Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20262D028 + (Underground and Above Ground Permanent Facilities)
- ML20262D021 + (Underground and Above Ground Permanent Facilities)
- ML20262D017 + (Underground and Above Ground Permanent Facilities)
- ML20262D007 + (Underground and Above Ground Permanent Facilities)
- ML20262D043 + (Underground and Above Ground Permanent Facilities (Area C))
- ML20262D010 + (Underground and Above Ground Permanent Facilities (Area C))
- ML20262D082 + (Underground and Above Ground Permanent Facilities. Rev Date Illegible)
- ML21181A072 + (Underlying Decision from Which Appeal Arises (Case No. 21-1134))
- ML18288A401 + (Underlying Decision from Which Appeal or Petition Arises)
- ML19303B314 + (Underlying Decisions from Which Appeal or Petition Arises (DC Cir.)(Case No. 19-1198) 10-28-19)
- ML14363A514 + (Underlying Decisions from Which Petition Arises)
- ML16279A096 + (Underlying Decisions from Which Petition Arises (D.C. Cir. 16-1298) 9-26-16)
- ML15012A574 + (Underlying Decisions from Which Petition Arises Cases Filed by NRDC - NRDC V NRC - DC Cir 14-1225)
- Information Notice 1986-22, Underresponse of Radiation Survey Instrument to High Radiation Fields + (Underresponse of Radiation Survey Instrument to High Radiation Fields)
- ML20128R189 + (Underscores Need for Full & Complete Exam of Plant Safety. State Atty General Should Be Made Aware of All NRC Findings)
- ML17093A634 + (Undersized Documents)
- ML18018B320 + (Undersized Documents - Transformer 2MTX-XM1B - Oil Cooler Piping, Failed Windings, Tank Bulging, Preparation for Removal, HV Tap Changer, and Lv Leads and Bracing)
- ML18018B194 + (Undersized Documents, Drawings and Photographs)
- ML040420567 + (Undersized Emergency Feedwater Pump Shaft Report Pursuant to 10 CFR Part 21.21)
- 05000255/FIN-2014008-03 + (Undersized Motors)
- Information Notice 1985-33, Undersized Nozzle-To-Shell Welded Joints in Tanks and Heat Exchangers Constructed Under the Rules of the ASME Boiler and Pressure Vessel Code + (Undersized Nozzle-To-Shell Welded Joints in Tanks and Heat Exchangers Constructed Under the Rules of the ASME Boiler and Pressure Vessel Code)
- 05000255/FIN-2014008-02 + (Undersized Supply Cables from Startup Transformer to 2400V Buses)
- ML20043B384 + (Understanding BWR Limit Cycle, Paper Submitted to BWR Stability Symposium in Idaho Falls,Id on 890810-11)
- ML20149H528 + (Understandings & Procedures for Interagency Steering Committee on Radiation Stds)
- ML20055D415 + (Understands Hearing Scheduled for 870414 Re Conoco Conquista License,Canceled & Response to 870407 Requests Unnecessary)
- ML19309F487 + (Understands QA Program Description Will Be Submitted by 800417)
- W3P89-3046, Understands That 2-wk Extension to Respond to Violations Noted in Insp Rept 50-382/89-07 Granted During 890517 Telcon.Response Will Be Submitted No Later than 890531 + (Understands That 2-wk Extension to Respond to Violations Noted in Insp Rept 50-382/89-07 Granted During 890517 Telcon.Response Will Be Submitted No Later than 890531)
- ML20056E414 + (Understands That 930804 Meeting W/Util in Atlanta,Ga for Util to Present self-assessment of Plant Beneficial in That Meeting Provided Better Understanding of Established Goals & Actions Taken W/Respect to Weaknesses Noted in SALP Rept)
- ML20079E143 + (Understands That ABB Atom Will Submit Pius Design to NRC for Preliminary Safety Info Document Review.Urges Consideration of Design for Certification)
- ML20235B635 + (Understands That AEC Processing CP Applications & Preparing Environ Analyses for Plants.Advises That AEC Should Not Take Any Action on Either Plant Until Question of Availability W/O Tocks Island Project Resolved)
- AECM-86-0319, Understands That Agreements Reached W/Nrc During 861007-08 Discussions Re Svc Water Sys Supply to Control Room Air Conditioning Unit Can Be Applied to Control Room Air Conditioning Sys (Loop a) + (Understands That Agreements Reached W/Nrc During 861007-08 Discussions Re Svc Water Sys Supply to Control Room Air Conditioning Unit Can Be Applied to Control Room Air Conditioning Sys (Loop a))
- ML20097C341 + (Understands That Approval for Rev 14 to Operational QA Manual Was Only for Administrative Changes & Does Not Apply to Audit Program Changes)
