ML032750747

From kanterella
Jump to navigation Jump to search
Volume B, Revision 2003-06, September 2003
ML032750747
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/25/2003
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032750747 (31)


Text

_ Duke OWPowere A Duke Energy Company R. A. JONES Vice President Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax September 25, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual Volume B Revision 2003-06 Please find attached for your use and review copies of Oconee Nuclear Station Emergency Plan:

the revision to the Volume B Revision 2003-06 September 2003 This revision is being submitted in accordance with 10 CFR 50-54(q) and does not decrease the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.

Any questions or concerns pertaining to this revision Emergency Planning Manager at 864-885-3301.

By copy of this letter, two copies of this revision NRC, Region II, Atlanta, Georgia.

Very

yours, A. ones Cnee Nuclear Site xc:

(w/2 copies of attachments)

Mr. Luis Reyes, Regional Administrator, Region II U. S. Nuclear Regulatory Commission 61 Forsyth St., SW, Suite 24T23 Atlanta, Georgia 30303 w/copy of attachments Mr. James R. Hall Rockville, Maryland (w/o Attachments, Oconee Nuclear Station)

NRC Resident Inspector M. D. Thorne, Manager, Emergency Planning please call Rodney Brown, are being provided to the Ao4S www. duke-energy. corn

September 25, 2003 OCONEE NUCLEAR SITE

SUBJECT:

Emergency Plan Implementing Procedures Volume B, Revision 2003-06 Please make the following changes to the Emergency Plan, Volume B by following the below instructions.

REMOVE Cover Sheet Rev. 2003-05 Table of Contents, page 1 & 2 CP/1&2/A/2002/005 -

07/24/02 CP/3/A/2002/005 -

07/24/02 INSERT Cover Sheet Rev. 2003-06 Table of Contents page 1 & 2 CP/1&2/A/2002/005 -

09/10/03 CP/3/A/2002/005 -

09/10/03

DUKE POWER EMERGENCY PLAN IMPLEMENTING PROCEDURES VOLUME B APPROVED:

W. W. Foster, Manager Safety Assurance 09/29/03 Date Approved 09/29/03 Effective Date VOLUME B REVISION 2003-06 SEPTEMBER 2003

VOLUME B TABLE OF CONTENTS Chemistry Lab LM-O-PO03C Chemistry Lab LM-O-P919 CP/l/A/2002004C CP/1&21A12002/005 CP/2/A/2002/004C CP/3/A12002/004C CP/3/A120021005 HP/01B/1009/009 HPIOIB/1009/012 HP/01B/1009/015 HPI01B/1009/016 HP/1/A11009/017 HP/21A/1009/017 HP/3/A11009/017 RP/O/B/1000/01 1 RP/01B/10001025 RP/O/B/10001027 Determination Of Boron By Manual Colorimetric Titration Boron Analysis by Mettler DL 58 Boron Titration Operating Procedure For The Post Accident Liquid Sampling System (PALSS)

Post Accident Caustic Injection Into The Low Pressure Injection System Operating Procedure For The Post Accident Liquid Sampling System (PALSS)

Operation Procedure For The Post-Accident Liquid Sampling System (PALSS)

Post Accident Caustic Injection Into The Low Pressure Injection System Procedure For Determining The Inplant Airborne Radioiodine Concentration During Accident Conditions Distribution Of Potassium Iodide Tablets In The Event Of A Radioiodine Release Procedure For Sampling And Quantifying High Level Gaseous Radioiodine And Particulate Radioactivity Procedure For Emergency Decontamination Of Personnel And Vehicles On-Site And From Off-Site Remote Assembly Area Operating Procedure For Post-Accident Containment Air Sampling System Operating Procedure For Post-Accident Containment Air Sampling System Operating Procedure For Post-Accident Containment Air Sampling System Planned Emergency Exposure Operational Support Center Manager Procedure Re-Entry Recovery Procedure 11/06/02 10128/02 01/10103 09/10/03 I

01/10/03 01110/03 09/10/03 12/03/97 01/09/01 07/23/01 12/29/97 I

09/13/00 09/13/00 09/13/00 02/01/94 04/29/03 05/30/00 1

Revision 2003-06 September 2003

VOLUME B TABLE OF CONTENTS Chemistry Manual 5.1 Chemistry Manual 5.2 Maintenance Directive 9.1 WPG 1.5 OMP 1-7 Radiation Protection Manual 11.1 Radiation Protection Manual 11.4 Safety Services Procedure 2.1 Emergency Response Guidelines Post Accident Procedure Use Guidelines Emergency Preparedness Plan Activation Emergency Plan for Work Control Group Operations Emergency Response Organization Radiation Protection Emergency Response Radiation Protection Site Assembly Safety Services Emergency Response Procedure 2.1 05/09/03 05/29/03 08/06/02 03/31/03 08/31/00 09/01/98 06/05/00 03/14/00 2

Revision 2003-06 September 2003

Duke Power Company PROCEDURE PROCESS RECORD INFORMATION ONLY (I) ID No. CP/1&2/A/2002/005 Revision No.

