RE calculated from MAR and SD are 0.028 and 0.040, respectively, and indicate a good quality of calibration.

Values of RE have also been analyzed on an individual basis. Of the 69 calibration targets, 57 (83 percent of targets) have a value of RE less than 0.050, and are categorized as good. Nine targets are categorized as satisfactory. The remaining three targets have RE values greater than 0.100. Of these, MWO12B has the greatest RE value of 0.168. However, the observed head at MWO12B is anomalous when compared to the observed heads at nearby wells MWO07B and MW072B. MWO07B and MW072B both exhibit heads 30 foot higher than at MWO12B. The other 2 targets with RE values greater than 0.100 are equal to or less than 0.121, and only slightly exceed the satisfactory classification.

Flow rates in four site streams have also been evaluated during the calibration process. Stream flow rates for 001/Creek A, 004, 005, 007 streams are presented and discussed in Section 2.3.2.

It should be noted that the OKDEQ stream flow function is a generalized, empirical equation, and practically only represents an order of magnitude estimate. Therefore, residuals less than an order of magnitude are considered to be reasonable. Stream flow in 001/Creek A and 005 streams are consistent with the OKDEQ estimates. The flow estimate for 004 and 007 streams is less than the respective OKDEQ estimates.

The flow model calibration is considered to be very good. Both head and stream flow target criteria have met the pre-defined calibration goals. The favorable calibration results indicate the model produces a reasonable representation of observed groundwater flow conditions at the Facility. The calibration results also provide high levels of confidence in the flow model's ability to predict future hydrologic conditions under the post-decommissioning setting.

Sequoyah Fuels Corporation MFG Inc.

. 92 October 2002

8.4.5 Predictive Scenario After flow model calibration was achieved, the model was modified to incorporate changes to the surface topography and groundwater flow system that will result from decommissioning activities (Section 3.0). The modified groundwater flow model was used'for the long-term solute transport prediction simulations. The modifications were based on the reclamation activities described in Final Decommissioning Alternatives Study Report, June 8, 1998 (SFC, 1998b). The surface elevation was altered to reflect regrading in the Process Area and the geometry of the proposed disposal cell. The modified topography and disposal cell footprint, as incorporated into the model, are presented in Figure 8-25. Recharge was modified to be 0 ft/day over the disposal cell footprint, and 0.0022 ft/day in a band on the north, west, and south sides of the footprint to simulate additional infiltration resulting from precipitation running off of the cell cover. Recharge is not increased on the east side of the cell in response to surface drain system that is proposed for this area. The drain boundary conditions simulating the CSD and French drains near Pond 2 and 005 stream were removed from the model. The Constant Head Cells simulating the Decorative Pond, Storm Water Reservoir, and Emergency Basin/North Ditch have been removed as well. Cells within the Process Area that are used to simulate open borings or wells screened in multiple shales remained in place.

The calculated long-term steady state potentiometric surfaces for the post reclamation modeling are presented in Figures 8-26 through 8-31. The impacts of these changes are significant only in the vicinity of the Process Area where the heads have decreased slightly primarily due to the removal of the leaky fire water system. Despite the change in heads, groundwater flow under the Process Area is still to the west, toward the Robert S. Kerr Reservoir. Heads in other areas of the model domain are practically unchanged. One consequence of the lower heads west of the Process Area is that 004 drainage becomes dry. River loading from the 004 drainage is, therefore, negligible.

8.5 Solute Transport Model Groundwater solute transport modeling of the Facility COCs has been conducted in order to estimate their future migration in the groundwater system underlying the Facility. The identified Sequoyah Fuels Corporation MFG Inc.

. . ,, .. . RMA, 93 October 2002

COCs included in the transport simulations are nitrate, uranium, and arsenic. A discussion of the selection of the COCs is presented in Section 5.7. Transport-modeling parameters were determined based on Facility geochemical testing (Section 5.5) and calibration simulations.

Predictive 1,000-year simulations were then executed based on post-decommissioning modifications to the site topography and subsurface flow field, as described in Section 8.4.5.

The modeling results provide calculated concentrations of the COCs throughout the alluvial and bedrock hydrologic units as well as in potential surface water exposure points surrounding the Facility.

8.5.1 Mathematical Approach The transport solution has been obtained by formulating the three-dimensional Advection-Dispersion Equation with the Third-Order Total Variation Diminishing Method (TVD). The TVD formulation is presented and discussed in detail by Zheng (1990). The TVD method is characterized by stable solutions that are inherently mass conservative. TVD solutions typically produce much less numerical dispersion than finite difference solutions and smaller mass balance errors than Hybrid Method of Characteristic solutions.

8.5.2 Transport Model Parameters The input parameters for the transport simulations include linear distribution coefficient (Kd),

lithologic bulk density (Pb), effective porosity (ýe), and longitudinal, transverse, and vertical dispersivity (CaL, XT, Civ). Horizontal and vertical groundwater flux terms and heads were imported from groundwater flow modeling results described in Section 8.4.

Bulk density of each hydrologic unit is required (along with Kd) to calculate the retarded velocity of the solutes. A value of 2.69 g/cm 3 is used for the shale units, and a value of 1.76 g/cm 3 is used for the alluvial units.

The longitudinal dispersivity in all layers has been initially estimated based on an empirical, scale dependent equation from Xu and Eckstien (1995). The transverse dispersivity and vertical dispersivity were estimated to 10 percent and 1 percent of the longitudinal dispersivity, Sequoyah Fuels Corporation MFG Inc.

PI.,&. o---, .- ,* ,.,, 94 October 2002

respectively (Fetter, 1999). Estimated values of longitudinal, transverse, and Vertical dispersivity using Xu and Eckstien are 50 feet, 5 feet, and 0.5 feet, respectively. Effective porosity was estimated to be 25 percent for the alluvial units and 10 percent for the shale units based on visual inspection of lithologic samples and model calibration. Effective porosity and longitudinal dispersivity were further refined using the Ogata-Banks advection dispersion equation (ADE) solution (Section 8.5.3).

Linear distribution coefficients for uranium and arsenic in Units 1 through 4 Shale were developed from the column desorption and batch testing described in Section 5.5. In Unit 1, 2, and 4 Shale, two estimates of Kd were made from separate borehole locations. Ultimately, Kd derived from laboratory geochemical testing could not reproduce observed conditions in site wells. Bulk Kd values were estimated during model calibration.

Nitrate is an anion and will likely have little affinity to shales and sandstones that consist primarily of silica (no charge) and clay minerals (negative charge). Therefore, the Id for nitrate has been assumed to be zero, allowing it to be transported as a conservative solute with no retardation in all layers. Table 8-4 presents the modeled Kd values for the COCs in all of the model layers.

Nitrate is known to degrade to nitrite and elemental nitrogen under certain natural conditions.

MT3DMS allows for the biochemical degradation of compounds using a first order irreversible rate expression. However, because the extensive data requirements, and because biochemical reactions are generally more complex than is modeled by a first order rate relationship, a conservative approach of no biodegradation was assumed.

8.5.3 One-Dimensional Transport Analysis One-dimensional solute transport analyses were conducted in order to estimate physical transport parameters, including groundwater velocity and longitudinal dispersivity, based on measured COC concentrations. Measured nitrate concentrations at selected wells were analyzed with the Ogata-Barnks solution to the advection-dispersion equation (Ogata and Banks, 1961). The Ogata-Banks solution models one-dimensional solute transport in a uniform flow field, with initial Sequoyah Fuels Corporation MFG Inc.

95 October 2002

conditions of C(x,0) = 0, and boundary conditions of C(0,t) = Co, and C(oo,t) = 0. These conditions represent the migration of a solute from a constant source through a system with zero concentration. The Ogata-Banks solution is expressed as:

2 _

Co+22l- +/-Lerfcx ~X-V j + exp( 21a-v:- jx]

x )erfcL x Ix Where:

C/Co relative solute concentration (dimensionless) vx = groundwater velocity (L t-L) aL = longitudinal dispersivity (L) t = time since start of constant source (t) x = distance from constant source (L)

The analysis consisted of comparing the calculated value of C/Co to the measured value.

Velocity was varied so that the measured and calculated breakthrough (C/Co=0.5) matched.

Longitudinal dispersivity was then varied until the distribution or "spreading" of the calculated curve fit the measured data. The analyses were only conducted where the location, magnitude, and timing of the constituent release are reasonably constrained.

Nitrate was chosen, in part, because it is considered to be conservative in the subsurface. Its migration is not chemically depleted or retarded in the subsurface, and therefore, is transported at the same rate as groundwater. As a result, the velocities determined from the analysis are representative of groundwater velocities. Five wells have been identified that exhibit the conditions consistent with the Ogata-Banks solution, and also are located near sources that are reasonably constrained. These wells include 2322A, 2341, 2354, 2356, and MW095A.

The results of the one-dimensional analyses are presented in Figures 8-32 through 8-36. Near the Fertilizer Pond Area (monitoring wells 2322A, 2341, 2354, and 2356), estimates of groundwater velocity range from 0.072 ft/day to 0.145 ft/day. Values of dispersivity range from 1 ft to 15 ft. The analysis at MW095A indicates that down gradient of Pond 2, the average groundwater velocity is 0.115 ft/day, and the longitudinal dispersivity is 20 feet.

Sequoyah Fuels Corporation MFG Inc.

.. .... 96 October 2002

8.5.4 Transport Model Calibration The transport model was calibrated with a procedure that consisted of comparison of historical geochemical conditions to those predicted by historical transport simulations. The calibration simulations incorporated existing hydrologic conditions (as modeled in Section 7.6) to represent the historical migration of the COCs during the time period from January 1, 1990 to January 1, 2001. Initial chemical concentrations observed in January 1, 1990 are incorporated into the calibration simulation for each COC. The 1990 starting time was selected because it is the earliest time when sufficient groundwater concentration data are available for initial model concentrations. This is primarily because many of the monitoring wells were install in 1990. A significant amount of the COC mass had already entered the groundwater system by 1990. This eliminates the need to simulate many of the complex site sources. Modeling the site COC sources is a significant challenge due to the unknown and most likely variable nature of the location, geometry, timing, and magnitude of the COC sources. It is evident by the data that some sources continued to contribute COC mass to the groundwater after 1990 and even after 1993, when the Facility ceased operations. Where appropriate, these sources were incorporated into the calibration simulations.

Nitrate, a compound assumed to be a conservatively transported constituent, was used to calibrate the effective porosity and dispersion of the transport model. The solute velocity of nitrate, therefore, is equal to groundwater velocity. Nitrate distribution at the site was estimated using available monitoring well data from 1990. Contours of nitrate concentrations were developed for each layer of the model and imported as initial conditions. In cases where a monitoring well was completed in multiple layers, nitrate concentrations were assumed to be the same in all penetrated layers. The initial nitrate concentrations for each model layer are presented in Figures 8-37 through 8-41. Measured nitrate concentrations were compared to modeled nitrate concentrations in key wells. Effective porosity and dispersion were adjusted until the values were approximately the same, mimicking arrival times and concentration.

Chemographs containing observed and calculated COC concentrations for the target well are presented in Appendix F. Using this method, the effects of retardation in uranium and arsenic transport can be calibrated independently of effective porosity and dispersion. Calibrated effective porosity was 25 percent for alluvial units, and 10 percent for shale units. Longitudinal Sequoyah Fuels Corporation MFG Inc.

,.. 97 October 2002

dispersion was calibrated at 20 feet. These values are consistent with observations of lithologic samples, the site conceptual hydrogeologic model, and with the values estimated using the Ogata-Banks analysis. Further estimates of the longitudinal dispersion and effective porosity were obtained using the inverse modeling program PEST (Doherty, 1994, 1995, 2000 and 2001).

Both parameters for each model layer were allowed to vary over two orders of magnitude. The PEST estimates of both effective porosity and longitudinal dispersion exhibited less than five percent difference than those estimated from the Ogata-Banks equation and manual calibration.

The values used incalibration provide good correlation with most of the monitoring well data (Appendix F). There are instances where the model does not predict monitoring well data well.

These wells are generally located close to a suspected nitrate source. Since the exact location, geometry or strength of the source is unknown, no attempt to correct the calibration simulation for active continuing sources. It is assumed that these sources will be removed during decommissioning and will have not significant effect on future predictions.

Once effective porosity and dispersion were calibrated, uranium and arsenic calibration simulations were completed to estimate Kd. The distribution of uranium and arsenic concentrations were estimated using data from groundwater monitoring wells for each layer. As in the nitrate calibration, wells completed in multiple layers were assumed to be representative of the in-situ concentration of all the penetrated layers.

The Kd value was then adjusted until modeled concentrations matched measured concentrations.

It should be noted that the calibrated Kd value used in the model actually represents a bulk parameter used as an effective Kd value that incorporates numerous factors affecting the transport of each constituent. Among these factors are pH, ionic strength of the solute, the presence of organic compounds, number of competing cations, and permeation of the ion exchange sites of the aquifer material. The Kd values used in the model are not representative of those obtained through batch laboratory tests. Kd values obtained from laboratory tests meet the strict definition of Kd, whereas Kd values used in the model are values that make the arrival times and contaminant magnitude in the model behave as observed.

Sequoyah Fuels Corporation MFG Inc.

.. -ý ,.,,.98 October 2002

Additionally, the modeling results in some locations were sensitive to initial concentrations used.

Although a better fit to late time data could be improved by altering the initial conditions, these alterations would be more reflective of source calibration than Kd calibrations. Although some changes in the magnitude of the initial conditions were warranted by the data, these changes were kept to a minimum.

Initial uranium concentrations for each model layer in the uranium transport calibration are presented in Figures 8-42 through 8-46. Historically, the primary sources of site-derived uranium to groundwater are the MPB, SX Building, and Solid Waste Burial Areas (Section 5.8).

Data from the majority of wells near these areas (i.e. MWO10, MWO12, MWO12A, and MW087A) display decreasing uranium concentrations over time, and indicate that source loading is no longer occurring (Appendix F). As a result, no source term was included in the uranium transport calibration. Two wells MW025 and MW067A exhibit increasing concentrations over time, however data from these wells represent the initial breakthrough of the solute front. It is anticipated that the concentrations in these wells will decrease in the future. Uranium sources were also not included to simulate desorption and/or dissolution of uranium from soils.

Although significant soil concentrations have been measured at the Facility, there is no apparent correlation between soil concentrations and groundwater concentrations.

Values of Kd in the calibrated uranium transport model were estimated from comparison of observed and calculated concentrations at 54 well locations. As with the arsenic simulation, values of effective porosity and dispersivity were obtained from the nitrate calibration results.

The observed and calculated chemographs for all of the wells included in the uranium calibration are presented in Appendix F. A value of KI has been estimated for the Quaternary surface deposits and each shale unit. A unique Kd value could not be developed for the individual lithologies that make up the surface deposits (terrace deposits, colluvium, alluvium, and fill material) due to lack of observed data in these units. Therefore, all of the surface deposit lithologies are assigned the same Kd value. The calibrated Kd values range from 0.16 L/kg to 0.92 L/kg, and are presented in Table 8-4.

Initial arsenic concentrations for each model layer in the arsenic transport calibration are presented in Figures 8-47 through 8-51. Historically, the primary sources of site-derived arsenic Sequoyah Fuels Corporation MFG Inc.

.. ,99 October 2002

to groundwater are the MPB, SX Building, the Pond 2 Area, the Emergency Basin (Section 5.8).

Additional arsenic sources to groundwater include the fluoride clarifier, setting basins and holding basin. In general, data from wells near' these areas display decreasing arsenic concentrations over time, indicating the source has diminished or ceased. (Appendix F). A few wells, notably MW095A, exhibit steady or increasing arsenic concentrations over the time interval of interest. To maintain arsenic concentrations, an arsenic source was required in Pond 2, Fluoride Clarifier, the Fluoride Settling Basins, Fluoride Burial Area and the Fluoride Holding Basin #1. The source concentration was applied to recharge in all of these areas, with two exceptions. Pond 2 required 11.51 ýtg/L recharge source and the eastern-most Burial Site required 2 [ig/L recharge source. It is anticipated that the concentrations in these wells will decrease in the future. Arsenic sources were also not included to simulate desorption and/or dissolution of arsenic from soils or aquifer material. It is possible that some portion of the arsenic present at the facility is not the result of an arsenic release, but rather, a dissolution of mineral phase arsenic of the aquifer material due to changing redox conditions.

Values of Kd in the calibrated arsenic transport model were estimated from comparison of observed and calculated concentrations at 34 well locations. Values of effective porosity and dispersivity were obtained from the nitrate calibration results. The observed and calculated chemographs for all of the wells included in the arsenic calibration are presented in Appendix F.

Kd values in the calibrated arsenic transport model were determined to be 0.1 L/kg for hydrostratigraphic units. The resulting calibrated arsenic Kd were the result of manual calibration to match existing data. The inverse model, PEST, was also used to guide the selection of Kd. In Unit 3 Shale, Kd was estimated by PEST at 8 L/kg. All other layer were estimated within 15 percent higher Kd than calibrated value of 0.1 L/kg. As a conservative measure, the lower value was implemented in all layers.

The calibrated Kd value does not compare well with the values determined in the laboratory. The average Kd determined by laboratory tests ranged from four to hundreds of L/kg. The discrepancy may be due to sample preparation that included grinding of the sample that would increase the available surface area for adsorption.

Sequoyah Fuels Corporation MFG Inc.

... . 100 October 2002

8.5.5 Prediction Simulations Following the calibration of transport parameters, predictive simulations were conducted to estimate the future concentration distributions in the subsurface and at potential surface water exposure points. Potential surface water exposure points include Robert S. Kerr Reservoir, Salt Branch, and 001, 004, 005, and 007 outfalls. Heads and groundwater flux terms used in the predictive transport simulations are from the post-decommissioning groundwater flow simulation described in Section 7.0. This flow simulation incorporates topographical modifications, as well as removal of the Combination Stream Drain, the various french drain systems, and the stormwater pond. The post decommissioning flow model also assumes that all of the poorly constructed/abandoned wells and boreholes will remain in place, and will continue to act as vertical transport pathways between hydrologic units. This is a conservative assumption because most, if not all, of these wells and borings will be properly abandoned during site decommissioning. Finally, the predictive simulations assume that any existing COC source material above the water table will be remediated during decommissioning activities and that the only COC mass remaining in the system is either dissolved in groundwater, or sorbed to geologic materials below the water table.

Although the decommissioning activities have been assumed to be completed at the start of the predictive simulation, they are presently under review, and it is uncertain when they will be implemented (Section 3.0). The effects of this assumption are not believed to have significant effects on the long-term COC transport through the subsurface. Initial concentrations in the alluvium and bedrock units are from the geochemical sampling results from 2001 presented in Section 5.0. Maps displaying the initial concentrations for nitrate, uranium, and arsenic are presented in with the modeling results in Section 8.5.6.

8.5.6 Transport Model Predictions Model results are displayed as maximum calculated concentrations and the maximum concentration represents the greatest value in all of the model layers at any point. Plots of maximum concentration are indicative of the extent and magnitude of the COCs in the entire Sequoyah Fuels Corporation MFG Inc.

. .... - * -- 101 October 2002

groundwater system, and are not necessarily representative of the distribution of a COC in any one layer.

The maximum initial concentrations for nitrate in the prediction simulation are presented in Figure 8-52. This map indicates that at the beginning of the simulation nitrate is widely distributed across the Facility, but is most highly concentrated near source areas such as Pond 2, the Fertilizer Pond Area, and the SX Building. Nitrate has reached the Arkansas/Illinois River between the 008 and 005 streams. The maximum calculated nitrate concentrations at the 5, 25, 50, and 100-year time steps are presented in Figures 8-53 through 8-56. Generally, nitrate in both the Process Area and the Fertilizer Pond Area is transported toward the Arkansas/Illinois River between streams 008 and 005. Some nitrate originating in the Fertilizer Pond Area is transported toward the river through the Agland Area. At the 50-year time step, all calculated concentrations are below 500 mg/L, and concentrations of 100 mg/L are only exceeded in a few areas near the Fertilizer Ponds and 008 stream. At the 125-year time step, no calculated concentrations exceed 10 mg/L, land nitrate is effectively removed from the system.

Figures 8-57 through 8-62 are chemograph plots of calculated COC concentrations at selected observation point locations. Observation points 2, 3, 4, and 6 are located' along or within the Facility boundary (observation points 1 and 5 are discussed in Section 8.5.6.4). Calculated nitrate concentrations are in excess of the 10 mg/L MCL at the observation points 2 and 4.

Concentrations at these locations exceed 250 mg/L and 300 mg/L, respectively, at early times, but decrease to less than 10 mg/L by 50 years.

Maximum initial arsenic concentration in the uranium transport calibration are presented in Figure 8-63. This figure represents the arsenic distribution at the end of the calibrated transport simulation (January 1, 2001).

Arsenic trans'port is generally westward from the above-mentioned source areas to the Illinois/Arkansas River to the west. Figures 8-64 through 8-67 illustrate the maximum modeled arsenic concentration in any 'model layer as single plume maps for selected transport times.

Arsenic is discharged to the river system between the 008 Stream and the 007 Stream. The highest arsenic concentrations are transported down the 008 Stream. Eight MT3D observation Sequoyah Fuels Corporation MFG Inc.

....... , R0.,- 102 October 2002

points were placed to observe the calculated arsenic concentrations as transport progressed. The location of the observation points are depicted on Figure 8-63. Figures 8-68 through 8-75 contain chemograph plots of calculated concentration at the observation point locations.

In general, significant arsenic concentration reduction is accomplished through dispersion of the plume. Significant discharge to the river system does, however, occur. River loading is discussed further in Section 8.5.6.4. Calculated arsenic concentrations in the 5-year simulation exceed 1,000 jig/L near the southwest comer of Pond 2. Although westward migration of this area of high arsenic concentration is evident, it remains persistent until about year 175.

Of the eight observation points simulated, the highest arsenic concentration occurs in Observation Point 4, located near well MW095A. Calculated concentrations in observation point 4 peak at 240 ýig/L and exceed 10 ýtg/L for 75 years. The plume maximum passes through Observation Point 4, the 008 Stream seep, and Observation Point 5 and then to the river system.

The lowest modeled arsenic concentrations were simulated in Observation Point 3, located northwest of Fluoride Holding Pond No. 2, which did not exceed 10 [tg/L.

Model results displaying the maximum calculated uranium concentrations at the initial concentration and 50, 100, 250, 500, and 1,000-year time steps are presented in Figures 8-76 through 8-80. Uranium originating in the MPB and SX Building areas is transported northwest to the 005 Stream, and south to the 001 Stream. Uranium originating in the Solid Waste Burial Areas is transported down the 007 Stream. Generally, the transport rate of uranium is less than that of nitrate and arsenic due to its larger calibrated values of Kd. Calculated concentrations exceeding the 30 ptg/L MCL are present after the 500-year time step in 005 Stream and between the present locations of Pond 2 and the Stormwater Reservoir. There are no calculated concentrations greater than 30 ýig/L after the 750-year time step.

