Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NLS2003039, Third Biennial Report on Financial Assurance for Decommissioning Funding + (Third Biennial Report on Financial Assurance for Decommissioning Funding)
- ML071840035 + (Third Disclosure Statement by Pilgrim Watch)
- ML20062M220 + (Third Discovery Progress Rept for Period Ending 811207. Certificate of Svc Encl.Related Correspondence)
- ML18318A386 + (Third Extension Request for Nuclear Regulatory Commission Office of Investigations Report 3-2017-003 and Notice of Violation)
- ML20137A631 + (Third Final Response to FOIA Request for Documents.Records in App E Encl & Will Be Available in Pdr.App F Records Withheld in Part (Ref FOIA Exemption 3))
- ML20137A635 + (Third Final Response to FOIA Request for Documents.Records in App E Encl & Will Be Available in Pdr.App F Records Withheld in Part (Ref FOIA Exemption 3))
- ML20136A917 + (Third Final Response to FOIA Request for Documents.Records in App D Partially Withheld (Ref FOIA Exemption 6).App E Documents Withheld in Entirety (Ref FOIA Exemption 5))
- ML20136A921 + (Third Final Response to FOIA Request for Documents.Records in App D Partially Withheld (Ref FOIA Exemption 6).App E Documents Withheld in Entirety (Ref FOIA Exemption 5))
- ML20134E716 + (Third Final Response to FOIA Request for Documents.Records in App C Encl & Available in PDR)
- ML20132C631 + (Third Final Response to FOIA Request for Documents.Records in App C Encl & Available in PDR)
- ML20154G284 + (Third Final Response to FOIA Request for Documents.Records in App C Being Withheld in Part(Ref Exemption 6).Records in App D Being Released in Entirety)
- ML20216G170 + (Third Final Response to FOIA Request for Records.Records in App C Being Made Available in PDR & Encl)
- ML20141G313 + (Third Final Response to FOIA Request for Documents.Forwards Documents Listed in App F.Documents Will Be Placed in Pdr. App G Documents Partially Withheld (Ref FOIA Exemption 5) & App H Documents Completely Withheld (Ref FOIA Exemption 5))
- ML20141G320 + (Third Final Response to FOIA Request for Documents.Forwards Documents Listed in App F.Documents Will Be Placed in Pdr. App G Documents Partially Withheld (Ref FOIA Exemption 5) & App H Documents Completely Withheld (Ref FOIA Exemption 5))
- ML20092C475 + (Third Final Response to FOIA Request for Documents.Records in App E Encl & Being Made Available for Pdr.App F Withheld in Part (Ref FOIA Exemption 7))
- ML20205C364 + (Third Final Response to FOIA Request for Records.Records in App D Already Available in Pdr.Records in App E Being Made Available in PDR & Encl)
- ML20129E775 + (Third Final Response to FOIA Request for Documents.App D Document Encl & Released in Part (Ref FOIA Exemption 7C))
- ML20129E780 + (Third Final Response to FOIA Request for Documents.App D Document Encl & Released in Part (Ref FOIA Exemption 7C))
- IA-98-301, Third Final Response to FOIA Request for Documents.App D Records Already Available in Pdr.Portions of App E Records Encl and Placed in Pdr.Portions of App E Records Withheld (Ref FOIA Exemption 6) + (Third Final Response to FOIA Request for Documents.App D Records Already Available in Pdr.Portions of App E Records Encl and Placed in Pdr.Portions of App E Records Withheld (Ref FOIA Exemption 6))
- ML20205A188 + (Third Final Response to FOIA Request for Documents.App D Records Already Available in Pdr.Portions of App E Records Encl and Placed in Pdr.Portions of App E Records Withheld (Ref FOIA Exemption 6))
- ML20211J218 + (Third Final Response to FOIA Request.Forwards App D Records. Records Being Made Available in Pdr.App E Records Being Withheld in Part & App F Records Being Withheld in Entirety (Ref FOIA Exemption 4))
- ML071430470 + (Third Handout for April 19, 2007 Clarification Call Concerning Shearon Harris Transition to NFPA 805)
- ML19296C032 + (Third Hearing Conference Order Ruling on Petitions to Intervene Filed by L Burrel,W Byrd,C Glymour,Rap Funnell & Ellis.Applicants Motion Considering Issues Re LWA Granted. Motion to Add Parties Denied)
- ML18018B052 + (Third Inservice Inspection Interval)
- ML18018B053 + (Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule)
- RS-10-117, Third Inservice Inspection Interval Relief Request No. I3R-06 Related to Use of Code Case N-513-2 + (Third Inservice Inspection Interval Relief Request No. I3R-06 Related to Use of Code Case N-513-2)
- RS-21-069, Third Inservice Inspection Interval Relief Request I3R-18 + (Third Inservice Inspection Interval Relief Request I3R-18)
- EPID:L-2021-LLR-0047 + (Third Inservice Inspection Interval Relief Request I3R-18)
- ML091950307 + (Third Inservice Inspection Interval Third Inservice Inspection Period 2009 Owners Activity Report for RFO-20 Inservice Examinations)
- ML14203A008 + (Third Inservice Inspection Interval, Second Inservice Inspection Period 2014 Owners Activity Report for RFO14 Inservice Examinations)
