November 18, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Dockets 50-255 License No. DPR-20 Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Paula Anderson Licensing Manager Voluntary Response to NRC Regulatory Issue Summary 2009-11: Preparation and Scheduling of Operator Licensing Examinations
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. submitted a voluntary response to Regulatory Issue Summary 2009-11 on September 1,2009, to communicate operator licensing examination estimates at the Palisades Nuclear Plant. This letter supersedes that response.
The enclosure contains a revised NRC Form 536. The form has been revised to reflect no scheduled examination in 2011, and the addition of an examination in 2012.
This letter contains no new commitments and no revisions to existing commitments.
pkalbed Enclosure (1)
CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
N 536 NRC FORM 536 US NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 EXPIRES 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAIPrivacy Services Branch (T-5 F53), US OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet email to infocollects@nrc.gov, and EXAMINATION DATA to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043 NRC REGION III DOCKET 50-255 LICENSE DPR-20 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 ESTIMATED NUMBER OF 1
0 1
1 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0
0 0
0 NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 6
0 6
7 OPERATORS NUMBER OF SENIOR REACTOR 8
0 5
3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1
0 1
3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8/16/2010 NIA 6/25/2012 07/08/2013 ALTERNATE DATE 9/13/2010 NIA 7/23/2012 08105/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2010 CY2011 PROPOSED NUMBER March June September December March June September December
~~~~t~~
CANDIDATES 0
0 0
0 11 0
0 0