Third Interim Const Deficiency Rept 72 Re Radiation Monitoring Sys RM-23 Control Modules.Util Awaiting Receipt of Six Control Modules Shipped by Vendor on 830617. Corrective Action & Final Rept Delayed Until 830728
ML20072N597
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/05/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
72, Q-3-A35-07.72, Q-3-A35-7.72, NUDOCS 8307150388
Download: ML20072N597 (1)


Text

LOUISIANA f ,42 OctAnONOe sineer POWE A & LIGHT / P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345

'$USNIvsNO uu July 5, 1983 W3I83-0228 Q-3-A35.07.72 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission  % 4 611 Ryan Plaza Drive, Suite 1000 u Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 y Significant Construction Deficiency No. 72

" Radiation Monitoring System RM-23 Control Modui" Third Interim Report

REFERENCE:

LP&L letter W3183-0159 dated Fay 11, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than June 30, 1983.

At the present time, LP&L is awaiting receipt of six (6) RM-23 control modules which were shipped by the vendor on June 17, 1983. The corrective action will be complete when these six (6) control modules are installed and tested.

A Final Report will therefore be submitted to the USNRC by July 28, 1983.

Very truly yours,

/

mm F. J. Drummond Project Support Manager - Nuclear FJD/RWP/ MAL:keh cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director 4) Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8307150388 830705 gDRADOCK 05000382 PDR L E-%7 ll0 1