Calculated uranium concentrations are in excess of 30 ýig/L at the Facility boundary along 005 and 007 streams. Figure 8-81 displays calculated groundwater concentrations in Unit Shale 4 and 5 at the Facility boundary in each stream. These plots represent points where concentrations are the highest in both areas. Uranium is calculated to arrive at the Facility boundary in the 007 Sequoyah Fuels Corporation MFG Inc.

... . . ,, .. . . *.",,. 103 October 2002

Stream in approximately 80 years. The maximum calculated concentration in Unit 4 Shale is 17.9 [tg/L at 250 years. In Unit 5 Shale calculated concentrations exceed the uranium MCL from approximately 125 years to 350 years. The maximum concentration in Unit 5 Shale is 70.9 ýtg/L.

In 005 Stream, uranium is calculated to arrive at the Facility boundary at approximately 300 years. The maximum concentration in Unit 4 Shale is 18.9 ýtg/L and below the uranium MCL.

The maximum concentration in Unit 5 Shale in the 005 Stream is 139.9 [tg/L at 500 years. The uranium concentration is calculated to exceed the MCL from 400 years to 750 years.

8.5.6.1 Stream Concentration Calculations The objective of the transport modeling effort was to estimate source loading to the river and surface water concentrations in flowing streams. Although source loading to the river derived from the aquifers was readily available using Groundwater Vistas, no estimate was available for the loading from the streams that drain from the Facility and flow into the river system. As mentioned previously, MODFLOW calculates the flow in streams using the Prudic Stream Package. The MODFLOW output file contains the model-calculated inflow, outflow of the stream reach, and the stream flux to or from the aquifer. A FORTRAN 77 program, STRMCALC.FOR, was written to calculate the concentration of each constituent in each stream reach using a simple mixing approach.

Since the flow of each stream reach and the flux from the aquifer node was calculated by MODFLOW, the concentration of the aquifer node could be multiplied by the flux to obtain the loading to the stream from the aquifer. Concentrations for each stream node were obtained from the binary concentration file saved by MT3D. The concentration for the first node on all streams was set to zero, assuming that there was no initial stream flow. The only contaminant entering the first stream cell would be contributed by the aquifer. The resulting concentration of the stream could be calculated.

The downstream stream node would then mix the flow and concentration from the previous stream node, along with the flux and concentration from the aquifer, in a sequential manner using the equation:

Sequoyah Fuels Corporation MFG Inc.

..... ý w ý "-,- 104 October 2002

C = (Cup*FUP+CA*QA) / (QA+Fup) (Equation 1)

Where:

Cup =Upstream Concentration Fup =Upstream Flow QA =Aquifer Flux CA =Aquifer Concentration Concentrations were calculated in all reaches of a stream segment. When calculating the contributions of tributaries to the first reach of a stream segment, the equation was expanded to:

C = (Cup,*Fump+ CuvP*FuP2 +CA*QA) / (QA+FupI +FuP 2) (Equation 2)

Where:

Cup = Upstream Concentration from Tributary 1 Fur, =Upstream Flow from Tributary 1 Cup2= Upstream Concentration from Tributary 2 Fup1 =Upstream Flow from Tributary 2 QA =Aquifer Flux CA = Aquifer Concentration Subsequent reach concentrations are calculated as before using Equation 1. When the reach was losing (the aquifer flux was negative), the concentration was held constant and only the flow was diminished according to the MODFLOW calculated value. The results of these calculations are presented in Table 8-5. No source loading to the aquifer from the resultant stream discharge to the aquifer was considered. This function is not available to MT3D and would have resulted in numerous recursive model simulations. Since the transport model required substantial computation time requirements, the recursive simulations would be prohibitive. The benefits of conducting the simulations are negligible, since all streams tend to lose flow to the aquifer in the near river reaches. Additionally, no attempt was made to account for biochemical decay of nitrate in the stream, which could be substantial. This approach is considered to be conservative in that all mass was transported to the river. The only instance where mass was removed from the stream was when surface water re-entered the groundwater system. Mass was then removed in accordance with the volume of surface water reduction.

Sequoyah Fuels Corporation MFG Inc.

.. . - -..... , 105 October 2002

8.5.6.2 Stream Modeling Results Calculated arsenic concentrations in site streams are shown in Figure 8-82. The calculated arsenic concentration in the all streams remains below the 10 ýtg/L standard for the entire simulation. The 005 Stream exhibits the greatest calculated stream concentration at the beginning of the predictive simulation. Arsenic concentration is initially 1.4 [tg/L and diminishes less than 0.1 ýtg/L within 75 years.

Calculated nitrate concentration in site streams is depicted in Figure 8-83. Nitrate concentrations are estimated to be less that the MCL of 10 mg/L for the entirety of the 1,000-year simulation.

The calculated nitrate concentration in the 005 stream decreases from 8.6 mg/L at the beginning of the simulation to less than 2.0 mg/L at 18 years. The calculated nitrate concentration at the 007 stream is effectively zero mg/L for the entire simulation.

Calculated uranium concentrations in site streams are illustrated in Figure 8-84. Although calculated uranium concentrations in all streams remain below the protective standard of 30 itg/L, concentrations in the 007 Stream are 28 jtg/L. The concentration remains high for only a brief period and diminishes rapidly to essentially 0 ýtg/L after 100 years. The difference between calculated uranium concentration and MCL may be within the error of the method of calculation implemented and the MCL may be exceeded for a few years.

8.5.6.3 Seeps- and Pools A facility inspection was conducted to locate seeps and pools in the drainage areas of the Facility. Craig Harlin and Scott Munson of SFC conducted the inspection on August 27, 2001.

During the inspection, three seeps and associated pools were encountered. The location and description of the seeps and pools are included in Table 2-3 and are included in Figure 2-5.

Since seeps and pools would provide a pathway to potential receptors, the seeps were simulated using observation points to establish the estimated nitrate and uranium concentration of the surface water. The discharge rate of these seeps was not estimated. The concentration of the Sequoyah Fuels Corporation MFG Inc.

....... .,. ,ý. C%.-

Ri 106 October 2002

seeps was obtained by placing an observation point in MT3D at the coordinates shown given in Table 2-3.

Nitrate concentration at the three site groundwater seeps is presented in Figure 8-85. The calculated concentration at 008 Seep increases from 171.9 mg/L at the beginning of the simulation to a maximum of 352.0 mg/L at 32 years. The concentration at the 008 Seep is less than the MCL, 10 mg/L, after approximately 65 years. The calculated concentration at the 0,05 Seep slightly exceeds the MCL from 8 to 15 years. The maximum concentration at 005 Seep is 10.8 mg/L. The calculated nitrate concentration at the 007 Seep is effectively 0 mg/L for the entire simulation.

Arsenic concentration at the three site groundwater seeps is presented in Figure 8-86. The calculated concentration at 008 seep increases from about 17 tig/L at the beginning of the simulation to a maximum of 78 ýtg/L at 32 years. The concentration at 008 Seep is than the MCL, 10 jtg/L, after approximately 100 years. The calculated concentration at the 005 Seep slightly exceeds the MCL from 8 to 15 years. The maximum concentrations at the 005 and 007 seeps never exceed 10 [ig/L for the entire simulation.

Modeled uranium concentrations in the 007 Seep are summarized on Figure 8-87 and indicate slight exceedance of the 30 /tg/L MCL. The calculated concentrations are greater than 30 *tg/L from approximately 100 years to 200 years, and a maximum concentration of 35 jig/L is reached.

The maximum calculated concentrations at 005 Seep and 008 Seep are slightly less than the 30 jtg/L MCL, 21.3 jig/L and 10 ptg/L, respectively.

8.5.6.4 River Loading River loading of the three COCs was calculated by multiplying the flux into the constant head nodes representing the Illinois and Arkansas Rivers by the concentration of the aquifer material.

This calculation was performed using the Groundwater Vistas program. The resulting nitrate mass loading rate, reported in units of mg/L

  • ft3/day was converted to mg/day by multiplying by 28.32 L/ft3. Arsenic and uranium concentrations were reported as *g/L
  • ft3/day and were converted similarly.

Sequoyah Fuels Corporation MFG Inc.

....... C-_.V.X,.107 October 2002

The nitrate in groundwater discharges to the Arkansas and Illinois Rivers in the between the 001 and 005 streams. Figures 8-57 and 8-61 present calculated groundwater concentration discharging to the river at observation points 1 and 5, near the 004 and 001 streams, respectively.

The nitrate concentration at Observation Point 1 in layers 5 and 6 decreases from greater than 80 mg/L at the start of the simulation to less than 10 mg/L at approximately 40 years. The highest concentration at Observation Point 5 occurs in Layer 1 at 6.3 years. The groundwater concentration entering the river at this location is less than 10 mg/L at approximately 60 years.

Calculated nitrate mass loading to the river over time is presented in Figure 8-88. The loading occurs as a sharp-fronted pulse that has a maximum loading rate of 10.4 kg/day at 15.8 years.

The loading rate then quickly decreases to less than 2.0 kg/day at 50 years. At 100 years, the calculated loading rate is less than 0.4kg/day.

The arsenic in groundwater discharges to the Arkansas and Illinois Rivers in the between the 001 and 005 streams. Figures 8-68, 8-72 and 8-76 present calculated groundwater concentration discharging to the river at observation points 1, 5 and 8. The arsenic concentration at Observation Point 1, 27 jig/L, in layer 6 is greatest at 15 years and diminishes to less than 5 jig/L at approximately 30 years. The highest concentration at Observation Point 5, 69 jtg/L, occurs in Layer 1 at 15 years. The groundwater concentration entering the river at this location is less than 5 jtg/L at approximately 90 years. Observation Point 8 exhibits the greatest concentration, 28 jtg/L, at 15 years and falls below the 5 itg/L protective standard at 25 years.

Calculated arsenic mass loading to the river over time is presented in Figure 8-89. The loading occurs as a sharp fronted pulse that has a maximum loading rate of 0.0028 kg/day at 15 years.

The loading rate then quickly decreases to less than 0.0005 kg/day at 50 years. At 100 years, the calculated loading rate is less than 0.00015 kg/day.

The model results indicate that uranium in groundwater discharges to the Arkansas and Illinois Rivers in the areas near the 001; 005, and 007 streams. Figure 8-90 presents calculated groundwater concentration discharging to the river versus time in Unit 5 Shale (Layer 6) near the 001, 005, and 007 streams. Groundwater discharge to the river near streams 005 and 007 both have maximum concentrations slightly higher than the MCL of 30 ýtggL, 36.3 ýtg/L and 41.7 Sequoyah Fuels Corporation MFG Inc.

..- 108 October 2002

ýtg/L, respectively. The calculated concentration discharging to the river near the 001 Stream appears to reach a maximum of 3.6 ýig/L at 1,000 years. Calculated uranium mass loading to the river over time is presented in Figure 8-91. The calculated groundwater loading occurs in two distinct pulses. The initial pulse enters the river at approximately 250 years in response to the discharging of mass from the 007 stream. Peak loading during the initial pulse is calculated to be 0.355 g/day. The second pulse results from mass in the 005 Stream entering the river. This pulse peaks at 0.514 g/day at 550 years. At 1,000 years, the calculated uranium mass loading to the river is 0.103 g/day.

8.5.7 Sensitivity Analysis A sensitivity analysis was conducted in order to determine the model-calculated response to changes in selected model parameters. Sensitivity analyses for the flow and transport models were conducted using UCODE (Poeter and Hill, U.S.G.S., 1998). Transport sensitivity analysis was conducted on the calibrated uranium transport model. To calculate dimensionless sensitivities of the simulated parameters, the application models, in this case MODFLOW and MT3DMS, are executed for each parameter. For the flow model these parameters include hydraulic conductivity, recharge, and evapotranspiration. Transport model parameters implemented in the sensitivity analyses include Kd, dispersion and porosity. UCODE then calculated the difference between the perturbed (slightly different) simulated responses to the unperturbed simulated response. These differences are used to calculate forward difference sensitivities. The changes in parameter values are then compared against change in the sum of the weighted residuals.

The results of the flow model sensitivity analyses for each parameter are presented in Figures 8-92 and 8-93. Figure 8-92 depicts the composite dimensionless sensitivity by parameter.

Parameters that were selected for sensitivity analysis are identified in Table 8-6. Sensitivity was divided into two subjective categories: high and low. Parameters Kxl2, Kxl4, Kxl6, R6, R5, ET2 and ET3 are classified as highly sensitive. The remaining parameters, Kxl5, Kxl3, Kx18, Kxl 1, R3, R4, and ET5 are classified as low sensitive parameters. In general, parameters with low sensitivity may have inaccuracies that slightly influence the model results. Conversely, Sequoyah Fuels Corporation MFG Inc.

.... ...- . ... I*.- 109 October 2002

highly sensitive parameters that contain relatively small inaccuracies in parameter estimates may have large implications in the model results.

Figure 8-93 displays the UCODE determined dimensionless sensitivities for each parameter for each target well. Most wells have low sensitivity to variation in the sensitivity parameters examined. The five wells that display the greatest sensitivity are MW96A, MW99A, MW50B, MW1 12, and MW1 13. While the magnitude of sensitivity in these five wells is greater than most other wells, the proportional sensitivity to each parameter is about the same. MW1 12 and MWl 13 are located south of the Fertilizer Ponds. MW96A, MW99A, and MW50B are all located north and west of the Fluoride Holding Basin.

As stated previously, transport sensitivity analysis was conducted on the calibrated uranium model. The uranium model was selected because of its increased significance in model prediction errors. Parameters that were selected for sensitivity analysis are identified in Table 8-7.

Figure 8-94 summarizes the composite scaled parameter sensitivities. The parameters were subjectively divided into high sensitive and low sensitive parameters. Unlike the flow analysis, no parameters fell into the moderately sensitive category. Only All, Kd33, and KD37 were classified as low sensitivity parameter. The transport model results appear to be sensitive to most of the Kd values used in the model. Bedrock porosity also appears to be a high sensitive parameter. The calculated sensitivity results are unsurprising. The Kd parameter and porosity both have significant contribution in the calculation of solute velocity and should affect the transport modeling results. Little transport occurs in the terrace materials, therefore, parameter Kd37 variations should have little impact on the transport modeling results.

Sequoyah Fuels Corporation MFG Inc.

... .ý ,ý*-.,,,.110 October 2002

9.0 ANALYSIS AND CONCLUSIONS The overall reclamation objective for the SFC Facility is to provide post-closure site conditions that provide long-term protection of public health, safety and the environment. The site investigation and predictive flow and transport modeling in this report have focused on understanding the site post-closure groundwater conditions. Specifically, the transport modeling effort was designed to determine if groundwater COCs present a potential future hazard to the public or the environment. To make this determination, the predicted future groundwater COC concentrations at the exposure points, developed in Section 8.0 of this report, must be compared to appropriate protective human and ecological values. The following sections develop these appropriate protective values and discuss the relationship between the values and the modeling results.

9.1 Appropriate Protective Values Determination of appropriate protective values for the specific Site groundwater COCs depends on the type of future receptors and the potential exposure routes to which those receptors may subjected. Potential receptors at the site include human and other terrestrial organisms as well as aquatic receptors in the rivers and drainages in and adjacent to the Facility. The potential exposure routes for the human and other terrestrial organisms are primarily from consumption of surface water at seeps, stream drainages or rivers. Direct groundwater consumption has not been specifically addressed, as it is believed that the saturated shale units below the site do not constitute a viable drinking water supply for domestic consumption because of insufficient yield and/or poor water quality such that there is a reasonable assurance that there will be no potential future exposure through this exposure route. The reader is referred to Appendix K, which contains a technical memorandum that addresses this issue in greater detail. Aquatic receptors may be exposed via both water ingestion and direct exposure. Since aquatic receptors may be resident in potentially affected water bodies and may have continual exposure, these receptors are believed to have a greater likelihood of exposure and potential risk than terrestrial species.

For humans, potential exposure concentrations are compared to 'drinking water standards promulgated in 40 CFR 141 (Safe Drinking Water Act). These values are also utilized for Sequoyah Fuels Corporation MFG Inc.

.....

  • c.... *,.. 1ll October 2002

screening-level comparisons for other possible terrestrial receptors. Use of these MCLs for this purpose is overly-conservative since these values are based on very conservative exposure and effect assumptions associated with a human residential exposure scenario, an exposure scenario that is highly unlikely at this site.

In addition to the standard species expected to occur near the Facility, due to the greater likelihood of completed exposure pathways and higher exposure levels for aquatic species, the possible occurrence of sensitive aquatic species was evaluated. The Natural Heritage Program of the Oklahoma Biological Survey does not list any Federally listed threatened or endangered aquatic species for Sequoyah County. There are, however, two aquatic species of potential concern listed by Oklahoma State that may occur in the County. The longnose darter (Percina nasuta) is listed as endangered by the State, and the alligator snapping turtle (Macroclemys temminckii) is listed as having a closed hunting season and as a species of special concern (SS2 ranking). The longnose darter has only been found in a few small streams along the far-eastern edge of Oklahoma, and is unlikely to occur near the SFC Site (Wagner and others, 1985). The alligator snapping turtle's habitat includes deepwater rivers, oxbows, sloughs, and lakes (Behler and King 1997). Therefore, there is potentially-suitable habitat for this turtle near the Site in either the Illinois or the Arkansas River, but not in the smaller feeder drainages to the rivers themselves.

Both Federal and Oklahoma State water standards relevant to human and aquatic biota surface water exposure were reviewed (Table 9-3). Applicable Federal standards are the MCL values promulgated under the Safe Drinking Water Act and the National Recommended Water Quality Criteria (NRWQC), promulgated under Section 304(a) of the Clean Water Act (40 CFR 131), for protection of aquatic biota. Oklahoma water regulations are outlined in Title 785 Chapter 45 of the Oklahoma Administrative Code. Waters designated as Public or Private Water Supply must meet Raw Water Numerical Criteria (785:45-5-10) and water column criteria to protect for the consumption of fish flesh and water. All waters with a designated use as fish and wildlife propagation must achieve protective values for toxic substances (785:45-5-12). These criteria are to be meet at all times outside of the regulatory mixing zone as defined in 785:45-5-26. As listed in the Oklahoma State Regulations, the Arkansas River near the site has designated uses of: 1)

Sequoyah Fuels Corporation MFG Inc.

.Rw. 112 October 2002

Emergency, Water supply, 2) Warm Water Aquatic Community water, and 3) Primary Body Contact recreational water. The Illinois River has designations of: 1) Public and Private Water Supply, 2) Trout Fishery, 3) a Class I irrigation water, 4) Primary Body Contact recreational water, and 5) a High Quality Water.

Three COCs have been identified by SFC: arsenic, uranium, and nitrate. The protective values for these COCs are discussed in the following section, relative to applicable regulatory limits and exposure to terrestrial and aquatic receptors in the Arkansas and Illinois Rivers, and tributaries that originate on or near the site.

The recently revised (October 2001) Federal arsenic MCL is 10 parts per billion (ppb). The existing Oklahoma arsenic Raw Water Criteria is 40 ppb. The Illinois River would need to meet this criteria outside of the mixing zone (long-term average concentration) due to its designation as a Public and Private Water Supply. The NRWQC values are general arsenic values and are highly dependent on chemical speciation of the arsenic and the specific species at potential risk.

Derivation of site-specific criteria may be applicable to the SFC Site. The general values listed are conservative values that assume the presence of the more toxic arsenic (III) form and sensitive species.

The MCL listed by the EPA for uranium is 30 ppb. The Canadian Maximum Acceptable Concentration or MAC (-MCL) is 100 ppb for drinking water. There are no NRWQC values or Oklahoma State numerical criteria values for uranium. Other potentially applicable and relevant values are the Colorado water criteria for protection of aquatic life of 2.4 ppm for acute exposure and 1.5 ppm for chronic (CDPHE, 2001). The Colorado values are hardness dependent and are listed for a hardness value of 100 ppm (expressed as CaCO 3). At a hardness of 400 ppm, the acute value is 11.1 ppm and the chronic value is 6.9 ppm. The Oak Ridge National Laboratory Guidance (ORNL, 1998) lists a radiological screening level for U-238+daughter products that is protective of fish of 4.55E3 pCi/L. Assuming an activity factor of 0.68 pCi/gg, this ORNL value results in a "safe" uranium concentration of 6.7 ppm for fish. Additional uranium safe and toxic values from the literature are listed in Table 9-1. A reasonable safe level for fish from this data is 1 ppm.

Sequoyah Fuels Corporation MFG Inc.

P4,g. ,".4--.*,.113 October 2002

The Federal and State regulatory limits for nitrate in drinking water is 10 ppm. There are no NRWQC or State numerical criteria for protection of aquatic life. Values from the literature on safe and toxic water concentrations of nitrate to fish and aquatic invertebrates are shown in Table 9-2. Amphibians appear to be more sensitive to nitrate than purely aquatic species. The lowest reported toxic concentration to aquatic invertebrates is 65.5 ppm. Fish are not affected by nitrate concentrations up to at least 3,000 ppm. Based on the available literature values, a protective value of 10 ppm is set for aquatic biota.

Table 9-3 summarizes available ARARs and selected appropriate protective standards, as developed above, for humans and for aquatic life.

9.2 Status of Future Protection from Groundwater The degree of protection of humans as well as terrestrial and aquatic ecological receptors from potential impacts due to exposure to future groundwater concentrations are evaluated by comparing the transport modeling results presented in Section 8.0 and the appropriate protective standards developed in Section 9.1. The critical model output includes the peak constituent concentrations in the Site streams and theI total loading from streams and groundwater discharge to the River.

The following section addresses the status of protection from groundwater conditions in two steps. The first addresses the concentrations and potential exposures in the streams as well as the constituent loads these streams carry. The second addresses the concentrations and potential exposures in the river from stream loading and the groundwater discharging directly to the rivers.

9.2.1 Stream Concentrations and Conditions The predicted concentrations of arsenic, uranium, and nitrate in the streams and seeps are discussed in Sections 8.5.6.2 and 8.5.6.3. The estimated loading of these constituents to the river, as a result of the Site discharge is discussed in Section 8.5.6.4. These stream outfall concentrations are also illustrated in Figures 8-82 through 8-84. The predicted results show that.

there is insufficient loading of arsenic, uranium, or nitrate in any stream to present a potential future hazard to humans from concentrations of nitrate, arsenic or uranium in the streams. While Sequoyah Fuels Corporation MFG Inc.

.. ,.-- " §,. 114 October 2002

there are some transient exceedances of the MCL values in, the seeps (Figures 8.85-8.87),

especially for nitrate, the likely point of exposure to humans is the streams, which have predicted concentrations below the protective levels (MCLs) over all of the compliance period.

Additionally, all predicted concentrations of arsenic and uranium in the seeps are below protective standards developed in Section 9.1 (Table 9-3) for aquatic life. As shown in Table 9-2, fish are unlikely to be effected by nitrate concentrations as high as 3,000 mg/L. Aquatic invertebrates and amphibians, however, may be at risk at lower nitrate levels more than fish.