18 Continuous Use S4EPARATION (2)

Station (3)

Procedure Title Oconee Nuclear Station Post Accident Caustic Iniection Into the Low Pressure Iniection Svstem (4)

Prepared By 6D (5)

Requires NSD 228 Applicability Determination?

r Yes (New procedure or revision with major changes) 0 No (Revision with minor changes)

E No (To incorporate previously approved changes)

(6)

Reviewed By (QR)

D Cross-Disciplinary Review By ___(QR)

NA D

Reactivity Mgmt. Review By __(QR)

NA_&Z ID Mgmt. Involvement Review By (Ops. Supt.) NA D

(7)

Additional Reviews QA Review By D

Reviewed By D

Reviewed By D

-Temporary Approval (if necessary) late SL/03 late 4//4 late 0>

4/dTr 0,

I late late late late late By

.(OSM/QR)

Date By (QR)

Date (9)

ApprovedBy 7cfy.

>7C Date -TL6103 PERFORMANCE (Compare wivontrol coy every 14 calendardays while work is beingperforned)

(10) Compared with Control Copy Date Compared with Control Copy Date Compared with Control Copy_

Date (11) Date(s) Performed Work Order Number (WO#)

COMPLETION (12) Procedure Completion Verification o Yes 0 NA Check lists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?

0 Yes 0 NA Required enclosures attached?

0 Yes 0 NA Data sheets attached, completed, dated, and signed?

0 Yes 0 NA Charts, graphs, etc. attached, dated, identified, and marked?

0 Yes 0 NA Procedure requirements met?

Verified By Date Procedure Completion Approved Date (14) Remarks (Attachadditionalpages, if necessary)

i 1 cP/1&2IA2002/005 Page 2 of 8 Post Accident Caustic Injection into the Low Pressure Injection System NOTE:

1. This entire procedure supports an AP or EOP action. The procedure will require AP/EOP validation per NSD 705.
2. A control copy of this procedure shall be routed to the Emergency Preparedness Team within 3 working days after any approved changes.
1. Purpose 1.1 This procedure is to provide instruction for determining the amount and method of caustic addition into the LPI System during a LOCA.

1.2 Principle Caustic is injected into the LPI System during a LOCA to neutralize the borated water used in the Reactor Building Emergency Spray System to pH 7.0 - 8.0.

The neutralization will inhibit the generation of hydrogen gas and promote a higher partition factor for iodine.

2. Limits and Precautions 02.1 The following safety equipment shall be worn when connecting/disconnecting caustic tote bins:

2.1.1 Chemical goggles 2.1.2 Face shield 2.1.3 Corrosive resistant suit, neoprene or chemrel 2.1.4 Corrosive resistant boots, neoprene or PVC 2.1.5 Corrosive resistant gloves, neoprene or PVC

] 2.2 Chemical hazards shall be known prior to use. For additional information refer to the MSDS sheets shall be referenced.

[ 2.3 Under accident conditions, valve alignments shall NOT be made and injection shall NOT begin without prior authorization from the Operations Emergency Coordinator OR the Technical Support Center (TSC)/Operational Support Center (OSC)!

, I cP/1 &2IN2oo2Ioos Page 3 of 8 NOTE:

An initial caustic add of 15 inches will neutralize an RCS inventory of 80,000 gallons with a boron concentration of 1800 ppm. This is a conservative initial add to allow immediate response to a large break LOCA.

o 2.4 An initial caustic add of 15 inches can be made without performing CSM 5.2, Enclosure 6.3 (Caustic Addition Calculations).

o 2.5 In the event of a caustic spill, extension 4911 shall be called to report spill.

o 2.6 iTS 5.4.1.a and SLC 16.13.7 require that pH be measured AND that the addition of caustic to Reactor Coolant commence within 30 minutes AFTER switchover to Recirculation Mode of Core Cooling to adjust the pH to a range of 7.0 to 8.0 WITHIN 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

During recirculation mode, long-term core cooling is provided by injection of water from the Reactor Building Emergency Sump to the core by the Low Pressure Injection (LP) pumps (1 LP-19 & 20 or 2 LP-19 & 20 are open). Switchover to recirculation mode is accomplished with minimal level in the BWST.

o 2.7 Safety and caustic addition equipment is stored in the brown storage container located in the Auxiliary Building, Unit 1 & 2 Chemical Addition Area.

I 2.8 Keys to the brown storage container are stored with the caustic addition procedures in the OSC Chemistry Emergency Procedure Files and in the filing cabinet located in the Primary Chemistry lab office. All personnel in Primary Chemistry and Radwaste have also been issued individual keys.

0 2.9 Power to the caustic addition pump is provided through 1XL located near the LPI -hatch area.

(Power supply diagram, Enclosure 5.6.)

o 2.10 Protective clothing shall be worn prior to connecting/disconnecting chemical line on tote bin.

3. Procedure 3.1 Upon notification from Operations Emergency Coordinator OR TSC / OSC take the

-following actions to align the caustic addition system to the appropriate unit:

NOTE:

The following steps may be performed simultaneously to conserve time.

0 Verify eyewash station and safety shower operable.

  • Verify label of tote bin to be used for addition as caustic soda and/or sodium hydroxide (NaOH).

CP/1&2/A/20021005 Page 4 of 8 o

Mark the current liquid level directly on the translucent tote bin container.

o Measure down from the liquid level mark 15 inches.

Mark this level directly on the tote bin.

o IF necessary, move the tote bin into position.

o Remove dust cover from swagelock fitting on tote bin.

o Remove dust cover from swagelock fitting at CA-36 (Caustic Pump Suction Tell Tale). (Bottom of 1&2 Caustic Mix Tank downstream of CA-35, Elev 783)

I NOTE:

Protective clothing shall be worn prior to Step 3.1.1.