- ML16216A149 + (Third Inservice Inspection Interval, Second Inservice Inspection Period 2016 Owners Activity Report for RFO-15 Inservice Examinations)
- ML18207A406 + (Third Inservice Inspection Interval, Third Iservice Inspection Period 2018 Owners Activity Report for RF0-16 Inservice Examinations)
- ML021570089 + (Third Interim Application of Pricewaterhousecooper Llp for Allowance and Payment of Compensation and Reimbursement of Expenses (December 1, 2002 Through March 31, 2002); Declaration of Thomas E. Lumsden in Support Thereof)
- ML20023C616 + (Third Interim Const Deficiency Rept 60 Re Turnover Documentation & Inadequate Hanger Weld Problems.Initially Reported on 830214.Corrective Actions 95% Complete.Final Rept Will Be Submitted by 830715)
- ML20072N597 + (Third Interim Const Deficiency Rept 72 Re Radiation Monitoring Sys RM-23 Control Modules.Util Awaiting Receipt of Six Control Modules Shipped by Vendor on 830617. Corrective Action & Final Rept Delayed Until 830728)
- ML20072N337 + (Third Interim Const Deficiency Rept 77 Re Inadequate Closure Time & Flow Rate for Containment Purge Valves.Corrective Action Completed.Final Rept Will Be Submitted by 830729)
- ML20203E233 + (Third Interim Deficiency & Part 21 Rept NCR 85-1420 Re Insulation Breakdown on GE 7.5 Kva Inverters Supplied by Westinghouse.Initially Reported on 860212.Channel IV Inverter Undergoing 6-month Load Test.Final Rept by 860711)
- ML20108B506 + (Third Interim Deficiency & Part 21 Rept,Item 149 Re Defective engine-mounted Fuel Oil Lines on Tdi Emergency Diesel Generator Sets.Initially Reported on 831024.Next Rept Will Be Submitted by 850627)
- ML20099H511 + (Third Interim Deficiency & Part 21 Rept,Item 157,re Gh Bettis Operators on Ruskin-supplied HVAC Dampers. Lubricant & Seals Replaced in Affected Actuators on Dampers. Final Rept Will Be Submitted by 850410)
- ML20083B531 + (Third Interim Deficiency & Part 21 Repts,Item 101 Re Defective Transamerica Delaval Governor Drive Coupling. Initially Reported on 820909.Isoprene Governor Drive Coupling Replaced.Final Rept by 840224)
- ML20073P487 + (Third Interim Deficiency Rept & Part 21 Rept Re Westinghouse Electro-Mechanical Div-manufactured Gate Valves Which May Not Fully Close or Open.Initially Reported on 801204.Final Rept Will Be Submitted by 840101)
- ML19351G558 + (Third Interim Deficiency Rept (NCR SQN Eeb 8023,et Al) Re Environ Qualification of Electrical Equipment,Initially Reported 801024.Environ Qualification Documentation Still Being Gathered from Vendors)
- ML20031D767 + (Third Interim Deficiency Rept 28 Re Undersized 2-inch & Below Schedule 160 Socket Welds.Final Rept Will Be Delayed Until 811019 Due to Need to Complete Verification of Corrective Action by Tompkins Beckwith on Welds)
- ML20080N697 + (Third Interim Deficiency Rept 77 Re Shop Welding Defects in Seismic Class I Cable Tray,Conduit & HVAC Hangers.Initially Reported on 820802.Final Rept Expected by 840301.Also Reportable Per 10CFR21)
- ML20079L966 + (Third Interim Deficiency Rept 80 Re Unsatisfactory Stroking of Emergency Feedwater Pump Turbine Steam Shutoff Valves. Valves Reinstalled,Electrical Svc Being Installed & Testing Scheduled for Late Feb 1984.Next Rept by 840309)
- ML20079E281 + (Third Interim Deficiency Rept 83-02 Re Failure of Air Compressor Motor.Initially Reported on 821209.Cause Under Investigation.Engineering Change Notice 1916 Approved to Implement Motor Replacement.Next Rept Expected by 841003)
- ML20078A589 + (Third Interim Deficiency Rept 83-07 Re Failure of Dc Cables in Underground Duct.Cables Will Be Shipped Back to Supplier to Attempt to Determine Cause of Ground Fault.Final Rept Expected by 831201)
- ML20082U553 + (Third Interim Deficiency Rept 83-07 Re Reactor Coolant Pump Bearing Failure.Final Rept Delayed Until 840115)
- ML20080G970 + (Third Interim Deficiency Rept 92 Re HPSI Sys Performance. Initially Reported on 831215.Final Rept Will Be Submitted by 840224)
- ML20080B248 + (Third Interim Deficiency Rept BLRD-50-438/82-80 Re Raw Cooling Water Chiller Unit Flow Control Valve.Initially Reported on 821126.Valve Configuration Drawing Received from Vendor.Next Rept by 831205.Also Reportable Per 10CFR21)
- TXX-4885, Third Interim Deficiency Rept CP-85-50 Re Improper Welding Processes in Mfg of Cable Tray Tee Fittings.Initially Reported on 851206.Applicant Awaiting Ebasco Evaluation.Next Rept Anticipated by 861021 + (Third Interim Deficiency Rept CP-85-50 Re Improper Welding Processes in Mfg of Cable Tray Tee Fittings.Initially Reported on 851206.Applicant Awaiting Ebasco Evaluation.Next Rept Anticipated by 861021)
- ML20091M607 + (Third Interim Deficiency Rept NCR 1894 Re Deficient Welds on Cable Tray Supports.Initially Reported on 820908.Sizes of Fillet Welds Identified by Bellefonte Const & Required Rework Initiated.Next Rept Will Be Submitted by 841130)