- ML20196J550 + (Understands That Date for Site Visit to Tour Emergency Response Facilities Will Be 880714,per 880621 Telcon.Goal Is to Consider,W/Licensee,Ways of Making More Efficient Use of Available Space & Providing Adequate Communications)
- ML20196J522 + (Understands That Dates for Site Visit to Tour Emergency Response Facilities Will Be 880711 & 12,per 880621 Telcon. Goal Is to Consider Ways of Making More Efficient Use of Available Space & of Providing Adequate Communications)
- ML20138R694 + (Understands That Excess Unirradiated High Enriched U Fuel Will Be Shipped to DOE Chicago Operations Ofc within 2-4 Wks.Should Difficulties Arise,Extension of Time May Be Necessary)
- ML19273A975 + (Understands That Faulty Const of Compacted Spent Fuel Racks Allows Water to React W/Matl in Rack Wall.Asks If Venting Is Designed to Alleviate Problem, & If So,Why band-aid Solution Was Adopted)
- ML20036B514 + (Understands That Listed Individual Will Not Be Requesting Renewal of Operator License.Response Requested If Listed Info Incorrect)
- ML20036B509 + (Understands That Listed Operator Will Not Be Requesting Renewal of Operator License & That License Will Expire on Listed Expiration Date.Requests Response If Info Incorrect)
- ST-HL-AE-2158, Understands That NRC Finds Meteorological Measurement Sys Acceptable.Item Considered Closed.Addl 6 Months of Data from Nov 1986 - Apr 1987 Will Be Provided.Comparison of Data from Primary & Backup Towers Will Also Be Provided by Aug 19 + (Understands That NRC Finds Meteorological Measurement Sys Acceptable.Item Considered Closed.Addl 6 Months of Data from Nov 1986 - Apr 1987 Will Be Provided.Comparison of Data from Primary & Backup Towers Will Also Be Provided by Aug 1987)
- 3F0786-16, Understands That Performing Simulator Training for Scenario of Loss of Instrument Air on Generic Simulator Acceptable in Absence of plant-specific Simulator.Scenario Will Be Included in Generic Simulator Training + (Understands That Performing Simulator Training for Scenario of Loss of Instrument Air on Generic Simulator Acceptable in Absence of plant-specific Simulator.Scenario Will Be Included in Generic Simulator Training)
- ML20206J114 + (Understands That Permanent Mod of Containment Air Return & Hydrogen Skimmer Sys Will Be Installed by Jul 1989 Refueling Outage,Based on 881131 Request for Relief from Action Statement of Tech Spec 3.6.5.6)
- ML20045G978 + (Understands That Recipient Plans to Hold Hearing W/Staff on NRC Handling of Whistleblowers in Nuclear Industry & That a Mosbaugh of Util Will Be Called to Testify Re Site Emergency on 900320)
- ML20149M052 + (Understands That Response to Insp Rept 50-443/87-07 Will Be Received within 4-6 Wks,Per & 870917 Telcon W/T Elsasser.Nrc Review of Matter Will Be Documented in Routine Resident Insp Rept)
- ML20024B316 + (Understands That Small Group of Key Designers Will Be Put Together to Review Smud Rapid Cooldown Transient.Group Will Determine What Could Be Done in B&W Nss/Plant Design to Reduce Likelihood of Recurrence)
- ML20024B565 + (Understands That Small Group of Key Designers Organized to Review Smud Rapid Cooldown Transient & Develop What Could Have Been or Could Be Done to Reduce Likelihood or Limit Consequences of Recurrence)
- ML20234B277 + (Understands That Util Planning to Put Atomic Power Plant at Bodega Bay,Ca,Approx 50 Air Miles from San Francisco.Informs That Power Plants Supposed to Be Built at Least 100 Air Miles from Large Cities & on Specific Amount of Land)
- ML20128D890 + (Understands That Util Proposing Prompt Relief Trip Circuit for Plant Bwr,As Well as Mod to Relief/Safety Valve Sys. Listed Items Should Be Considered)
- ML20215M688 + (Understands That Util Will Consider IE Bulletin 85-003, Motor-Operated Valve Improper Switch Settings, Applicable to Core Spray & Isolation Condenser Sys & Will Submit Revised Response by 861217,per 861014 & 17 Discussions)
- ML20138A849 + (Understands That Written Concurrence Will Be Issued for Utilization of Supplemental Stds on Listed Vicinity Properties.Procedure to Document Contamination on Owner Deeds Will Be Stated in Concurrence Ltr)
- ENS 53347 + (Undervoltage Actuation of the Engineered Safety Feature Bus)
- ENS 53358 + (Undervoltage Actuation of the Engineered Safety Feature Bus)