The maximum nitrate concentration of 9 ppm (005 Stream) is below levels reported as toxic to these organisms (Table 9-2), but is at the high end of concentrations that are reported as no observed adverse effects levels (NOAEL). With the exception of threatened and endangered species, the overall ecological concern is protecting the population of each species, rather than individual organisms. Given, that only the 005 Stream on the site is predicted to contain elevated nitrate levels, and that these concentrations will exist for a reasonably short time period (less than 20 years), the overall population of invertebrates and amphibians within the overall watershed, or even within the Facility boundary, will not be significantly impacted due to the limited spatial and temporal nature of the elevated nitrate levels.

In terms of terrestrial receptors, ruminants (i.e. deer, cattle, sheep) are the most sensitive receptor. Acute toxicity to cattle has been reported at nitrate concentrations of 500 mg/L (Francis, 1994). Dogs and rats are not affected by dietary nitrate concentrations as high as 10,000 mg/kg (equivalent to mg/L; Francis, 1994). The EPA summarizes extensive work conducted by the Food and Drug Administration on nitrate toxicity to animals. Based on these results, no observed adverse effect levels (NOAEL) of 66 NO3 mg/kg body weight per day were reported for mice and 41 mg N0 3/kg body weight per day for rabbits (IRIS, 2001). These values can be converted to water concentrations by accounting for the weight of these species and their daily water consumption. This conversion results in safe drinking water concentrations of 330 mg/L for mice (based on deer mice) and 422 mg/L for rabbits (based on eastern cottontail values). From this discussion, the highest stream nitrate concentration of 9 ppm is not expected to negatively impact terrestrial receptors.

Sequoyah Fuels Corporation MFG Inc.

........ ,l- ,b.ýC..-,Rp.,,.115 October 2002

9.2.2 River Loading and Calculated Concentrations The potential future concentrations in the river, due to loading of site-derived constituents from the groundwater and stream drainages, are evaluated using the methods and criteria presented in the Oklahoma Water Resources Board (OWRB) Rules Chapters 45 (Oklahoma's Water Quality Standards) and Chapter 46 (Implementation of Oklahoma's Water Quality Standards). This approach looks at the total waste loads to the river from both groundwater and stream drainage discharges.

The transport modeling has demonstrated that nitrate is the sole critical COC and is being loaded to the River both by direct groundwater discharge and through discharge of the 001 Drainage, which receives load from site groundwater up gradient from the river. The Arkansas River from the Arkansas State line to the mouth of the Canadian River, including Robert S. Kerr Reservoir, has a designated beneficial use of Public and Private Water Supply (PPWS) and has a Fish and Wildlife Service subcategory designation of Warm Water Aquatic Community (WWAC; 785:45 Appendix A). Section 785:46-7-1(e) of the OWRB Rules states that human health criteria apply to the receiving waters designated PPWS. Therefore, because OWRB Chapter 45 does not have aquatic protection standards for nitrate, the human health standard of 10 mg/L is the controlling standard. Further, Section 785:46-7-2(a) states that long-term average receiving stream flows shall be used to implement water column numerical criteria to protect human health. This means that the mean annual flow of the River at the reach where loading is occurring is the appropriate flow to consider when calculating the allowable Waste Load Allocation (WLA, 785:45-5-4).

For this site, the only WLA of concern is the total mass of nitrate being loaded to the river per unit time. The allowable WLA can be established through a mass balance calculation using the following equation:

C.Q. + CeQe = C(Q. + Qe). (Equation 1)

Where:

Cu = upstream concentration (assumed to be very small or zero)

Qu = upstream receiving water flow (mean annual flow)

Ce = concentration of the effluent being discharged into the River Sequoyah Fuels Corporation MFG Inc.

. 116 October 2002

Qe = flow rate of this effluent discharge C = regulatory protective standard (10 mg/L)

This equation may be simplified in the following manner. First, the assumption is made that the quantity Cu is very small or essentially zero, eliminating background mass term (CuQu). This leaves the term CeQe, which is the allowable WLA. Second, it can reasonably be assumed that the quantity Qe (the combined flows of the ground water and the streams) is much smaller than the quantity Qu (the flow rate of the river). This assumption reduces the right side of the equation to CQu. Given C is the 10 mg/L protective standard and Qu is the annual average flow of the river (1,610 cfs or 3,938,284,627 liters per day), the allowable WLA is, therefore, 3.9 x 110 mg/day (39,383 Kg/day). This allowable WLA is three orders of magnitude greater than the estimated 10.4 Kg/day maximum peak loading to the river from all sources predicted by the transport model (see Section 8.5.6.4). Therefore, it is clear that the contribution of nitrate to the river adjacent to the site has no potential to pose a present or potential future hazard to public health safety or the environment. Similarly, arsenic and uranium pose no present or potential future hazard to any receptor in the river.

9.3 Conclusions The transport modeling, based on detailed understanding of site-specific hydrologic, geologic and geochemical conditions, indicates that there are no significant hazards to humans i1n the site surface waters or adjacent river resulting from arsenic, nitrate, or uranium in the site groundwater. The arsenic and uranium concentrations in the streams are also below protective levels for ecological receptors. Further, there are no present or potential future hazards from nitrate in the river or any of the surface drainage streams, with the possible exception of the 005 Stream. Though transient (less than 5 years) concentrations in this stream are less than concentrations reported as effecting aquatic invertebrates and amphibians, the maximum concentrations are at the upper end, or exceed, reported NOAEL values for these organisms.

Any potential impacts to these biotic groups, however, will be limited due to the rapid decrease in stream concentrations, and the limited spatial scale (i.e. one stream on the site) of elevated concentrations.

Sequoyah Fuels Corporation MFG Inc.

...- - ,, 117 October 2002

10.0 REFERENCES

American Public Health Association (APHA), 1992. Standard Methods for the Examination of Water and Wastewater. In A.E. Greenberg and others (eds.) 18th Edition. American Public Health Association, Washington, D.C.

Anderson, M.P. and W.W. Woessner, 1992. Applied Groundwater Modeling: Simulation of Flow and Advective Transport. New York, New York, Academic Press Inc.

Behler, J.L. and F.W. King, 1997. National Audobon Society Field Guide to North American Reptiles and Amphibians. Alfred A. Knopf, New York, NY.

Bohn, H.L., B.L. McNeal, and G.A. O'Connor, 1985. Soil Chemistry. 2nd Edition. John Wiley

& Sons, New York.

Brookins, D.G., 1988. Eh-pH Diagramsfor Geochemistry. Springer-Verlag, Berlin. pp. 176.

Colorado Department of Public Health and Environment (CDPHE), 2001. Regulation No. 31-The Basic Standards and Methodologies for Surface Water (5 CCR 1002-3 1).

Camargo, J.A. and J.V. Ward, 1992. "Short-term Toxicity of Sodium Nitrate to Non-target Freshwater Invertebrates." Chemosphere 24: 23-28 Camargo,'J.A. and J.V. Ward, 1995. "Nitrate Toxicity to Aquatic Life: A Proposal of Safe Concentrations for Two Species of Neararctic Freshwater Invertebrates." Chemosphere 31:3211-3216.

Daugherty, R., J. Franzini, and E. Finnemore, 1985. Fluid Mechanics with Engineering Applications. Mcgraw-Hill, New York.

Davis, J.A. and D.B. Kent, 1990. "Surface Complexation Modeling in Aqueous Geochemistry."

In M.F. Hochella and A.F. White (Editors), Mineral-Water Interface Geochemistry.

Reviews in Mineralogy. Mineralogical Society of America, Washington D.C., pp. 177-260.

Doherty, J., 1994. PEST: Model-Independent Parameter Estimation., Watermark Computing.

Doherty, J., 1995. PEST Utilities for MODFLOW and MT3D Parameter Estimation.

Watermark Computing.

Doherty, J., 2000. PEST-ASP. Model-Independent Parameter Estimation. Watermark Computing.

Sequoyah Fuels Corporation MFG Inc.

.. 118 October 2002

Doherty, J., 2001. Manual for Groundwater Data Utilities. Watermark Numerical Computing.

Domenico, P.A. and F.W. Schwartz, 1998. Physical and Chemical Hydrogeology. Wiley, New York.

Duff, M.C. and C. Amrhein, 1996. "Uranium(VI) Adsorption on Goethite and Soil in Carbonate Solutions." Soil Science Society ofAmerica Journal.60:1393-1400.

Dzombak, D.A. and F.M.M. Morel, 1990. Surface Complexation Modeling-Hydrous Ferric Oxide. John Wiley & Sons, New York. pp. 393.

Earth Science Consultants, 1998. Treatability Study Report, Sequoyah Fuels Corporation, Gore Oklahoma. Consultant Report. December.

Fetter, C.W. 1999. ContaminantHydrology. 2 nd Ed., Upper Saddle River, New Jersey: Prentice Hall, Inc.

Francis, A. 1994. Toxicity Summary for Nitrates. Prepared for U.S. Army Environmental Center, Aberdeen Proving Ground, MD. Contract DE-AC05-84OR21400.

Freeze, R.A. and J.A. Cherry 1979. Groundwater. Englewood Cliffs, New Jersey: Prentice Hall, Inc.

Hamilton, S. J., 1995. "Hazard Assessment of Inorganics to Three Endangered Fish in the Green River, Utah." Ecotoxicology and EnvironmentalSafety 30: 134-142.

Harlin, C., 2001. Site Manager at Sequoyah Fuels Company, Gore, Oklahoma. Personal communication to M. Gard, Shepherd Miller, Inc., Fort Collins, Colorado. August 24.

Hecnar, S.J., 1991. "Acute and Chronic Toxicity of Ammonium Nitrate Fertilizer to Amphibians from S. Ontario." Environ. Toxicol. Chem.14: 2131-2137.

Holdway, D. A., 1992. "Uranium Toxicity to Two Species of Australian Tropical Fish." Sci.

Total Environ. 125: 137-158.

Integrated Risk Information System (IRIS), 2001. Nitrate (CASRN 14797-55-8). United States Environmental Protection Agency.

International Centre for Diffraction Data. 1993. Mineral Powder Diffraction File. ICDD, Swarthmore, PA.

Sequoyah Fuels Corporation MFG Inc.

&.. Ch- , .* C.---*S.. 119 October 2002

Jenne, E.A., 1968. "Controls on Mn, Fe, Co, Ni, Cu, and Zn Concentrations in Soils and Water:

The Significant Role of Hydrous Mn and Fe Oxides." American Chemical Society Advances in Chemistry Series. 7337-387.

Jove Colon, C.F., Brady, P.V., Siegel, E.R. and Lindgren, E.R., 2001. Historical Case Analysis of Uranium Plume Attenuation. NUREG/CR-6705, U.S. Nuclear Regulatory Commission, Washington, D.C.

Langmuir, D.L. and A.C. Riese, 1985. "The Thermodynamic Properties of Radium."

Geochimica et Cosmochimica Acta. 49:1593-1601.

Langmuir, D.L., 1997. Aqueous Environmental Geochemistry. Prentice Hall, New Jersey.

Lovley, D., E. Phillips, Y. Gorby, and E. Landa, 1991. "Microbial Reduction of Uranium."

Nature, Vol. 350, pp. 413-416.

Marcher, M.V., 1969. "Hydrologic Atlas 1, Reconnaissance of the Water Resources of the Fort Smith Quadrangle, East-central Oklahoma." Oklahoma Geological Survey, scale 1:250, 000, 4 sheets.

McDonald, M.G. and A.W. Harbaugh, 1988. A Modular Three-dimensional Finite-difference GroundwaterFlow Model. U.S. Geological Survey Professional Paper.

Meade, T.L., 1974. The Technology of the Closed System Culture of Salmonids. University of Rhode Island, Narragansett, RI.

Miller, M.A., Eames. L. E., and Prezbindowski, D.R., 1989. "Upper Mississippian and lower Pennsylvanian lithofacies and palynology from northeastern Oklahoma: a filed excursion." In American Association of StratigraphicPalynologists,Field trip guidebook, pp. 64.

Mitchum, D. L. and T. D. Moore, 1966. "Study of Water Pollution Problems which Affect Fish and Other Aquatic Forms." Laramie, University of Wyoming, Game and Fish Laboratory Report FW-3-R-13.

Ogata, A., and R. Banks, 1961. "A Solution of the Differential Equation of Longitudinal Dispersion in Porous Media." U.S. Geological Survey Professional Paper 411-A.

Oak Ridge National Laboratory (ORNL), 1998. Radiological Benchmarks for Screening Contaminants of Potential Concern for Effects on Aquatic Biota at Oak Ridge National Laboratory, Oak Ridge, Tennessee. BJC/OR-80.

Sequoyah Fuels Corporation MFG Inc.

..- 120 October 2002

Parkhurst, B. R., R. G. Elder, J. S. Meyer, D. A. Sanchez, R. W. Pennak, and W. T. Waller, 1984. "An Environmental Hazard Evaluation of Uranium in a Rocky Mountain Stream."

Environ. Toxicol. Chem. 3:113-124.

Parkhurst, D.L. and C.A.J Appelo, 1999. "User's Guide to PHREEQC (Version 2) - A Computer Program for Speciation, Batch-Reaction, One-Dimensional Transport, and Inverse Geochemical Calculations." USGS Water-Resources Investigations Report 99-4259.

United States Geological Survey, Denver, Colorado.

Pierce, M.L. and Moore, C.B., 1980. Adsorption of arsenite on amorphous iron hydroxide from dilute aqueous solution. Environ. Sci. Technol., 14: 214.

Pierce, M.L. and C.B. Moore, 1982. "Adsorption of Arsenite and Arsenate on Amorphous Iron Hydroxide." Water Resources. 16:1247-1253.

Pierce, R.H., J.M. Weeks, and J.M. Prappas, 1993. "Nitrate Toxicity to Five Species of Marine Fish." J. World. Aquaculture Soc. 24:105-107.

Poeter, E., and M. Hill, 1998. "Documentation of UCODE, A Computer Code for Universal Inverse Modeling." USGS Water-Resource Investigations Report 98-4080. United States Geological Survey, Denver, Colorado.

Raven, K.P., Jain, A. and Loeppert, R.H., 1998. Arsenite and arsenate adsorption on ferrihydrite:

Kinetics*, equilibrium, and envelopes. Environ. Sci. Technol., 32(3): 344-349.

Reardon, E.J., 1981. "Kd's - Can they be used to describe reversible ion sorption reactions in contaminant migration?" Ground Water, 19(3): 279-286.

Roberts/Schornick & Associates, Inc. (RSA), 1991. "Sequoyah Fuels Corporation Facility Environmental Investigation Findings Report." Consultant Report. Volumes I - V. July 31.

Rumbaugh, J., and D. Rumbaugh, 2001.ý Groundwater Vistas, Version 3.09, developed by Environmental Simulations, Inc. Herndon, Virginia.

Sawhney, B.L. 1989. "Interstratification in Layer Silicates." In J.B. Dixon and S.B. Weed (eds.)

Minerals in Soil Environments. Soil Science Society of America, Madison, Wisconsin.

pp. 789-824.

Sequoyah Fuels Corporation (SFC), 1997. "Final RCRA Facility Investigation of the Sequoyah Fuels Uranium Conversion Industrial Facility."

Sequoyah Fuels Corporation (SFC), 1998a. "Site Characterization Report." December 15.

Sequoyah Fuels Corporation MFG Inc.

. . ,, .. .*.,.,. 121 October 2002

Sequoyah Fuels Corporation (SFC), 1998b. "Final Decommissioning Alternatives Study Report

[FDASR]." June 8.

Sequoyah Fuels Corporation (SFC), 1999. "Decommissioning Plafn." March 26.

Shepherd Miller, Inc. (SMI), 2001.- "Hydrogeochemical Characterization Work Plan."

Consultants Report. April.

Stephens, D. W., B. Waddell, and J. B. Miller, 1988. "Reconnaissance Investigation of Water Quality, Bottom Sediment, Biota Associated with Irrigation Drainage in the Middle Green River Basin, Utah, 1986-1987." USGS Water-Resources Investigations Report 88-4011, U. S. Geological Survey, Salt Lake City, Utah.

Stumm, W. and J.J. Morgan, 1996. Aquatic Chemistry. Wiley, New York.

Sutherland, P.K., 1988. "Late Mississippian and Pennsylvanian Depositional History in the Arkoma Basin Area." Oklahoma and Arkansas: Geological Society of America Bulletin,

v. 100, pp. 1787-1802.

Tarzwell, C. M. and C. Henderson, 1960. "Toxicity of Less Common Metals to Fishes." Ind.

Wastes 5: 12.

U.S. Army Corps of Engineers (COE), 1982. "Engineering and Design Stability for Earth and Rockfill Dams." EMI 120-2-1902.

U.S. Environmental Protection Agency (EPA), 1999. "Understanding Variation in Partition Coefficient, Kd, Values. Volume II: Review of Geochemistry and Available Kd Values for Cadmium, Cesium, Chromium, Lead, Plutonium, Radon, Strontium, Thorium, Tritium (3H), and Uranium." Office of Air and Radiation. EPA402-R-99-004B. August.

U.S. Nuclear Regulatory Commission (NRC), 1998. "Sequoyah Fuels Corporation (SFC) Site evaluation of faults and faulting: Input to safety evaluation report." Note to James Shepherd, Sequoyah Fuels Corporation, from Philip Justus, NRC, December 3.

Wagner, B.A., A.A. Aschelle, -O.E. Maughan, 1985. "Status and Distribution of the Longnose Darter, Percina nasuta, and the Neosho Madtom, Noturus placidus." In Oklahoma.

Proceed. Okla. Acad. Sci. 65: 59-60.

.Welch, A.H., D.B. Westjohn, D.R. Helsel, and R.B. Wanty. 2000. "Arsenic in Groundwater of the United States: Occurrence and Geochemistry." Groundwater.Vol. 38, pp. 589-604.

Sequoyah Fuels Corporation MFG Inc.

... .*. L-... , ... 122 October 2002

Xu, M., and Y.. Eckstein. 1995. "Use of Weighted Least Squares Method in Evaluation of the Relationship Between Dispersivity and Field Scale." Groundwater, Vol. 33, No. 6:905-908.

Zachara, J.M. and S.C. Smith, 1994. "Edge Complexation Reactions of Cadmium on Speciman and Soil-derived Smectite." Soil Science Society of America Journal, 58(3): 762-769.

Zheng, C., and P. Wang, 1999. MT3DMS: A Modular Three-Dimensional Multispecies Transport Model for Simulation of Advection Dispersion and Chemical Reactions of Contaminants in Groundwater Systems; Documentation and User's Guide. Washington D.C.

Zheng, C. 1990. A Modular Three-dimensional Transport Model for Simulation of Advection, Dispersion and Chemical Reactions of Contaminants in Groundwater Systems. U.S.

Ada, Oklahoma, Environmental Protection Agency.

Sequoyah Fuels Corporation MFG Inc.

MlqWh.Th..4Cb. Rq.C.".. K" *~.. 123 October 2002

TABLES Tnhi X-1 Annuial Avprn PFInw Year Annual Year Annual Average Flow Average Flow (cfs) (cfs) 1939 543.3 1970 2164.6 1940 623.4 1971 1150.0 1941 2006.7 1972 1153.8 1942 2293.9 1973 3999.0 1943 1821.7 1974 2717.0 1944 1532.1 1975 2266.3 1945 3811.9 1976 1402.9 1946 2250.9 1977 434.5 1947 1210.1 1978 1524.3 1948 1815.8 1979 955.1 1949 2226.1 1980 445.5 1950 2513.5 1981 593.4 1951 1595.6 1982 1213.5 1952 918.1 1983 1011.6 1953 185.6 1984 1585.9 1954 695.0 1985 2542.9 1955 778.9 1986 2639.0 1956 337.9 1987 1746.5 1957 2816.8 1988 1548.8 1958 1695.3 1989 1493.4 1959 1363.7 1990 2977.2 1960 1546.4 1991 1957.0 1961 2258.7 1992 1909.4 1962 1205.9 1993 3203.4 1963 351.3 1994 1738.5 1964 365.0 1995 1964.5 1965 872.3 1996 1590.7 1966 937.0 1997 1385.0 1967 359.6 1998 1822.5 1968 1939.2 1999 1921.1 1969 1829.8 2000 2066.2 Total annual average flow 1610.0 Flow data from Tenkiller Dam Gauging Station

Table 2,2 Table 2r2 Stream Stream Flow Drainage Calculations Area Calculated Mean Annual (mi2) Flow (cfs) 001 0.063 0.056 004 0.019 0.017 005 0.031 0.027 007 0.069 0.061 Table 2-3 Location and Description of Seeps and Pools Seep and Pool Northing Easting Description Comments 007 Outfall Pool 197483.5 2835845.3 about 41/2' Long X Located on top of 4' Wide X 2" Deep sandstone No significant algae or bug life present 005 Outfall Seep Located about 40 about 12' Long X 7' Significant algae and bug and Pool feet southwest of Wide X 5" Deep life present in pool MW-100B Located on top of sandstone 008 Outfall Seep 195156.8 2834289 1' X 3' X 2" Deep Some flow observed but and Pool very slight Located on top of sandstone

Table 4-1 Location Summary Location Borehole Monitoring Well 1 NA MW-118 2 BH-328 MW-1 flA, MW-114A, MW-120 3 BH-330 4 BH-327 MW-110A 5 BH-331 MW-113A 6 BH-329 MW-112A 7 BH-333 BH-334 8 BH-339 BH-340 9 SAME AS LOCATION 3 10 BH-332 11 BH-335 MW-115A 12 BH-338 MW-117 13 BH-337 MW-119A 14 BH-336 MW-116A

Table 4-2 Monitoring Well Survey Information Monitoring Northing' Easting f Top of PVC Stickup Ground Well Elevation (ft)3 Surface (PVC height Elevation 4 above ground surface)

MW-11OA 194734.729 2838412.800 554.934 2.34 552.594 MW-111A 193655.492 2833803.491 483.095 2.90 480.195 MW-112A 192595.278 2833775.339 485.713 2.83 482.883 MW-113A 192791.609 2836049.545 504.498 2.90 501.598 MW-114A 193665.618 2833804.796 483.019 2.93 480.089 MW-115A 194834.682 2835592.937 528.052 2.34 525.712 MW-116A 194444.654 2837511.146 542.637 2.82 539.817 MW- 117 194357.346 2834786.146 491.248 3.14 488.108 MW-118 196921.188 2836603.199 551.359 2.7 548.659 MW-119A 194780.707 2836858.314 541.327 2.91 538.417 MW-120 193645.224 2833802.577 482.763 2.59 480.173 1 State plane coordinates of PVC well casing.

2 Surveyed top of PVC well casing, feet above mean sea level.

3 Stickup measured during well construction.

4 Ground surface elevation (feet above mean sea level) calculated using surveyed top of PVC well casing and stickup measured during completion.

