Understands That ABB Atom Will Submit Pius Design to NRC for Preliminary Safety Info Document Review.Urges Consideration of Design for Certification
ML20079E143
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/26/1991
From: William White
AMERICAN ELECTRIC POWER SERVICE CORP.
To: Carr K
NRC COMMISSION (OCM)
Shared Package
ML20079E119 List:
References
FOIA-91-151 NUDOCS 9110070044
Download: ML20079E143 (2)


Text

- - - - - - _ _ _ - _ _ _. _ _ _ - _

i p

p o,,4 e.,,,, r,,,

$tmte CCtt0,8 tit *,

[

a br4 : h:s C e :a OH 0716 PP' ast af AMERICAN b

ILICTRIC POWER The Honorable Kenneth M. Carr, Chairman V. 5. Nuclear Regulatory Comission jf Vashington, DC 20555 s c'<

.s July 26,1969 Dear Chairman Cert

. t. Chite. J,,

wtman of the B:ve anc We at American Electric Power recognize that nuclear power may tet tit:vmt 0'i.:r' I' M U become an attractive option for future generation capacity needs.

The environmental pressures on other generation methods coupled with increased public acceptance of nuclear plant designs featuring greater rellence on passive, or

natural, safety mechanises could lead to a resurgence in the nuclear power industry.

A selection of HRC certlfled nuclear plant designs will be when additional nuclear capacity is considered.

One necessary possible design is the PlVS nuclear reactor of fered by ABB Atom, a merger of ASCA and Brown Beveri companies.

Representatives of ABB Atom presented this innovative design tc our nuclear personnel and we believe it merits consideration when selecting aeditional nuclear capacity.

I understand that ABB Atom will submit their PlUS design to the NRC for a preliminary safety information document review.

We urge your consideration of this design for certification.

Ve deem It a potentially competitive option for our industry.

$1ncerely, k

I'

/

V. 5. White, Jr.

Chairman of the Board and Chief Cxecutive Officer rdh Dr. Fritz Leutwiler, Co-Chairman ABB cc:

Dr. Curt Nicolin, Co-Chairman ABB 7/31.. 10 EDO for Appropriate Action... Copies to Rt.. 89-0695 9110070044 910912 PDR FOIA PENL AND91-151 PDR

s naa a.. e t,,,s.

e j

f(! ;) s !It o o.... u.... a

< u.n, u,~;u R',f.; },7,' * "

Duxt Powen July 6. 1989 Mr Lennart Foge15trom President ABB Atom S-721 63 Yasteras, Sweden

Dear Mr Fogelstrom:

l It is our understanding that All Atom will request, in July, that the NRC undertake the review of the ABB P!US Preliminary Safety Infonnation Document.

Duke Power Company has, for many years, monitored the development of the advanced reactor concepts that are likely to assist us in

.I-meeting future electricity demand. We have followed the ABB P!US System as part of that effort. We are encouraged to hear of your pending submittal to NRC and hope that your design receives an expeditious and thorough regulatory review.

It.is important to us that we have a selection of advanced reactor concepts available in the appropriate timeframe relative to our needs. The NRC is currently reviewing several competing concepts and the ABB P!US design would be a welcome competitor, at this time.

Please advise if we can be of assistance to you as you proceed through this process.

Sincerely.

g R B Priory RBP/mrp e

-4'

-=,e-....

,,*-vi

., e w

< d em--

r--

-r -w e w y---t-r-r

-r t-r 1--

,-p--*

r-v t-v e-w-emyp