0

.0 3.1.1 Connect stainless steel flex hose to the Swagelock quick-connect fitting upstream of CA-36 (Caustic Pump Suction Tell Tale) (Bottom of 1&2 Caustic Mix Tank downstream of CA-35, Elev. 783).

3.1.2 Connect stainless steel flex hose to the Swagelock fitting on tote-bin.

3.1.3 For Unit 1, notify Operations for permission to operate 1CA-62 AND 1LP-51 per procedure.

Person contacted 3.1.4 For Unit 2, notify Operations for permission to operate 2CA-63 AND 2LP-51 per procedure.

Person contacted 3.1.5 For Unit 1, ensure valve alignments per Enclosure 5.1.

3.1.6 For Unit 2, ensure valve alignments per Enclosure 5.2.

3.1.7 Vent the caustic tote bin by removing the tote bin fill cap.

3.1.8 Open the caustic tote bin outlet valve.

3.1.9 Notify Operations OR the OSC (if activated) that valve alignments for caustic injection are complete and ready to be initiated.

Person contacted Date/Time

/

0 0

0 0

0

cP/1&2/A/2005oos Page 5 of 8 NOTE:

Low dose waiting area shall be used as possible during addition.

The caustic pump switch is located on the Chemical Addition Control Panel. The maximum pump capacity is approximately 2 gallons per minute.

3.1.10 WHEN notified by Operations, perform the following:

o 3.1.10.1 Open CA-36 (Caustic Pump Suction Tell Tale). (bottom of 1&2 Caustic Mix Tank downstream of CA-35, Elev. 783) o 3.1.10.2 Start Caustic Addition Pump.

3.1.11 Check pressure gauge (above CA-112) to ensure pump working.

3.1.12 Notify Operations OR the OSC (if activated) that caustic injection has begun.

Person contacted.

Date/Time

/

0 NOTE:

The caustic pump has an average pump rate of 1.2 gallons per minute. To pump the initial setting of 15 inches will require 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

0 3.1.13 Calculate the total amount of caustic (in gallons) to be added for the neutralization of the borated water added to the system by using CSM 5.2 (Enclosure 6.3).

o 3.1.14 Convert gallons from Step 3.1.13 to inches (in the 350 gallon tote bin) by dividing the number of gallons to be added by 8.1.

Gallons to be added Inches to be added from the tote bin o 3.1.15 Mark the calculated liquid level directly on the tote bin by measuring down from the original "current liquid leverl mark made in Step 3.1.

o 3.1.16 WHEN the caustic tote bin level reaches the desired level (as marked in Step 3.1)

OR WHEN the caustic tote bin is empty, STOP caustic addition pump using the switch located on the Chemical Addition Control Panel.

0 3.1.17 Close tote bin outlet valve.

E 3.1.18 Close CA-36 (Caustic Pump Suction Tell Tale) (Bottom of 1&2 Caustic Mix Tank downstream of CA-35, Elev 783).

E 3.1.19 Record time and volume added on Enclosure 5.5.

cP/1&2iA/2002/005 Page 6 of 8 0 3.1.20

]IF necessary, replace the caustic tote bin as follows:

o 3.1.20.1 Replace tote bin fill cap.

o 3.1.20.2 Disconnect empty tote bin from swagelock fitting on stainless flex hose.

O 3.1.20.3 EF necessary, perform the following:

  • Move tote bins.

Remove dust cover from swagelock fitting on new tote bin.

0 3.1.20.4 Connect stainless flex hose to the new tote bin.

O 3.1.20.5 IF pumping is to continue, mark the tote bin per Section 3.1 for the amount to be added from the new tote bin.

A. Proceed to Step 3.1.7.

E 3.1.21 Notify OSC that caustic addition to the LPI is complete and no further -additions are in progress at this time.

Person contacted Date/Time

/

0 3.1.22 Allow LPI to recirc 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for mixing.

o 3.1.23 WHEN authorized by the TSC/OSC, collect sample (per appropriate procedure) to determine the resultant pH of the reactor coolant.

E 3.1.24 IF pH is < 7.0,

  • Calculate (refer to CSM 5.2, Enclosure 6.3) the amount of caustic (in gallons) to be added.
  • Convert this number to inches (in the 350 gallon tote bin) by dividing the number of gallons to be added by 8.1 gallons/inch.
  • Record the values below:

Gallons to be added:

Inches to be added from tote bin:

E 3.1.25 IF pH is > 7.0, go to Step 3.1.29.

0 3.1.26 Mark the current liquid level directly on the translucent tote bin container.

cPJ1 &2/As2002/005 Page 7 of 8 o 3.1.27 Measure down from this mark the number of inches calculated in Step 31.24 above.

  • Mark this level directly on the tote bin.

o 3.1.28 Repeat Steps 3.1.1 through 3.1.25 until all necessary caustic (as determined by TSCIOSC) has been added.

o -3.1.29 WHEN all necessary caustic has been added and upon authorization from the TSCIOSC, return the system to normal as follows:

D 3.1.29.1 Replace tote bin fill cap.

0 3.1.29.2 Disconnect empty tote bin from swagelock fitting on stainless flex hose.

3.1.29.3 For Unit 1, notify Operations for permission to operate 1CA-62 AND lLP-51 per procedure.

Person contacted 3.1.29.4 For Unit 2, notify Operations for permission to operate 2CA-63 AND 2LP-51 per procedure.

Person contacted El 3.1.29.5 For Unit 1, perform alignments per Enclosure 5.3 to return valves to normal position.

