Browse wiki
Jump to navigation
Jump to search
At 1130 PST on 3/19/18, with the reactor a … At 1130 PST on 3/19/18, with the reactor at 100% power (100 kW thermal), GE Hitachi Vallecitos Nuclear Test Reactor violated their Technical Specifications (NDO 32765, section 6.1.3.1) when the licensed reactor operator became sick, called for the backup licensed reactor operator, and left the control room. The backup licensed operator entered the control room less than 30 seconds after the other operator left. There were other trained but unlicensed operators in the control room. The reactor remained at 100% power with no issues.</br>This notification is the 24 hour notification required in accordance with GE Hitachi Vallecitos Nuclear Test Reactor Technical Specifications (NDO 32765, section 6.1.3.1). The Technical Specifications also require a 14 day written report which will be submitted. The facility has initiated a corrective action report (28168).</br>GE Hitachi Vallecitos Nuclear Test Reactor, license R-33, is a 100 kW thermal Light Water Highly Enriched Graphite Moderated Reactor.</br>The licensee notified their NRC Project Manager.censee notified their NRC Project Manager. +
18:30:00, 19 March 2018 +
53,274 +
09:52:00, 20 March 2018 +
18:30:00, 19 March 2018 +
At 1130 PST on 3/19/18, with the reactor a … At 1130 PST on 3/19/18, with the reactor at 100% power (100 kW thermal), GE Hitachi Vallecitos Nuclear Test Reactor violated their Technical Specifications (NDO 32765, section 6.1.3.1) when the licensed reactor operator became sick, called for the backup licensed reactor operator, and left the control room. The backup licensed operator entered the control room less than 30 seconds after the other operator left. There were other trained but unlicensed operators in the control room. The reactor remained at 100% power with no issues.</br>This notification is the 24 hour notification required in accordance with GE Hitachi Vallecitos Nuclear Test Reactor Technical Specifications (NDO 32765, section 6.1.3.1). The Technical Specifications also require a 14 day written report which will be submitted. The facility has initiated a corrective action report (28168).</br>GE Hitachi Vallecitos Nuclear Test Reactor, license R-33, is a 100 kW thermal Light Water Highly Enriched Graphite Moderated Reactor.</br>The licensee notified their NRC Project Manager.censee notified their NRC Project Manager. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 20 March 2018 +
R-33 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
05:14:54, 24 February 2020 +
09:52:00, 20 March 2018 +
0.64 d (15.37 hours, 0.0915 weeks, 0.0211 months) +
18:30:00, 19 March 2018 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.