ML092450008

From kanterella
Jump to navigation Jump to search
Voluntary Response to NRC Regulatory Issue Summary 2009-11: Preparation and Scheduling of Operator Licensing Examinations
ML092450008
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/01/2009
From: Patricia Anderson
Entergy Nuclear Operations, Entergy Nuclear Palisades
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-09-011
Download: ML092450008 (2)


Text

Entergy September 1,2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Dockets 50-255 License No. DPR-20 Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Paula Anderson Licensing Manager Voluntary Response to NRC Regulatory Issue Summary 2009-11: Preparation and Scheduling of Operator Licensing Examinations

Dear Sir or Madam:

Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," requests that licensees submit, on a voluntary basis, an NRC Form 536, "Operator Licensing Examination Data." This form provides: A) Proposed Examination Preparation Schedule; 8) Initial Operator License Examinations; and, C) Proposed Generic Fundamentals Examination Schedule. The purpose of these estimates is to assist the NRC in budgeting and scheduling resources.

In response to this request, Entergy Nuclear Operations, Inc. is providing the enclosed NRC Form 536 for the Palisades Nuclear Plant.

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, pka/bed Enclosure (1)

CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ENCLOSURE 1 NRC FORM 536 OPERATOR LICENSING EXAMINATION DATA NRC FORM 536 US NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 EXPIRES 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations_ Send comments regarding burden estimate to the Records and FOIAJPrivacy Services Branch (T-5 F53), US OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet email to infocollects@nrc_gov, and EXAMINATION DATA to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503_ If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection_

FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043 NRC REGION III DOCKET 50-255 LICENSE DPR-20 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 ESTIMATED NUMBER OF 1

1 0

1 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0

0 0

0 NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 6

6 0

7 OPERATORS -

NUMBER OF SENIOR REACTOR 8

5 0

3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

2 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8/16/2010 12/5/2011 NIA 07108/2013 ALTERNATE DATE 9/13/2010 12/12/2011 NIA 08/05/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2010 CY2011 PROPOSED NUMBER March June September December March June September December

~~~:tt~ 6tt=

CANDIDATES 0

10 0

0 0

0 0

0