Cl 3.1.29.6 For Unit 2, perform alignments per Enclosure 5.4 to return valves to normal position.

4. References 4.1 Dwg. No. OFD-11OA-1.8 Chemical Addition System (Primary Side Chemical Addition) 4.2 Dwg. No. OFD-102A-1.1 and OFD-102A-2.1 Low Pressure Injection System, Borated Water Supply and LPI Pump Suction.

4.3 CSM 5.2 4.4 ITS 5.4.1.a 4.5 SLC 16.13.7

cPI1&2/A/2oo21005 Page 8 of 8

5. Enclosures 5.1 Valve Alignment for Caustic Injection on Unit 1 5.2 Valve Alignment for Caustic Injection on Unit 2 5.3 Normal Valve Alignment for Caustic Injection System on Unit 1 5.4 Normal Valve Alignment for Caustic Injection System on Unit 2 5.5 Caustic Mixing and Injection Record 5.6 Unit 1&2 Caustic Pump Power Supplies I

.1 CP/1&2/A/2002/005 Page 1 of I Valve Alignment for Caustic Injection on Unit 1 s"'

l NOTE:

This enclosure is AP/EOP related.

I Date DV lnit Position Valve No.

Valve Name Location Closed 2CA-98 Caustic to Unit #2 LPI Unit 1&2 LPI Hatch Area, AB Block (Chm)

Rm. 119, Elev 771, Col. T-74 Closed lCA-58 Caustic to Ul LPI Suct Tell Unit 1&2 LPI Hatch Area, AB, Tale (Chm)

Elev 771, Col. T-72 Open ICA-39 Caustic to Unit #1 LPI Unit 1&2 LPI Hatch Area, AB Block (Chm)

Rm 118, Elev 771, Col. T-72 Open 1CA-62 Caustic to Unit #1 LPI Unit 1&2 LPI Hatch-Area, AB Block (Ops)

Rn. 119, Elev 771, Col. T-72 Open ILP-51 LPI Sample Recirc Isolation Unit 1&2 LPI Hatch Area, AB (Ops)

Rm. 061, Elev 771, Col. T-71 Open CA-103 Caustic Recirc Line and Downstream of 1&2 Caustic Press Gauge Block Pump and CA-37, Elev 783, Col. Q-67 Closed CA-96 Caustic Recirc Block Recirc Line tapping off between CA-103 & CA-1 12 returning to Caustic Mix Tank, Eltv 783 Closed CA-97 Caustic Recirc Block Downstream of CA-96 and upstream of DW-120 or Caustic Mix Tank recirc line, Elev. 783 Closed CA-35 Caustic Pump Suction Next valve after CA-34.Tank and upstream of Caustic Pump, Elev 783 Closed CA-37 Caustic Header to Waste AB Hallway, Elev 783, near Col.

Evap. Feed Tank Block P-74, 6 ft. overhead Open CA-1 12 Caustic Pump Press Gauge First valve downstream of Isol PG-27 (Pressure Gauge) behind Caustic Mix Tank on West Wall, Elev 783

.2 CP/1&2/A/2002/oo5 Page 1 of 1 Valve Alignment for Caustic Injection System on Unit 2 I NOTE:

This enclosure is AP/EOP related.

I Date DV Init Position Valve No.

Valve Name Location Closed ICA-39 Caustic to Unit #1 LPI Block Unit 1&2 LPI Hatch Area, AB (Chin)

Rm 118, Elev 771, Col. T-72 Closed 2CA-58 Caustic to #2 LPI Pump Suct Unit 1&2 LPI Hatch Area, AB Tell Tale (Chin)

Rm 119, Elev 771, Col. T-74 Open 2CA-98 Caustic to Unit #2 LPI Block Unit 1&2 LPI Hatch Area, AB (Chm)

Rm. 119, Elev 771, Col. T-74 Open 2CA-63 Caustic to Unit #2 LPI Block Unit 1&2 LPI Hatch Area, AB (Ops)

Rm. 119, Elev 771, Col. T-74 Open 2LP-51 LPI Sample Recirc Isolation Unit 1&2 LPI-Hatch Area, AB (Ops)

Rm 063, Elev 771, Col. T-71 Open CA-103 Caustic Recirc Line and Press Downstream of 1&2 Caustic Gauge Block Pump and CA-37, Elev 783, Col. Q-67 Closed CA-96 Caustic Recirc Block Recirc Line tapping off betweenCA-103 & CA-1 12 returning to Caustic Mix Tank, Elev 783 Closed CA-97 Caustic Recirc Block Downstream of CA-96 and upstream of DW-120 or Caustic Mix Tank recirc line, Elev. 783 Closed CA-35 Caustic Pump Suction Next valve after CA-34 Tank and upstream of Caustic Pump, Elev 783 Closed CA-37 Caustic Header to Waste Evap.

AB Hallway, Elev 783, near Feed Tank Block Col. P-74, 6 ft. overhead Open CA-1 12 Caustic Pump Press Gauge Isol First valve downstream of PG-27 (Pressure Gauge) behind Caustic Mix Tank on West Wall, Elev 783 3

CP/1&2 /A/2002/005 Page 1 of 1 Normal Valve Alignment for Caustic Injection System on Unit 1

\\' 2 NOTE:

This enclosure is AP/EOP related.

Date DV Ini Position Valve No.

