Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266J089 + (Test System C - as Built Representing Portion of System 078 Cb Building Level 2, as Built.Sheet 3 of 3)
- PMNS20190514, Test System Feature on Win 7 on IE 11 That Permits a User to See and Create Meetings with a System Generated Agenda by Fp + (Test System Feature on Win 7 on IE 11 That Permits a User to See and Create Meetings with a System Generated Agenda by Fp)
- ML20266J087 + (Test System a - as Built Representing Portion of System 065 Cb Electrical Tunnel Level C, as Built.Sheet 1 of 3)
- PMNS20220822, Test Ticket Please Ignors + (Test Ticket Please Ignors)
- ML19224B500 + (Test Tp 368/1A,radiation Monitoring Sys Test (Atmosphere))
- ML20260C150 + (Test Train Arrangement. Sheet 1 of 17)
- ML20260C155 + (Test Train Arrangement. Sheet 2 of 17)
- ENS 53274 + (Test and Research Reactor - Notification of Technical Specification Violation)
- ML20235M209 + (Test of 6-IN.-THICK Pressure Vessels.Series 3:Intermediate Test Vessel V-8A.Tearing Behavior of Low Upper-Shelf Material)
- ML20149A659 + (Test of 6-In-Thick Pressure Vessels.Series 3:Intermediate Test Vessel V-7B)
- ML19312D995 + (Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Power Generating Station, for 790531 Testing)
- ML19312E001 + (Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Power Generating Station, Final Rept for 790907 Testing)
- ML19312D997 + (Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Generating Station, Final Rept for 790829 Testing)
- ML20212M817 + (Test of Integrated Control Sys at Davis-Besse Nuclear Power Station to Determine Integrated Control Sys Response When Power Lost & Subsequently Restored, on 860317)
- 05000280/LER-2077-009, Test of Main Steam Safety Valve Setpoint + (Test of Main Steam Safety Valve Setpoint)
- ML19257A375 + (Test of Masonry Bond Tension to Concrete Core in Masonry Block Walls, Special Plant Test Procedure SPT-51.Test Evaluation & Supporting Documentation Encl)
- ML20151B152 + (Test of Performance of Personnel Dosimeters)
- ML19324B263 + (Test of Safety-Related Bolts,Studs & Nuts from San Onofre & Rancho Seco Nuclear Power Plants, Final Rept)
- ML19324A362 + (Test of Safety-Related Threaded Fasteners from Rancho Seco & Calvert Cliffs Nuclear Power Plants, Final Rept)
- ML19324B269 + (Test of Safety-Related Threaded Fasteners from Rancho Seco Nuclear Power Plant, Final Rept)
- ML19257C018 + (Test of Six-Inch-Thick Pressure Vessels,Series 3: Intermediate Test Vessel V-8. Two Microfiche Encl)
- ML20135E743 + (Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement Matl)
- ML19208A940 + (Test to Qualify Cable & Pipe Penetrations in Fire Walls & Floors)
- ML17303A361 + (Test/Retest Recovery Program Diesel Generator B & Associated Support Equipment)
- ML18017B789 + (Tester,Failure and Alarm. Sheet 22.No Revision Date. Consists of Three Aperture Cards)
- ML19263E086 + (Testifies on Land Use Issues.Supporting Documentation Encl)
- ML19241B241 + (Testimomy of RW Bostian.Economic Comparison of Alternatives Indicates That Mod of Existing Pools Is Not Preferable to Proposed Shipment)
- ML20090K783 + (Testimonies of B Thompson & R Smith Re Proctor Value Use by Comparison to Jar Samples,On 790122-23.Related Info Encl, Including List of Documentation & Meetings Re Soils)
- ML20214C846 + (Testimonies of HR Goodwin,Ah Joyner,Dn Keast & DB Overman Re Eddleman Contention 57-C-3 (Nighttime Notification). Resumes of HR Goodwin & DB Overman Encl.W/Certificate of Svc.Related Correspondence)