Table 4-3 Table 4-3 Borehole S.rvev Information Ground Total Depth Borehole Northing' Easting t Surface Elevation 3 Elevation 2 (Depth) 4 BH-327 194737.544 2838429.968 549.519 499.519 BH-328 193658.419 2833793.889 479.860 432.860 BH-329 192596.303 2833765.847 482.458 441.458 BH-330 195232.190 2835267.952 538.550 485.050 BH-331 192778.644 2836051.066 500.959 458.959 BH-332 196421.514 2836778.759 559.406 543.406 BH-333 195906.448 2836846.613 564.919 536.919 BH-334 195890.142 2836847.933 565.355 541.855 BH-335 194835.138 2835602.774 525.631 507.631 BH-336 194456.380 2837511.637 539.378 519.178 BH-337 194784.183 2836948.621 543.191 529.191 BH-338 193949.250 2834874.424 484.708 478.708

  • BH-339 195204.274 2836453.104 549.652 500.652 BH-340 195204.274 2836450.104 549.652 534.152 1 State plane coordinates.

2 Surveyed ground surface elevation, feet above mean sea level.

3 Elevation (feet above mean sea level

0 Table 4-4 Borehole Summary Borehole Total Alluvium Unit 1 Unit 1 Unit 2 Unit 2 Unit 3 Unit 3 Unit 4 Unit 4 Unit 5 Depth' or terrace' Shale Sandstone' Shale' Sandstone' Shale' Sandstone ' Shale' Sandstone' Shale' BH-327 50 0-10 10-14.8 14.8-15.7 15.7-16.7 16.7-18.9 18.9-24.2 24.2-40.6 40.6-TD BH-328 47 0-24.0 24.0-39.3 39.3-TD BH-329 41 0-15.2 15.2-33.0 33.0-39.3 39.3-TD BH-330 53.5 0-13.0 13.0-20.4 20.4-23.0 23.0-29.7 29.7-46.1 46.1-TD BH-331 42 0-11.0 11.0-19.0 19.0-TD BH-332 16 0-10 10-16 BH-333 28 0-4.4 4.4-19 19-25.8 25.8-27.1 27.1-TD BH-334 23.5 21-23.5 BH-335 18 0-1.0 1.0-12.9 12.9-13.0 13.0-16.5 16.5-TD BH-336 20.2 0-6 6.0-7.5 7.5-11.0 11.0-18.3 18.3-TD BH-337 14 0-5.0 5.0-7.0 7.0-10.0 10.0-TD BH-338 6 0-TD BH-339 49 0-11 11-12.3 12.3-21 21-26.9 26.9-30 30-36.5 36.5-TD BH-340 15.5 12-14 I Depth in feet below ground surface

Table 4-5 Monitor Well Completion Data Monitor Well Open Bottom of Top of Bottom of Top of Sand Top of Top of PVC Nominal Borehole Screen Screen Sand Filter Filter Pack Bentonite Bentonite Stickup3 Borehole Elevation' Elevation' Elevation' Pack Elevation' Pellets Chip Diameter (Depth2" (Depth 2) (Depth2 ) Elevation' (Depth 2) Elevation' Elevation' (Depth2) (Depth 2) (Depth2)

MW-110A 507.594 507.934 518.574 507.594 520.594 NA 524.194 2.34 8.5 (45.0) (44.66) (34.02) (45.0) (32.0) (28.4)

MW-IlIlA 441.695 442.745 448.095 441.695 451.295 454.395 457.695 2.90 8.625 (38.5) (37.45) (32.1) (38.5) (28.9) (25.8) (22.5)

MW-112A 450.483 451.313 461.663 450.483 463.983 NA 467.983 2.83 8.5 (32.4) (31.57) (21.22) (32.4) (18.9) (14.9)

MW-113A 460.398 460.348 475.698 460.398 479.198 482.598 2.90 8.5 (41.2) (41.25) (25.9) (41.2) (22.4) (19.0) NA MW-114A 441.139 443.089 448.099 441.139 451.089 453.089 455.089 2.93 9 (38.95) (37.0) (31.99) (38.95) (29.0) (27.0) (25.0)

MW-I15A 510.812 512.712 518.042 512.712 519.712 521.712 521.112 2.34 8.5 (14.9) (13.0) (7.67) (13.0) (6.0) (4.0) (4.6)

MW-116A 525.617 525.477 530.817 525.477 532.817 533.817 535.117 2.82 8.5 (14.2) (14.34) (9.00) (14.34) (7.0) (6.0) (4.7)

MW-117 472.578 473.508 478.858 473.508 480.518 482.518 NA 3.14 8 (15.53) (14.6) (9.25) (14.6) (7.59) (5.59)

MW-118 541.359 541.319 546.659 541.319 547.159 548.159 NA 2.70 8 (7.3) (7.34) (2.0) (7.34) (1.5) (0.5)

MW-119A 523.917 524.417 529.757 524.417 531.417 533.817 NA 2.91 8.5 (14.5) (14.0) (8.66) (14.0) (7.0) (4.6)

MW-120 456.173 455.723 471.073 455.723 473.673 475.073 476.673 2.59 8.25 (24.0) (24.45) (9.1) (24.45) (6.5) (5.1) (3.5) 1 Feet Above Mean Sea Level 2 Feet Below Ground Surface 3 Above Ground Surface

Table 4-6 Table 4-6 Monitor Well Develo~ment Data Monitor Development Development Comments Well/Piezometer Volume Date (gal)

MW-110A 80 6/5/01 Bailed then purged with RediFlo2 MW-i 1 A 24.75 6/5/01 Bailed dry three times MW-i 12A 41 6/5/01 Bailed three times, can't bail dry MW-113A 32.5 6/4/01 Bailed twice, can't bail dry MW-1 14A 15.5 6/5/01 Bailed dry three times MW-1 15A 0.6 NA Monitor well dry, bailed water added during well construction MW- 116A 4.5 MW- 117 6 6/5/01 Bailed dry twice MW- 118 0 NA Monitor well dry MW-119A 4.0 6/5/01 MW-120 270 6/6/01 Bailed then purged with RediFlo2 Table 4-7 Monitor Well Static Water Levels Monitoring Well Date Depth to Water Below Static Water Elevation top of PVC (feet) (feet above mean sea level)

MW-11OA 6/13/01 19.40 533.194 MW-i1A 6/15/01- 15.17 465.025 MW-112A 6/12/01 17.11 465.773 MW-i 13A 6/12/01 2.80 498.798 MW-114A 6/15/01 15.34 464.749 MW-115A 6/16/01 Dry Dry MW-116A 6/13/01 Dry Dry MW-117 6/12/01 12.14 475.968 MW- 118 6/13/01 Dry Dry MW-119A 6/16/01 Dry Dry, MW-120 6/15/01 14.99 465.183 C

Table 4-8 Slug Test Results Horizontal Hydro-stratigraphic Hydraulic Well Date Unit Conductivity Analytical Method (ft/day)

MWO10 02012/02 Gravel Backfill 23.79 Bouwer-Rice, 1976 (Unconfined)

MWI17 06/12/01 Alluvium 0.0223 Bouwer-Rice, 1976 (Unconfined)

MW120 06/16/01 Alluvium 5.01 Bouwer-Rice, 1976 (Unconfined)

MW097 02012/02 Colluvium 19.86 Bouwer-Rice, 1976(Unconfined) 12/04/90 Terrace/Shale 1 0.0156 Bouwer-Rice, 1976 (Unconfined)

MWO08 06/15/01 Terrace/Shale 1 0.0134 Bouwer-Rice, 1976 (Unconfined)

MWO12 12/06/90 Terrace/Shale 1 0.00556 Bouwer-Rice, 1976 (Unconfined)

MWO13 12/06/90 Terrace/Shale 1 0.0110 Bouwer-Rice, 1976 (Unconfined) 12/06/90 Terrace/Shale 1 0.0382 Bouwer-Rice, 1976 (Unconfined)

MWO16 12/09/90 Terrace/Shale 1 0.0480 Bouwer-Rice, 1976 (Unconfined) 06/15/01 Terrace/Shale 1 0.0129 Bouwer-Rice, 1976 (Unconfined) 12/06/90 Terrace/Shale 1 0.0311 Bouwer-Rice, 1976 (Unconfined)

MWO17 12/06/90 Terrace/Shale 1 0.126 Bouwer-Rice, 1976 (Unconfined)

MW026 06/15/01 Terrace/Shale 1 0.0310 Bouwer-Rice, 1976 (Unconfined)

MW073 06/13/01 Terrace/Shale 1 0.261 Bouwer-Rice, 1976 (Unconfined)

MW076 06/15/01 Terrace/Shale 1 0.00416 Bouwer-Rice, 1976 (Unconfined)

MWI02 06/14/01 Terrace/Shale 1 0.0297 CBP, 1967 (Confined)

MW035A 06/13/01 Shale 2 1.35 CBP, 1967 (Confined)

MW040A 06/13/01 Shale 2 0.327 CBP, 1967 (Confined)

MW042A 06/13/01 Shale 2 0.0318 CBP, 1967 (Confined)

MW085A 06/15/01 Shale 2 0.0700 CBP, 1967 (Confined) 2346 06/12/01 Shale 3 '0.489 CBP, 1967 (Confined)

MW037A 06/13/01 Shale 3 0.0103 Bouwer-Rice, 1976 (Unconfined)

Table 4-8 Table 4-8 Slug Test Results (continued)

Horizontal Hydro-stratigraphic Hydraulic Well Date Unit Conductivity Analytical Method (ft/day)

MW084A 06/14/01 Shale 3 0.0217 CBP, 1967 (Confined)

MW093A 02/12/02 Shale 4 )0.94 Bouwer-Rice, 1976 (Unconfined)

MW095A 02/12/02 Shale 4 1.88 Bouwer-Rice, 1976 (Unconfined)

MW097A 02/12/02 Shale 4 0.35 Bouwer-Rice, 1976 (Unconfined)

MW1lOA 06/13/01 Shale 4 0.0343 CBP, 1967 (Confined)

MWI 11A 06/15/01 Shale 4 0.0482 Bouwer-Rice, 1976 (Unconfined)

MWl 12A 06/12/01 Shale 4 1.30 Bouwer-Rice, 1976 (Unconfined)

MWl 13A 06/12/01 Shale 4 0.00730 CBP, 1967 (Confined)

MW1 14A 06/16/01 Shale 4 0.00466 Bouwer-Rice, 1976 (Unconfined)

Note: CBP = Cooper, Bredehoeft & Papadopulos Table 4-Q Avera e. Maximum. and Minimum Values of T-vdraiilic Cnductivitv ....... j Average Hydraulic Maximum Minimum Hydrologic Unit Conductivity Hydraulic Hydraulic ydrlogi UConductivity Conductivity (ft/day) (ft/day) (ft/day)

Alluvium/Colluvium 8.30 19.9 0.0223 Shale l/Terrace 0.0521 0.261 0.00416 Shale 2 0.445 1.35 0.03 18 Shale 3 0.174 0.489 0.0103 Shale 4 0.571 1.88 0.00466

Table 5-1 TCore SamDles Used in the Mineralogical and Geochemical Testing Plan Location Shale Borehole Sample Depth (Figure 4-1) Unit Designation (ft) 7 1 BH-333 4.0 to 20.0 10 I BH-332 10.7 to 16.0 8 2 BH-339 12.0 to 13.0 8 3 BH-339 26.9 to 29.1 9 3 BH-330 20.4 to 23.0 8 4 BH-339 36.5 to 39.0 9 4 BH-330 29.7 to 46.1 Table 5-2 Caleulated K. Values for UI and As for all Shale Samnles Uranium Arsenic Location Unit(Lg)L/)S(L/Kg) (L/Kg) 7 1 17.1 NA '

10, 1 286 >12,000 2 8 2 220 >5,650 8 3 40.6 3,968 9 3 67.4 >9,750 8 4 110 7,350 9 4 80.2 18,000 I NA indicates that arsenic in all test solutions was below detection (<0.001 mg/L).

2 "Greater than" symbol indicates that arsenic fell below detection (0.001 mg/L) prior to the end of test. The Kd value shown was calculated based on the last test that contained detectable arsenic in solution.

Table 5-3 Tabl 5-3 Saturation Index Values Calculated Using PIIREEOC for Imnortant U. As. and F Solid Phases in Selected Wells Well ID. I Uraninite Coffinite Ningyoite Carnotite Schoepite 1Rutherfordine Tyuyamunite Autunite W U0 2 (c) USiO 4 CaT(P0 4 )2 92H 2 0I K 2 (U0 2 )2 (VO 4)2 U0 2(OH) 2 9H 2 0 UO 2 COI Ca(U0 2)2 (VO 4)2 Ca(U0 2)z(PO4)z MW-012A -9.28 -9.70 -15.57 0.63 -1.72 -0.43 1.28 -4.29 MW-012B -17.64 -20.03 -21.34 -6.50 -7.53 -7.41 -6.05 -13.31 MW-025 -8.63 -8.89 -14.84 -0.68 -2.07 -0.79 0.47 -4.97 MW-025A -7.79 -8.19 -12.87 -0.79 -3.04 -1.78 -0.01 -5.75 MW-042A -14.18 -14.58 -18.58 -4.53 -6.10 -5.45 -3.33 -11.18 MW-059A -12.75 -13.25 -16.74 -3.22 -5.33 -3.73 -2.22 -9.24 MW-064A -13.40 -13.89 -17.97 -4.13 -5.78 -4.61 -3.07 -10.71 MW-067A -11.67 -12.17 -17.00 -1.57 -3.47 -2.53 -0.77 -6.88 MW-075 -10.03 -11.63 -15.70 -2.42 -3.50 -1.67 -1.18 -7.26 Well I.D. Uranophane K-Autunite Radium Sulfate Aluminum Arsenate Calcium Arsenate Iron Arsenate Fluorite

]

Ca(UO 2) 2(SiO 3OH) 2 K 2(U0 2)2(PO 4)2 RaSO 4 AIAsO 4e2H 20 Ca 3(AsO 4) 2o6H 20 FeAsO 4e2H 2O CaF 2 MW-012A -7.68 -4.86 -8.91 -3.61 -14.89 -5.75 -4.50 MW-012B -21.30 -13.49 -9.95 -8.65 -17.20 -7.85 -1.80 MW-025 -10.71 -6.56 -9.66 -6.57 -20.73 -6.79 -3.11 MW-025A -10.01 -6.59 -9.08 -3.55 -14.88 -6.85 -4.61 MW-042A -15.76 -12.86 -11.40 -4.41 -12.22 -3.96 -1.18 MW-059A -14.46 -10.52 -8.13 -2.40 -10.87 -4.43 -2.12 MW-064A -15.00 -12.12 -99.0 -6.18 -10.19 -2.80 +0.84 MW-067A -10.38 -7.75 -6.87 -4.31 -14.62 -5.64 -2.37 MW-075 -14.70 -9.04 -8.59 -6.06 -15.12 -4.55 -0.70

Table 5-4 -Important Uranium-Controlling Minerals in Oxidized and Reduced Environments (USEPA. 1999)

Reduced Environments [U(IV) Minerals]

Uraninite U0 2(c)

Coffinite USiO 4(c)

Ningyoite CaU(P0 4) 2e2H 20 Oxidized Environments [U(VT) Minerals]

Camotite K 2(UO2 ) 2(VO 4) 2 Schoepite U0 392H 20 Rutherfordine U0 2CO3 Tyuyamunite Ca(U0 2 ) 2 (VO 4 ) 2 Autunite Ca(U0 2 ) 2 (PO4)2 K-Autunite K2(UO 2)2(PO4)2 Uranophane Ca(U0 2)2(SiO3 OH) 2

Figure 5-5 Partition Coefficient (Kd) Values Determined for Arsenic and Uranium in I1aboratnrv Ratch Tests Arsenic b Uranium Matrix Adsorption Kd Arsenc ( b Uranium iml/g)W/O/g) Kd-srbd Sample type tyeAs As( U Wn/gO (

(nl/g) 005-S-01-01 Soil 46 726 1327 530 005-S-01-02 Shale 84 857 598 535 I

005-S-02-01 Soil 331 005-S-02-02 Shale 348 005-03N-1 Soil 762 005-03N-2 Shale 1028 005-04M- I Soil 817 738 005-04S-1 Soil 540 611 40 3733 258 182 005-04S-2 Shale 24 1333 308 108 005-05M-1 Soil 43 835 4212 2176 MWOIO-4-1 Soil 793 MW010-4-2 Gravel 2340 El-i Terrace material 572 E2-1 Terrace material 798 a Values determined using the hydroxylamine hydrchloride extraction procedure.

b Values determined using the EPA 3050 digestion procedure at the end of the rinse protocol.

Table 5-6 Table 5-6 Results for the Snecial Groundwater Samn1ins~ of Nine Selected Wells (June 2001')

Analytical 1 Parameter MW-012A MW-012B MW-025 MW-025A MW-042A Filtered Unfiltered Filtered Unfiltered Filtered Unfiltered Filtered Unfiltered Filtered [ Unfiltered Orthophoshate < 0.1 3.3 < 0.1 <0.1 < 0.1 Radium-226 (pCi/L) 0.347+/-0.273 . 0.045+0.142 -... __,__ 0.561+/-0.151 , 0.420+/-0.21 . 0.046+/-0.081:"

Uranium 5.31 4.96 0.0126 0.0154 11.0 111 376 469 1.32 <1 Alkalinity (as CaCO 3 ) 127 .- .. 975 2 1,,,131 95 Ammonia as N < 0.2 _____ 0.6 0.3 <0.2

< < 0.2 Chloride 4,640 28.5 ,, 23.8 .... 7 k 3,890 311 _

Fluorine 0.4 2.1 _______, 1.1 V ,'P>, 0.4 " ,: 1 _,... __

Nitrate 210 <1 , " 704 .. 482 21.1 _ _

Nitrite 0.012 0.021 0.041 .>,"' . < 0.01 < 0.01 _________

Sulfate 113 12.5 ' , , 67 , 67.7 '"; .. < I.. ,, ,_...

Sulfide < I - <I .<1 I <1 <1 Total Organic Carbon <1 2.9 , 4.8 ,'- 9.3 < I ,

Total Suspended Solids . 40.4 464 2340

  • 94 __________ 552 Aluminum 2.04 1.66 0.051 13.7 1.27 90.3 2.87 0.37 0.257 26.5 Arsenic 0.051 0.05 < 0.01 0.007 0.04 0.073 0.034 0.036 0.516 0.526 Calcium 887 687 2.82 5.6 386 240 915 1110 121 110 Total Iron 0.02 0.563 < 0.02 9.19 0.044 98.5 0.027 5.7 0.054 26.3 Ferrous Iron <0.01 <0.01 J-<.,' 0.02 ,77. 0.05 2.,,7 ,, <0.01 __,,_.,_:

Magnesium 287 238 0.986 <2 170 117 332 390 22.3 29.6 Manganese 0.074 0.073 < 0.01 0.054 4.35 4.05 0.046 0.142 < 0.005 0.474 Potassium 12.2 10 1.17 4.72 2.2 24.5 8.15 10.4 1.36 9.98 Silicon 10.5 10.5 0.123 22 14.8 73.5 10.7 33.6 11.6 37.5 Sodium 1,060 886 472 399 90.5 121 435 456 60.5 56.2 Vanadium < 0.05 < 0.035 , K 2. < 0.05 < 0.05 < 0.05 Eh (mV) 484 429 54400 461 ____

pH 5.48 __-_... 7.64 ,!' .> 4.23 5.56 ,_ __-- . 6.12 -______

Temp (°C) 18.9 20.0 " 16.2 17.0 18.9 ___--__1.9 Conductivity (.iS/cm) 16,247 ,, . 1,908 , 5,733 **2:k2 15,132 ,,1,580

Table 5-6 Analytical Results for the Special Groundwater Sampling of Nine Selected Wells (June 2001)

(continued)

Parameter MW-059A MW-064A MW-067A MW-075 Filtered Unfiltered Filtered Unfiltered Filtered Unfiltered Filtered Unfiltered Orthophosphate <"0.1 <<0.1<0.1<0.1 < 0.......

Radium-226 (pCi/L) 0.978+0.168 , 0+/-0.070 2.22+/-0.456 , 0.0810.130 _________

Uranium 0.0109 0.0185 0.045 0.0136 0.272 0.271 <1 <1 Alkalinity (as CaCO 3) 346 .... __" 446 . <2 . . . <1 Ammonia as N < 0.2 "_..... < 0.2 <0.2 <0.2

< i ">

Chloride 63.7 45.6 . 155 268 Fluorine 2.7 7.6 0.5 2.8 Nitrate 2,560 _: :_ _" 2 1.3 , <1 ___,___

Nitrite 0.114 < 0.01 < 0.01 ........ < 0.01 _.

Sulfate 359 185 1,990 278 Sulfide <1 < 1 <1 <1 Total Organic Carbon 2.5 1.8 2.4

  • 8.3 ________

Total Suspended Solids " 5.6 45.6 , 49.6 278 Aluminum 3.67 3.37 0.201 3.47 1.12 5.41 0.394 10.1 Arsenic 1.42 1.4 4.29 3.86 0.026 0.032 1.96 2.28 Calcium 1490 1380 102 77.3 229 164 38.8 26.6 Total Iron 0.015 0.438 0.109 4.52 0.032 4.27 < 0.02 7.06 Ferrous Iron <0.01 <0.01 <0.01 >1 <0.01 .: ,

Magnesium 476 444 26.8 16.3 153 123 14.9 1.76 Manganese 0.248 0.097 0.047 0.153 0.018 0.151 < 0.01 0.549 Potassium 6.22 6 1.5 .2.57 3.33 4.1 0.57 3.22 Silicon 8.41 9.59 9.27 13.2 8.63 14.6 0.69 24.6 Sodium 343 302 96.6 77.3 349 225 230 178 Vanadium < 0.05 < 0.05 < 0.05 < 0.035 Eh(mV) 475 .460 440 455 pH 5.64 ....... 6.3 .______ 6.27 5.51 Temp (°C) 16.9 __,_____ 17.7 _______ 17.0 1 17.2 1Conductivit (epscm) 1u6,750 1,330 4,25 101 I I Results expressed as mg/L unless otherwise indicated. Shaded cells indicate "not measured"

Table 5-7 Concentrations of Key Analvtes Measured from 1991 to 1995 AS FE MN U AS FE MN U LOC_ID DATE (mg/L) (mg/L) (mg/L) (nag/L) LOC_ID DATE (mg/L) (mg/L) (mg/L) (mg/L) 2301A 26-Apr-95 0.042 0.856 0.039 5.5 MW050A 14-Oct-94 <0.053 1.65 0.067 554.

