ML20196J522

From kanterella
Jump to navigation Jump to search
Understands That Dates for Site Visit to Tour Emergency Response Facilities Will Be 880711 & 12,per 880621 Telcon. Goal Is to Consider Ways of Making More Efficient Use of Available Space & of Providing Adequate Communications
ML20196J522
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/28/1988
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
References
IEIN-86-018, IEIN-86-18, NUDOCS 8807060402
Download: ML20196J522 (3)


Text

__ . = - - __ _ __ _-. ._ .

  1. to .. . y_

.g l

JUN 281988 i

/

Docket No. 50-341 The Detroit Edison Company ATTN: B. Ralph Sylvia-

-Senior Vice President Nuclear Operations 6400 North Dixie Highway Newport, MI 48166 Gatlemen:

Based on the June 21, 1988, telephone conversation between Ms. Joan Mulvehill ano Mr. Gary Shear of my staff, it is my understanding that July 11 and 12, 1988, were agreed upon as dates for our site visit to tour the emergency response facilities of the Enrico Fermi Atomic Power Plant.

Recent experience in the Federal Field Exercise identified the need for Region III to evaluate each licensee's emergency response facilities to determine if the NRC's~ Expanded Activation Site Team can be adequately accommodated. IE Information Notice No. 86-18 described the planned ccmposition and location of the NRC Site Team that would respond to a major nuclear power plant accident.

Region III does not expect licensees to backfit to provide increased facility space. Facilities that have been constructed and approved under current regulations and guidance may not have the capability to accommodate the NRC Expanded Site Team as outlined in Information Notice 86-18.

Our goal is to consider with each licensee, ways of making more efficient use of available space, of providing adequate communications, and of identifying alternate space where relevant data could be made available in a timely, reliable nunner.

Attached to this letter is an outline of the areas we will be reviewing. If there are questions regarding any of the abo /e, please contact Gary Shear at (312)790-5620.

, s Sincerely, g D islufd signed by W. go,11n NoS .

8 78 A ) W. D. Shafer, Emergency Chief Preparedness and

g y F.adiological Protection Branch

,83

Attachment:

As stated

88 ge See_ Attached Distribution to a.u.

RIII

  1. #v RIII WGS RI!!

fgh RIII 12/;,S A

~~i 1 IL Shea /mb Snell Cooper Shafe %g (d@& P/U _

- I ..

The Detroit Edison Company 2 JU N 2 81988 Ofstribution cc w/ attachment:

Patricia Anthony, Licensirg P. A. Marquardt, Corporate Legal Department DCD/DCB (RIDS)

Resident Inspector, RIII Joan Hulvehill l

l l

l I

l

, "E ..

ATTACHMENT OUTLINE FOR EVALUATING LICENSEE ACCOMMODATIONS FOR NRC SITE TEAM I. Communications A. Telephone Capabilities

1. Number of Available Phones
2. Location of Available Phones
3. Type of Phone Service (e.g., voice activated)

B. Computer Compatibility II. Size and Layout of TSC and EOF A. Space Availability for Expanded Site Team B. Seating and Desk Arrangements for Expanded Site Team C. Location of Key Counterpart Licensee Personnel D. Conferencing Space for NRC Personnel III. Alternate Space