Valve Name Location Closed 2CA-98 Caustic to Unit #2 LPI Block Unit 1&2 LPI Hatch Area, AB (Chm)

Rm. 119, Elev 771, Col. T-74 Closed 2CA-63 Caustic to Unit #2 LPI Block Unit l&2 LPI Hatch Area, AB (Ops)

Rm. 119, Elev 771, Col. T-74 Closed 1CA-58 Caustic to UI LPI Suct Tell Unit 1&2 LPI Hatch Area, AB, Tale (Chm)

Elev 771, Col. T-72 Closed ICA-39 Caustic to Unit #1 LPI Block Unit 1&2 LPI Hatch Area, AB (Chm)

Rm 118, Elev 771, Col. T-72

-Closed 1CA-62 Caustic to Unit #1 LPI Block Unit 1&2 LPI Hatch Area, AB (Ops)

Rim 119, Elev 771, Col. T-72 Closed lLP-51 LPI Sample Recirc Isolation Unit 1&2 LPI Hatch Area, AB

._._._._._. (OPs)

Rim 061, Elev 771, Col. T-71 0

Open CA-103 Caustic Recirc Line and Downstream of 1&2 Caustic Press Gauge Block Pump and A-37, Elev 783, Col. Q-67

.. Closed

.. CA-97; Caustic Recirc Block Downstream of CA-96 and upstream of DW-120 on Caustic Mix Tank Recirc Line, Elev 783 Closed CA-96 Caustic Recirc Block Recirc Lie tapping off between CA-103 & CA-1 12 returning to

.Caustic M ix Tank, Elev 783 Closed LWD-267 Caustic Tank Outlet Drain Base of Caustic Mix Tank West

__ _ __ _Side, Elev 783 Closed CA-34 Caustic Mix Tank Outlet First valve from bottom of Caustic Mix Tank and upstream of Caustic Pump, Elev 783 C ol. Q -68 Closed CA-35 Caustic Pump Suction Next valve after CA-34 Tank and upstream of Caustic Pump, Elev 783 Closed CA-37 Caustic Header to Waste AB Hallway, Elev 783, near Col.

Evap. Feed Tank Block P-74, 6 ft. overhead Open CA-I 12 Caustic Pump Press Gauge First valve downstream of Isol PG-27 (Pressure Gauge) behind Caustic Mix Tank on West Wall, Elev 783 Closed CA-36 Caustic Pump Suction Tell Bottom of 1&2 Caustic Mix Tank I__ _

_Tale downstream of CA-35, Elev 783

.4 Normal Valve Alignment for Caustic Injection System on Unit 2 CP/1&21A/2002/005 Page 1 of 1 INOTE:

This enclosure is APIEOP related.

I Date DV nit Position Valve No.

Valve Name Location Closed ICA-39 Caustic to Unit #1 LPI Block Unit 1&2 LPI Hatch Area, AB (Chm)

Rm 118, Elev 771, Col. T-72 Closed ICA-62 Caustic to Unit #1 LPI Block Unit 1&2 LPI Hatch Area, AB (OPS)

Ri. 119, Elev 771, Col. T-72 Closed 2CA-58 Caustic to #2 LPI Pump Suct Unit 1&2 LPI Hatch Area, AB Tell Tale (Chin)

Rm 119, Elev 771, Col. T-74 Closed 2CA-98 Caustic to Unit #2 LPI Block Unit 1&2 LPI Hatch Area, AB (Chin)

Rni. 119, Elev 771, Col. T-74 Closed 2CA-63 Caustic to Unit #2 LPI Block Unit I&2 LPI Hatch Area, AB (Ops)

Rm. 119, Elev 771, Col. T-74 Closed 2LP-51 LPI Sample Recirc Isolation Unit 1&g LPI Hatch Area, AB (Ops)

Rim. 063,Elev 771, Col. T-71 Open CA-103 Caustic Recirc Line and Press Downstream of 1&2 Caustic Gauge Block Pump and CA-37, Elev 783,

-Col.

Q -67 Closed CA-97 Caustic Recirc Block Downstr4am of CA-96 and upstream of DW-120 on Caustic Mix Tank Recirc Line, Elev 783' Closed CA-96 Caustic Recirc Block Recirc Line tapping off between CA-103 & CA-1 12 returning to Caustic Mix Tank, l _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ E lev 7 8 3 Closed LWD-267 Caustic Tank Outlet Drain Base of Caustic Mix Tank W est Side, Elev 783 Closed CA-34 Caustic Mix Tank Outlet First valve from bottom of Caustic Mix Tank and upstream of Caustic Pump, Elev 783 Col. Q-68 Closed CA-35 Caustic Pump Suction Next valve after CA-34 Tank and upstream of Caustic Pump, Elev 783 Closed CA-37 Caustic Header to Waste Evap.

AB Hallway, Elev 783, near Feed Tank Block Col. P-74, 6 ft. overhead Open CA-I 12 Caustic Pump Press Gauge Isol First valve downstream of PG-27 (Pressure Gauge) behind Caustic Mic Tank on

_ West Wall, Elev 783 Closed CA-36 Caustic Pump Suction Tell Tale Bottom of 1&2 Caustic Mix Tank downstream of CA-35,

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ E le v 7 8 3

.5 Caustic Mixing and Injection Record cPI1&2/A/2002/005 Page 1 of INOTE:

This enclosure is AP/EOP related.

Datetime of Injection Gal NaOH

.6 Unit 1 & 2 Caustic Pump Power Supplies cP/1 &2/A2oo2/005 Page I of 1 NOTE:

1. This enclosure is APIEOP related.
2. Operations alternates the power logic as outlined. Verification will be required to establish which alignment is in use at the time of question.