2301B 05-May-95 0.007 2.53 0.226 40.7 MW050B 25-Apr-95 <0.005 0.028 0.005 <5 2302A 14-Apr-95 <0.005 0.664 1.83 <5 MW050B 11-Oct-95 <0.005 0.054 0.007 <5 2302B 26-Apr-95 <0.005 0.057 0.013 <5 MW051A 26-Apr-94 <0.552 0.114 0.045 8.2 2341 05-May-95 0.023 0.405 0.108 <5 MW053 14-Apr-95 <0.005 1.99 0.105 32.9 2351 06-May-94 0.357 0.404 0.646 40.7 MW053A 26-Apr-95 <0.005 0.071 0.012 <5 MWO03A 18-Apr-96 0.01 0.25 0.67 MW057A 26-Apr-94 2.27 0.549 0.853 5.8 MWO05 19-Apr-94 <0.05 0.102 0.074 <5 MW059A 26-Apr-94 1.58 0.115 0.128 <5 MWO05 11-Apr-95 <0.005 0.09 0.075 <5 MW059A 18-Apr-96 1.6 0.08 4.9 MWO05A 27-Apr-94 <0.05 0.116 <0.001 <5 MW059B 20-Apr-95 0.035 25 1.06 29.2 MWO07 19-Apr-94 <0.05 0.2 <0.001 <5 MW059B 11-Oct-95 0.019 6.96 0.088 8.1 MWO07 13-Oct-94 <0.053 0.623 0.021 <5 MW061A 19-Apr-95 1.277 9.16 0.188 <5 MWO07 11-Apr-95 <0.005 1.04 0.003 <5 MW062B 21-Apr-95 <0.005 0.648 0.012 <5 MWO07A 27-Apr-94 <0.05 0.037 <0.001 <5 MW062B 10-Oct-95 <0.005 0.246 0.012 <5 MWO07A 13-Oct-94 <0.053 0.165 0.008 <5 MW063A 20-Apr-95 <0.005 0.652 0.045 <5 MWO07B 05-May-95 <0.005 5.08 0.108 <5 MW064A 19-Apr-95 3.45 3.27 0.095 <5 MWO07B 10-Oct-95 0.01 3.78 0.122 10 MW067 05-May-95 0.005 0.281 0.635 <5 MWO10 13-Apr-95 0.068 24.4 3.84 9030 MW067A 21-Apr-95 0.006 14.6 0.343 15.3 MWO1OA 20-Apr-95 0.019 0.749 0.006 <5 MW072 12-Apr-95 0.006 2.52 0.25 <5 MWO12B 15-Jun-95 0.014 10.8 <0.102 20.3 MW072A 26-Apr-94 <0.05 0.272 0.007 <5 MWO12B 13-Oct-95 0.011 2.701 0.028 15.5 MW072B 18-Apr-95 <0.005 0.404 <0.001 <5 MW022A 18-Apr-96 0.029 <0.03 <0.57 MW072B 10-Oct-95 <0.005 0.217 0.025 <5 MW025 14-Apr-95 <0.005 3.61 1.33 53700 MW084 14-Apr-95 <0.005 3.4 0.153 16.9 MW025A 26-Apr-95 0.008 0.312 0.054 930 MW084A 26-Apr-95 <0.005 0.396 0.073 <5 MW038A 26-Apr-94 <0.05 <0.01 0.006 <5 MW086 21-Apr-95 0.007 0.028 0.45 <5 MW042 12-Apr-95 3.218 46.1 13.7 <5 MWO86A 26-Apr-95 0.006 0.066 0.013 271 MW042A 26-Apr-94 0.075 0.121 0.012 <5 MW087 25-Apr-95 0.051 2.69 0.161 <5 MW045A 26-Apr-94 <0.053 0.654 0.089 22.4 MWO87A 25-Apr-95 0.058 2.07 0.175 53 MW050A 28-Apr-94 <0.05 0.105 0.001 579 MW092A 16-Apr-96 <0.005 <0.006 <0.57

Table 5-7 Concentrations of Key Analytes Measured from 1991 to 1995 (continued)

LOC ID DATE AS FE MN U LOC ID DATE AS FE MN U (mg/L) (mg/L) (g/L) (mgL) (mg/L) (mg/L) (mg/L) (mg/L)

MW095A 11-Oct-94 0.056 0.053 0.038 <5 STA09 22-Aug-95 0.006 1.07 0.031 <5 MW095A 20-Jan-95 0.048 0.053 0.016 <5 STA1O 19-Jul-95 0.029 53.8 4.49 <5 MW095A 19-Jul-95 0.035 4.17 0.088 <5 STA1O 22-Aug-95 0.006 0.196 0.012 <5 MW095A 22-Aug-95 0.05 <0.017 0.011 <5 STAI1 19-Jul-95 <0.005 0.554 0.27 <5 MW102A 21-Apr-95 0.141 11.9 1.1 <5 STAll 22-Aug-95 <0.005 0.18 0.251 <5 MWI03A 21-Apr-95 0.083 1.85 0.138 <5 MWI04B 21-Apr-95 0.023 25.7 0.228 6.8 MW104B 10-Oct-95 <0.005 0.244 0.026 <5 MWI05B 21-Apr-95 <0.005 0.295 0.006 <5 MWl05B 10-Oct-95 <0.005 0.394 0.006 <5 Q-MW042 12-Apr-95 3.392 36.4 13.2 <5 Q-MW064A 19-Apr-95 3.32 0.035 0.144 Q-STA03 19-Jul-95 0.012 10.4 0.205 <5 STA0I 20-Oct-95 <0.005 0.301 0.141 <5 STA02 19-Jul-95 0.006 23.3 0.61 <5 STA02 22-Aug-95 <0.005 0.407 4.92 <5 STA03 19-Jul-95 0.011 10.2 0.217 <5 STA03 22-Aug-95 0.031 0.07 0.225 <5 STA04 19-Jul-95 <0.005 14.5 0.1 <5 STA04 22-Aug-95 <0.005 0.084 0.094 <5 STA05 19-Jul-95 <0.005 0.406 0.024 <5 STA05 22-Aug-95 <0.005 0.111 0.015 <5 STA06 19-Jul-95 0.008 42.6 1.51 <5 STA06 22-Aug-95 <0.005 0.637 0.011 <5 STA07 19-Jul-95 0.008 9.76 0.344 <5 STA07 22-Aug-95 0.006 3.74 0.096 6.2 STA08 19-Jul-95 0.045 85.6 1.56 <5 STA08 22-Aug-95 <0.005 0.563 0.012 <5 STA09 19-Jul-95 0.016 41.6 0.9 <5

Table 5-8 Percentage Distribution of As(V), F, and U(VI) in the form of Aqueous Species for Selected Wells Calculated Using PHREEQC Sample %H 2 AsO 4 %HAsO 4 2 %AIF+

2

%AIF 2+ %F %U0 2 CO 3 UO2(CO3)2 J %U2(HPO4)2"2 %UO2+

MW-012A 89.4 10.6 91.4 3.1 1.9 68.9 25.0 3.3 1.11 MW-012B 8.2 91.8 0.00 0.003 99.6 0.003 1.0 94.7 0.000 MW-025 98.8 0.53 61.4 - 12.0 3.9 14.9 0.010 1.27 69.0 MW-025A 87t8 12.2 93.6 2.16 1.54 43.8 17.9 36.4 0.586 MW-042A 75.6 24.4 1.58 8.1783 58.4 2.78 2.34 - 94.7 0.005 MW-059A 85.0 15.0 55.5 17.1 3.46 16.6. 23.1 57.9 0.078 MW-064A 67.1 32.9 0.003 0.13 90.3 5.66 32.5 58.6 0.002 MW-067A 63.2 36.8 18.6 16.0 33.7 11.1 43.7 39.5 0.009 MW-075 92.4 7.6 0.16 2.19 70.6 43.9 30.0 24.1 0.109

Table 5-9 Wells Used for Estimation of Distribution of COCs Loc ID r Easting f Northing Completion Date sampled f Fluoride Nitrate Uranium Arsenic I______ I I______ I ______ (mgIL)

I______ J(mg/L) j(mg/L) j(mgIL)

Primary Wells MW-003< 2837278.8 195542.8 ISH 4/12/01 0.700 <1.0 4.60 0.008 MW-005 2837527.7 195617.6 ISH 4/12/01 <0.200 <1.0 2.81 <0.005 MW-007 2837540.3 195837.9 ISH 4/12/01 0.800 <1.0 12.40 <0.005 MW-008 2837366.3 195738.3 ISH 4/12/01 54.6 MW-010 2837015.8 195507.9 1SH 4/12/01 1.000 10.4 6000.00 0.026 MW-012 2836955.1 195847.1 1SH 4/18/01 0.700 302.0 73.90 MW-014 2836940.6 195984.9 1SH 4/19/01 6.900 23.5 23400.00 MW-015 2837034.8 195996.8 1SH 4/18/01 676.0 MW-017 2837239.9 195997.1 ISH 4/19/01 0.059 MW-018 2836995.8 195607.5 ISH 4/18/01 0.900 2.5 1170.00 <0.005 MW-019 2836905.8 195509.9 1SH 4/18/01 <1.0 <1.00 <0.005 MW-023 2837135.4 195863.1 1SH 4/18/01 2.300 MW-024 2836709.5 195824.2 ISH 4/19/01 0.500 532.0 3.16 MW-025 2836783.1 195915 ISH 6/14/01 1.1 704.0 11000.00 0.04 MW-030 2837024.2 195398.5 11SH 4/11/01 <1.0 <1.00 0.039 MW-031 2836894.8 195336.6 ISH 4/11/01 <1:0 12.40 MW-032 2837137 195396.9 ISH 4/12/01 0.108 MW-035 2836270 196331.1 1SH 4/10/01 0.300 1.8 4.04 2.100 MW-036 2836343 195954.4 ISH 4/10/01 0.200 31.6 <1.00 <0.005 MW-038 2836071.4 196243.7 ISH 4/4/01 <0.005 MW-039 2835935.7 196186.9 ISH 4/5/01 3.7 <1.00 <0.005 MW-040 2836100.6 195947.9 1SH 4/10/01 6.800 786.0 <1.00 0.092 MW-042 2836438.6 195246.6 iSH 4/11/01 1.100 1.0 <1.00 0.616 MW-049 2836196.3 196571.2 1SH 4/19/01 <1.0 <1.00 <0.005 MW-050 2836151.9 196894.1 1SH 4/4/01 <1.0 <1.00 <0.005 MW-053 2836589.5 196074.9 1SH 4/18/01 2.1 15.80 MW-054 2836236.7 196075.3 1SH 4/10/01 3.000 511.0 <1.00 0.080 MW-055 2835912.1 195961.2 1SH 4/11/01 0.300 1.8 26.40 0.010 MW-075 2836778.4 196386.8 ISH 6/14/01 2.8 <1.0 <1.00 2.280

Table 5-9 Wells Used for Estimation of Distribution of COCs (continued)

Loc ID Easting Northing Completion Date sampled Fluoride Nitrate Uranium Arsenic I

________ _________ _________ (mg/L)j (mg/L) (mgIL) J(mg/L)

Primary Wells MW-076 2836444 195639.4 ISH 4/18/01 <1.0 <1.00 MW-078 2836707.6 196661.7 ISH 4/17/01 <1.0 1220.00 MW-079 2836987.7 196172.6 ISH 4/17/01 <1.0 5.92 MW-084 2836670.2 195644.1 1SH 4/18/01 <1.0 1.86 <0.005 MW-102 2836127.3 195437.5 ISH 4/18/01 <1.0 4.39 0.006 MW-103 2835681.9 195589.1 ISH 4/18/01 119.0 <1.00 MW-026 2836802.4 195792.2 ISH 4/19/01 <1.0 <1.00 MW-072 2837530.7 196436.6 ISH 4/12/01 0.500 1.2 <1.00 <0.005 MW-077 2837004.3 196657.7 1SH 4/17/01 1.70 2301B 2836451.6 196494.4 2SH 4/17/01 0.700 18.8 27.60 <0.005 MW-013A 2836959.4 195717.3 2SH 4/18/01 35.0 27.00 0.023 MW-035A 2836263.5 196328.7 2SH 4/10/01 0.400 70.9 53.60 0.017 MW-043 2836516.9 194991 2SH 4/6/01 0.600 1.9 <1.00 0.086 MW-048 2835230.2 195739.6 2SH 4/11/01 0.500 17.7 1.43 MW-066 2836687.9 195338.1 2SH 4/11/01 11.3 <1.00 0.025 MW-116A 2837511.146 194444.654 2SH 8/23/01 0.8 <1.0 22.70 0.010 MW-119A 2836858.314 194780.707 2SH 8/23/01 1.7 <1.0 8.97 0.075 MW-036A 2836348.6 195953.9 2SH 4/10/01 17.3 <1.00 MW-040A 2836110.3 195956.1 2SH 4/10/01 245.0 <1.00 MW-042A 2836442.9 195238.7 2SH 6/14/01 1.0 21.0 1.30 0.516 MW-050A 2836155.9 196900.3 2SH 4/4/01 0.400 17.3 420.00 <0.005 2342 2835321 193351.8 3SH 4/6/01 0.200 126.0 <1.00 2343 2836459.9 193402.9 3SH 4/5/01 0.600 2540.0 3.65 2344 2836495.6 193084.9 3SH 4/6/01 26.1 1.10 2346 2836241.6 193138.5 3Si1 4/6/01 1050.0 5.70 MW-038A 2836076.6 196241.5 3SH 4/4/01 <0.005 MW-039A 2835929.2 196182.9 3SH 4/5/01 92.8 <1.00 MW-049A 2836203.3 196570 3SH 4/19/01 39.8 1.23 MW-084A 2836676.8 195644.2 3Sf! 4/18/01 <1.0 <1.00 <0.005

Table 5-9 Wells Used for Estimation of Distribution of COCs (continued)

Loc ID Easting ] Northing Completion Date sampled Fluoride 1 Nitrate Uranium Arsenic I____

Primary Wells I. ______I _______I I______ (mg/L) (mg/L) (mg/L) (mgfL)

MW-115A 194834.682 2835592.937 3SH 8/23/01 2.1 <1.0 13.90 0.068 MW-007A 2837540.9 195844.8 3SH 4/12/01 1.000 3.5 <1.00 <0.005 MW-063 2836698.2 194836.9 3SH 4/6/01 3.300 <1.00 <0.005 FTP-2B 2835787.4 193408.5 4SH 4/6/01 0.600 <1.0 <1.00 MW-037A 2836057.6 196408.1 4SH 4/4/01 26.0 <1.00 MW-062A 2836153.4 194763.9 4SH 4/10/01 0.500 <0.2 <1.00 0.090 MW-063A 2836704.5 194838.4 4SH 4/6/01 0.500 1.1 <1.00. <0.005 MW-087A 2836454.5 196656.1 4SH 4/17/01 2.0 46.00 0.069 MW-089A 2835979.4 196919.5 4SH 4/4/01 1.4 <1.00 MW-093A 2834987.2 194910.6 4SH 4/5/01 97.2 <1.00 0.026 MW-099A 2836019.7 197252.9 4SH 4/4/01 1.2 3.37 MW-109A 2837070 196970 4SH 4/10/01 <1.00 MW-110A 2838412.8 194734.729 4SH 8/23/01 0.6 <1.0 3.11 <0.030 MW-1lIA 2833803.491 193655.492 4SH 8/23/01 0.7 <1.0 16.30 0.014 MW-I12A 2833775.339 192595.278 4SH 8/23/01 0.3 <1.0 0.71 <0.030 MW-113A 2836049.545 192791.609 4SH 8/23/01 0.9 <1.0 12.40 <0.030 MW- 1i4A 2833804.796 193665.618 4SH 8/23/01 0.7 <1.0 7.98 0.010 MW-096A 2835669.9 197285.1 4SH 4/4/01 2.3 <1.00 MW-097A 2834493.1 195387.3 4SH 4/4/01 <1.0 <1.00 0.008 MW-007B 2837532.2 195843 5SH 4/3/01 2.400 <1.0 <1.00 <0.005 MW-012B 2836955.9 195852.6 5SH 6/14/01 2.1 1.0 15.40 <0.010 MW-050B 2836118.1 196919.4 5SH 4/3/01 <1.0 <1.00 <0.005 MW-059B 2835328.5 195023.2 5SH 4/3/01 1.5 <1.00 <0.005 MW-062B 2836165.8 194765.1 5SH 4/3/01 1.300 <0.2 <1.00 <0.005 MW-072B 2837549.8 196419.8 5SH 4/3/01 0.5 3.08 <0.005 MW-090B 2834952 194176 5SH 4/3/01 <1.0 <1.00 MW-098B 2834797.4 195698.4 5SH 4/4/01 <1.0 <1.00 <0.005 MW-100B 2835524.1 196661.9 5SH 4/4/01 <1.0 <1.00 <0.005 MW-104B 2836317.8 193501.4 5SH 4/3/01 0.8 <1.00 <0.005

Table 5-9 Wells Used for Estimation of Distribution of COCs (continued)

Loc ID Easting Northing Completion Date sampled Fluoride Nitrate Uranium Arsenic I (mg/L) (mgIL) (mg/L)

Primary Wells MW-105B 2834972.4 193728.9 5SH 4/3/01 <0.2 <1.00 <0.005 STA06 2833809.9 194861.1 ALIJV 4/20/01 5.3 <1.00 <0.005 STA07 2833166.2 194359.2 ALUV 4/20/01 42.5 <1.00 <0.005 STA08 2832536.2 193950.1 ALUV 4/20/01 33.6 <1.00 <0.005 STA09 2832555.5 193191.7 ALUV 4/20/01 36.2 <1.00 <0.005 STA1O 2832918.6 192353 ALUV 4/20/01 28.5 <1.00 <0.005 MW-117 2834786.146 194357.346 ALUV 8/23/01 0.6 <1.0 13.70 0.035 MW-120 2833802.577 193645.224 ALUV 8/23/01 0.9 16.6 8.35 0.017 Supplemental Wells 2303A 2835903 195962.7 3SH 4/11/01 0.6 265 8.35 0.035 2322A 2835576 194098.8 4SH 4/6/01 <0.2 1170 <1.0 2345 2835152 193260.1 4SH 4/6/01 <1.0 <1.0 2347 2837058 193303.8 4SH 4/6/01 0.3 9.3 <1.0 2348 2836046 194115.5 4SH 4/6/01 178 <1.0 2349 2836525 194137.5 4SH 4/6/01 748 <1.0 2351 2836467 193933.5 4SH 4/5/01 0.3 1720 1.56 MW-003A 2837285 195544 3SH 4/12/01 1.1 88.3 0.009 MW-005A 2837528 195612.2 4SH 4/12/01 0.5 <1.0 <1.0 <0.005 MW-008A 2837366 195743.5 3SH 4/12/01 3.5 MW-024A 2836711 195809.6 2SS 4/19/01 489 15.9 0.04 MW-031 2836895 195336.6 ISH 4/11/01 <1.0 12.4 MW-032A 2837138 195400.9 3SH 4/12/01 1.9 0.058 MW-041A 2835239 195344.1 4SH 4/11/01 9.9 1.53 MW-046A 2835455 195981.9 3SS 4/11/01 0.7 1400 <1.0 0.307 MW-051A 2835238 195543.9 2SS 4/11/01 0.7 2850 5.39 0.277 MW-053A 2836598 196071.3 2SS 4/18/01 0.3 60.3 <1.0 rO.011 MW-057A 2835254 195211 3SH 4/11/01 5.7 10200 4.68 3.35 MW-058A 2835554 195013.3 3SH 4/11/01 1.5 3200 <1.0 0.784 MW-059A 2835336 195015.7 4SH 6/14/01 2.7 2560 10.9 1.42

Table 5-9 Wells Used for Estimation of Distribution of COCs (continued)

Loc ID f Easting Northing Completion Date sampled Fluoride Nitrate Uranium Arsenic Supplemental Wells I [ (mg/L) (mg/L) (mg/L) (mg/L)

MW-060A 2835796 195028.6 '4SH 4/11/01 0.9 197 3.51 0.175 MW-061A 2835959 194877.4 4SH 4/10/01 0.8 0.3 <1.0 0.005 MW-062 2836148 194771.2 2SH 4/10/01 0.5 <1.0 0.074 MW-064A 2836315 194875.1 4SH 6/14/01 7.6 2 4.5 4.29 MW-065 2835939 195133.4 2SS 4/11/01 0.9 <1.0 <1.0 0.112 MW-065A 2835958 195136.7 4SH 4/11/01 1.4 20 2.26 0.595 MW-066A 2836685 195345.9 3SH 4/11/01 10.5 112 0.022 MW-067 2836397 196866.1 2SH 4/17/01 MW-068 2836606 196873.2 2SH 4/17/01 7.5 1.46 MW-068A 2836616 196873.7 4SH 4/17/01 <1.0 6.35 <0.005 MW-071A 2836965 195056 4SH 4/10/01 <1.0 <1.0 MW-076A 2836451 195638.9 2SH 4/18/01 76 313 MW-077A 2837013 196656.3 4SH 4/17/01 1.15 MW-078A 2836718 196665.2 4SH 4/17/01 <1.0 7.57 MW-079A 2836988 196166.2 4SH 4/17/01 2.7 1.76 MW-081A 2837138 196805.6 4SH 4/17/01 30.4 MW-082A 2835718 195347.7 4SH 4/18/01 0.4 352 6.41 0.063 MW-087 2836444 196655.7 2SH 4/17/01 <1.0 578 <0.005 MW-088A 2836149 197047.4 3SS 4/4/01 <1.0 16.1 MW-091A 2835850 194672.9 4SH 4/10/01 <1.0 <1.0 0.029 MW-092A 2835378 194783.2 4SH 4/10/01 3 <1.0 <0.005 MW-094A 2835203 196390.3 4SH 4/4/01 6.5 <1.0 <0.005 MW-095A 2834517 195032.4 4SH 4/10/01 99.3 <1.0 0.016 MW-1OlA 2836433 194547.3 4SH 4/6/01 <1.0 <1.0 <0.005 MW-102A 2836133 195436.8 4SH 4/18/01 14 <1.0 0.024 MW-103A 2835683 195584 4SH 4/18/01 872 <1.0 0.088

