Third Interim Deficiency & Part 21 Rept NCR 85-1420 Re Insulation Breakdown on GE 7.5 Kva Inverters Supplied by Westinghouse.Initially Reported on 860212.Channel IV Inverter Undergoing 6-month Load Test.Final Rept by 860711
ML20203E233
Person / Time
Site: Harris 
Issue date: 04/15/1986
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-438, REF-PT21-86, REF-PT21-86-171-000 HO-860284(O), HO-860284CO, NCR-85-1420, PT21-86-171, PT21-86-171-000, NUDOCS 8604240174
Download: ML20203E233 (4)


Text

.

CP&L Carolina Power & Light Company

,k0

d*~

3,g SHEARON HARRIS NUCLEAR PROJECT P. O. BOX 165 New Hill, North Carolina 27562 l

APR 151966 File Number:

SHF/10-13510 Letter Number: HO-860284(0)

NRC-438 Dr. J. Nelson Grace United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgic 30323 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - Unit 1 7.5 KVA INVERTERS -

INSULATION BREAKDOWN, ITEM 191

Dear Dr. Grace:

Attached is our second interim report on the subject item, which was deemed reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21 on February 12, 1986.

CP&L is pursuing this matter, and it is currently projected that corrective action and submission of the final report will be accomplished by July 11, 1986.

Thank you for your consideration in this matter.

o re very truly, l

J R

.4 n

Vice President Harris Nuclear Project RAW /ajj Attachment ces Messrs. C. Maxwell (NRC-SHNPP) l J. M. Taylor (NRC) l k

$CK05000400 74 U60415 S

PDR fI ZEp1

CAROLINA POWER & LICHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 THIRD INTERIM REPORT 7.5 KVA INVERTERS - INSULATION BRFAKDOWN NCR 85-1420 ITEM 191 APRIL 10, 1986 REPORTABLE UNDER 10CPR 50.55 (e) AND 10CFR, PART 21 NBT-MS-860481/2-OS1

SUBJECT:

Shearon Harris Nuclear Power Plant Unit Number 1,

10CFR 50.55(e) and 10CFR Part 21 reportable deficiency.

Insulation breakdown on General Electric transformers supplied with Westinghouse 7.5 KVA Inverters.

ITEM:

General Electric ferro-resonant transformers Westinghouse Part Number 3485C38 H08 SUPPLIED BY:

Westinghouse Electric Corporation NATURE OF General Electric ferro-resonant transformers as supplied on l

DEFICIENCY:

Westinghouse 7.5 KVA Inverters have experienced failures on some units due to a shorting between the coil and core of one of two reactors connected to the secondary of the ferro-resonant transformer.

This failure has been attributed to

{

vibration which resulted from insufficient securing of laminations making up the center leg of the C40 reactor core. Over a period of time the operation of the transformer results in failure of coil insulation due to this vibration.

DATE PROBLEM Westinghouse notified CP&L in October 1984 of this potential IDENTIFIED:

problem.

DATE PROBLEM On October 29, 1984, Mr. N. J. Chiangi notified the NRC of a REPORTED:

potentially reportable item under the provisions of 10CFR 50.55(e) and 10CFR, Part 21.

On February 12, 1986, Mr. N. J. Chiangi notified the NRC that this item was reportable per the provisions of 10CFR 50.55(e) and 10CFR, Part 21.

I SCOPE OF This deficiency involves four NIS Inverters (Channels I, II, PROBLEM:

III, & IV) and two Auxiliary Transfer Panel Inverters (SA and SB), for a total of six inverters.

SAFETY Failure of the ferro-resonant transformer results in a greatly IMPLICATION:

reduced output which leads to a failure of the inverter output.

Loss of inverter output results in a loss of the safety function of the loads fed by the inverter.

REASON Redundancy of safety systems will be comprcmised by a failure DEFICIENCY of one or more inverters.

This could jeopardize the safety IS REPORTARLE:

function of equipment powered from NIS Channels I, II, III,

& IV, and the Auxiliary Transfer Panel.

CORRECTIVE In order to determine that the inverters supplied for the ACTION:

Harris Plant are adequate to perform their function, the six Harris inverters will be subjected to a six month load test as recommended by Westinghouse.

This load test will consist of connection of permanent loads and heaters as required to achieve a 20% minimum load at all times on the inverters.

Completion of the load test will be regarded as demonstration that the inverter is free from the defect in construction of the ferro-resonant transformer.

f NBI-MS-860481/3-0S1

c 1

FINAL The six month load test of the Channel I,

II, III, & IV REPORT:

inverters was successfully completed on August 15, 1985.

The six-month load test for the SA and SB inverters supplying power to the Auxiliary Transfer Panels was successfully completed on March 30, 1986.

On September 6, 1985 the Channel IV Inverter ferro-resonant transformer shorted to ground.

An investigation has determined that this failure was a failure of the laminations in the center leg of the C40 reactor core. The ferro-resonant transformer for the Channel IV Inverter has been replaced with a spare transformer.

The Channel IV Inverter is currently undergoing a load test which will be completed in July, 1986.

This testing was necessitated by the transformer supplier's inability to guarantee that ferro-resonant transformers purchased as spare parts were not subject to the failures which resulted in the issuance of Westinghouse Technical Bulletin NSID-TB-84-il.

The final report for this item is pending successful completion of the six-mc. nth load test of the Channel IV Inverter.

A final report is projected to be issued by July 11, 1986.

t NBI-MS-860481/4-OSI