I TD2 TD (4160) 1TE2 TE (4160)

-l 4A 6D 1X6 4A C

1X5 A.-.

4AT (600 VOLT) lXL I.

-4.

2A 3A 208 VOLT lXL 5A Unit 1 & 2 CAUSTIC PUMP

, /

(R04-01)

Duke Power Company PROCEDURE PROCESS RECORD (I) ID No.

CP/31A/2002/005 Revision No.

16 Continuous Use PREPARATION (2)

Station (3)

Procedure Title INFORMATION ONLY Oconee Nuclear Station Post Accident Caustic Injection Into the Low Pressure Injection System (4)

Prepared By Date

____/°3 (5)

Requires NSD 228 Applicability Determination?

[l' Yes (New procedure or revision with major changes) 0 No (Revision with minor changes) 0 No (To inco rate previously approved changes)

(6)

Reviewed By (QR)

Date Cross-Disciplinary Review By (QR) NA_

Date a Reactivity Mgmt. Review By (QR) NA.f.4_Date Mgmt. Involvement Review By

_(Ops.

Supt.) NAO+)aate (7)

Additional Reviews QA Review By Date Reviewed By Date Reviewed By Date

~I~')

Temporary Approval (if necessary)

By (OSMIQR)

Date By (QR)

Date (9)

Approved By Date jj£)/0 PERFORMANCE omparen controcopy every 14 calendar days while work is being performed.)

(10) Compared with Control Copy Date Compared with Control Copy Date Compared with Control Copy Date (II) Date(s) Performed Work Order Number (WO#)

COMPLETION (12) Procedure Completion Verification 0 Yes 0 NA Check lists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?

O Yes 0 NA Required enclosures attached?

o Yes 0 NA Data sheets attached, completed, dated, and signed?

o Yes 0 NA Charts, graphs, etc. attached, dated, identified, and marked?

o Yes 0 NA Procedure requirements met?

Verified By Date Procedure Completion Approved Date (14) Remarks (Attach additionalpages, if necessary) r

CP/3/A/2002/005 Page 2 of 8 Post Accident Caustic Injection into the Low Pressure Injection System NOTE:

1. This entire procedure supports an AP or EOP action. The procedure will require AP/EOP validation per NSD 705.
2. A control copy of this procedure shall be routed to the Emergency Preparedness Team within 3 working days after any approved changes.
1. Purpose 1.1 This procedure is to provide instruction for caustic addition into the LPI System during a Logs of Coolant Accident. (LOCA) 1.2 Principle Caustic is injected into the LPI System during a LOCA to neutralize the borated water used in the Reactor Building Emergency Spray System to pH 7.0 - 8.0.

The neutralization will inhibit the generation of hydrogen gas and promote a higher partition factor for iodine.

2. Limits and Precautions o 2.1 The following safety equipment shall be worn when connecting/disconnecting caustic tote bins:

2.1.1 Chemical goggles 2.1.2 Face shield 2.1.3 Corrosive resistant suit, neoprene or chemrel 2.1.4 Corrosive resistant boots, neoprene or PVC 2.1.5 Corrosive resistant gloves, neoprene or PVC o 2.2 Chemical hazards shall be known prior to use. For additional information, MSDS sheets shall be referenced.

0 2.3 Under accident conditions, valve alignments shall NOT be made and injection shall NOT begin without prior authorization from the Operations Emergency Coordinator OR the Technical Support Center (TSC) I Operational Support Center (OSC)!

CP/3A/2002/005 Page 3 of 8 NOTE:

An initial-caustic add of 15 inches will neutralize an RCS inventory of 80,000 gallons with a boron concentration of 1800 ppm. This is a conservative initial add to allow immediate response to a large break LOCA.

O 2.4 An initial caustic add of 15 inches can be made without performing CSM 5.2,.3 (Caustic Addition Calculations).

o 2.5 In the event of caustic spill, extension 4911 shall be called to report spill.

O 2.6 ITS 5.4..a and SLC 16.13.7 require that pH be measured AND that the addition of caustic to Reactor Coolant commence within 30 minutes AFTER switchover to recirculation mode of core cooling to adjust pH to a range of 7.0 to 8.0 WlTHIN 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

During recirculation mode, long-term core cooling is provided by injection of water from the Reactor Building Emergency Sump to the core by the Low Pressure Injection (LPI) pumps (3 LP-19 and 3 LP-20 are open). Switchover to recirculation mode is accomplished with minimal level in the BWST.

0 2.7 Safety and caustic addition equipment is stored in the brown storage container located in the Auxiliary Building, Unit 1 & 2 Chemical Addition Area. The following equipment should be retrieved for Caustic Addition:

Chemical Goggles Tape Measure Face Shield Marking Pen (to mark level on Tote Bin)

Corrosive resistant suit Bung Wrench Corrosive resistant gloves Leather Gloves l 2.8 Keys to the brown storage container are stored with the caustic addition procedure in the OSC Chemistry Emergency Procedure Files and in the filing cabinet located in the Primary Chemistry lab office. All personnel in Primary Chemistry and Radwaste have also been issued individual keys.

0 2.9 Power to the caustic addition pump is provided through 3XL located near the LPI Hatch Area (Power supply diagram, Enclosure 5.4).

E 2.10 Protective clothing shall be worn prior to connecting/disconnecting chemical line or tote bin.