Table 5-10 Range of pH Values Recorded from 1991 to 1994 LOCID DATE pH LOC ID DATE pH LOCID DATE pH LOCID DATE pH 2343 25-Nov-91 6.6 MWO01 23-Oct-91 7.2 MW063A 01-May-91 8.1 MW038 22-Oct-91 7 MW082A 24-Jan-92 7.1 MWO02 23-Oct-91 6.5 MW072A 01-May-91 7.6 MW038A 22-Oct-91 7.6 MW102 24-Jan-92 7.4 MWO02A 23-Oct-91 7 MWO07 01-May-91 7.5 MW039A 22-Oct-91 6.8 MW102A 24-Jan-92 7.2 MWO03 23-Oct-91 7.3 MWO07A 01-May-91 7.4 MW040 22-Oct-91 4.5 MW103 24-Jan-92 6.2 MWO03A 23-Oct-91 6.7 MW040A 22-Oct-91 6.7 MW073 22-Oct-91 7.3 MWI03A 24-Jan-92 7 MWO04 23-Oct-91 7.3 MW041A 23-Oct-91 7.8 MW073A 22-Oct-91 7.8 MW102 03-Mar-92 7.3 MWO04A 23-Oct-91 7.4 MW042 22-Oct-91 6.7 MW074 22-Oct-91 7.4 MW102A 03-Mar-92 7.2 MWO05A 23-Oct-91 7 MW042A 22-Oct-91 7.1 MW077A 23-Oct-91 7.2 MW103 03-Mar-92 6.4 MWO06 23-Oct-91 7.1 MW043 22-Oct-91 6.7 MW078 23-Oct-91 6.8 MW103A 03-Mar-92 6.9 MWO06A 23-Oct-91 7.3 MW045A 22-Oct-91 7.6 MW078A 23-Oct-91 7.7 MW076 19-Oct-94 7.2 MWO07 23-Oct-91 6.9 MW046A 22-Oct-91 7.1 MW080 23-Oct-91 7.1 MW076A 19-Oct-94 6.8 MWO07A 23-Oct-91 7.3 MW051A 22-Oct-91 7.3 MW080A 23-Oct-91 7.1 MW082 19-Oct-94 6.6 MWO1O 23-Oct-91 5.2 MW052A 22-Oct-91 7.3 MW081A 23-Oct-91 7.6 MW082A 19-Oct-94 7 MWO1OA 23-Oct-91 11.2 MW054 22-Oct-91 6.8 MW087 28-Oct-91 7.3 MW084 19-Oct-94 7.1 MW021 23-Oct-91 6.9 MW057 22-Oct-91 7.2 MW088A 22-Oct-91 7.2 MWO84A 19-Oct-94 7.4 MW021A 23-Oct-91 7.2 MW057A 22-Oct-91 7 MW089A 22-Oct-91 7.6 MW102 19-Oct-94 7.3 MW024 28-Oct-91 6.6 MW058A 22-Oct-91 6.8 MW090B 28-Oct-91 8.3 MW102A 19-Oct-94 6.8 MW024A 28-Oct-91 6.4 MW059A 22-Oct-91 7.2 MW091A 22-Oct-91 6.4 MWO11 21-Oct-94 5.9 MW025 28-Oct-91 6.4 MW060A 23-Oct-91 6.7 MW092A 23-Oct-91 7.1 MWO13 21-Oct-94 6.9 MW025A 28-Oct-91 6.6 MW061A 22-Oct-91 6.9 MW093A 22-Oct-91 7.5 MWO13A 21 -Oct-94 6.6 MW026 28-Oct-91 7.1 MW062 22-Oct-91 7.2 MW094A 22-Oct-91 7 MWO14 21-Oct-94 6.8 MW026A 28-Oct-91 6.4 MW062A 22-Oct-91 7.3 MW095A 22-Oct-91 6.8 MWO14A 21-Oct-94 6.6 MW027 28-Oct-91 7 MW063 22-Oct-91 6.1 MW096A 22-Oct-91 7.2 MWO16 21-Oct-94 7.1 MW027A 28-Oct-91 6.7 MW063A 22-Oct-91 7.3 MW097A 22-Oct-91 7.4 MWO16A 21 -Oct-94 7.3 MW031 23-Oct-91 6.6 MW064A 22-Oct-91 6 MW099A 22-Oct-91 6.5 MWO18 21-Oct-94 6.2 MW031A 23-Oct-91 7.3 MW065A 22-Oct-91 7.4 MW1O1A 22-Oct-91 7.2 MWO18A 21-Oct-94 6.7 MW035 22-Oct-91 6.3 MW066 22-Oct-91 6.7 2303A 22-Oct-91 7.1 MW075A 21-Oct-94 6.6 MW035A 22-Oct-91 7 MW066A 22-Oct-91 6.5 MW059B 15-Jun-95 7.7 MWO12A 24-Oct-94 6.7 MW036 22-Oct-91 6.3 MW067 22-Oct-91 6.2 MWI04B 15-Jun-95 7.99 MW095A 20-Jan-95 6.43 MW036A 22-Oct-91 6.8 MW067A 22-Oct-91 7 MWO12B 15-Jun-95 7.97 MW063 01-May-91 6.5 MW037A 22-Oct-91 7.5 MW068A 22-Oct-91 7.2 MW050 05-Apr-91 7.3

Table 5-10 Range of pH Values Recorded from 1991 to 1994 continued)

LOCID DATE pH LOCID DATE pH LOC ID DATE pH LOCID DATE pH MW069 13-Jun-91 6.9 MW083 05-Apr-91 7.7 MWO13A 25-Oct-91 6.6 MW086 01-May-91 6.9 MW069A 23-Oct-91 7.4 MW083A 05-Apr-91 7.3. MWO12 25-Oct-91 7.2 MW086A 01-May-91 6.9 MW070 23-Oct-91 7.4 MW084 05-Apr-91 7.5 MWO12A 25-Oct-91 6.2 MW025 01-May-91 6 MW070A 23-Oct-91 7.1 MW084A 05-Apr-91 7.8 MW058A 23-Apr-91 6.5 MW025A 01-May-91 6.6 MW071A 13-Jun-91 8.4 MW085 05-Apr-91 7.5 MW059A 23-Apr-91 6.4 MW067 17-May-91 6.6 MW071A 22-Oct-91 7.6 MW085A 05-Apr-91 7 MW060A 23-Apr-91 6.6 MW065 21-May-91 7.5 MW072 23-Oct-91 7.2 MW086 05-Apr-91 7.7 MW061A 23-Apr-91 6.8 MW024 30-Apr-91 8.1 MW072A 23-Oct-91 7 MW086A 05-Apr-91 7.6 MW062A 23-Apr-91 7.4 MW024A 30-Apr-91 7.1 MW087A 05-Apr-91 7.8 MW078 23-Apr-91 6.9 MW064A 23-Apr-91 7.2 MW026 30-Apr-91 7.5 MW049 25-Oct-91 7.3 MW078A 23-Apr-91 7.3 MW065A 23-Apr-91 7.5 MW026A 30-Apr-91 7 MW049A 25-Oct-91 7 MW051A 23-Apr-91 6.6 MW049A 23-Apr-91 7 MW075A 30-Apr-91 7.5 MW050 25-Oct-91 7 MW046A 23-Apr-91 6.8 MW049 23-Apr-91 7.1 Q-MW075A 30-Apr-91 7.4 MW050A 25-Oct-91 6.9 2303A 23-Apr-91 7 MW077A 23-Apr-91 7.1 MW079 30-Apr-91 8.3 MW079 25-Oct-91 7.3 MW088A 23-Apr-91 7.1 MW077 23-Apr-91 6.5 Q-MW079A 30-Apr-91 7.7 MW079A 25-Oct-91 6.9 MW089A 23-Apr-91 7.4 MW079A 30-Apr-91 7.8 MW083 24-Oct-91 7.1 MW082 25-Oct-91 6.7 MW052A 23-Apr-91 7.4 MWO80 30-Apr-91 7.6 MW083A 24-Oct-91 7 MW082A 25-Oct-91 7.1 MW037A 23-Apr-91 7.4 MW080A 30-Apr-91 7.5 MWO17 24-Oct-91 7.4 MW103A 25-Oct-91 7.1 MW038 23-Apr-91 6.9 Q-MW080A 30-Apr-91 7.6 MWO17A 24-Oct-91 7.3 MW102 25-Oct-91 7.3 MW038A 23-Apr-91 7.4 MW083 30-Apr-91 7.5 MWO16 24-Oct-91 7.2 MW102A 25-Oct-91 7.3 MW039A 23-Apr-91 6.8 MW083A 30-Apr-91 7.7 MWO16A 24-Oct-91 7.2 MW076 25-Oct-91 7.3 MW035A 23-Apr-91 6.9 MW087 30-Apr-91 8.1 MWO15 24-Oct-91 6.6 MW076A 25-Oct-91 7 MW054 23-Apr-91 6.7 MW087A 30-Apr-91 8 MWO14 24-Oct-91 6.8 MW084 25-Oct-91 7.2 MW036 23-Apr-91 5.9 Q-MW087A 30-Apr-91 7.7 MWO14A 24-Oct-91 7.7 MW084A 25-Oct-91 7.5 MW036A 23-Apr-91 6.8 2301A 30-Apr-91 7.2 MW023 24-Oct-91 7 MWO18 25-Oct-91 6 MW040 23-Apr-91 4.7 2301B 30-Apr-91 7.9 2301A 24-Oct-91 6.8 MWO18A 25-Oct-91 6.9 MW040A 23-Apr-91 6.7 2302A 30-Apr-91 6.9 2301B 24-Oct-91 7.6 MWO11 25-Oct-91 6 MW090B 23-Apr-91 8.6 2302B 30-Apr-91 7.2 2302A 24-Oct-91 5.7 MWO11 A 25-Oct-91 6.5 MW087 02-May-91 7.7 MW053 30-Apr-91 7.8 2302B 24-Oct-91 6.8 MW019 25-Oct-91 6.2 MW075 02-May-91 7.4 MW053A 30-Apr-91 7.1 MW047A 24-Oct-91 7.9 2348 25-Oct-91 9.6 MWO18 01-May-91 6.4 Q-MW053A 30-Apr-91 7.1 MW065 24-Oct-91 7.8 MW085 25-Oct-91 7.1 MWO18A 01-May-91 7.3 MWO12 30-Apr-91 7.8 MWO05 24-Oct-91 6.5 MW085A 25-Oct-91 6.8 MW050 01-May-91 6.9 MWO12A 30-Apr-91 6.8 MW039 24-Oct-91 6.8 MWO13 25-Oct-91 7 MW050A 01-May-91 6.9 MW022 24-Oct-91 6-6 MW030A 24-Oct-91 7.1

0 Table 5-10 Range of pH Values Recorded from 1991 to 1994 (continued)

LOCID DATE pH LOCID DATE pH LOCID DATE pH LOCID DATE pH MW032 24-Oct-91 6.7 MWO17A 26-Apr-91 7.2 MW058A 25-Apr-91 6.8 MW073A 25-Apr-91 8.1 MW032A 24-Oct-91 7 Q-MWO17A 26-Apr-91 7.5 MW060A 25-Apr-91 6.9 MWO06 25-Apr-91 7.2 MW029 24-Oct-91 6.3 MW023 26-Apr-91 7.3 MW065A 25-Apr-91 7.3 MW006A 25-Apr-91 7.9 MW030 24-Oct-91 6.9 MW016 26-Apr-91 7.1 MW042 25-Apr-91 6.8 MW005 25-Apr-91 7.1 MW028 24-Oct-91 6.8 MWO16A 26-Apr-91 6.7 MW042A 25-Apr-91 7.3 MWO05A 25-Apr-91 8.2 MW028A 24-Oct-91 7.2 MWO15 26-Apr-91 6.7- MW062 25-Apr-91 7.2 MWO02 25-Apr-91 6.8 MW020 24-Oct-91 6.4 MW027 26-Apr-91 7.1 MW043 25-Apr-91 6.8 MW002A 25-Apr-91 8 MW020A 24-Oct-91 7.1 MW027A 26-Apr-91 6.3 MW004A 25-Apr-91 8.2 MW003 25-Apr-91 7.3 MW008 24-Oct-91 6.9 MW013 26-Apr-91 7.1 MW020 25-Apr-91 8 MWO03A 25-Apr-91 7.2 MWOO8A 24-Oct-91 10.5 MW013A 26-Apr-91 6.5 MW020A 25-Apr-91 8.3 MWOO1 25-Apr-91 8.1 MW086 24-Oct-91 7.2 MWO14 - 26-Apr-91 6.7 MW008 25-Apr-91 8.5 MWO04 25-Apr-91 8 MW086A 24-Oct-91 6.7 MWO14A 26-Apr-91 6.7 MWO08A, 25-Apr-91 11.5 MW057 01-May-91 7.7 MW075 24-Oct-91 7.1 Q-MW014A 26-Apr-91 6.6 MW021 25-Apr-91 8.4 MW057A 01-May-91 7.5 MW075A 24-Oct-91 7.1 MW085 26-Apr-91 7.5 MW021A 25-Apr-91 8.2 MW098B 22-Oct-91 8.2 MW053 24-Oct-91 7.3 MWO85A 26-Apr-91 6.9 MW066 25-Apr-91 8.2 MW100B 23-Oct-91 7.6 MW053A 24-Oct-91 7 Q-MWO85A 26-Apr-91 6.9 MW066A 25-Apr-91 8.1 2323 23-Apr-91 4.3 MWO87A 24-Oct-91 7.1 MW084 26-Apr-91 7.3 Q-MW022A 25-Apr-91 11.5 2328 23-Apr-91 6.3 MWO84A 26-Apr-91 78 MW071 25-Apr-91 8.2 Q-MWO09A 25-Apr-91 6.9 2330 23-Apr-91 7.5 MWO11 26-Apr-91 6.2 MW009 25-Apr-91 7.8 Q-MW032A 25-Apr-91 6.9 MWO11A 26-Apr-91 6.6 MW032 25-Apr-91 8.3 Q-MW031A 25-Apr-91 6.8 Q-MWO11A 26-Apr-91 6.5 MW029 25-Apr-91 7.2 Q-MW066A 25-Apr-91 8.2 MWO19 26-Apr-91 6.2 MW030 25-Apr-91 8.1 MW044 25-Apr-91 8.2 MWO19A I 26-Apr-91 11.9 MW030A I 25-Apr-91 8.2 MW076A 26-Apr-91 7.2 MW031 25-Apr-91 7.6 MW082A 26-Apr-91 7.1 MWO1OA 25-Apr-91 11.7 MW028 25-Apr-91 6.9 MW074 25-Apr-91 8.2 MW028A 25-Apr-9,1 7.2 MW067A 25-Apr-91 7.5 MW022 25-Apr-91 6.8 MW068A 25-Apr-91 7.2 MW022A. 25-Apr-91 11.1 MW069A 25-Apr-91 7.7 MWO09A 25-Apr-91 6.9 MW081A 25-Apr-91 7.8 MW032A 25-Apr 6.9 MW070A 25-Apr-91 7.6 MW031A 25-Apr-91 6.9 MW073 25-Apr-91 8

Table 8-1 Model Laver and Corresponding Geologic Layers Model Layer Geologic Layer Layer I Terrace/Colluvium/Alluvium Layer 2 Unit 1 Shale

'Layer 3 Unit 2 Shale Layer 4 Unit 3 Shale Layer 5 Unit 4 Shale Layer 6 Unit 5 Shale Table 8-2 Calibrated Conductive Values Hydrologic Unit Kx Ky Kz (ft/day) (ft/day) (ft/day)

Alluvium 50 50 50 Colluvium 8.6 8.6 8.6 Terrace 0.20 0.20 0.002 Unit I Shale 0.20 0.20 0.002 Unit 2 Shale 0.125 0.125 0.0125 Unit 3 Shale 0.125 0.125 0.0125 Unit 4 Shale 0.45 0.45 0.045 Unit 5 Shale 0.25 0.25 0.025

Table 8-3 Computed versus Observed Heads Easting Northing Observed Head Computed Residual Absolute Name (feat) Norethn Obser erved Hadl Head Resu Residual Error (fee) (fet) Laye (fet asl) (feet amsl) (fet) (feet/feet)

MW-111 2833814 193663 1 465.03 466.57 -1.54 0.012 MW-117 2834811 194372 1 475.97 487.82 -11.85 0.096 MW-120 2833825 193669 1 465.18 466.65 -1.47 0.012 MWO03 2837304 195568 2 556.76 555.17 1.58 0.013 MWO07 2837565 195863 2 560.27 561.91 -1.64 0.013 MWO08 2837391 195763 2 558.54 558.90 -0.36 0.003 MWO12 2836975 195867 2 555.89 556.17 -0.28 0.002 MWO13 2836982 195739 2 555.43 554.46 0.97 0.008 MWO15 2837060 196022 2 556.64 556.31 0.33 0.003 -

MWO16 2837172 196018 2 555.22 557.02 -1.80 0.015 MWO17 2837260 196022 2 559.36 558.23 1.13 0.009 MW021 2837412 195894 2 557.99 560.63 -2.64 0.021 MW022 2837199 195623 2 558.05 554.21 3.84 0.031 MW023 2837150 195888 2 557.70 557.16 0.54 0.004 MW025 2836808 195940 2 555.51 553.12 2.39 0.019 MW026 2836827 195817 2 555.60 553.82 1.78 0.014 MW027 2836883 195883 2 555.43 555.22 0.21 0.002 MW052 2835998 196764 2 527.98 532.00 -4.02 0.032 MW070 2837395 196575 2 558.55 559.36 -0.80 0.006 MW073 2837602 196183 2 560.22 562.36 -2.14 0.017 MW076 2836469 195664 2 553.26 549.90 3.36 0.027 MW079 2837013 196198 2 556.05 556.92 -0.87 0.007 MW083 2837296 196305 2 558.35 558.96 -0.61 0.005 MW084 2836695 195669 2 552.71 548.51 4.20 0.034 MW085 2836734 195536 2 551.58 550.56 1.02 0.008 MWI02 2836152 195463 2 550.08 547.25 2.82 0.023 MW036A 2836362 195976 3 548.87 548.52 0.34 0.003 MW040A 2836127 195981 3 542.27 544.46 -2.19 0.018 MW042A 2836461 195264 3 542.50 540.98 1.52 0.012 MW045A 2835681 195996 3 528.75 536.27 -7.52 0.061 MW046 2835463 196002 3 526.24 529.14 -2.90 0.023 MW048 2835245 195761 3 523.59 524.50 -0.91 0.007 MW085A 2836727 195526 3 549.91 549.38 0.52 0.004 2344 2836515 193110 4 513.84 514.16 -0.32 0.003 2346 2836267 193164 4 513.27 510.22 3.05 0.025 MW035A 2836289 196354 4 534.32 534.99 -0.67 0.005 MW047A 2835260 195981 4 516.61 522.73 -6.12 0.049 MW084A 2836702 195669 4 547.99 548.61 -0.62 0.005 MW086A 2836882 196067 .4 552.91 551.14 1.77 0.014 270-1 2839203 195930 5 552.45 559.39 -6.94 0.056 270-2 2839849 194334 5 530.81 535.87 -5.05 0.041 270-3 2841138 195318 5 516.43 514.59 1.83 0.015

Tahla, Q-1 n~rn i+n,,Ar waircuic nhearvPl l-lacl Ideanfinng-tl' Northin Observed Head Computed Residual Absolute Easting Name sg og Head Residual Error (feet) (feet) Layr (feet amsl) (feet amsl) (feet/feet)

FTP-2B 2835812 193434 5 504.84 507.95 -3.11 0.025 MW037A 2836077 196436 5 512.00 526.92 -14.92 0.121 MW039A 2835948 196208 5 521.68 529.27 -7.59 0.061 MW062A 2836178 194789 5 516.94 523.78 -6.83 0.055 MW063A 2836724 194863 5 526.15 532.02 -5.87 0.047 MWO83A 2837302 196290 5 557.16 553.92 3.25 0.026 MWO87A 2836464 196681 5 533.24 535.74 -2.50 0.020 MW093A 2835012 194930 5 495.41 503.78 -8.37 0.068 MW095A 2834525 195116 5 478.59 476.64 1.95 0.016 MW096A 2835695 197304 5 502.65 507.18 -4.54 0.037' MW097A 2834512 195412 5 473.48 472.57 0.91 0.007 MW099A 2836045 197278 5 510.55 512.81 -2.26 0.018 MWI10 2838430 194760 5 533.19 546.40 -13.21 0.107 MW1l2 2833800 192631 5 465.77 470.36 / -4.59 0.037 MW113 2836075 192811 5 498.80 499.60 -0.80 0.006 MW1l4A 2833831 193680 5 465.03 466.77 -1.74 0.014.

MWO07B 2837559 195868 ,6 532.01, 532.49 -0.49 0.004 MWO12B 2836966 195878 6 505.06 525.88 -20.82 0.168 MW050B 2836143 196938 6 510.47 499.08 11.38 0.092 MW059B 2835347 195048 6 501.98 495.12 6.86 0.055 MW062B 2836191 194790 6 511.34 511.65 -0.31 .0.003 MW072B 2837569 196445 6 538.40 528.74 9.65 0.078 MW090B 2834977 194201 6 487.68 489.05  ; -1.37 0.011 MW098B 2834822 195723 6 476.13 476.93 -0.80 0.006 MW100B 2835549 196687 6 485.18 484.30 0.88 0.007 MW104B 2836343 193537 6 507.41 511.39 -3.98 0.032 MWI05B 2834997 193754 6 484.70 489.69 -5.00 0.040 Mean Residual (MR) -1.51 Mean Absolute Residual (MAR) 3.48 Standard Deviation (SD) - 5.00.