- ML20053E709 + (Testimonies of P Mcintire,I Husar & Jh Keller Re Commission Questions 3 & 4.Prof Qualifications Encl)
- ML20069L051 + (Testimonies of RW Mccoy,Jt Phillippe,M Kaufmann,C Emery, P Lewis & Landis Re Aquatic Impacts & Results of NRC Site Visits.Prof Qualifications Encl)
- ML19341C499 + (Testimony & Exhibits of Bm Louiselle Re Fair Rate of Return Before Public Svc Commission of State of La)
- ML19341C501 + (Testimony & Exhibits of Rj Lurito Re Fair Rate of Return Before Public Svc Commission of State of La)
- ML19339C905 + (Testimony Addressing Anti Nuclear Group Representing York Contention 3A(F),re Mobilization of Offsite Health Physics Support & Sholly Contention 9, Re Offsite Radiation Monitoring Program.Prof Qualifications Encl)
- ML19254E093 + (Testimony Addressing Question B1 of Aslab 790405 Memorandum & Order Re Offsite Power Supply.Discusses Bulk Electric Power Supply Planning & Design Program.Supporting Documentation Encl)
- ML19347E493 + (Testimony Addressing Whether Applicant Proposed QA Program Meets Requirements,In Response to ASLB Issue F.Prof Qualifications Encl)
- ML19269D024 + (Testimony After Review of Available Info.Concludes That NRC Alternative Site Evalutaion Was Inadequate & That Other Sites Are Clearly Superior.Qualifications & Certificate of Svc Encl)
- ML19269D017 + (Testimony After Review of Available Info.Concludes That NRC Alternative Site Evaluation Was Inadequate & That Lake Norman & Wateree Sites Are Clearly Superior.Qualifications Encl)
- ML19269D018 + (Testimony After Review of Available Info.Concludes That NRC Alternative Site Evaluation Was Inadequate & That Lake Norman & Wateree Sites Are Clearly Superior.Qualifications Encl)
- ML20154N500 + (Testimony Before Environ,Energy & Natural Resources Subcommittee of House Committee on Govt Operations, Presented by Cv Smith,Jr on 770308 Re Nuclear Fuel Services Inc,West Valley,Ny)
- ML20154N511 + (Testimony Before Environment & Atmosphere Subcommittee of House Committee on Science & Technology Re Nuclear Fuel Services,Inc,West Valley,Ny on 770615)
- ML20154N592 + (Testimony Before Environment,Energy & Natural Resources Subcommittee of House Govt Operations Committee on 770913 Re Decommissioning of Nuclear Facilities)
- ML19254F867 + (Testimony Before NRC Hearing Board Re Amend of 10CFR11,50 & 70 Concerning Authority for Access to or Control Over SNM)
- ML19260C549 + (Testimony Before NRC on Question of Considering TMI Extraordinary Nuclear Occurrence.Outlines Economic & Mental Effects on Area Residents)
- ML19309D545 + (Testimony Before Ny State Board on Electric Generation Siting & Environ Re Proposed Jamesport Facilities.Prof Qualifications Encl)
- ML19309D554 + (Testimony Before Ny State Board on Electric Generation Siting & Environ Re Proposed Jamesport Facilities.Related Diagrams,Ref & Prof Qualifications Encl)
- ML19309D534 + (Testimony Before Ny State Board on Electric Generation Siting & Environ Re Proposed Jamesport Facilities)
- ML20235T828 + (Testimony Before Senate Labor & Human Resources Committee Re Pilgrim Nuclear Power Station.*)
- ML20245C382 + (Testimony Before Senate Labor & Human Resources Committee Re Pilgrim Nuclear Power Station)
- ML19224A919 + (Testimony Before Senate Subcommittee on Nuclear Regulation on 790430 Re PA Public Util Commission Actions Following TMI Incident)
- ML19312B612 + (Testimony Before State of Ny Board on Electric Generation Siting & Environ & Before ASLB Re Const of Proposed Plant)