CP/31A/2002/005 Page 4 of 8

3. Procedure 3.1 Upon notification from Operations Emergency Coordinator OR TSC I OSC, take the following actions to align the caustic addition system to the appropriate unit:

NOTE:

The following steps may be performed simultaneously to conserve time.

o Verify eyewash and safety shower operable.

Verify label of tote bin to be used for addition as caustic soda AND/OR sodium hydroxide (NaOH).

]

Mark the current liquid level directly on the translucent tote bin container.

o Measure down from the liquid level mark 15 inches.

Mark this level directly on the tote bin.

o IF necessary, move the tote bin into position.

O Remove dust cover from Swagelock fitting on tote bin.

[

Remove dust cover from Swagelock fitting at 3CA-36 (Caustic Pump Suction Tell Tale). (AB Elev 771 at base of Unit 3 NaOH pump)

-NOTE:

Protective clothing shall be worn prior to Step 3.1.1.

E 3.1.1 Connect stainless steel flex hose to the Swagelock quick-connect fitting upstream of 3CA-36 (Caustic Pump Suction Tell Tale). (AB 771 at base of Unit 3 NaOH pump)

E 3.1.2 Connect stainless steel flex hose to the Swagelock fitting on the tote bin.

3.1.3 Notify Operations for permission to operate 3CA-62 AND 3LP-51 per procedure.

Person contacted E 3.1.4 Ensure valve alignments per Enclosure 5.1 to allow caustic injection into the Low Pressure Injection (LPI) pump suction on Unit 3.

o 3.1.5 Vent the caustic tote bin by removing the tote bin fill cap.

E 3.1.6 Open the caustic tote bin outlet valve.

CP/31A/20021oo Page 5 of 8 0 3.1.7 Notify Operations OR the OSC (if activated) that valve alignments for caustic injection are complete and ready to be initiated.

Person contacted Date/Time

/

NOTE:

The caustic pump switch is located on the Chemical Addition Control Panel. The maximum pump capacity is approximately 2 gallons per minute.

0 3.1.8 WHEN notified by Operations perform the following:

3.1.8.1 Open 3CA-36 (Caustic Pump Suction Tell Tale). (AB Elev. 771 at base of U3 NaOH Pump).

3.1.8.2 Start caustic addition pump.

3.1.9 Check pressure gauge 3PG-262 (upstream 3CA-112, AB Elev. 771 adjacent to but west of Unit 3 NaOH mix tank) to verify the pump is working.

INOTE:

Low dose waiting area as possible during addition I

U 3.1.10 Notify Operations OR the OSC (if activated) that caustic injection has begun.

Person contacted Date/Time

/

NOTE:

The caustic pump has an average pump rate of 1.2 gallons per minute. To pump the initial setting of 15 inches will require 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

0 3.1.11 Calculate the total amount of caustic (in gallons) to be added for the neutralization of the borated water added to the system by using CSM 5.2 (Enclosure 6.3).

El 3.1.12 Convert gallons from Step 3.1.10 to inches (in the 350 gallon tote bin) by dividing the number of gallons to be added by 8.1. Record the values below:

Gallons to be added Inches to be added from the tote bin E 3.1.13 Mark the calculated liquid level directly on the tote bin by measuring down from the original "current liquid level" mark made in Step 3.1.

0 3.1.14 WHEN the caustic tote bin level reaches the desired level (as marked in Step 3. 1) OR WHEN the caustic tote bin is empty, stop caustic addition pump using the switch located on the Chemical Addition Control Panel.

0 3.1.15 Close tote bin outlet valve.

CP/31A12002/005 Page 6 of 8 0 3.1.16 Close 3CA-36 (Caustic Pump Suction Tell Tale) (AB Elev. 771 at base of Unit 3 NaOH pump).

O 3.1.17 Record time and volume added on Enclosure 5.3.

O 3.1.18 IF necessary, replace the caustic tote bin as follows:

J 3.1.18.1 Replace tote bin fill cap.

o 3.1.18.2 Disconnect empty tote bin from Swagelock fitting on stainless flex hose.

o 3.1.18.3 IF necessary, move tote bins and remove dust cover from Swagelock fitting on new tote bin.

0 3.1.18.4 Connect stainless flex hose to the new tote bin.

O 3.1.18.5 IF pumping is to continue, A. Mark the tote bin per Section 3.1 for the amount to be added from the new tote bin B.. Proceed to Step 3.1.5.

O 3.1.19 Notify OSC caustic addition to U-3 LPI is complete and no further additions are in progress.

Person contacted Date/Time I

0 3.1.20 Allow LPI to recirc for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for mixing.

o 3.1.21 WHEN authorized by the TSCIOSC, collect sample (per appropriate procedure) to determine the resultant pH of the reactor coolant.

0 3.1.22 IFpHis<7.0:

  • Calculate (refer to CSM 5.2, Enclosure 6.3) the amount of caustic (in gallons) to be added to complete the neutralization of the borated water added to the system.
  • Convert this number to inches (in the 350 gallon tote bin) by dividing the number of gallons to be added by 8.1 gallons/inch.
  • Record the values below:

Gallons to be added:

Inches to be added from tote bin:

CP/31A12002/005 Page 7 of 8 0 3.1.23 IF pH is > 7.0, go to Step 3.1.27.

I 3.1.24 Mark the current liquid level directly on the translucent tote bin container.

o 3.1.25 Measure down from this mark the number of inches calculated in Step 3.1.22 above.