Sum of Squares 1884 Minimum Residual -20.82 Maximum Residual 11.38 Range 123.74 MAR/Range , 0.028 SD/Range 0.040

Table 8-4 Calibrated Uranium KI Table Unit New Kd Surf deposit 0.92 SHI 0.33 SH2 0.16 SH3 0.33 SH4/5 0.23

Table 8-5a Summary of Surface Water Modeling Results - Stream Concentrations and Mass Loadin2 005 007 Total Time Mass Mass Mass (years) Concentration Loading Concentration Loading Loading (mg/L) (kg/day) (mg[L) (kg/day) (kg/day)

Nitrate 1.4 8.6838 6.37E-01 0 0 6.37E-01 1.8 8.40079 6.16E-01 0 0 6.16E-01 2.2 8.04953 5.90E-01 0 0 5.90E-01 2.8 7.60445 5.58E-01 0 0 5.58E-01 3.6 7.05494 5.17E-01 0 0 5.17E-01 4.5 6.38541 4.68E-01 0 0 4.68E-01 5.6 5.73758 4.21E-01 0 0 4.21E-01 7.1 4.9472 3.63E-01 0 0 3.63E-01 8.9 4.12697 3.03E-01 0 0 3.03E-01 11.2 3.37321 2.47E-01 0 0 2.47E-01 14.2 2.63187 1.93E-01 0 0 1.93E-01 17.8 1.95244 1.43E-01 0 0 1.43E-01 22.4 1.37969 1.01E-01 0 0 1.OIE-01 28.1 0.969339 7.11E-02 0 0 7.11E-02 35.5 0.68531 5.03E-02 0 0 5.03E-02 44.8 0.489104 3.59E-02 0 0 3.59E-02 56,2 0.332159 2.44E-02 0 0 2.44E-02 70.9 0.170159 1.25E-02 0 0 1.25E-02 89.3 5.28E-02 3.87E-03 0 0 3.87E-03 112.3 9.56E-03 7.01E-04 0 0 7.01E-04 Uranium 0.0 3.49E+00 2.56E-04 1.17E-15 8.72E-21 2.56E-04 0.3 4.34E+00 3.19E-04 1.17E-03 8.76E-09 3.19E-04 0.4 4.36E+00 3.20E-04 2.24E-03 1.67E-08 3.20E-04 0.5 4.34E+00 3.18E-04 4.07E-03 3.04E-08 3.18E-04 0.6 4.26E+00 3.13E-04 7.11E-03 5.32E-08 3.13E-04 0.8 4.1OE+00 3.01E-04 1.21E-02 9.06E-08 3.01E-04 1.0 3.82E+00 2.80E-04 2.1OE-02 1.57E-07 2.80E-04 1.3 3.43E+00 2.52E-04 3.66E-02 2.74E-07 2.52E-04 1.6 2.95E+00 2.17E-04 6.69E-02 5.OOE-07 2.17E-04 2.0 2.45E+00 1.79E-04 1.27E-01 9.48E-07 1.80E-04 2.5 1.94E+00 1.42E-04 2.49E-01 1.86E-06, 1.44E-04 3.1 1.47E+00 1.08E-04 4.98E-01 3.73E-06 1.12E-04 4.0 1.08E+00 7.91E-05 9.81E-01 7.34E-06 8.64E-05 5.0 7.81E-01 5.73E-05 2.04E+00 1.53E-05 7.26E-05 6.2 5.88E-01 4.31E-05 3.80E+00 2.84E-05 7.15E-05 7.9 4.57E-01 3.35E-05 6.44E+00 4.82E-05 8.17E-05 9.9 3.69E-01 2.70E-05 8.11E+00 6.06E-05 8.76E-05

Table 8-5a Summary of Surface Water Modeling Results - Stream Concentrations and Mass Loading (continued) 005 007 Total Time Mass Mass Mass (years) Concentration a Loading Concentration I/XLoading Loading (mg/L) (kg/day) (mg/L) (kg/day) (kg/day)

Uranium (continued) 12.5 3.08E-01 2.26E-05 9.18E+00 6.86E-05 9.13E-05 15.7 2.80E-01 2.05E-05 1.34E+01 9.99E-05 1.20E-04 19.8 2.83E-01 2.08E-05 2.30E+01 1.72E-04 1.93E-04 24.9 3.32E-01 2.43E-05 2.85E+01 2.13E-04 2.37E-04 31.3 6.42E-01 4.71E-05 2.13E+01 1.60E-04 2.07E-04 39.4 2.28E+00 1.67E-04 9.56E+00 7.15E-05 2.39E-04 49.6 6.53E+00 4.79E-04 3.71E+00 2.77E-05 5.07E-04 62.2 1.09E+01 7.98E-04 1.38E+00 1.03E-05 8.08E-04 74.6 1.17E+O1 8.55E-04 4.73E-01 3.54E-06 8.59E-04 87.0 1.03E+01 7.55E-04 1.35E-01 1.01E-06 7.56E-04 99.5 8.14E+00 5.97E-04 3.21E-02 2.40E-07 5.97E-04 111.9 5.91E+00 4.34E-04 6.50E-03 4.86E-08 4.34E-04 124.4 3.99E+00 2.93E-04 1.18E-03 8.81E-09 2.93E-04 136.8 2.55E+00 1.87E-04 1.99E-04 1.49E-09 1.87E-04 149.3 1.58E+00 1.16E-04 3.28E-05 2.45E-10 1.16E-04 161.7 9.60E-01 7.04E-05 5.69E-06 4.25E-11 7.04E-05 174.2 5.85E-01 4.29E-05 1.03E-06 7.68E-12 4.29E-05 186.6 3.59E-01 2.63E-05 1.64E-07 1.22E-12 2.63E-05 199.0 2.22E-01 1.63E-05 0.OOE+00 0.OOE+00 1.63E-05 211.4 1.38E-01 1.OIE-05 0.OOE+00 0.OOE+00 1.01E-05 223.8 8.62E-02 6.32E-06 0.OOE+00 0.OOE+00 6.32E-06 236.2 5.36E-02 3.93E-06 0.OOE+00 0.OOE+00 3.93E-06 248.6 3.32E-02 2.43E-06 O.OOE+00 O.OOE+00 2.43E-06 Arsenic 1.7 1.42E+00 1.04E-04 7.94E-04 5.93E-09 1.04E-04 2.1 1.38E+00 1.01E-04 2.83E-03 2.11E-08 1.01E-04 2.7 1.34E+00 9.80E-05 9.17E-03 6.86E-08 9.81E-05 3.4 1.29E+00 9.49E-05 2.62E-02 1.96E-07 9.51E-05 4.2 1.25E+00 9.17E-05 6.40E-02 4.78E-07 9.21E-05 5.3 1.22E+00 8.93E-05 1.31E-01 9.82E-07 9.03E-05 6.7 1.19E+00 8.75E-05 2.23E-01 1.67E-06 8.91E-05 8.4 1.17E+00 8.58E-05 3.33E-01 2.49E-06 8.83E-05 10.6 1.14E+00 8.35E-05 4.29E-01 3.21E-06 8.67E-05 13.4 1.06E+00 7.74E-05 4.73E-01 3.54E-06 8.1OE-05 16.8 8.89E-01 6.52E-05 4.35E-01 3.25E-06 6.85E-05 21.2 6.43E-01 4.72E-05 3.22E-01 2.41E-06 4.96E-05 26.7 3.99E-01 2.93E-05 1.78E-Oi 1.33E-06 3.06E-05 33.4 2.25E-01 1.65E-05 7.93E-02 5.93E-07 1.71E-05

Table 8-5a Summary of Surface Water Modeling Results - Stream Concentrations and Mass Loading (continued) 005 007 Total Time Mass Mass Mass (years) Concentration Loading Concentration Loading Loading (mg/L) (kg/day) (mg/L) (kg/day) (kg/day)

Arsenic (continued) 42.2 1.27E-01 9.34E-06 2.50E-02 1.87E-07 9.52E-06 53.2 8.81E-02 6.46E-06 5.46E-03 4.08E-08 6.51E-06 66.8 6.93E-02 5.09E-06 6.62E-04 4.95E-09 5.09E-06 84.3 4.98E-02 3.65E-06 3.23E-05 2.41E-10 3.65E-06 106.1 2.46E-02 1.81E-06 4.29E-07 3.21E-12 1.81E-06 133.6 5.84E-03 4.29E-07 1.23E-08 9.23E-14 4.29E-07 168.1 5.88E-04 4.31E-08 3.61E-08 2.70E-13 4.31E-08 211.6 3.17E-05 2.33E-09 3.82E-09 2.86E-14 2.33E-09 266.3 8.94E-07 6.56E-11 4.08E-11 3.05E-16 6.56E-11 266.9 8.58E-07 6.29E-11 3.85E-11 2.88E-16 6.29E-11 Table 8-5b Summary of Groundwater Modeling Results - Stream Concentrations and Mass Loading Nitrate Uranium, Arsenic Mass Mass Mass (years) Loading Time (years) Loading (years) Loading (kg/day) (kg/day) (kg/day) 1.3 5.30E+00 50.0 3.45E-06 1.3 3.23E-04 5 5.99E+00 100 5.60E-05 5 1.11E-03 10 9.19E+00 158.5 2.03E-04 10 2.82E-03 15.8 1.04E+01 200 2.69E-04 25 1.62E-03 20 8.78E+00 250 3.55E-04 50 4.16E-04 25 6.38E+00 300 3.42E-04 100 8.03E-05 50 1.68E+00 350 2.44E-04 158 4.79E-06 100 3.74E-01 400 2.22E-04 200 3.07E-07 125 2.53E-01 450 0.00031165 500 0.00043721f 550 0.000514372 650 0.00045307ý 750 0.00029353ý 1000 0.00010299(

Table 8-6 Flow Model Sensitivity Parameters Parameter Parameter Type Area Kxl5 Hydraulic Conductivity Colluvium Kx 13 Hydraulic Conductivity Terrrace/Shale 1/Shale2 Kx 18 Hydraulic Conductivity Alluvium Kx 12 Hydraulic Conductivity Simulated Vertical Conduits Kxl 1 Hydraulic Conductivity Shale3/Shale4 Kxl4 Hydraulic Conductivity Shale5/Shale6 Kxl 6 Hydraulic Conductivity Gravel Fill R6 Recharge Process Area R3 Recharge Prairie Grassland R4 Recharge Oak/Hickory Forrest R5 Recharge Agland ET2 Evapotranspiration Agland ET5 Evapotranspiration Prairie Grassland ET3 Evapotranspiration Oak/Hickory Forrest Table 8-7 Transport Model Sensitivity Parameters Parameter Parameter Type Area Po2 Porosity Shales Po3 Porosity Unconsolidated Deposits All Longitudinal Dispersion All Areas/All Layers Kd32 Linear Adsorption Shale 4/ Shale 5 Kd33 Linear Adsorption Simulated Vertical Conduits Kd34 Linear Adsorption Shale 2 Kd35 Linear Adsorption Shale 1 Kd36 Linear Adsorption Shale 3 Kd37 Linear Adsorption Terrace Kd38 Linear Adsorption Gravel Deposits Kd39 Linear Adsorption Alluvium/Colluvium

Table 9-1 Safe and Toxic Concentrations of Uranium in Water Species U(ppm) Effect Ref FISH-IN WATER Most fish 0.005 No effect Mitchum and Moore (1966)

Bonytail 0.033 Max acceptable Stephens et al. (1988)

Colorado squawfish 0.033 Max acceptable Stephens et a]. (1988)

Razorback sucker 0.033 Max acceptable Stephens et al. (1988)

Razorback sucker daMax 0.073 acceptable Stephens et al. (1988)

Colorado squawfish 0.073 Max acceptable Stephens et al. (1988)

Bonytail 0.073 Max acceptable Stephens et al. (1988)

Australio sqafish 32d.r3yitae 46 96-hr LC 50 Hamilton (1995); (hardness 32333mgfL)

Fathead minnow 1rnl 357 96-hr LC 50 Tarzwell and Henderson (1960); hardness 400mgfL Not Shaded: No observed effects; Shaded: Observed Effects

Table 9-2 Safe and Toxic Concentrations of Nitrate in Water Species Common name Nitrate Effect Reference (nnm)

Amphibian- water Pseudacristriseriata Chorus frog 5 NOAEL Hecnar 1991 Rana pipiens Leopard frog 5 NOAEL Hecnar 1991 Rana clamitans Green frog 10 NOAEL Hecnar 1991 Bufo americanus American toad 13.6-39.3 LC50 Hecnar 1991 Pseudacristriseriata Chorus frog 17 LC50 Hecnar 1991 Rana pipiens Leopard frog 22.6 LC50 Hecnar 1991 Rana clamitans Green frog 32.4 LC50 Hecnar 1991 Invertebrate- water Hydropsyche occidentalis Caddisfly 1.4-2.2 NOAEL Camargo and Ward 1995 Cheumatopsyche pettiti Caddisfly 2.4-3.5 NOAEL Camargo and Ward 1995 Hydropsyche occidentalis Caddisfly "65.5-1835 LC50 Camargo and Ward 1992 Cheumatopsycheipettiti , Caddisfly 106.5-210 LC50 Camargo and Ward1992, Fish- water Salmonids Trout and salmon 100 No effect Meade 1974 Monacanthus hispidus planehead filefish 573 NOAEL Pierce et al. 1993 Raja eglanteria clearnose skate >960 NOAEL Pierce et al. 1993 Trachinotus carolinus Florida pompano 1000 NOAEL Pierce et al. 1993 Centropristisstriata black sea bass 2400 NOAEL Pierce et al. 1993 Pomacentrusleucostritus beaugregory >3000 NOAEL Pierce et al. 1993 Oncorhyncus tsawytascha Chinook salmon 5000 LC50 Westin (1973) in Meade (1974)

Not Shaded: No observed effects; Shaded: Observed Effects Table 9-3 ARARs and Established Protective Values MCL Acute Chronic OK OK OK Protective Protective NRWQ NRWQ raw ANC CNC criteria for criteria for CNR CNR water humans aquatic WQC WQC criteria biota Arsenic 10 ppb 340 ppb 150 ppb 40 ppb 340 ppb 150 ppb 10 ppb 150 ppb Uranium 30 ppb NA NA NA NA NA 30 ppb 1000 ppb Nitrate 10 ppm NA NA 10 ppm NA NA 10 ppm 10 ppm

Date: OCTOBER 2002 FIGURE 2-1 Project: P:\100734-2\REV CHAR RPT LOCATION MAP File: SECT 2.ppt

_ engineers

0 iii

-' t~tI

'I

'5 i 0 ~ WeI~

'5 vi, ii 4L After U.S.G.S. 7.5 Min. Topographic quadrangles, Gore, OK (1974) and Stigler NE, OK (1963).

Date: OCTOBER 2002 FIGURE 2-2 Project: P:\100734-2\REV CHAR RPT TOPOGRAPHIC MAP engineers File: SECT 2.ppt

199000-',

198000+ý 197000-i 196000 195000- __

194000-1930007 192000 191000 SI I  ! I I 2832000 2833000 2834000 2835000 2836000 2837000 2838000 Process Area Boundary Industrial Area Perimeter Facility Boundary FU 2- Date: OCTOBER 2002

-- FIGURE 2-3

- icon'og, FACILITY AREA DESIGNATIONS Project: P:\100734-2\REV RPT

___ ...... File: SECT2PORT.ppt

1' \~

F---- ---- 7

.L AI r K

/I

/

/

/I FERTILIZER PONDAREA

/ /1 K

OCTOBER 2002 I

ect: P:\1 00734-2\REV RPT SECT2PORT.ppt I

A Spring F- - FIGURE 2-5 Date: OCTOBER 2002 LOCATIONS OF FACILITY Project: P:\1 00734-2\REV RPT DRAINAGES AND SPRINGS File: SECT2PORT.ppt

THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:

DRAWING NO. FIGURE 4-1, "SMI WELL, BOREHOLE, AND GEOCHEMICAL SAMPLING LOCATIONS" WITHIN THIS PACKAGE... OR BY SEARCHING USING THE DOCUMENT/REPORT NO.

FIGURE 4-1 D-O1

ih/' I 10A-SHALE 4E MW120-ALLUVIUM MW111A-SHALE4 MW1 14A-SHALE 4 0 MW112A-SHALE 4 SCALE IN FEET 0 800

0 100 10.00 -)K- Location 7-1

-- a- Location 8-2


Location 8-3

-J 1.00

& Location 8-4 E

5' -X- Location 9-3 0.100

- Location 9-4

- Location 10-1 0.010 0.001 0 1 2 3 4 5 6 Rinse No.

Date: OCTOBER 2002 r~M~

FIGURE 5-1 Project: P:\100734-2\REV CHAR RPT L Od URANIUM CONCENTRATIONS INTHE Kd BATCH TEST SOLUTIONS File: GEOCHEM.ppt

0.020


Location 7-1

-U-- Location 8-2 0.015 --- Location 8-3

  • Location 8-4

-X- Location 9-3

-- Location 9-4 o 0.010 - Location 10-1 C

0.005 0.000 0 12 3 4 5 6 Rinse No.

Date: OCTOBER 2002 FIGURE 5-2 Project: P:\100734-2\REV CHAR RPT G ce ~ f**n ARSENIC CONCENTRATIONS IN THE Kd BATCH TEST SOLUTIONS File: GEOCHEM.ppt

Quartz 3.34 ethylene glycol solvated IS chlorite-smectite 15.6 A Illite Quartz 10.1 4.3 7.2 0 10 20 30 40 50 60 Degrees 2-Theta FIGURE 5-3 Date: OCTOBER 2002 X-RAY DIFFRACTION PATTERN FOR SHALE 1 (LOCATION 7) COMPARING Project: P:\100734-2\REV CHAR RPT THE d(001)-SPACING OF UNTREATED AND ETHYLENE GLYCOL SOLVATED File: GEOCHEM.ppt engineers SAMPLES

0 inilali water (u) ana:uzsequem ranses (1-t) 0 1 2 3 4 5 6 - AIAsO4 X FeAs04


Ca3(As 04)2 0 Uraninite

- Co ffmnite Ningyo ite (0

- Camotite 0 - Schoepite

-- Rutherfo rdine 0


Tyuyam unite Autunite Gl)

- K-Autunite SUranophane

--- Gypsum

-18 Date: OCTOBER 2002 rM -I FIGURE 5-4 P:\100734-2\REV CHAR RPT MINERAL SATURATION INDICES FOR THE SHALE 1 (LOCATION 7) Project:

BATCH TEST SOLUTIONS File: GEOCHEM.ppt

Initial Water (0) and Subsequent Rinses (1-6) 0 1 2 3 4 5 6 2 I I

--- AAs O4 0

I I I ----- FeAsO4

-2 -K-- Ca3(AsO4)2 04 - A- Uraninite M -4 - Coffinite C) Ningyoite r -6

  • - Carnotite 0

-- Schoepite o -8

-m- Rutherfordine x

V--10 -Tyuyam unite

,- -10 x--- Autunite 0

" -12 ,-, K-Autunite 1 ---- Uranophane

--+-- Gypsum

-16

-18 FIGURE 5-5 Date: OCTOBER 2002 Lon...... MINERAL SATURATION INDICES FOR THE SHALE 2 (LOCATION 8) Project: P:\100734-2\REV CHAR RPT Sinitand

_ tW° BATCH TEST SOLUTIONS File: GEOCHEM.ppt

__- engineers

0 0 Initial Water (0) and Subsequent Rinses (1-6) 0 1 2 3 4 5 6 2

0 II I I I

II I I

-2

-4 0

-6 0

-. 1

-8 0 -10

-o

-12

-14J I

-16

-18 Date: OCTOBER 2002 FIGURE 5-6 LF 4Consulting MINERAL SATURATION INDICES FOR THE SHALE 3 (LOCATION 8) Project: P:\100734-2\REV CHAR RPT Gengineers BATCH TEST SOLUTIONS File: GEOCHEM.ppt

Initial Water (0) and Subsequent Rinses (1-6) 0 1 2 3 4 5 6 1 1 1 2

0

-2 1~ I I

-)K---

AAs 04 FeAsO4 Ca3(AsO4)2 Uraninite

- Coffinite

-4 a) - Ningyoite Carnotite

-6 0

- Schoepite 0 ---- Rutherfordine

-8 x -A- Tyuyam unite

--x-- Autunite

-10 I-

-- -K-Au tu n ite 0

-12 -- 4W-- Uranophane

+ Gypsum

-14 o I

-16

-18 Date: OCTOBER 2002 FIGURE 5-7 MINERAL SATURATION INDICES FOR THE SHALE 4 (LOCATION 8) Project: P:\100734-2\REV CHAR RPT engineers BATCH TEST SOLUTIONS File: GEOCHEM.ppt

Initial Water (0 and Subsequent Rinses (1-6) 0 1 2 3 4 5 6 2

--3-- AJAsO4 0 ---- FeAsO4

-K Ca3(AsO4)2

-2 ---- Uraninite 4)

-- +-- Coffinite

-4 Ningyoite Carnotite C'P

-6

- Schoepite 0

--- Rutherfordine 0 -8

-J

-- Tyuyamunite

4) X Autunite

.10

... - K-Autunite 0

0 Uranophane

.12

--- Gypsum Cn

-14

-16

-18 Date: OCTOBER 2002 FIGURE 5-8 FOR THE SHALE 3 (LOCATION 9) Project: P:\100734-2\REV CHAR RPT MINERAL SATURATION INDICES sr anfists and Sengineers BATCH TEST SOLUTIONS File: GEOCHEM.ppt

Initial Water (0 and Subsequent Rinses (1-6) 01 2 3 4 5 6 2III I 0U AAsO4

- FeAsO4 2 K Ca3(AsO4)2

) .- - Uraninite

-4

-4 I Coffinite

  • Ningyoite

-- Carnotite 0 0 Schoepite 0 -8

-x *----* Rutherfordine

-10 - Tyuyamunite 0

0 **v* -X- Alutunite

-12 -- K-Autunite M--0-- Uranophane uw -14


Gypsum

-16

-18 I

Date: OCTOBER 2002 FIGURE 5-9

_____ 0900 MINERAL SATURATION INDICES FOR THE SHALE 4 (LOCATION 9)

BATCH TEST SOLUTIONS j Project:

File:

P:\100734-2\REV CHAR RPT GEOCHEMppt

Initial Water (0 and Subsequent Rinses (1-6) 0 1 2 3 4 5 6 2

AlAsO4 0 ----- FeAsO4 I I I

-- )K Ca3(AsO4)2

-2 ---- Uraninite

- Coffinite U) -4 4 Ningyoite CT Carnotite

-6

-Schoepite C.2


Rutherfordine 0 -8

-J A--Tyuyamunite x X Autunite

-10

--- K-Autunite 0

-12 -Uranophane


Gypsum

-14 X

-16

-18 Date: OCTOBER 2002 FIGURE 5-10 Project: P:\100734-2\REV CHAR RPT r- -I q e MINERAL SATURATION INDICES FOR THE SHALE 1 (LOCATION 10)

BATCH TEST SOLUTIONS File: GEOCHEM.ppt

900 800 700 600

-J E 500 0)


Ca C

I.o -~KMg g 400 0

C.

L) -- K o

300 200 0 1 2 3 4 5 6 Initial Water (0) and Rinse No. (I to 6)

Date: OCTOBER 2002 FIGURE 5-11 EXAMPLE OF MAJOR ION CHEMISTRY CHANGES DURING THE Kd Project: P:\100734-2\REV CHAR RPT S engineers BATCH TESTING File: GEOCHEM.ppt

Nitrate, mg/I WATER PTONM IEEOD 1000 POD5 POND 3W POND 3E PON04 1 !10000 100 10 MCL FER TIL2LE RPONDAREA BDL Extent of Terrace/Shale 1

.05 Concentration V*MVn I, Well #

Date: OCTOBER 2002 FIGURE 5-12 ISOPLETH OF NITRATE CONCENTRATIONS IN TERRACE/SHALE 1 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING File: ISOPLETHppt

0 Nitrate, mg/I 10000 1000 100 10 MCL BDL Extent of Shale 2

.05 Concentration Mvvt) w Well #

Date: OCTOBER 2002 FIGURE 5-13 Project: P:\100734-2\REV CHAR RPT ISOPLETH OF NITRATE CONCENTRATIONS IN SHALE 2 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

0 Nitrate, mg/I 10000 1000 100 10 MCL BDL Extent of Shale 3

.05 Concentration V" 2, Well #

F- I'll Date: OCTOBER 2002 FIGURE 5-14 ISOPLETH OF NITRATE CONCENTRATIONS IN SHALE 3 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

Nitrate, mg/I M

X 10000 1000 100 10 MCL iI BDL Extent of Shale 4

,05 Concentration M Wv" Well #

Date: OCTOBER 2002 FIGURE 5-15 4._ ISOPLETH OF NITRATE CONCENTRATIONS IN SHALE 4 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

S Nitrate, mg/I 10000 1000 S-AýRRESE-R 100 10 MCL

+ z, BDL TW POND 3E POND P04 PENDE P E Extent of Shale 5 MF0 FEPONLUR

.05 Concentration t,,W 1 Well #

Lii 0

ISOPLETH OF NITRATE FIGURE 5-16 CONCENTRATIONS IN SHALE 5 2001 GROUNDWATER SAMPLING

'F Date:

Project:

File:

OCTOBER 2002 P:\100734-2\REV CHAR RPT ISOPLETH.ppt

S

/

,--W

/

STORW WATER RE-EVOIR PD PONDO3 E POND S 8 Nitrate, mg/I 10000 1000 100 10 MCL BDL Extent of Alluvium

.05 Concentration Ni*wwi, Well #

Date: OCTOBER 2002 FIGURE 5-17 ISOPLETH OF NITRATE CONCENTRATIONS IN ALLUVIUM Project: P:\100734-2\REV CHAR RPT 0 ........

2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt I

Uranium, pig/I ESERVOM SMRMWATER RE 10000 1000 100

-OD3E PN poND3w BDL FERTILIZER POND AREA Extent of Terrace/Shale 1 PO~N

ý

.05 Concentration rvwnv o Well #

r, ý1 1

Date: OCTOBER 2002 FIGURE 5-18 ISOPLETH OF URANIUM CONCENTRATIONS IN TERRACE/SHALE 1 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

Uranium, pg/I 10000 1000 100 BDL Extent of Shale 2

.05 Concentration MwVt12 Well #

Date: OCTOBER 2002 FIGURE 5-19 ISOPLETH OF URANIUM CONCENTRATIONS IN SHALE 2 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

Uranium, jig/I 10000 1000 N100 BDL Extent of Shale 3 05 Concentration

%IVIPý f? Well #

Date: OCTOBER 2002 FIGURE 5-20 ISOPLETH OF URANIUM CONCENTRATIONS IN SHALE 3 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

+w* Uranium, pig/I

+

.wtul-STORM WATER RESERVOI S10000 1000 23 100 3 POND 3W 2P.- pONO 3E BDL FERT-LZERPOND AREA Extent of Shale 4

&a + 22343 POND FTI FPOP2Z

.05 Concentration

+ MVwO 1z Well #

+2 Date: OCTOBER 2002 FIGURE 5-21 Project: P:\100734-2\REV CHAR RPT ISOPLETH OF URANIUM CONCENTRATIONS IN SHALE 4 Go 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

L I

- 3S 8 -2SPSI M I2 Uranium, p~g/I 10000 1000 Sý. -ýý ýEýE--

100

+

Li BDL P0505W POND PE Extent of Shale 5

+ -- Ns FERTILIZD PON ODO

.05 Concentration

+10 I MVW1" Well #

ýDýO Date: OCTOBER 2002 FIGURE 5-22 Project: P:\100734-2\REV CHAR RPT ISOPLETH OF URANIUM CONCENTRATIONS IN SHALE 5 (I;

________ 0 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

-P '-P

/

ST- WITERRE-DR

-37

<-*30N,

/

POND

-w P D 3E ON

  1. 3

+/-

FOND Uranium, pg/I 10000 1000 100 BDL Extent of Alluvium

.05 Concentration MVV Well #

Date: OCTOBER 2002 FIGURE 5-23 ISOPLETH OF URANIUM CONCENTRATIONS IN ALLUVIUM Project: P:\100734-2\REV CHAR RPT e

2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

~JIp -I4R1

/

4t Arsenic, mg/I 1 STORM WATER RESERVOIR 1

0.1 7

0.05 MCL POSE3W POND3E POT P*OND 5 BDL pOND FERTILIZER AREA Extent of Terrace/Shale 1 POND6

.05 Concentration Mwfl1? Well #

Date: OCTOBER 2002 FIGURE 5-24 SOPRIS S C ISOPLETH OF ARSENIC CONCENTRATIONS IN TERRACE/SHALE 1 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

0 c, mg/I MCL Extent of Shale 2 Concentration Well #

__ h Date: OCTOBER 2002 FIGURE 5-25 ISOPLETH OF ARSENIC CONCENTRATIONS IN SHALE 2 Project: P:\100734-2\REV CHAR RPT G

_________ 9 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

0

/

Arsenic, mg/I 1

0.1 0.05 MCL BDL Extent of Shale 3

,05 Concentration mvwvn? Well #

FIGURE 5-26 F- I ISOPLETH OF ARSENIC CONCENTRATIONS IN SHALE 3 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING I File:

Date:

ISOPLETH.ppt OCTOBER 2002

0

-Ný

+ I.

-4i' I Arsenic, mg/I 0.1 7-p 3W 0.05 MCL

  • D5 BDL

+/- 2333*

FERTS.ZER pORDTEA Extent of Shale 4 T

  • 3 pOND6

.05 Conceni tration MW( 12 Well #

"bý3 Date: OCTOBER 2002 FIGURE 5-27 Project: P:\100734-2\REV CHAR RPT ISOPLETH OF ARSENIC CONCENTRATIONS IN SHALE 4 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

  • s ST- IATERRESERVQIR

!1 Arsenic, mg/I 0.1 0.05 MCL PO.D - W0 OD 3E BDL

.t ý01 DDE~

POND FERTPFZeD Extent c f Shale 5

-D6

.05 Concent ration vn MWf Well #

Date: OCTOBER 2002 FIGURE 5-28 Project: P:\100734-2\REV CHAR RPT ISOPLETH OF ARSENIC CONCENTRATIONS IN SHALE 5 G- 'I 2001 GROUNDWATER SAMPLING File: ISOPLETHppt

STORM WATER RESErV-iR

'1411tý

!1 P0*03- --553 DE Arsenic, mg/I

+/-

0.1 0.05 MCL BDL Extent of Alluvium

.05 Concentration MWO12 Well #

Date: OCTOBER 2002 FIGURE 5-29 Project: P:\100734-2\REV CHAR RPT ISOPLETH OF ARSENIC CONCENTRATIONS IN ALLUVIUM

________ 03 N 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

0 RESERVOW S-OONWATER

!6 Fluoride, mg/I 4 MCL BDL PONDPw PONOTE EVOOT PONI Extent of Terrace/Shale 1 FERTILIZER

ýOOAR*

F*O h'D .05 Concentration MW*I Well #

Date: OCTOBER 2002 FIGURE 5-30 ISOPLETH OF FLUORIDE CONCENTRATIONS IN TERRACE/SHALE 1 Project: P:\100734-2\REV CHAR RPT L4 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt C- gner

Fluoride, mg/I 6

4 MCL

-",Z BDL Extent of Shale 2

.05 Concentration MvW12 Well #

Date: OCTOBER 2002 FIGURE 5-31 Project: P:\100734-2\REV CHAR RPT ISOPLETH OF FLUORIDE CONCENTRATIONS IN SHALE 2 Li. 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

Fluoride, mg/I 6

4 MCL BDL POND- 3E

-POD OD Extent of Shale 3 FERnLQER - -ARE POND6 .05 Concentration MWoN2 Well #

Date: OCTOBER 2002 FIGURE 5-32

_____ "I G ISOPLETH OF FLUORIDE CONCENTRATIONS IN SHALE 3 Project: P:\100734-2\REV CHAR RPT 2001 GROUNDWATER SAMPLING File: ISOPLETHppt

0 i-Fluoride, mg/I

  • m2A ot 4 MCL STREEVI TR +11 " BDL Extent of Shale 4

+N PONDA 2353PNOE2 PND

.05 Concentration I,? + MWO12 Well #

+ AID PON -- 1 O hIW.¶INA ETRI, PANDA FTP-26 2a0

+

+/-

-I-Date: OCTOBER 2002 FIGURE 5-33 ISOPLETH OF FLUORIDE CONCENTRATIONS IN SHALE 4 Project: P:\100734-2\REV CHAR RPT

_________ El 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

0 y

Fluoride, mg/I 6

4 MCL BDL Extent of Shale 5 STORM WATER RESERVOR .i

+ .05 Concentration Mwr I Well #

PONDSW pOND3E IONOS

ýw PONO FERSILIZER WFEArE Date: OCTOBER 2002 FIGURE 5-34 Project: P:\100734-2\REV CHAR RPT r, . ISOPLETH OF FLUORIDE CONCENTRATIONS IN SHALE 5 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

POND2 RSN OI WATER STORM RESERVOIR P P..

.NOSN E POND 3SPNO3 Fluoride, mg/I

+/-*AI2 FERTILIZER POIND AREA, POND6 4 MCL BDL Extent of Alluvium

.05 Concentration MWO12 Well #

Date: OCTOBER 2002 FIGURE 5-35 Project: P:\100734-2\REV CHAR RPT ISOPLETH OF FLUORIDE CONCENTRATIONS IN ALLUVIUM 2001 GROUNDWATER SAMPLING File: ISOPLETH.ppt

0

ýJ MW-110 MWO12A

  • j MW012B

. MW025 0 MW025A 0Ao MW059A MW064A q)

Q, 0'

Q& 0 Mg SO 4 (SI 0'

0

  • 0 0'

-o 20 Na+K 80 C0 Ca 80 60-.. 40 HCO3+CO3 20 40 60 Calcium (Ca) Chloride (CI)

CATIONS %meq/I ANIONS I

Dat:GOTOBER 2002 rM -

FIGURE 5-36 Prjc:P\0742RVCA P L ýA n scIenfisti and TRILINEAR DIAGRAM FOR SELECTED WELL WATERS File:GEOCHEMppt enginees

0 TULSA OZARK UPLIFT NORTHEAST OKLAHOMA PLATFORM 9

/

0 OKLAHOMA CITY G ore

/

  • FORT SMITH ARKOMA BASIN LAWRENCE AUL S es LITTLE ROCK MouNTAINS 0. >\

NTFýL\,, Ozi O

/J 4 MSOUTHERN\ \\

ARDO RE ..........

OKLAHOMA ARKANSAS I

':':':: .:.+.:. .... ...

0 50 100 miles i 4 0 80 160 km After Sutherland, 1988

" ".....FIGURE Date: OCTOBER 2002 6-1 FIGUR 6-1j.ii Project: P:\100734-2\REV RPT REGIONAL GEOLOGIC PROVINCES File: SECT 6.ppt

-AI

AP

\<tj Aj /

Spiro*

Date: OCTOBER 2002 FIGURE 6-2 Project: P:\100734-2\REV RPT REGIONAL GEOLOGIC MAP engineers File: SECT 6.ppt

Explanation ALLUVIUM MISSISSIPPIAN ROCKS ABOVE ChATTANOOGA SHALE Gravel, sand, silt, and clay. Yields large amounts of water of good Mu Undifferentiated.

quality along the Arkansas River and probably will yield moderate Mp Pitkin Fbrmation, limestone; Fayetteville Formation, shale and to large amounts along the Canadian River. limestone; Hindsville Formation, limestone and shale; and Moorefield Formation, limestone.

Mkr Keokuk Formation, chert; Reeds Spring Formation, chert and limestone; and St. Joe "°Group,"limestone and marlstone.

Yield small to moderate amounts of water of fair to good quality.

TERRACE DEPOSITS Gravel, sand, silt, and clay. Yield moderate to large atnounts of water of good quality locally along the Arkansas River; smaller amounts elsewhere.

MISSISSIPPIAN, DEVONIAN, SILURIAN, AND ORDOVICIAN ROCKS, UNDIFFERENTIATED Mississippian and Devonian. ChattanoogaShale, shale.

Devonian. Sallisaw Formation, limestone, sandstone, and chert; and BOGGY FORMATION Frisco Formation, limestone.

Shale, sandstone, arsd coal; includes Bluejacket Sandstone Member Silurian. Quarry Mountain Formation, limestone; Tenkiller Forma-at base. Yields limited amounts of water of poor quality. lion, limestone; and Blackgnm Formation, limestone and dolomite.

Ordovician. Sylvan Shale, shale; Fernvale Limestone, limestone; Fite Limestote, limestone; Tyner Formation,shale, sandstone, dolomite, and limestone; Burgen Sandstone, sandstone and minor shales and limestones; and Cotter" Dolomite, dolomite.

SAVANNA, McALESTER, AND HARTSHORNE Limestone, dolomite, and sandstone units may yield small to mod-FORMATIONS erate amounts of water of fair to good quality; shale units probably IPsv Savanna Formation, shale, sandstone, and coal. Yields limited will yield only limited amounts of water of poor to fair quality.

amounts of water of poor quality.

IPsh McAlester and Hartshorne Formations (undifferentiated), shale, sandstone, and coal. Yield limited amounts of water of poor The stratigraphic nomenclature and age determinations used herein quality.

are those accepted by the Oklahoma Geological Survey and do not IPsm Savanna and McAlester Formations (undifferentiated; T. 15 N.,

necessarily agree with those of the U. S. Geological Survey.

Rs. 18, 19 E.), shale and minor sandstones. Yield limited amounts of water of poor quality.

U Fault Dotted where concealed; U, upthrown side; D, downthrown side ATOKA, BLOYD, AND HALE FORMATIONS IPu Undifferentiated.

IPa Atoka Formation, shale and sandstone. Yields limited amounts of water of poor quality.

IPbh Bl1yd Formation, shale and limestone; and Hale Formation, limestone and sandstone. Probably will yield only small amounts of water of fair to poor quality.

rM- I FIGURE 6-2a Date: OCTOBER 2002 EION_ _EO I Ma Project: P:\100734-2\REV CHAR RPT Ln___ see EXPLANATION OF GEOLOGIC MAP File: SECT6PORTRAIT.ppt

I I

FIGURE 6-3 Date: OCTOBER 2002

__ CORRELATION OF UPPER MISSISSIPPIAN AND LOWER Project: P:\100734-2\REV CHAR RPT PENNSYLVANIAN FORMATIONS File: SECT6PORTRAIT.ppt

rM~

Date: OCTOBER 2002 FIGURE 6-4 Project: P:\100734-2\REV RPT n~ ee LOCATIONS OF LOCAL FAULTS File: SECT 6.ppt

0 0 r-, -I Date: OCTOBER 2002 J FIGURE 6-5 P:1 00734-2\REV RPII SITE TOPOGRAPHICAL SURFACE SECT 6.ppt engineers SECT 6.ppt engineers

0 916 I--

5' t

j ~ 54

/~

V -

- s~

--- ~36 p 5~

  • 2 9>

/

62~ ** ~

-~ .9- ml

-I 55' Ia I

-5 2

'1/,'

-3/4 ,*Ill 440

. 3' Date: OCTOBER 2002 l FIGURE 6-6 Project: P:\1 00734-2\REV RPT REGIONAL HYDROLOGICAL UNITS SengIneer File: SECT 6.ppt

Explanation Most favorable for ground-water supplies Least favorable for ground-water supplies This area includes alluvium along the Arkansas and Canadian The area is underlain by shale, siltstone, and sandstone of Rivers and some terrace deposits along the Arkansas River. Wells Pennsylvanian age and by terrace deposits mainly along the in alluvium along the Arkansas River are reported to yield up to shores of Eufaula Reservoir. Most wells in the shale, siltstone, 900 gpm (gallons per minute); larger yields might be obtained and sandstone yield only a fraction of a gallon per minute to a locally. Alluvium along the Canadian River is untested, but few gallons per minute. A few wells are reported to yield as much yields comparable to those from alluvium of the Arkansas River as 20 gpm. In local areas, terrace deposits along Eufaula Reservoir probably could be obtained. Area A, shown by diagonal lines in may yield 10 gpm or possibly more.

Tulsa and Wagoner Counties, is underlain by terrace deposits, up to 60 feet thick, that are reported to yield as much as 125 gpm locally. Area B, shown by diagonal lines near Braggs, is also underlain by terrace deposits, up to 90 feet thick, that may yield 3Z up to 100 gpm. 01 Well Upper number is depth of the well in feet; middle number is depth to water in feet below land surface in 1966 and 1967; lower number is yield of the well in gallons per minute. e =

estimated value, , = reported value, f = flowing well. +

Moderately favorable for ground-water supplies height of water level above ground level, u - unknown.

This area is underlain by the Keokuk and Reeds Spring For-mations and, in T. 13 N., R. 23 E., by rocks of pre-Mississippian age. Wells in the Keokuk and Reeds Spring Formations are re-ported to yield as much as 20 gpm and, locally, more. A few springs yield several hundred gallons per minute. Some of the limestones and sandstones, particularly the Burgen Sandstone Spring in T. 13 N., R. 23 E., and in the vicinity of Quails, are reported Number beside spring symbol is yield in gallons per minute.

to yield up to 20 gpm.

e = estimated yield. Yield data obtained in 1966.

FIGURE 6-6a Date: OCTOBER 2002 r-. -I. EXPLANATION OF REGIONAL Project: P:\100734-2\REV CHAR RPT HYDROLOGICAL UNITS File: SECT6PORTRAIT.ppt

0 LEGEND:

UNIT 1 SHALE UNIT 2 SHALE UNIT 3 SHALE UNIT 4 SHALE UNIT 5 SHALE SANDSTONE UNITS SCALE IN FEET 0 1200 Date: OCTOBER 2002 FIGURE 7-1 HYDROSTRATIGRAPHIC MODEL Project: 100734\REVISED-20*\

BEDROCK GEOLOGY MAP File: GEO-MAP.dwg

Ic F9 E,

I Date: OCTOBER 2002 FIGURE 7-2 Project: P:\100734-2\REV RPj GEOLOGIC CROSS-SECTION LOCATIONS Sengineers File: SECT7.ppt

0 A As ARKANSAS/

ILLINOIS OUTFALL OUTFALL STORMWATER FERTILIZER POND 2 RESERVOIR POND AREA RIVER 007 005 1

moms.

LEGEND:

ALLUVIUM AND COLLUVIUM TERRACE DEPOSIT UNIT 1 SHALE

<4.UNIT 2 SHALE UNIT 3 SHALE UNIT 4 SHALE UNITS5 SHALE SCALE INFEET SANDSTONE UNITS 0 1000 VERTICAL EXAGERATION = 10x FIGURE 7-3 consutn LAYER 1 Project: 100734\REVISED-20*\

HYDROSTRATIGRAPHIC MODEL CROSS SECTION A-A' I File:

Date:

SECTIONS.dwg OCTOBER 2002

B Be SALT OUTFALL OUTFALL STORMWATER FERTILIZER BRANCH 007 005 RESERVOIR POND AREA LEGEND:

ALLUVIUM AND COLLUVIUM TERRACE DEPOSIT UNIT 1 SHALE UNIT 2 SHALE UNIT 3 SHALE UNIT 4 SHALE UNIT 5 SHALE SCALE IN FEET SANDSTONE UNITS 0 1000o VERTICAL EXAGERATION = 10x FIGURE 7-4 Date: OCTOBER 2002 L2 consulting L ýscientists and LAYER 2 Project: 100734\REVISE D-20*\

Qengineers HYDROSTRATIGRAPHIC MODEL CROSS SECTION B-B' File: SECTIONS.dwg

C C11 YELLOWCAKE SALT OUTFALL STORAGE FERTILIZER BRANCH 007 AREA POND AREA LEGEND:

ALLUVIUM AND COLLUVIUM TERRACE DEPOSIT UNIT 1 SHALE UNIT 2 SHALE UNIT 3 SHALE UNIT 4 SHALE UNIT 5 SHALE SANDSTONE UNITS SCALE IN FEET 0 1000 VERTICAL EXAGERATION = 10x Date: OCTOBER 2002 FIGURE 7-5 consulting LAYER 3 Project: 100734\REVISED-20*\

e scientists and engineers HYDROSTRATIGRAPHIC MODEL CROSS SECTION C-C' File: SECTIONS.dwg

0 D

ARKANSAS/

ILLINOIS SANITARY SALT BRANCH I

RIVER POND 2 LAGOON HIGHWAY 10 LEGEND:

ALLUVIUM AND COLLUVIUM TERRACE DEPOSIT UNIT I SHALE UNIT 2 SHALE UNIT 3 SHALE UNIT 4 SHALE UNIT 5 SHALE SANDSTONE UNITS SCALE IN FEET 0 1000 VERTICAL EXAGERATION = 10x FIGURE 7-6 Date: OCTOBER 2002 Sconsulting LAYER 4 Project: 100734\REVISED-20*\

sc:ientists and dD engineers HYDROSTRATIGRAPHIC MODEL CROSS SECTION D-D' File: SECTIONS.dwg

0 E E, ARKANSAS/ SALT FERTILIZER BRANCH ILLINOIS TRIBUTARY RIVER POND AREA HIGHWAY 10 AGLAND LEGEND:

ALLUVIUM AND COLLUVIUM TERRACE DEPOSIT UNIT 1 SHALE UNIT 2 SHALE UNIT 3 SHALE UNIT 4 SHALE UNIT 5 SHALE SCALE IN FEET SANDSTONE UNITS 010000 VERTICAL EXAGERATION = 10x VERTICAL EXAGERATION = 10x I

FIGURE 7-7 Date: OCTOBER 2002 LAYER 5 Project: 100734\REVISED-20*\

scienists and engineers HYDROSTRATIGRAPHIC MODEL CROSS SECTION E-E' File: SECTIONS.dwg

F F@

YELLOWCAKE STORMWATER STORAGE RESERVOIR I

AREA HIGHWAY 10 AGLAND LEGEND:

ALLUVIUM AND COLLUVIUM TERRACE DEPOSIT UNIT 1 SHALE UNIT 2 SHALE UNIT 3 SHALE UNIT 4 SHALE UNIT 5 SHALE SCALE IN FEET SANDSTONE UNITS 0 1000 VERTICAL EXAGERATION = lOx Date: OCTOBER 2002

  • /l* onsuting FIGURE 7-8 LAYER 6 Project: 100734\REVISED-20*\

scientists and A engineers HYDROSTRATIGRAPHIC MODEL CROSS SECTION F-F' File: SECTIONS.dwg

0 G,

'-N LEGEND U*\) I'

\~f *HEAD LOCATION AND MEASUREMENT (FT, MSL)

POTENTIOMETRIC CONTOUR (FT, MSL)

OF SHALE UNIT SEXTENT SCALE IN FEET 0 1300'

LEGEND

. HEAD LOCATION AND MEASUREMENT (FT, MSL)

POTENTIOMETRIC CONTOUR (FT, MSL)

-EXTENT OF SHALE UNIT SCALE IN FEET 0 1300'

0 0 LEGEND

  • HEAD LOCATION AND MEASUREMENT (FT, MSL)

POTENTIOMETRIC CONTOUR (FT, MSL)

-EXTENT OF SHALE UNIT SCALE IN FEET

- - - 0 1300' N1\

FIGURE 7-11 Project: 100734 POTENTIOMETRIC SURFACE SHALE 3 10 efgiflcem JUNE 2001 I File:

Date:

SHALE.dwg OCTOBER 2002

LEGEND

  • HEAD LOCATION AND MEASUREMENT (FT, MSL)

POTENTIOMETRIC CONTOUR (FT, MSL)

-EXTENT OF SHALE UNIT

- N

$MZA 4 N

/

/

- -550 - /

MW110A/

I SCALE IN FEET 0 1300' Date: OCTOBER 2002 FIGURE 7-12 POTENTIOMETRIC SURFACE SHALE 4 Project: 100734 JUNE 2001 File: SHALE.dwg

LEGEND o HEAD LOCATION AND MEASUREMENT (FT, MSL)

POTENTIOMETRIC CONTOUR (FT, MSL)

-EXTENT OF SHALE UNIT SCALE IN FEET 0 1300' FIGURE 7-13 Date: OCTOBER 2002 consulting POTENTIOMETRIC SURFACE ALLUVIUM Project: 100734 scientists and engineers 5 JUNE 2001 File: SHALE.dwg

0 Evapotranspiration Precipitation 4

Surface Cover River Shale Date: OCTOBER 2002 r -I FIGURE 7-14 Project: P:\100734-2\REV RPT e--ngier CONCEPTUALIZED HYDROGEOLOGY File: SECT7.ppt