  • Mark this level directly on the tote bin.

0 3.1.26 Repeat Steps 3.1.1 through 3.1.23 until all necessary caustic (as determined by TSC/OSC) has been added.

o 3.1.27 WHEN all necessary caustic has been added and upon authorization from the TSC/OSC, return the system to normal as follows:

0 3.1.27.1 Replace tote bin fill cap.

o 3.1.27.2 Disconnect empty tote bin from Swagelock fitting on stainless flex hose.

3.1.27.3 Notify Operations for permission to operate 3CA-62 AND 3LP-51 per procedure.

Person contacted 0 3.1.27.4 Ensure alignments per Enclosure 5.2 to return valves to normal position.

4. References

. 4.1 Dwg. No. OFD-1 10A-3.8 Chemical Addition System (Primary Side Chemical Addition) 4.2 Dwg. No. OFD-102A-3.1, Low Pressure Injection System, Borated Water Supply and LPI Pump Suction.

4.3 CSM 5.2 4.4 ITS 5.4.1.a 4.5 SLC 16.13.7

CP/31A120021005 Page 8 of 8

5. Enclosures 5.1 Valve Alignment for Caustic Injection on Unit 3 5.2 Normal Valve Alignment for Caustic Injection System on Unit 3 5.3 Caustic Mixing and Injection Record 5.4 Unit 3 Caustic Pump Power Supplies

.1 CP/3/A2002J005 Page 1 of 1 Valve Alignment for Caustic Injection on Unit 3 NOTE:

This enclosure is AP/EOP related.

Date DV Init Position Valve No.

Valve Name Location Open 3CA-103 Caustic Recirc Line & Press AB Rm. 150, at Caustic Gauge Block Mix Tank north side downstream of PG27 &

upstream of 3CA-103 Closed 3CA-96 Caustic Recirc Block AB Elev 771 at Unit 3 NaOH Pump Discharge Closed 3CA-97 Caustic Recirc Block AB Elev 771 at Unit 3 NaOH Pump Discharge Closed 3CA-35 Caustic Pump Suction AB Elev 771 at base of Unit 3 NaOH pump Open 3CA-112 Caustic Pump Pressure AB Elev 771 adjacent to Gauge Isolation but west of Unit 3 NaOH mix tank Closed 3CA-58 Caustic to #3 LP Pump AB Elev 783 Col. Q-91, Suction Tell Tale near CC Cooler Room Open 3CA-39 Caustic to Unit #3 LP Block AB Hall, Elev 783 (Chm)

Col. Q-91, near CC Cooler Room Open 3CA-62 Caustic to Unit #3 LPI AB Elev 783 Col. Q-91, Block (OPS) near CC Cooler Room Open 3LP-51 LPI Sample Recirc.

AB Elev 783 Col. R-90 Isolation Valve (Ops) near CC Cooler Room

.2 Normal Valve Alignment for Caustic Injection System on Unit 3 CP/31A/20021005 Page l of 1 NOTE:

This enclosure is APIEOP related.

Date_

DV lInt Position Valve No.

Valve Name Location Open 3CA-103 Caustic Recirc Line &

AB Rm. 150, at Caustic Mix Press Gauge Block Tank north side downstream of PG27 & upstream of 3CA-103 Closed 3CA-97 Caustic Recirc Block AB Elev 771 overhead at Unit 3 NaOH mix tank Closed 3CA-96 Caustic Recirc Block AB Elev 771 at Unit 3 NaOH Pump Discharge Closed 3LWD-267 Caustic Tank Outlet Drain AB Elev 771 at tank drain pipe of Unit 3 NaOH pump Closed 3CA-34 Caustic Mix Tank Outlet AB Elev 771 at base of Unit 3 NaOH pump Closed 3CA-35 Caustic Pump Suction AB Elev 771 at base of Unit 3 NaOH pump Closed 3CA-36 Caustic Pump Suction AB Elev 771 at base of Unit 3 Tell Tale NaOH pump Open 3CA-112 Caustic Pump Pressure AB Elev 771 adjacent to but Gauge Isolation west of Unit 3 NaOH mix tank Closed 3CA-58 Caustic to #3 LPI Pump AB Elev 783 Col. Q-91, near Suct Tell Tale CC Cooler Room Closed 3CA-39 Caustic to Unit #3 LPI AB Hall, Elev 783 Block (Chm)

Col. Q-91, near CC Cooler Room Closed 3CA-62 Caustic to.Unit #3 LPI AB Elev 783 Col. Q-91, near Block (OPS)

CC Cooler Room Closed 3LP-51 LPI Sample Recirc.

AB Elev 783 Col. R-90 near Isolation Valve (Ops)

CC Cooler Room

.3 Caustic Mixing and Injection Record I NOTE:

This enclosure is AP/EOP related.

Date/Time of Injection CP/31A12002/005 Page 1 of I Gal. NaOH

..1.

A CP13/Ao2002J005 Page 1 of I Unit 3 Caustic Pump Power Supplies NOTE:

1. This enclosure is AP/EOP related.
2. Operations alternates the power logic as outlined. Verification will be required to establish which alignment is in use at the time of question.

3 TD3 3TD (4160) 3TC3 3TC (4160) 4A 6B 3X4 4A 5C I

I 1X5 I

4AT (600 VOLT)

IX.

4 2A 3A 208 VOLT 3XL 5

Unit 3 CAUSTIC PUMP